Loading...
HomeMy WebLinkAbout20190604 Ver 1_CAMA Major Permit No. 45-19_20190618Permit Class Permit Number NEW 45-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to James W. Oestreich,140 Summer Haven Lane, Washineton, NC 27889 Authorizing development in Beaufort County at adi. Pamlico River, at 140 Summer Haven Lane, near Washington as requested in the permittee's application dated 2/12/19 (MP - 1,2) and 3/22/19 (MP -4) including attached workplan drawings (3), all dated 2/12/19. This permit, issued on June 18, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation .n mese terms may ne sunject to Imes, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization - Bulkhead 1) The bulkhead shall not extend waterward more than 2 feet from the existing bulkhead at any point along its alignment at the time of construction. 2) No open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. (See attached sheets for Additional Conditions) tms permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. 3FG Braxt(?6e. Davis, Director /'Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee James W. Oestreich Permit No. 45-19 Page 2 of 3 ADDITIONAL CONDITIONS 4) The bulkhead shall be constructed prior to any backfilling activities. 5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 6) The fill material shall be clean and free of any pollutants except in trace quantities. 7) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Dockine Facility 9) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 11) This permit authorizes a maximum of 2 formalized boat slips. 12) The boathouse shall not be completely enclosed or have side coverage more than one half the height of the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the authorized workplans. 13) The authorized boathouse shall be single story, and shall not be designed to allow for second story use. 14) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 15) Should the Lot to the west be sold prior to the initiation of construction of the docking facility, the permittee shall obtain a written agreement from the new owner(s) waiving the 15 foot riparian corridor setback and submit it to the Division of Coastal Management prior to initiating construction of the docking facility. James W. Oestreich ADDITIONAL CONDITIONS General Permit No. 45-19 Page 3 of 3 16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 17) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW -2019-00787). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-0604. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.