Loading...
HomeMy WebLinkAbout20190823 Ver 1_PCN Form Submission_20190617DR 02*10n of Water R"Ourc" Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance into the review process?* r Yes r No Is this project a public transportation project?* r Yes r No Change only if needed. BIMS # Assigned * Version#* 20190823 1 Is a payment required for this project?* * No payment required What amout is owed?* * Fee received r $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Stephanie Goss:eads\szgoss Information for Initial Review 1a. Name of project: 1011 Washington Street 1a. Who is the Primary Contact?* Eric Kulz 1 b. Primary Contact Email:* eric.kulz@townofcary.org Date Submitted 6/17/2019 Nearest Body of Water Lynn Branch Basin Neuse Water Classification WS -III; NSW Site Coordinates Latitude: 35.772525 A. Processing Information County (or Counties) where the project is located: Wake Is this project a public transportation project?* r Yes r No Longitude: -78.776268 1a. Type(s) of approval sought from the Corps: V Section 404 Permit (wetlands, streams and waters, Clean Water Act) F Section 10 Permit (navigable venters, tidal waters, Rivers and Harbors Act) 1 b. What type(s) of permit(s) do you wish to seek authorization? P Nationwide Permit (NWP) F- Regional General Permit (RGP) r- Standard (IP) 1c. Primary Contact Phone:* (919)462-3931 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular F Non -404 Jurisdictional General Permit F Individual Permit 13 - Bank Stabilization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F 401 Water Quality Certification - Express fJ Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r- Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r- Yes r- No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r- Yes r No B. Applicant Information 1d. Who is applying for the permit? F- Owner FT Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Alexander & Cecile Kohlhofer (project within Town of Cary 20 -foot sanitary sewer easement 2b. Deed book and page no.: 016424 - 00534 2c. Responsible party: Eric Kulz (Town of Cary) 2d. Address Street Address 1011 Washington Street Address Line 2 aY Cary Postal / Zip Cade 27511-3919 2e. Telephone Number: (919)462-3931 2g. Email Address:* eric.kulz@townofcary.org 3. Applicant Information (if different from owner) 3a. Name: Eric Kulz State / Rwince / Pagion NC Country USA 2f. Fax Number: r Yes r No r Yes r No 3b. Business Name: Town of Cary 3c. Address Street Address P.O. Box 8005 Address Line 2 cfty Cary Postal / Zip Code 27512-8005 3d. Telephone Number: (919)462-3931 3f. Email Address:* eric.kulz@townofcary.org C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) Greenwood Forest 1c. Nearest municipality/ town: Cary 2. Project Identification 2a. Property Identification Number: Real ID# 0017778 2c. Project Address Street Address 1011 Washington Street Address Line 2 4tY Cary Postal / Zip (ode 27511-3919 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Lynn Branch 3b. Water Resources Classification of nearest receiving water:* WS -III; NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12 -digit HUC in which the project is located. 030202011001 4. Project Description and History Slate / Rwince / Region NC Country USA 3e. Fax Number: 2b. Property size: 0.78 State / Rwince / Pagron NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site is a single-family residential lot within the Greenwood Forest subdivision, which was constructed in the 1960s. General land use in the vicinity is single-family residential, with commercial development to the west along Kildaire Farm Road. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes 6 No r Unknown 4d. Attach an 8 1/2 X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS.pdf 73.09KB 4e. Attach an 8 1/2 X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soils.pdf 227.94KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 100 4h. Explain the purpose of the proposed project:* The purpose of the project is to cover a partially -exposed sewer line (eight -inch vitrified clay pipe; VCP) in the right streambank to protect the pipe from breakage and releasing sewage to Lynn Branch. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project will entail laying back the undercut bank that hangs over the sewer line, establishing a 2:1 slope, and stabilizing the streambank with erosion control fabric and Class B riprap. 4j. Please upload project drawings for the proposed project. Washington St Impact Map.pdf 466.76KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: Sc. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5dl. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? No. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): F Wetlands 17 Streams -tributaries V Buffers r- Open Waters F Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* i1 streambank stabilizaStabilization nch P::] Both A ] � 12 (linearfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 31. Total temporary stream impacts: 0 12 3i. Total stream and ditch impacts: 12 3j. Comments 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Ch�k all that apply. V Neuse F Catawba F Goose Creek F Other F Tar -Pamlico F Randleman r Jordan Lake b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. ZoneZone 2 impact 'treambank stabilization (riprap) P Lynn Branch No 144 Eo - 6h. 6h. Total buffer impacts: 61. Comments: See Impact Map uploaded for Section 4.4.1 above. Supporting Documentation E. Impact Justification and Mitigation J 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Stabilization is limited to the length of stream where the pipe is exposed (12 LF). Ib. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction will occur during a period of low flow. Disturbed areas will be either stabilized with filter fabric and riprap or will be seeded and strewed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Streambank stabilization does not require either stream or buffer mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? F Level Spreader F Vegetated Conveyance (lower SHWT) F Wetland Swale (higher SHWT) F Other SCM that removes minimum 30% nitrogen fJ Proposed project will not create concentrated stormwater flowthrough the buffer Diffuse Flow Documentation Stormwater.pdf 6.99KB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 144.00 0.00 Zone 1 Zone 2 Total combined buffer impacts: 144.00 0.00 61. Comments: See Impact Map uploaded for Section 4.4.1 above. Supporting Documentation E. Impact Justification and Mitigation J 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Stabilization is limited to the length of stream where the pipe is exposed (12 LF). Ib. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction will occur during a period of low flow. Disturbed areas will be either stabilized with filter fabric and riprap or will be seeded and strewed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Streambank stabilization does not require either stream or buffer mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? F Level Spreader F Vegetated Conveyance (lower SHWT) F Wetland Swale (higher SHWT) F Other SCM that removes minimum 30% nitrogen fJ Proposed project will not create concentrated stormwater flowthrough the buffer Diffuse Flow Documentation Stormwater.pdf 6.99KB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters.* r Stormwater Management r Antidegradation Plan Calculations 3b. Stormwater Management Plan 3c. Antidegradation Calculations: Stormwater.pdf 6.99KB Comments: This project involves restoring cover over an exposed sanitary sewer line and stabilizing the streambank. No concentrated stormwater flow will result from this project. Original contours will be restored and seeded upon completion of the work. No impervious surface will be added beyond the riprap used to stabilize the stream banks. G. Supplementary Information �= 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments: Local funds only. In addition, 15A NCAC 01C .0407 states that standard maintenance/repair activities do not require filing of environmental documents. (3) specifies eAsting utilities. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 213.0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The site vicinity and areas downstream are completely built out. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. Is another Federal agency involved?* C Yes r No r' Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r• No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP website (6/12/19) and USFWS iPac website (6/12/19). Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Project site not located within the 20 coastal counties. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC Historic Protection Office HPOWEB Service (accessed 6/12/19). No elements on or near the project site. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* Map No. 3720076400K Firm Panel: 0764. date: 5/2/06. Miscellaneous Comments Miscellaneous attachments not previously requested. Aerial Zoom.pdf Signature P By checking the box and signing below, I certify that: 247.16KB • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Eric Kulz Signature Date 6/17/2019 Upstream Section 0 5 10 15 20 25 300-5-10 Section A - Existing 0 5 10 15 20 25 300-5-10 Section A - Proposed 0 5 10 15 20 25 300-5-10 LOCATION: 1011 WASHINGTON ST LOCATION: 1002 WARREN AVE SHEET NO. RAC RAC 6/17/19 As ShownScale Hor: Proj. No. Design By: Drawn By: Date: ---- Revisions Plan & Profile1011 Washington StreetSignature Scale Ver:As Shown1871CARY, NORTH CAROLINATOWNCARYfONORTH CAROLINAP 1.0Storm Drainage Improvements316 North Academy StreetCary, N.C. 27513Tel: 919-469-4030 Fax: 919-460-4935www.townofcary.orgVICINITY MAP DAVIS DRNW MAYNARD RDSE MAYNARD RDWA L N U T S T WAL N U T S TN HARRISONSW MAYNARD RD WALNUT STREGENCYOLD A P E X R D OLD APEX RDW C H A T H A M ST N HARRISON AVED A N K M O O R E F RW Y WES T O N P K Y DYNAST Y D R ELECTRA DR TRINITY RDNC 54 HWY CHAPE L H I L L R D GRIFFIS STLAKE PI N E D R KILDAIREKILDA IRE FARMHOLLY SPRINGS YA T ES M I L L POND RD CARY T O W N E B L V BUCK JONES RD SW CARY P K Y MORRISVILLE PKY CRABTREE CROSSING PKYEV AN S RDCHURCH STSAS REEDY CREEK RDSALEM C H U R C H R D N SA L E M S T SE CA R Y P K Y CAMPBELL RDAVIATION PKYNW CARY PKYHILLSB O R O G H S T N SALEM ST UMSTEAD PARK TRENTON RDN ACADEMY STFARM GATE RDNORWELL BLVNE MAYNARD RD JONES FRANKLINE CHATH A M S T TRYON R D HIG H H O U S E R D OLD R A L E I G H R DLAURA DUNCAN RDFARM RDW CHA T H A M S T NC 5 4 HWY CAM P U S EDWARDSMILL RDO L D T R I N I T Y R D PKYRDCARY SITE 64 1 64 1 440 40 40 D RAVE MORRISV I L L E CARPEN T E R R D (NOT TO SCALE) Stormwater Issues This project involves restoring cover over an exposed sanitary sewer line and stabilizing the streambank. No concentrated stormwater flow will result from this project. Original contours will be restored and seeded upon completion of the work. No impervious surface will be added beyond the riprap used to stabilize the stream banks. Stormwater Issues This project involves restoring cover over an exposed sanitary sewer line and stabilizing the streambank. No concentrated stormwater flow will result from this project. Original contours will be restored and seeded upon completion of the work. No impervious surface will be added beyond the riprap used to stabilize the stream banks. •� •f v 4'. 75� r