Loading...
HomeMy WebLinkAboutSW6190602_Engineering Calculations (Drawdown)_20190619Edgerton Industrial Park Pond 1 Drawdown Time Temporary storage volume = Orifice #1 diameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 67,766 cf 4 in 1 0.0873 sf 0 in 0 0.0000 sf 0.60 146.00 ft 147.85 ft 0.62 ft 0.3300 cfs 205347 s 57.0 hr 2_4 days 1479 Drawdown.xlsx Printed 6/19/2019