HomeMy WebLinkAboutNC0020664_PAR Review_20190619
June 19, 2019
Town of Spindale
Scott Webber, Town Manager
PO Box 186
Spindale, NC 28160
Subject: Pretreatment Annual Report Review
Town of Spindale WWTP-Pretreatment Program
NPDES #: NC0020664
Rutherford County
Dear Mr. Webber:
The Asheville Regional Office of the Division of Water Resources has reviewed the Pretreatment Annual
Report (PAR) covering January through December 2018. This PAR was received on March 5, 2019.
Our review indicates that the PAR is in good order and satisfies the requirements of 15A NCAC 2H .0908(b)
and the Comprehensive Guidance for North Carolina Pretreatment Programs. As a reminder, Spindale’s HWA
is due December 1, 2020. The next PAR will be due March 1, 2020.
Thank you for your continued support of the Pretreatment Program. If you have any questions, please contact
me at (828) 296-4500 mikal.willmer@ncdenr.gov or Vivien Zhong, at (919) 707-3627
vivien.zhong@ncdenr.gov.
Sincerely,
Mikal Willmer
Environmental Specialist I
Water Quality Regional Operations
Asheville Regional Office
EC: WQS-ARO Server
LF, PERCS
G:\WR\WQ\Rutherford\Wastewater\Municipal\Spindale WWTP 20664\Pretreatment\PARs\20190619_NC0020664_PARREV
Regional Pretreatment Annual Report Review
$89d3ed94c9b1$B100AF53563A462D8CDD59EFD1D8CCB8.docx 16
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included? ADEQUATE? POTW noted Corrections? Regional Office: ARO
Narrative YES NO NA YES NO NA POTW: Spindale WWTP
PPS Form YES NO YES NO NPDES Permit No. NC0020664
SNCR YES NO YES NO Report Period: 1/1/18 to 12/31/18
IDSF YES NO YES NO
Full Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
Allocation Table YES NO YES NO
Compliance Schedules YES NO NA YES NO NA
Public Notice YES NO NA YES NO NA
Program Information YES NO YES NO YES NO
Historical SNC YES NO NA YES NO NA YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
days of expiration? (See Allocation Table).
Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
SNC, including those causing pass-through or interference? (See
Narrative and SNCR Form)
Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
Reviewed By: Mikal Willmer Date: 06/19/19
Certificate Of Completion
Envelope Id: 1741CEB869D94B94914422D68C5610DD Status: Completed
Subject: Please DocuSign: 20190619_NC0020664_PARREV.cvr.docx, 20190424_NC0020664_PARREV2018.draft.docx
Source Envelope:
Document Pages: 2 Signatures: 1 Envelope Originator:
Certificate Pages: 1 Initials: 0 Mikal Willmer
AutoNav: Disabled
EnvelopeId Stamping: Disabled
Time Zone: (UTC-05:00) Eastern Time (US & Canada)
217 W. Jones Street
Raleigh, NC 27699
Mikal.willmer@ncdenr.gov
IP Address: 149.168.204.10
Record Tracking
Status: Original
Jun 19, 2019 | 10:12
Holder: Mikal Willmer
Mikal.willmer@ncdenr.gov
Location: DocuSign
Signer Events Signature Timestamp
Mikal Willmer
mikal.willmer@ncdenr.gov
Environmental Specialist
North Carolina Department of Environmental Quality
Security Level: Email, Account Authentication
(None)
Signature Adoption: Drawn on Device
Using IP Address: 149.168.204.10
Sent: Jun 19, 2019 | 10:13
Viewed: Jun 19, 2019 | 10:13
Signed: Jun 19, 2019 | 10:13
Freeform Signing
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted Jun 19, 2019 | 10:13
Certified Delivered Security Checked Jun 19, 2019 | 10:13
Signing Complete Security Checked Jun 19, 2019 | 10:13
Completed Security Checked Jun 19, 2019 | 10:13
Payment Events Status Timestamps