Loading...
HomeMy WebLinkAbout20040008 Ver 1_COMPLETE FILE_20040105UTATF O R Michael F. Easley, Governor O? QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ` 7 Alan W. Klimek, P.E., Director .? Division of Water Quality -K . Coleen H. Sullins, Deputy Director Division of Water Quality February 23, 2004 DWQ# 04-0008 Camden County County of Camden P.O. Box 190 Camden, NC, 27921 APPROVAL of 401 Water Quality Certification with Additional Conditions To Whom It May Concern: You have our approval, in accordance with the attached conditions, to shade 0.005 acre of Public Trust Waters in order to construct a multi-use trail with a wood bridge along the Dismal Swamp Canal in Camden County, as described in your application received by the Division of Water Quality on January 5, 2004. No fill in wetlands or water is involved in this work. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3400, which can be downloaded from our web site at http://h2o.enr.state.nc.us/ncwetiands . This Certification allows you to use your CAMA Permit when issued by the NC Division of Coastal Management. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge, Water Supply Watershed, Coastal Stormwater and U.S. Coast Guard regulations. Also this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you.must follow the conditions listed in the attached certification and the additional conditions listed below: 1. You are required to return the attached Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed; 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 276994650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetiands) Customer Service #: 1-877-623-6748 EPA County of Camden February 23, 2004 Page 2 of 2 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources: has released the project; If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Tom Steffens in our Washington Regional Office at (252) 946-6481 or Cyndi Karoly in our Central Office in Raleigh at (919) 733-9721. Sincerely, Alan W. Klimek, P.E. AW K/cbk Attachments cc: Corps of Engineers Washington Field Office Washington DWQ Regional Office Central Files File Copy Doug Huggett, DCM Hobbs, Upchurch & Associates, PO Drawer 1929, Nags Head, NC, 27959 040008 7A r LA? NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G, Ross Jr., Secretary December 31, 2003 MEMORANDUM: TO: Mr. John R. Dorney Environmental Biological Supervisor Division of Water Quality FROM: SUBJECT: Doug Huggett Major Permits Processing Coordinator WETLANDS/ 401 GROUP JAN 0 5 2004 WATER QUALITY SECTION 040008 ?` r CAMA/DREDGE & FILL Permit Application Review. Applicant: Project Location: County of Camden Dismal Swamp Welcome Center on US 17 to South Mills, Camden County Proposed Project: Multi-Use Trail and Bridge Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 21, 2004. If you have any questions regarding the proposed project, please contact Edward Harrell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-39011 FAX: 252-264-37231 Internet: http://dcm2,enr,state.nc.us An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Camden County - Multi-Use Trail; along Dismal Swamp Canal 2. LOCATION OF PROJECT SITE: Dismal Swamp Welcome Center on US 17 to South Mills, Camden County, adjacent Dismal Swamp Canal Photo Index - 2000: N/A 1995: N/A 1989: N/A 1984: N/A 1978: N/A State Plane Coordinates - X: 2629600 Y: 1017500 GPS: B091713A 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 09/17/03 Was Applicant Present - NO 5. PROCESSING PROCEDURE: Application Received Complete - 12/12/03 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Camden County Land Classification From LUP - Conservation, Rural (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: YES (D) Intended Use: Public (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - None Planned - 10' Trail, 41' long Bridge, Culverts (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: IMPERVIOUS LAND SHADFD COVER DISTURBANCE (A) Public Trust Waters 224 sq. ft. Fresh Water Habitat (B) Public Trust Shoreline 400 sq. ft. AEC (30' Buffer) (C) High Ground 222,000 sq. ft. 317,000 sq. ft. (D) Total Area Disturbed: 539,624 sq. ft. (12.4 acres) (E) Primary Nursery Area: No (F) Water Classification: WS-IVSW Open: N/A 8. PROJECT SUMMARY: Construct a 4-1/2 mile long multi-use trail with 14 feet wide wood bridge over 16 feet wide Public Trust Waters with 11 feet vertical clearance. FIELD INVESTIGATION REPORT Camden County - Multi-Use Trail PAGE #2 PROJECT SETTING Camden County has been awarded a grant from the North Carolina Department of Transportation's (DOT) TEA- 21 Program to construct a 4.5 mile long multi-use path within DOT's right-of-way. The proposed path originates at the Dismal Swamp Canal Welcome Center located west of US 17 and terminates in the village of South Mills. A vegetated area lying between US Highway (HWY) 17 and the canal will be cleared and graded to create the northernmost 3 miles of trail. Existing pavement along NC 343 and along Mullen Drive will be widened by 4 feet on each side to create the remaining 1.5 miles. The waters of the Dismal Swamp Canal in the vicinity of the project are classified as WS-IVSW by the NC Environmental Management Commission. These waters are classified as Inland Waters by. the NC Marine Fisheries Commission and NC Wildlife Resources Commission and as Public Trust Waters by the NC Coastal Resources Commission. Water depths in the project area (within a 16 feet wide slough) measure 1 foot to 2 feet below NWL. The presence of submerged aquatic vegetation was not noted within the project area. Review of available information suggests that there are no known archeological sites or geologic formations associated with the project. However, the canal has been placed in the National Register of Historic Places and is designated a National Civil Engineering Landmark, having been dug between the years 1793-1805. There is the potential for the discovery of historic and archeological artifacts during land disturbing activity. PROJECT DESCRIPTION The project has been designed, to the maximum extent feasible, to avoid development within the 30 feet buffer [Public Trust Shoreline Area of Environmental Concern (AEC)]. The northern portion of the proposed trail extends 3 miles from NC DOT's Welcome Center off US 17 to the US 17/NC Highway 343 intersection. In this segment, 10 feet wide impervious asphalt is proposed within a 20 feet wide vegetated area lying between the south-bound lanes of HWY 17 and the canal. Wherever possible, 5 feet wide shoulders are proposed; however, clearing activities will be limited where the asphalt trail abuts the buffer. In those locations, clearing will be limited to the removal of overhanging brush and trees likely to impede traffic flow. Four hundred (400) square feet of impervious asphalt are proposed within the Public Trust Shoreline AEC located 1.1 miles south of the Welcome Center. At this location, a 16 feet wide slough with water depths ranging 1.0 foot to 2.0 feet juts off the eastern side of the canal. In order to span the slough's navigable waters, a 14 feet by 41 feet pre-fabricated bridge with 11 feet of vertical clearance is proposed. At five locations, the 10 feet asphalt trail changes directions and crosses either an existing drainage swale and/or an existing drainage culvert. At these locations, new culverts and/or culvert extensions are proposed. The remaining 1.5 miles of the path consist of 4 feet pavement extensions of the north and south-bound lanes of NC HWY 343 and Mullen Drive. The southern terminus of the trail is proposed in a graveled parking area located just north of the South Mills Bridge. FIELD INVESTIGATION REPORT Camden County - Multi-Use Trail PAGE #3 ANTICIPATED IMPACTS • The 10 feet wide paved approaches to the pre-fabricated bridge will result in the placement of 400 square feet of impervious coverage within the Public Trust Shoreline AEC (30 feet buffer). • The 14 feet wide by 41 feet long bridge will shade 224 square feet of Public Trust Waters/Fresh Water Habitat. • The construction of the 10 feet wide asphalt path and 4 feet wide pavement extensions will cover 222,000 square feet of High Ground. • The clearing of a 20 feet wide access way and the installation of culverts and/or culvert extensions will disturb approximately 317,000 square feet of high ground. Submitted by: Edward Harrell Date: December 31, 2003 Hobbs, Upchurch & Associates, P.A. Consulting Engineers 2522 S. Croatan Highway • Suite 2A • P.O. Drawer 1929 • Nags Head, No DEC 12 2oj?.3 December 10, 2003 COASTAL SLIZAgL 7F t i?"f N Mr. Ed Harrell NCDENR-Division of Coastal Management Elizabeth City District Office 1367 US 17 South Elizabeth City, NC 27909 RE: Proposed Dismal Swamp Canal Multi-use Trail TEA-21 NCDOT Project No.: E-4504 Camden County, NC HUA No.: CM0205 - Permits Dear Mr. Harrell: Enclosed please fmd a detail of the proposed bridge location. It provides the requested clarification and delineates the AEC as it relates to the ditch and bridge. From this drawing the impervious surface associated with the bike path in this location is 400 sq. ft ( the bridge is planked ). Since the bridge terminates 10 feet outside the top of banks, the sedimentation/erosion control measures stipulated in the plans will mitigate any impact to the surface water. Furthermore I would like to clarify that the bike path route in general is designed to stay out of the AEC completely. This includes clearing. The route will follow a "natural" contour and avoid large trees or other features deemed aesthetically significant. In the event that the impervious surface of the path falls adjacent to the AEC, the only clearing in the AEC will be removal of branches or brush to allow unimpeded traffic flow. I appreciate your efforts in the permitting process of this project. If you need further information please call. Sincerely, Hobbs, Upchurch & Associates, P.A. 16g?v? ?? Ed Lawler Construction Manager Nags Head, NC • Telephone 252-441-3913 • Fax 252-441-2100 • e-mail: info@hobbsupchurch.com Southern Pines • Myrtle Beach • Raleigh • Charlotte PROPOSED MULTI-USE RECREATIONAL TRAIL L CAMA 30 FOOT AEC SETBACK All t \ \ 200 SF , 41' SPAN LIGHT ul.. . VEHICULAR \ BRIDGE EXTENDS \ 10' ON BOTH SIDES OF BANK \ 200 SF I ;, \ \ DISMAL SWAMP CANAL ? ' TOP OF BANK \ DISMAL SWAMP CANAL R/W (VARIES) DISMAL SWAMP TRAIL HOBBS, UPCHURCH&ASSOCIAlES, P.A. CONSULTING ENGINEERS lqj NAGS HEAD, NORTH CAROLINA 27959 25228 MA TM WY,, SUITEV 252-441-M FAX 252-441-2M FHWA 30 FOOT BUFFER \ EXISTING \ 48" RCP\ J\ \ \ r fir/ \ L CAMA 30 FOOT AEC SETBACK SCALE: 1" = 25' DATE: DECEMBER 2003 r i DESIGNED: ,J H B DRAWN: JH B CHECKED: EFL SHEET: 1 OF 1 Form DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: Name Couno? of Camden Address PO Box 190 City Camden State NC Zip 27921 Day Phone 252-338-1919 Fax 252-333-1603 b. Authorized Agent: Name Hobbs, Upchurch & Associates PA Address PO Drawer 1929 City Nags Head State NC Zip NC Day Phone 252-441-3913 Fax 252-441-2100 c. Project name (if any) _Dismal Swamp Canal Multi- Purpose Trail NOTE. Permit will be issued in name of landowner(s), and/or project name 2. LOCATION OF PROPOSED PROJECT a. County Camden b. City, town, community or landmark Dismal Swamp Visitor Center to the Village of South Mills C. Street address or secondary road number Highway 17, SR-343, Mullen Drive d. Is proposed work within city limits or planning jurisdiction? Yes x No e. Name of body of water nearest project (e.g. river, Creek, sound, bay) Dismal Swamp Canal 3. DESCRIPTION AND PLANNED USE OF OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Place 10' (ft) multi-purpose asphalted trail in a 20 ft cleared path along the Dismal Swamp Canal and 4 ft lane widening along Hwv 343 and Mullen Drive with minimal disturbance to environment, including12"(in) undercut for asphalt path. b. Is the proposed activity maintenance of an existing project, new work, or both? new work c. Will the project be for public, private, or commercial use? public d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. The purpose of this project is to provide a third way to access the Dismal Swamp Visitor Center, and to 'give the public other means of viewing and appreciating the natural beauty of the Dismal Swamp Canal. Please see cover letter for additional details. Revised 03195 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 4.5-miles or 7.2-kilometer b. Size of individual lot(s) n/a c. Approximate elevation of tract above MHW or NWL 13-18' ft above NWL d. Soil type(s) and texture(s) of tact CFA - See attached EP 0 ,?. E' .;2. - H ,gip, %Ac I m? JUN 2 3 2003 rM()ASTAL 4,A44AGEMEN7 CITY m. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) no discharges to state waters o. Describe existing drinking water supply source. e. Vegetation on tract maintained vegetated shoulder and treed area throughout entire project f. Man-made features now on tract Dismal Swamn . Canal and Visitor Center, and U.S. Highway 17 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plant) x Conservation Transitional - Developed Community x Rural Other h. How is the tract zoned by local government? general use i. Is the proposed project consistent with the applicable zoning? x Yes No (Attach zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? x_ Yes No If yes, by whom? Division of Cultural Resources (See attached letter) k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? x Yes No 1. Are there wetlands on the site? Yes x No Coastal (marsh) Other If yes, has a delineation been conducted? (Attach documentation, if available) In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 ''/z" by 11" white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include highway or secondary road (SR) numbers, landmarks, and the like. Revised 03/95 Form DCM-MP-1 RFEMEIVa s ,m a s ra "Ii' 4, E Ca> j 't? is -:.,i 13 JASTAL r w, .J,..?.. A Stormwater Certification, if one is necessary. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name Norfolk District -USACE 803 Front Street Norfolk. Virginia 23510 Attn: Dillard Horton. Real Estate Branch Name ?? (?oNA/C!- !?%?. (??t ra fi yris ?iU9 ?/CQ t/ Address NCbor 113A'rport /?e? Bch i4i?ra Phone edt4j&y) A-C • 471932- Name Address Phone A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. The following hermits have been annlied for. but not received as of date: Erosion Control, Stormwater, NCDOT Encroachment q0V • A check forS260-made payable to the Department of Environment, Health, and Natural Resources (DHENR) to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N. C. Environmental Policy Act (N.C.G.S. 113A -1 to 10). If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the day of , 2003. Print Name Carl Classe to M a er - Z?? Signature Landowner or Authorized Agznt Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information x DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the Space provided at the bottom of each form. Revised 03/95 Form DCM-MP-3 UPLAND fF f.w7L f,,. .. 71: u1L° CCU ! DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed n/a -as halttrail b. Number of lots or parcels n/a :JUN 2, / h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? x_ Yes _ No If yes, date submitted Ma 19, 2003 i. Describe proposed method of sewage disposal. n/a j. Have the facilities described in Item i. above c. Density (give the number of residential units and the received state or local approval? n/a units per acre) 0 (Attach appropriate documentation) d. Size of area to be graded, filled or disturbed including roads, ditches, etc. 475200 fl (sq. ft.) or 4.5 miles x 20 feet e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion Control plan been submitted to the Division of Land Resources? x Yes No If yes, date submitted f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. asphalt. travel. and packed sand (see attached copv of cross sectional) g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. 'W* o / °/a E.G . 4/b?o 3 k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). None, however there are grass strips Describe proposed drinking water supply source (e.g. well, community, public system, etc.) n/a m. Will Water be impounded? If yes, how many acres? _ n. If the project is an oceanfront development, when was the lot(s) platted and recorded? n/a Carl Classen Ca County Mana er Applicant or 'ect ame Signature Date Yes x No Revised 03/95 DISMAL SWAMP CANAL MULTI-USE TRAIL, EROSION CONTROL PLAN PROJECT DESCRIPTION: The purpose of this project is to construct a 4.5 mile asphalt bike path originating at the Dismal Swamp Canal Welcome Center and terminating along Mullen Drive in the Village of South Mills. Construction will consist of clearing and grading 11 acres of land consisting of a 20 foot wide corridor through the vegetated area between US-17 and the Dismal Swamp Canal for approximately 3 miles- Care will be taken to insure that the path is just beyond the 30 foot required buffer between respective edge of pavements while simultaneously insuring that the impervious surface does come within 30 feet of the edge of the canal. Upon reaching NC HWY 343, the constructed bike path will take the form of 5 foot pavement extensions along either side of the road. This method of pavement extension will be repeated on the last leg of the bike path as NC HWY 343 intersects Mullen Drive. These 5 foot pavement extensions constitute the remaining 1.5 miles of the path. SITE DESCRIPTION: The project is located between the historic and scenic Dismal Swamp Canal and U.S. Highway 17 from the Dismal Swamp Canal Welcome Center to the historic Village of S-outh-Il lls-in Camden County. Camden County is designated a Tier 1 County by the North Carolina Department of Commerce and is located in NCDOT Eastern Region 3, Division 1. The 4.5 mile path will be an asphalt surface of 10 feet in width with 5 foot cleared grassy shoulders on either side through the vegetated area between U.S. Highway 17 and the Dismal Swamp Canal resulting in 158,400 SF of new impervious surface. The remaining 1.5 miles of construction along NC HWY 343 and Mullen Drive will be in the form of 5 foot pavement extensions along either side of the respective roads as well as 5 feet of grassy shoulder adjoining the existing respective vegetated swales thus generating 79,200 SF of new impervious surface respectively. The swales along these roads will be modified and stabilized to accommodate the pavements extensions as needed Total area of disturbance for this project is approximately 11 acres. CONSTRUCTION: During construction, until a noted growth of grass is established, the following procedures shall be implemented: • All seeding operations shall commence within 15 days of disturbance and grass established within 30 days. • All disturbed ditches will be stabilized with jute matting after seeding OOIZ-1+6 (ZSZ) :XDA - £I6£-1++ (ZSZ) auo4d 1 6S6LZ ou.IloauO 41JON 'poaH s6oN •yZ afmS '-N•H uufoao -S ZZSZ M31A NVId 319nou llb81 3sn-mnn N a O N IUDI W - ON 9fAGM! - ON am s m ? N OS HOM 37ltllM - ON S3NId NtQF11f10S vNnOWJ HL2ION •uNnOO N3oww.I S y ou nslro sraeu Q# r i i3 r N' y pf ? ? d ` ` N IrvUL IVNOLLV3N338 3sn-mnvi ?Iw nowala3s3 a V R ssJt'30ssV V yajng3 d s1?9o H a3SOd02ld 1VNVO dWVMS 1VWSIa o SNOISIAM MHS SIHL 33S NOLLYnmwo 2103 EZ JO 6 BINS 33S NOLLV#INLLN00 N03 IM 3sn-LL'1nn oo+L9 V•LS v Wa 3sn-L inm o0+ss V1S !I { I \\? 11# I !I ?? ? it ? I I f I 1 - -, 4't \ I I I ? N\ I O? yU0 z L #1 I I I I I I F # I I f# - -T \ i# 082 F°° (n lJ 0 666 i i SFZ. 5FZ i S t ;.?_ o z 6 zWI?a3 1 I # 1 I ? `" oQO wnz4! KOZ 0 ? # j I / # 0- a I ? II f l 1 J II I I o x I v 100-0 ?` 1 t-.. i f I I/ ?, Fg U, o = f II # t i I i? ?? / ? ? ?i •?V?---Aj-- i # I I Z go Mme? I.' ll, 1 ? # f I II"' 1 1? M W GO- VIII I I I ? U) I I'f I' I I I _ n i€ #! I I I ## I ?? a Ld I z I.i?! I K fl l i I I [ IL I?? ? - ... ?... t I # o F g ;?;' ' # # II 1 I O Z I ' t # # 1 # # 8W rn Z => f I II I 1 I I ZF v o # ## I :? I I O m 1g i I I I I 1 -9 #1 J 1 t I ?, a of 2 I- 1 ,1 f`1 f l 1 I I T, e z ' I ! 1 11•? I I # toU ?o to v m # I I I ~ tl w <o? F Q J I , ?I ## I ?+ 1 g 11i? I 00 O tin" O `? N Z I? J# I I II( # # .= 0 1# I I I ?•? 3 , # I' I \j ?8? m 1 I {' ? I wJ ? it t. 1# i n-j 1 \? v>o s a aw a? = O 1 Ir mF I ;.j ? I +# # I it 1 ?,l 08 z M I ? I I F ?i ( i I 11 !I I F I I a? ?IpI 31 I # I a { I I I l 1 ,? 1; i I ?I I a'i f ' I I't ? m ? I II # I 1 ? I ;?Niyt ?# ? I 1 11 ? w.i ? I# I Ip? ? I I 1 # I # II '"`? I I I ? } ? C I, I 1 t I? I 1?; # n f ? ? F is ? I L,i I i II I I f j hl I I i ?.f n 1 ^ N w Z I ; Z 1 11IiI 1 t `o 7- II E I I I" a till, I I 1 I14 ? I I I 5t ti? I i II It \" I 1 I ? - I I ` # , i ' # s I X111 I I f I I I # i1 I U 4111 I I I I { QY It ! j 11 t # V (11I! I I f I iS ' 7 i Ia1 i l wF 3 I I I{ 1, Lf I J I#. 1 I I gzO h ll 4 I e I f ` ?d ?i 3 Z >? Z I , K 4 E I # y 1 I ? 1 i I f b o vz? 18 ' 11 I I I II {# ; fI M ; ` I , n ad <o f I I I 1 I 1 ; I If z 8W z , I! II II I I I I ' I 'f t, I i orc Zoe oi I I 1# [[4 I 1 z? I I 9 1 I < ? I I ( I fl II1,.M 1 1 3 Z ? f I I l a I' IIIt l1 I I ?g 'r 1 it I ? 3'. II# II I 1 ? 1%} I I, Z 1 ?` f I ' S ????? ? x 'I f OK I l f I 1 I I i? f I I I' II I S S a f'II ' I fI I I zF I I t I s a C ®? 1 N If 1 , III, I w lllf I I 1 w I I I, ?I I I I F ,,, ? #? I f ' I , ' \ ? ? I 11111 I I II I I Yi6 ? ?? ?e? = ' 3f ' I 1 '"? I I1 I 1 I ' .j I f • 0 cs 'z 1 „i 1r 1 I 1? I " 11 Ii 1 I j 1 f ` 11 I i I I I I I i i I 1 I I I ? I I I I i i t i I 1? 4 11 1 I Ifl I '1 I ? 11 + I I I a i 1' I I ' (f f 1 1 I:,? I l I I 1 1i1 I II j 1 Ii I CZ 30 L LBHS 33S NOLLV#1NI1N00 2103 I I I IJ I i 133HS SIHL 33S NOILVnNLLN00 2103 IMLL 3sn-LLinm oO+6i ws imi 3sn-LLInW o0+us Va,S 002-lt'4 (ZSZ) :XDJ - £l6£-li4 (ZSZ) :a004d 1 6S6LZ ougaDO yNO N 'PDDH S5DN 'vZ a}mS "IAH DD}DD/'J 'S ZZSZ MMA NV Id manoo IMU 3sn-innW N C) Y6E?t W ?tLO1MYFR7 - DM FWQMI - ON `aaH SOW 11?? 05 Fp19B 3'U2I.lq - ON S3Nfd N213Hlf10S vNnow NINON 'ALNn00 Nmnv0 ' vooul&efikonswo ` " ' d ` IMH.I_ NNOLLV3 UMU 3sn-LLIn W ?? ND??a?a MAS saie?o V d sggo ossy 2k ynanga n H 03SOdONd -WW 3 dWVMS -NWS IO a SNO}SVOa t M 133HS SIHL 33S co NOLMNl1N00 MOA eO lNN1 3Sn-LLInW 00+p6 V1S m m m £Z 30 8 J33HS 33S llllltl 38nml1l W 000+61 V1S I 1 ON I 'f OIL a 1 II } zU 3 I i } or 13} 1 I q t ?? 'f pN I I ism ° ? I 1 1 it I i }I I I U ?I I 1} I 1 alj'OD °J I I +?ma I 'II I II I I I I rn? I .} I I I no$ fn'?F m } I 1 1!I I ' I ';I s ? ICI ? ? '' I WI I t } 4- Ld 1 i? I I ? k,. I ? I I I ! I Fill I } Z p ? { I I I I }I I !I I ,I iff Z 1 }} } i t I i I I rn i I Z z N O 11 I I 141 1 JI ` Z ; }} 1 p ?; I 1 °m I I romo° r a @5 r I I IiI i 1 I;1 ? J I<I } I3] I 1 I j o I } I I I Ci F.. ? Ci z0 m to I 11} 1 I I S; U?" ?.1? p m 1 t } / I } I I } I d zF m oU3: I I 1 ; ?I 12, I I I I ° 6 a I II I 1 YU U) I I F F . Zf C3 UN`5U?/i7d I ( I 11 I "2 ??; I T I I I I C4 gd I? f I I ! } i } I I' I II } I I} 'f I I }} ' I ? I I I 1? ;? I! ? I I?: % f t ? j ? n? } ? i w I ? ? o ?- III } ' / } I} i I ?-? ?? } i ? }?? ?\ 1 l;I ! ; ? I I i B° i ' ( (JI I I I I} IL j I I I t 01 i 1 U? z a 1 }1I I ll }' l I I O? ' I a m I I OU a n I f I ' } } ? III---CCC } = U o W } I I I 111?? 3 5; ? .• ? III ; 4 I ? 11,,,4 \ I ?, ? ? I } 3U / ' I } I 1 I? f'jH I ? ? n / ? f??Ja I i i}} I? 1 1 1 4; I p? ; I I I I1 I '}?f I } Jr I '! i 1 ? i l }I i , / >" 80 f ` I t I ! I °a t I I w°111{ 1} I I {?.., a ?a I I S I I j 1 I ! z 3: p I i I , I !? I ?4 o 1 }} / 1 I t I ,}} I' ° w a I I I }? ' j I 1 J I I r I I ° F I II 1 o , l T I I I F d Bcn I I I 1 1 I f a wd ? I '< ? 1tl L I z ? aoU zN I}? } I lip I or 14 o lri vi 1 I I I 1 1 } I , # } i I ' } • /9 W ? Q ? I I .y ? I d7J .I I 1 ? ? ? ? w 1 ? 1 ? ?} } I I ? ob I f I q/ a 1 I t I Y 2 3 I i . v II t}} i = I 11 } I I > L'i I _ ?i S I / / I/ o? I, fA f LK ° f f ! I I? f f I 1 I l ? -_?\\ I u?UO C; } owaD I ?O 1 I? I} I I{ I I I I to, r3 Q I I I{ I:>1 E I 1 11 `s } 1? } ' I j f I I I I r ? ; No °a ? '? ? I II I I I 3 ? I I :f } ? ' } I 1 1 ",? ?? I 1 I r I? I •? j I ' o j I I jj ? I I -f I I , ? I\, } ? } ? 1 ? 1 I ?` fl I i t 1 i! t £Z 30 S 133HS 33S I z°? -wa I I I I '"I } 1 ` i I I j} I j j NOLLVnNU N00 1103 IFVUL. 3sn-Lnnw oo+t£ vJs 133HS SIHL 33S NOLLVnNUN00 2103 IIVM1 3sn-Lonw oo+o+ vJs 0OIZ-l44 (ZSZ) :XDJ - £l6£-146 (ZSZ) :aOOyd 1 , 696LZ ougaoJ LWON WaN s6ON 'VZ alms '.i4µ{ UDJ-3 'S ZZSZ S1FVJ3G '?. IM U 3Sn-LL IM N ?? ON lawo - -W 'HOmm - ON aver s,%w 8 "' ra CS HOM 3UaM - W 1531W I?HIM vNnOW3 WMPI 'AINnw P30WWI N Z (V N • Sl88U BVIJ B . azvO rloudrox3a rus `SaB/DOSS ` TV81 lb+N011V321032! 3Sn-LLInW ° AS bd d t 99/!!yOI>7n sq40H , 03SOdONd 7VW3 dNMMS TdWSIa o rz - v 'o 'o SN(11CIA7N ° ° m J J Z Z s QW m? O Q C? J ? 1 ° Wu=iS< oa n Jo 1..1_ Z W O O v 3 W _j U) d ? O 00 t9 U05?? J O d ? ? ? ( ias } U Aso Q IL All ?i m ? yZ?z?o W _O?OW 7 L Q OW3K0 i i- _ 4 _ O 0 t i 0 0 I£ 1 } o Zy, e, O 0 O O b d i m 6 i #r 1 a i 0 0 1 O O ?A ~ "\ lV O W I*I O Ld Z ti C) I M9 i m no n 41, z a Z j1Ty- c; fZ N f./ W ° a Z z 7 ?. N r J b L N rc z O 9 W O ?? O Fs O NN « ? i O Ui lil ~ ? O U N i?i m O w 9 3 az ?a K ?d? ?N <o ° 6 E o m ° O ¢ SW 4 U 62 zS Z O SW F- O ZU 0W pW< U^ 6Z 2 M Z OY m Q Z vi °• y X41. ° ? ? ¢ UcJ 'S w<m ? ° r W ? ? ? N f LL O W S? tl k m W Ha OQ Ga O ??pd IN ?rV ?W O m ??Z ' ?` 20 ? ma "? -Zi 8 p5 ain? << Q O yW yyy U ml O: ? W C M l o €? i g W? f% ?1 U IONi Z =O NN ? z O Z3J ZZ g s S ?j P^pOF 1 , d N o SW ?O Z <«< eg O 8 ? m o F< < W ?.4 i /4Z 0- is 4 ? o a4 Z d o¢ j 50 V 5t0? wo- W W 2 ? Nc0 ;o > Y O 8= - 01 N Z= < W N ZJ4N.. W Km?yJ1 OF <? > c KF L Z?[ W? a 00 p W?°. K 240 ?i?y ?Q ?d .z A 30 to ?4U ?N ?z< s ' l ? ? d p JZ U rn ` ri1V O- V O¢ W W 1 y ZLL' O W l Y? W . G K yp8?4F- FZ? a W ???°? J [v iJ N ((( OOOK??? O , 8% 0 ? is O ?°- S W Sag J? (yJ rl<m TOR WO 1 0 r m CI h < h 40 r` MEMORANDUM TO: John Dorney Regional Contact: tom steffens Non-Discharge Branch WQ Supervisor: Boger Thorpe Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name County of Camden County Camden Project Number 04 0008 County2 Recvd From DCM Region Washington Received Date 115104 Recvd By Region Project Type Multi-use Trail & Bridge Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet In - Type Type Impact Score Index Prim. Supp. Basin Req. Req. CAMA -Public FT ON F__ 30-3-2 F C SW 30,150. 0.01 F_ F- F_F__PT _0N Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y O N Recommendation: 0 Issue 0 Issue/fond 0 Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Issue n/c cc: Regional Office Central Office Page Number 1