Loading...
HomeMy WebLinkAbout20080704 Ver 1_CAMA Major Hold Letter_20080602r NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary June 2, 2008 RECEIVED Gregory C. Gibbs Wag, LLC. PO Box 278 Engelhard, NC 27824 Dear Mr. Gibbs: ,JUN 0 5 2008 This letter is in response to your application request under the Coastal Area Management Act (CAMA) to construct to stabilize the shoreline by installing 1,555' of bulkhead, as well as excavate 3.2 acre pond and construct a subdivision road to service 24 residential lots, in Hyde County. Processing of the permit application, which was received by the Division of Coastal Management's Morehead City office on 4/8/08, is ongoing. However, it has been determined that additional information will be required prior to the Division taking final action on your application. This item is summarized below: 1) The N.C. Division of Water Quality, by way of the attached letter, has determined that additional information will be required in order for that agency to adequately review the proposed project. Due to the fact that a CAMA permit cannot be issued without a water quality certification first being issued, it is necessary that processing of your permit application be placed in abeyance until such time as the requested information is provided to the Division of Water Quality, a water quality certification is issued for the proposed project, and a copy of the certification is provided. to this office, Contact the Division of Water Quality directly at 252-948-3917 and reference DWQ project 08-0704 if you have questions regarding this issue. You will be given five working days from date of mailing. If you can provide to this office a copy of a water quality certification within the required time, DCM staff will continue processing of the application and the processing clock will not be suspended. If the required information is not provided to this office within the specified timeframe, processing of the application will be suspended until such time as the requested information is provided. If you have any questions concerning these matters, please feel free to contact me by telephone at (252) 808-2808, or by email at daniel.govoni@ncmail.net. Srnerl � Darnel M. Govom Asst. Major Permits Coordinator Cc: Kyle Bames-DWQ-WaRO Steve Trowell-DCM-WaRO 400 Commerce Ave., Morehead City, North Carolina 28557 Phone: 252 808.2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer -50% Recycled \ 10% Post Consumer Paper