Loading...
HomeMy WebLinkAbout20040021 Ver 1_COMPLETE FILE_20040107Soil & Environmental Consultants, PA Department of Environment and Natural Resources Division of Water Quality WETLANDS/ 401 GROUP Attn: Mr. John Dorney 2321 Crabtree Boulevard MAR Suite 250 12004 Raleigh, NC 27604 y'ATER OUALi!Y SECTION Re: Reply to the Division of Water Quality's February 8, 2004 Request for Further Information for the proposed Falls Landing Subdivision, Wake County, North Carolina Dear Mr. Dorney: This letter is in response to the letter from your office dated February 8, 2004 (copy attached), which requested additional information for the proposed Falls Landing Subdivision. At our meeting on January 7, 2004, you requested additional information regarding stream impacts. Below I have re-stated your concerns in italics and our response. We have also provided a letter from the engineer justifying the proposed impacts. Please note, we are not requesting 401/buffer certification at this time, only that you provide a preliminary approval so that the City of Raleigh will approve the PUD plan. Because we first met in early January, we would appreciate a quick response from your office. Please call if you need additional information or clarification. Thank you. 1. Please provide justification for the road crossing along the southern portion of the property. In addition, why can't the existing cul-de-sac be extended so that impacts are to an intermittent channel rather a perennial channel? (see the attached sketch). First, the existing cul-de-sac is part of the Falls Pointe Subdivision - these lots have been sold and subdivided. Therefore the cul-de-sac cannot be extended. Approximately 21 lots are clustered along the southern portion of the property in Phase 5 of the proposed project. DWQ has questioned whether or not an additional crossing is needed in this area. The City of Raleigh required that the road stub along Soil & Environmental 11010 Raven Ridge Road - Raleigh, North Carolina 27614 - www.SandEC.com Consultants, PA 'hone: (919) 846-5900 - Fax: (919) 846-9467 Charlotte Office: 236 LePhillip Court, Suite C Concord, NC 28025 Phone: (704) 720-9405 Fax: (704) 720-9406 Greensboro Office: 3817-E Lawndale Drive Greensboro, NC 27455 Phone: (336) 540-8234 Fax: (336) 540-8235 Hickory Office: 622 Coon Mountain Lane Taylorsville-, NC 28681 Phone: (828) 635-5820 Fax: (828) 635-5820 March 1, 2004 S&EC Project # 5967.W0 DWQ# 04-0021 the southern portion of the property (in the existing Oakcroft S/D) be extended into Falls Landing. Additionally, the City required that this phase of the project be connected to Phases 1-4 of Falls Landing. This requirement necessitates a stream crossing. Moreover, by allowing the residents in Phase 5 more than one access point, emergency providers can more quickly access the property. For example, if the additional stream crossing is not in place, the fire department would need to travel,1.4 miles, rather than 0.6 miles. In terms of marketability, this crossing would provide the residences with a sense of community and would provide easy access to the amenities of Falls Landing. The applicant is willing to move the proposed crossing in order to reduce impacts. Specifically, the crossing as proposed will impact approximately 170 linear feet of channel. The applicant has suggested moving the crossing (see map) in order to cross at a more perpendicular angle. 2. Why is the road stub along the northern property line needed? Specifically, will placement of this stub predicate future impacts off-site in order to `tie' into this stub? See attachments. This stub is a requirement by the City of Raleigh. As per comments from the engineer, if your office decides that this stub is not viable; John Wieland Homes can support this decision and will follow,up with Raleigh. However, proper documentation from the DWQ will need to be supplied for the City to consider removing this stub. Please call if you have any questions or require further explanation. Sincerely, Todd Preuninger Attachments: 1) DWQ letter dated February 8, 2004 2) l 1x17 site plan 3) Letter from Engineer 03,-.011'2004 14:46 FAX Soil & EnVxrowryiei) t al Co sultan ts, . A 11010 Raven Ridge Road • Raleigh, North Caroiina 27614 • 1='.ioncl (919) 846-;PW • F-: x. www-SandEC<orn R E -11" 'V? FACSIMILE SHEET FIX N'Q_ (919) 816-94W e - ?? DATA: Fro'ect TO, NAME: _:??•,.. COMPANY: ?- FAX NUMBER: FROM; SUBJECT:__?F'?.. The following items are being faxed. Number of pages including transrttittal 4l1cet_-_ For Your Comments /Approval _ For Your lnfc?rtn a t<: ?? - Per Our Conversation Per 'yotII R(_? lltcst Please AdvISe plea'-3c' Call Would. Like To Discuss J ?-_--- Please tJ andle HARD COPY SENT: US Regular Mail ? _Delivel V - overnight No Hard Cop,, :: nt REMARKS: r?1ti IM. .14?. ? 'i c IF YOU HAVE ANY PROBLEMS Wl'"-f THIS J-1tkNSMISSION', PI. E. SE CONTACT AT (919) 846-6900. *CONFIDENTIALITY NOTICE" Plus tifln:uuission is intended only for the use of the individual ur elltity to w`,ich it is adds rss? 1 to+3 .n< y t,7: t&i information that is privileged and eoL&deutial. If the reader of this u?essa?e if; not the tntendcd rttilli,'nt, y ju az . , . ,:i> notified toot any disclosure, distribution or coppng of this i0orrnation is strictly prohibited. If you ha rcc (,v; i tranSrnission in error. please notify us immediately by tclcpWwe ctu4 return the taxed ,.lor,uweu s tc:.. US AV dV W-O ,_ via the Ugited States Postal Service. Otte lffcer C?recnehnro f H 3917-E Uyxndnie Dri` c 6 u +'.in l.arn. 236 Le1'hillip CPart. Suitc C 5 GeensLoiv. NC 217455 foncord.lC 2802$ I ?D'n , i AvL hi+I t hi ;,- r t Phone: (3'i6) S40-9-14 phone: (704) 720-9405 E ,d Fax: (704) 720-9406 MAR-1-2004 MOH 14: c6 TEL: 919 7 7 3368'9? HPHE : D N" I - HE' _. +F 1[1,-. OV OL/2004 14:46 FAX Soil & Environmental Consultants, PA. tim0 kaven Ridge Road • Raleigh, North Carolina 276t4 • Phonc. (9i9i 84t)"59n+J x4-9467 www.5alndE(_.cnrn 14IWAI 1, (Y , ).I S&hC Project # 5}+67.141 1l)WQ# 04-002 1 Department of Environment and Natural Resources Division of Water Quality Attn: Mr. Jobn Dorney 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604 Re: Reply to the Division of Water Quality's February 8, 2004 Request for Further information for the proposed Falls Landing Subdivision. Wake County, North Carolina Dear Mr. Dorney: This letter, is in response to the letter from your office dated ) el)ruary 8, '21004 6;OjIv attached), which requested additional information fair the proposers falls Lauding Subdivision- At our meeting on January 7, 2004, you requested additional inform.i,,Ao regarding stream impacts- Below I have re-stated your concerrts In italics, aj d. oia response. We have also provided a letter from the engi.ncer 'ustiiying tl e Dropu,', 4i impacts. Please note, we are not requesting 401/buffer certification at this tilike, QUI that you }provide a preliminary approval so that the City of )[Weigh will approvc the PUD plan. Because we first met in early January, we would appreciate a q_uia-k. response from your office. Please call if you need :additional informaticto or clarification. Thank you. .l_ please provide Justificatiot, for the rood erossirxg c?lc ?rg the sardthcr,r E>artifl i the property. It, addition, why can't the existing csul-d&-sdc be extended so ";;ot impacts are to an intermittent chunrzel rather a perenniIal chc wlel? (see attached sketch)- First, the existing cul-de-sac is part of the palls Pointe Subdivision _. these lute 111.I.,.0 been sold and subdivided. Therefore the cul-de-sac canuot be extended. Approximately 21 lots are clustered along the southern potlion of the prope.E ty i t Phase 5 of the proposed project. DWQ has questioned whether or not an ad.di.6onal crossing is needed in this area. The City of Raleigh required that the road stab 'otllg 'reellQ nrri fJfftce 3g17-E L'awildatt Drive 62Lair:- LePbillip Court, rl?tC? - t rat ? ?iir'rn Co;nccorordd, , NC C 298025 U25 SusieC Grecrisboru, NC 2'115 t9tlts ;iP1 N(28681 Co Phonc: (336) 540-82,34 Phone: (704:1720-9405 ?'a^(: 636) 5?4{l_5?t??;,- <><,? `•_ ?-.?R2(i Fax: (704) 720-9406 MAR-1-2004 P'UOhd 14: 26 TEL: 9197336893 alt= ME: DWO -HE T LHhlDs f' 03'.'01/2004 11:47 FAX DWO UORNEY 4?l1iu3 the southern portion of the property (in the existing ()akcrolt S/D) be extecidr?d i t Falls Landing, Additionally, the City required that. this phase of the project ;e. connected to Phases 1-4 of Falls Landing. This rec:luitement necessitaLes a str;aszr crossing. Moreover, by allowing the residents in phase 5 more than one access pryi,,a, emergency providers can more quickly access the property. For exaraple, if thc, 1 additional stream crossing is not in place, the fire department would need to travel 1. rniles, rather than 0.6 Holes. In terms of marketability, this crossing would provide the residences with a wil,' :cat community and would provide easy access to the amembQs of Falls Landing. The applicant is wrilling to move the proposed crossing in carder- to reduce in1p; Cls Specifically, the crossing as proposed will impact apptioaoniatety 170 1111ear fctt 5f channel. The applicant has suggested moving the crossing (see ntap) in order to gross imap://john.dorney%40dwq.denr.ncmail.net @cros.ncmail.net:143/fe... Subject: Falls Landing From: Justin Patsey <Justin.Patsey@JWHOMES.com> Date: Fri, 23 Jan 2004 12:10:48 -0500 To: "John.dorney@ncmail.net"' <john.dorney@ncmail.net> Mr. Dorney, I appreciate you returning my calls. I know you have an extremely busy schedule. I know we keep missing each other and thought I might try this avenue of communication. You had a meeting with Kevin Martin with S&EC on 1/7/04. Todd discussed a project of mine with you on that date. My neighborhood is called Falls Landing (located off of Falls of the Neuse Rd- Lowery property). I'm presently requesting subdivision approval from the City of Raleigh. The city is demanding that I receive a PRELIMINARY Approval letter or e-mail from your department stating that you looked at the stream crossings (two) and are of the opinion they will be permitable. AGAIN, I don't need an official approval letter but just something in writing that we're preliminarily approved with conditions that I must submit a full application for the "official" permit. Todd is presently working on the submittal and we plan to request the permit via your express review option within the next 45 days or so. It is my understanding Todd provided you with information as to why we need both crossings. Please let me know if you need anything else in order to make your decision. I'm truly sorry that I have to request a preliminary approval, however, the City of Raleigh has my project at a complete stop until one is provided. A simple e-mail response from you would satisfy the City's request. Again, I appreciate your consideration in this matter. Please give me a call at 669-2084 (m) or 481-3309 (o). Thanks again- Justin Patsey 1 of 1 1/24/04 8:32 AM DATE: 1!TT TO: NAMC-??\^' .Y °r 1 COMPANY: FAX NUMBER: FRGM ,V' SUBJECT: Fo.??S t..?.,r?? •n? ?c+?" ?.1 The following items are being faxed. Number of pages including transmittal sheet: ?n For Your Information For Your Comments /Approval Per Our Conversation Per Your Request Please Advise Please Call Would Like To Discuss Please Handle HARD COPY SENT: US Regular Mail Hand Delivery Overnight No Hard Copy Sen ??n , REMARKS: V IF YOU HAVE ANY PROBLEMS WITH THIS TRANSMISSION, PLEASI?-? CONTACT AT (919) 846-5900. *CONFIDENTIALITY NOTICE* This transmission is intended only for the use of the individual or entity to which it is addressed and may contain information that is privileged and confidential. If the reader of this message is not the intended recipient, you are hereby notified that any disclosure, distribution or copying of this information is strictly prohibited. If you have received this transmission in error, please notify us immediately by telephone and return the faxed documents to us at the above address via the United States Postal Service. Environmental Consultants, PA Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 Project Number:'Spt6-+W CC: Charlotte Office: 236 LePhillip Court, Suite C Concord, NC 28025 Phone: (704) 720-9405 Fax: (704) 720-9406 Greensboro Office: 3817-E Lawndale Drive Greensboro, NC 27455 Phone: (336) 540-8234 Fax: (336) 540-8235 Hickory Off ce: 622 Coon Mountain Lane Taylorsville, NC 28681 Phone (828) 635-5820 Fax: (828) 635-5820 FACSIMILE SHEET FAX NO. (919) 846-9467 D-. a7C?1?Yh.?w?-t.,?roVc.` ?<' t rYMS? 01/07/2004 20:15 9195592143 THOMPSON ASSOC PAGE 01 r THOMPSON AND ASSOCIATES 153 HOLLY SPRINGS ROAD HOLLY SPRINGS, NORTH CAROLINA 27540 (919) 577- 0808 January 7, 2004 Mr_ Todd Preuninger Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 Re: Falls Landing Raleigh, North Carolina e f? Dear Mr. Preuninger: in regards to your fax of January 7, 2004, the following outlines the responses to each item: Item #1 - The extension of the road within Falls Pointe is not possible for the following reasons; a). This road is currently completely built with pavement and curb and gutter, b). The approval of Falls Pointe by the City of Raleigh required a cul-de- sac in this area in lieu of stub. c). Falls Pointe is in the process of being platted and recorded, d). Even if extension of this road were done, it would be crossing a buffer area. Also, given the existing alignment of the cul-de-sac, the crossing would not be at a desired angle. e). For the marketing of these subdivisions, due to amenities, it is not a desirable through connection. f). Placement of a cul-de-sac at the next creep crossing was not done to achieve the desired inter-connectivity the Raleigh DOT wanted. Also, since we had to cross this creels area with the sanitary sewer, an impact was already occurring. Crossing of the sanitary sewer was required to get into the existing pump station to the south 0"1/07/2004 :15 V 9198592143 THOMPSON ASSOC PAGE 02 Item#2 - The stub road to the north was placed as per the request of the City of Raleigh's Department of Transportation. From the owner's standpoint, we are willing to work with. DWQ if it is deemed that this stub may present a{' problem in the future with the road extension. After preliminary approval, we can discuss the stub with the City based upon any comments or request of DWQ. Lastly, we have noted your comment in regards to the calculation of the stream impacts. The length of the impacts shown at time of formal permitting will reflect the meandering stream lengths. I trust that this information will answer some of your concerns. Please feel free to contact me if you have any further questions or comments. Sincerely, Randall L. Milli, Thompson and Associates, PA 150 r '- 41 i 45 ? i 5 .• : ;off F ? t 139 1 138 J ?i 111 -: '! `•. r- 0 ?• 6P? J ?( I nr 28 11 \,, 14 ?? 15 12 13 ?. imo a y! 48" RCP W/ HEA ALL I ROAD CRO 1s - 17 18 19 304 0 { L 32"W i f C34 33 i 32 C >? E F 1. - n c? t? l7 ? tNi? G ? 23 24 m 20 2 N N m- mm 'i m 21 N I 182.95 L21 / S88'48'41 "W 656.81' L PRELIMINARY DRAWIA SUBMITTED FOR REV NOT RELEASED FOR CONS \ yKo v6$2?° Goy ssFsM125 \ \ ?? go r? / 120 \\ 12 t 121 131.E i VA. Bvr?R % l l e?,gFR ht 4 i L26 L24 L23 t } i i j9 S c F o? ?' N o P ; Y? / 25' CA??,..?fLA,KEmITPmT 5.7 _7 v 1114? ?58 Q / 92 ' H f1 1 57 11 60 \ 1 - S6 89 ? C87) 88 ? ? 55 I l @7 86 Is, 82 \ I 85 gp SING," 54 i ? I ? 419 i? S U _----- v N' W z U Q d l? J N n < n J ® * p O N r ? ? N N W C i f N Q ¦ 1 F C7 = - '? Y J I z O a n ® ? n n , ? 1 w . o n n `O 'i ??0 y pQ i 3 Q c?i l t AID ? Q Z obi ??,.?• Un O m O F}f }? z z C4 O 4 1 U mm / - a ® ?? ® a 0 ?q p t \? l W 1 /? l / 3 N Avu.og 1G.- w ? m 10 lug VJAWPVz 6- N O t 1! s ya %A O Q _ o 0 m J 4149 9 ? v Q L, j ,n. J C J U Q A a L - C L? 0 O log Id Z Zm zm u Q m c J ?m z U) V) O O V ? Q 0; oil {QLJ Q oa O- 0_' J a. F 10 « b zm zm U W Q LL ..e'er' ? / / °? ?.p , ? ~ ? v , ? ~ J ? ? ? ?jL py 4\ s / Z fig r / I = Qom'.//' \3?a ? a Ml / z m o W om 7? ?° o?? 7 f r?mk aue s;{e ca- k FIL Soil Environmental Consultants, PA 11010 Rave dg oad • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com 5%jwl September 18, 2003 NCDENR-DWQ US Army Corps of Engineers Attn: Mr. John Dorney Attn: Ms. Andrea Wade 2321 Crabtree Blvd 6508 Falls of the Neuse Rd., Ste. 120 Parkview Building Raleigh, NC 27615 Raleigh, NC 27604 RE: NWP 12 and Buffer Compliance Leonard Tract - Sewer Easement Raleigh, Wake County, North Carolina S&EC Project #: 03-5967.W2 Dear Mr. Dorney and Ms. Wade: On behalf of John Wieland Homes (purchaser, under contract), we hereby request authorization from the US Army Corps of Engineers to use Nationwide Permits 12 to cover impacts to wetlands (see attached overall map). We also request written concurrence from the North Carolina Division of Water Quality that the project complies with the Neuse Buffer Rules for impacts associated with proposed utility lines. A Pre- construction Notification Application (PCN) is attached, which includes an agent authorization form. S&EC evaluated the site for the presence of wetlands in July 2003 and submitted a delineation map for USACE approval in March 2003. S&EC conducted a site meeting with Ms. Andrea Wade of the USACE and she agreed with our delineation. The purpose of this project is to construct a residential subdivision that will meet the demand for housing in this area. In order to provide the infrastructure for the proposed subdivision (i.e. water and sewer), impacts to the riparian buffer cannot be avoided. Specifically, an existing sewer line is located off-site adjacent to the Neuse River. Due to topography (i.e. steep slopes and rock outcrops) and negotiations with the current property owner, impacts to the buffer are unavoidable. Additional impacts are anticipated within the proposed subdivision; however, the final alignment has not yet been determined. Impacts to the riparian buffer include 20,173 square feet of Zone 2. Wetland impacts consist of 270 square feet. Charlotte Office: Greensboro Office: Hickory Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord, NC 28025 Greensboro, NC 27455 Taylorsville, NC 28681 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone (828) 635-5820 Fax: (704) 720-9406 Fax: (336) 540-8235 Fax: (828) 635-5820 Mr. Patsey Page 2 of 2 October 6, 2003 The outside buffer. boundaries and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange fabric fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer. This fencing shall be installed prior to any land disturbing activities to ensure.compliance with 15A NCAC 2B .0233. The protective fencing should be removed once construction is complete. 4. Sewer Systems The project shall comply with 15A NCAC 2H .0219(i)(2)(G) and all other State, Federal and local sewer system regulations. 5. No Impacts to Zone 1 No impacts shall occur to Zone 1 of the protected riparian buffers (except for uses and activities designated as "exempt" within 15A NCAC 02B .0233), unless otherwise approved by the DWQ. 6. Construction Plans Any final construction plans for this project must include or reference the application and plans approved by the DWQ under this authorization letter and certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or coastal Area Management Act Permit. This Certification shall expire upon expiration of the 404 or CAMA permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzecki at 919-733-9726. Sincerely, Alan W. Klimek, P.E., NC DWQ, Director Attachments: Certificate of Completion GC 3374 Cc: Todd Preuninger, S&EC, Inc., 11010 Raven Ridge Road, Raleigh, NC 27614 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files bz DWQ # 031168 Date: October 6, 2003 State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office I----- r? Michael F. Easley, Governor William G. (Bill) Ross, Secre, January 16, 2001 Todd Preuninger S & E C, Inc. 11010 Raven Ridge Road Raleigh, N. C. 27614 Subject: Dear Mr. Preuninger: D)r 0aa JAN 2 3 ?001 1* 0 CDENR NORTH CAROLINA DEPARTMENT OF VIRONMENT AND NATURAL RESOURCES Neuse River Basin Riparian Buffer Rules NBRRO 1.006 Lowery Tract S & E C Project # 00-5967 Wake County The information that was received by the Raleigh Regional Office on January 12, 2001 has been reviewed. The map and other information was provided to allow a determination to be made as to whether or not the site would require compliance with the Neuse Buffer Rule. This project is referenced by the Raleigh Regional Office as NBRRO 1.006. The features represented on the Wake County Soil Survey and the USGS Quadrangle (topographic) maps were evaluated to determine their subjectivity to the Neuse Buffer Rule. Nine features depicted on the maps were reviewed. I have been determined that features C,D,E,H,M,G and O are ephemeral features and therefore are not subject to protection under the Neuse River Basin: Nutrient Sensitive Waters Management Strategy; Protection and Maintenance of Existing Riparian Areas, Administrative Code T15A:02B.0233 (NCAC 0233). Feature F, below point NRB-04, and feature L, below point NRB-09, are subject to the Neuse Buffer Rule. This letter only addresses the applicability of the Neuse Buffer Rules on this specific site. Thank you for your attention to this matter and if this Office can be of any assistance or if you have additional questions, please do not hesitate to contact us. Sincerely, Matt Flynn Environmental Specialist cc: RRO/John Dorney C: neusbuff1.06.doc 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX(919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post-consumer paper