Loading...
HomeMy WebLinkAboutSW6190602_Engineering Calculations (Stage Storage)_20190619Edgerton Industrial Park Wet Pond #1 Main Pond Volume Below Normal Pool Contour Contour Incr. Ace=. Elev. Area Storage Storage (S) (ft) (sf) (efl (efl 139.5 - - - 139.5 15,261 1 1 140.0 15,910 7,793 7,794 141.0 17,238 16,574 24,368 142.0 18,605 17,922 42,289 143.0 20,009 19,307 61,596 144.0 21,448 20,729 82,325 145.0 22,924 22,186 104,511 145.5 23,676 11,650 116,161 146.0 25,658 12,334 128,494 Forebay Volume Below Normal Pool Contour Contour Incr. Ace=. Elev. Area Storage Storage (S) (ft) (sf) (efl (efl 139.5 - - - 139.5 2,354 0 0 140.0 2,584 1,235 1,235 141.0 3,072 2,828 4,063 142.0 3,600 3,336 7,399 143.0 4,165 3,883 11,281 144.0 4,767 4,466 15,747 145.0 5,406 5,087 20,834 145.5 5,739 2,786 23,620 146.0 6,522 3,065 26,685