Loading...
HomeMy WebLinkAbout_External_ RE_ R-2615 CP1 and 2 merger Meeting Summary Wanucha, Dave From:Brew, Donnie (FHWA) <Donnie.Brew@dot.gov> Sent:Wednesday, June 12, 2019 9:43 AM To:Martha Register Cc:McLeary, Verrol; Martin, David; marella.buncick@fws.org; Adima, Nathan N; Robinson, Beverly G; Patterson, Robert D; Beckwith, Loretta A CIV USARMY CESAW (US); Turchy, Michael A; Johnna Kashmer; Wanucha, Dave; Moore, Kevin E; dgrahm@regiond.org; Akabi-Davis, William M; Berry, Michelle G; Staley, Mark K; mike.perkarek@mottmac.com; Anderson, Brook E; Greene, Richard G; Jamison, John; Smith, Caleb; claire_ellwanger (claire_ellwanger@fws.gov) Subject:\[External\] RE: R-2615 CP1 and 2 merger Meeting Summary CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning Martha, Thank you for providing the draft meeting summary. The first bullet point on page 2 currently reads:  The team discussed if it was necessary to make the purpose and need specific to the main line so any alternative selected will have a Level of Service (LOS) D or better. It was noted that with the relatively even distribution of unsignalized intersections along the project corridor, their overall LOS reflects the generally flow in the corridor. As I recall, this discussion was based on the following statement we included in the merger packet: “The project’s primary objective is to achieve an overall level of service (LOS) D or better for the corridor in design year 2045 during the highest average weekday traffic conditions.” 2 comments:  I am not sure if the draft bullet point above sufficiently captures the discussion during the st meeting. Please verify, and clarify the 1 sentence as appropriate.  I do not understand what exactly we’re trying to state/explain with the second sentence (in the bullet point above from the draft meeting summary). Please coordinate with the appropriate traffic / performance metric personnel, and modify this sentence so that it can be understood by non-traffic folks. Thank you, Donnie Donnie Brew Preconstruction & Environment Engineer 1 Federal Highway Administration 310 New Bern Ave, Suite 410 Raleigh, NC 27601 donnie.brew@dot.gov 919-747-7017 ***Please consider the environment before printing this email.*** From: Martha Register \[mailto:mregister@simpsonengr.com\] Sent: Friday, June 07, 2019 3:30 PM To: Beckwith, Loretta A CIV USARMY CESAW (US) <Loretta.A.Beckwith@usace.army.mil>; Brew, Donnie (FHWA) <Donnie.Brew@dot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; marella.buncick@fws.org; robert.patterson@ncdenr.gov; dgrahm@regiond.org; Moore, Kevin E <kmoore@ncdot.gov>; Anderson, Brook E <beanderson@ncdot.gov>; mgberry@ncdot.gov; Turchy, Michael A <maturchy@ncdot.gov>; mstaley@ncdot.gov; Akabi-Davis, William M <wakabidavis@ncdot.gov>; Smith, Caleb <chgsmith@ncdot.gov>; Greene, Richard G <rggreene@ncdot.gov>; mike.perkarek@mottmac.com; Martin, David <David.Martin@mottmac.com>; Johnna Kashmer <jkashmer@simpsonengr.com>; Jamison, John <johnjamison@ncdot.gov> Cc: McLeary, Verrol <vmcleary1@ncdot.gov>; nadima@ncdot.gov; Robinson, Beverly G <brobinson@ncdot.gov> Subject: R-2615 CP1 and 2 merger Meeting Summary All, https://connect.ncdot.gov/site/Preconstruction/division/div11/R- 2615/Project%20Development%20Collaboration/Forms/AllItems.aspx?InitialTabId=Ribbon%2ERead&VisibilityContext= WSSTabPersistence Please use the link to access the meeting summary for R-2615 CP1 and 2 merger meeting from May 16. Please let me know if you have comments. Regards, Martha M. Register Office 919.852.0468 x237 Fax 919.852.0598 mregister@simpsonengr.com www.simpsonengr.com 2