HomeMy WebLinkAbout20190604 Ver 1_CAMA Major Permit No. 45-19_20190618Permit Class Permit Number
NEW 45-19
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Vermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to James W. Oestreich,140 Summer Haven Lane, Washineton, NC 27889
Authorizing development in Beaufort County at adi. Pamlico River, at 140 Summer Haven
Lane, near Washington as requested in the permittee's application dated 2/12/19 (MP -
1,2) and 3/22/19 (MP -4) including attached workplan drawings (3), all dated 2/12/19.
This permit, issued on June 18, 2019 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
.n mese terms may ne sunject to Imes, imprisonment or civil action; or may cause the permit to be null and void.
Shoreline Stabilization - Bulkhead
1) The bulkhead shall not extend waterward more than 2 feet from the existing bulkhead at any point
along its alignment at the time of construction.
2) No open water shall be excavated or filled, even temporarily, outside of the approved bulkhead
alignment.
3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction.
(See attached sheets for Additional Conditions)
tms permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
3FG
Braxt(?6e. Davis, Director
/'Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
James W. Oestreich Permit No. 45-19
Page 2 of 3
ADDITIONAL CONDITIONS
4) The bulkhead shall be constructed prior to any backfilling activities.
5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
6) The fill material shall be clean and free of any pollutants except in trace quantities.
7) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
Dockine Facility
9) This permit authorizes only the docks, piers, and other structures and uses located in or over the water
that are expressly and specifically set forth in the permit application. No other structure, whether
floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust
waters without permit modification.
10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
11) This permit authorizes a maximum of 2 formalized boat slips.
12) The boathouse shall not be completely enclosed or have side coverage more than one half the height of
the side, from the roof waterward. The footprint of the boathouse shall not exceed the dimensions on the
authorized workplans.
13) The authorized boathouse shall be single story, and shall not be designed to allow for second story use.
14) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
15) Should the Lot to the west be sold prior to the initiation of construction of the docking facility, the
permittee shall obtain a written agreement from the new owner(s) waiving the 15 foot riparian corridor
setback and submit it to the Division of Coastal Management prior to initiating construction of the
docking facility.
James W. Oestreich
ADDITIONAL CONDITIONS
General
Permit No. 45-19
Page 3 of 3
16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
17) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
18) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW -2019-00787).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2019-0604.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946-6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many land disturbing
activities are not authorized within 50 feet of the normal water level unless specifically exempted
by Environmental Management Commission's (EMC) Tar Pamlico River buffer regulations
in place at the time of such development.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.