HomeMy WebLinkAbout20080704 Ver 1_CAMA Major Hold Letter_20080602r
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
June 2, 2008 RECEIVED
Gregory C. Gibbs
Wag, LLC.
PO Box 278
Engelhard, NC 27824
Dear Mr. Gibbs:
,JUN 0 5 2008
This letter is in response to your application request under the Coastal Area Management Act (CAMA) to
construct to stabilize the shoreline by installing 1,555' of bulkhead, as well as excavate 3.2 acre pond and
construct a subdivision road to service 24 residential lots, in Hyde County. Processing of the permit
application, which was received by the Division of Coastal Management's Morehead City office on
4/8/08, is ongoing. However, it has been determined that additional information will be required prior to
the Division taking final action on your application. This item is summarized below:
1) The N.C. Division of Water Quality, by way of the attached letter, has determined that additional
information will be required in order for that agency to adequately review the proposed project.
Due to the fact that a CAMA permit cannot be issued without a water quality certification first
being issued, it is necessary that processing of your permit application be placed in abeyance until
such time as the requested information is provided to the Division of Water Quality, a water
quality certification is issued for the proposed project, and a copy of the certification is provided.
to this office, Contact the Division of Water Quality directly at 252-948-3917 and reference
DWQ project 08-0704 if you have questions regarding this issue.
You will be given five working days from date of mailing. If you can provide to this office a copy of a
water quality certification within the required time, DCM staff will continue processing of the application
and the processing clock will not be suspended. If the required information is not provided to this office
within the specified timeframe, processing of the application will be suspended until such time as the
requested information is provided. If you have any questions concerning these matters, please feel free to
contact me by telephone at (252) 808-2808, or by email at daniel.govoni@ncmail.net.
Srnerl �
Darnel M. Govom
Asst. Major Permits Coordinator
Cc: Kyle Bames-DWQ-WaRO
Steve Trowell-DCM-WaRO
400 Commerce Ave., Morehead City, North Carolina 28557
Phone: 252 808.2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer -50% Recycled \ 10% Post Consumer Paper