Loading...
HomeMy WebLinkAbout20190821 Ver 1_PCN Form Submission_20190618DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190821 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Kevin Barnett:eads\khbarnett Information for Initial Review 1a. Name of project: Haywood County Bridge 401 1a. Who is the Primary Contact?* Patrick J Breedlove 1b. Primary Contact Email:* pjbreedlove@ncdot.gov Date Submitted 6/18/2019 Nearest Body of Water Lillte East Fork Pigeon River Basin French Broad Water Classification Class: WS III; Tr. Site Coordinates Latitude: 35.41282 FA. Processina Information County (or Counties) where the project is located: Haywood Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS#M 17BP.14.R.174 1a. Type(s) of approval sought from the Corps: Longitude: -82.90628 Version# * 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (828)631-1145 W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? t' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r- Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r- Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No F. Applicant Information 1d. Who is applying for the permit? [J Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? f Yes r- No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 14 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 253 Webster Road Address Line 2 city Sylva Postal / Zip Code 28779 2e. Telephone Number: (828)631-1145 2g. Email Address:* State / Frwinre / R�gion North Carolina Q�untry United States 2f. Fax Number: * r Yes r No r Yes r No pjbreedlove@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (i appropriate) 1c. Nearest municipality/ town: Waynesville 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address line 2 Oty Postal / Zip 03de 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Lillte East Fork Pigeon River 3b. Water Resources Classification of nearest receiving water:* Class: WS III; Tr. 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12-digit HUC in which the project is located. 060101060102 4. Project Description and History 2b. Property size: State / Frovince / Ibgion O�untry 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* EAsting land use is a 20' W x40' 8" L timber floor on a steel I-beam structure on an ebsting secondary road. Project site is located in a rural residential area with agriculture field adjacent to project area. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Haywood County - B401 - USGS Topo Map. pdf 1.21VIB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Haywood County - B401 - NRCS Soil Map.pdf 427.34KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.00 4g. List the total estimated linear feet of all existing streams on the property: 200 4h. Explain the purpose of the proposed project:* Project is replace an obsolete and deteriorating wood floor on steel I-beam structure with a cored slab bridge. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* NCDOT contractor will install erosion and sedimentation control measures. NCDOT contractor will install diversion structure in Little East Fork Pigeon River. Traffic will remain on the ebsting bridge until one lane of the new bridge is constructed. Traffic will then been placed on the new one lane structure while the second lane is constructed. NCDOT contactor will remove the existing structure in two phases. Bank stabilization materials will be installed once final grading allows and drainage culverts are installed. The diversion structure will be removed and temporary impacts will be restored. The bridge structure will be constructed utilizing the following equipment: crane, dump trucks, excavator, paving equipment, pumps and hand tools. 4j. Please upload project drawings for the proposed project. Haywood County - B401 - Permit Plans (Final).pdf 2.01 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No e Unknown Comments 5b. If the Corps made a jurisdictional determination, what type of determination was made?* f Preliminary r Approved r Not Verified r Unknown r NIA Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload Haywood County - B401 - PJD (Final).pdf 6. Future Project Plans 232.84KB 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? [Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Buffers r Open Waters r Pond Construction 3. Stream Impacts 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * [3f.Type of 3g. S. width 3h. Impact ❑ M urisdiction* length* S1 Site 1 Temporary Dewatering Little East Fork Pigeon River Perennial Both 35 100 Average (feet) (linear feet) S2 Site 2 Permanent Bank Stabilization Little East Fork Pi eon River g Perennial Both 35 15 Average (feet) (linear feet) S3 Site 3 Permanent Bank Stabilization J Little East Fork Pi eon River g Perennial Both 35 55 Ave age (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 70 31. Total stream and ditch impacts: 170 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 31. Total temporary stream impacts: 100 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The wasting bridge is being replaced with a structure that is adequate for traffic needs in the wasting bridge location. The structure was designed for the minimum size criteria to ensure safe conveyance of traffic on the secondary road. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The on -site stream (Little East Fork Pigeon River) will be diverted while the new bridge structure is constructed, the unclassified excavation occurs and the bank stabilization materials are installed. Erosion and sedimentation control measures will be installed prior to ground disturbance. Both of these measures will aid in the prevention of sediment into downstream habitats. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Proposed impacts do not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: Project is not located within a N.C. Riparian Buffer Protection Area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered `yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r No Comments:* NCDOT MCDC Attached. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (1 SA NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project is only to replace the wasting subject bridge due to deterioration and does not increase the capacity of the roads in the area. The propose project is not a road widening or improvement project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? f Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r^ Yes r No r^ Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* r- Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r^ Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? U.S. Fish & Wildlife - ECOS - Online Mapper Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA- Essential Fish Habitat v 3.0 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Culture Resource Specialist 7c. Historic or Prehistoric Information Upload Haywood County - 8401 - Archaeological Screening.pdf 2.01 MB Haywood County - B401 - Architecture Screening.pdf 11.26MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT & NCFPM MOU 8c. What source(s) did you use to make the floodplain determination?* N.C. Flood Maps - Flood Risk Information System Miscellaneous Comments Miscellaneous attachments not previously requested. Haywood County - B401 - MCDC (Final).pdf 1.27MB Haywood County - B401 - NC Hertiage Program.pdf 3.6MB Haywood County - B401 - Site Photos.pdf 1.68MB Haywood County - B401 - Bat Habitat Assessment.pdf 37.7KB Haywood County - B401 - Hydro Report.pdf 4.11 MB Signature u * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; . I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a Witten signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Patrick Jeremy Breedlove Signature ,�AVw,g oz-r y�9t use Date 6/18/2019