From:Brew, Donnie (FHWA) <Donnie.Brew@dot.gov>
Sent:Wednesday, June 12, 2019 9:43 AM
To:Martha Register
Cc:McLeary, Verrol; Martin, David; marella.buncick@fws.org; Adima, Nathan N; Robinson,
Beverly G; Patterson, Robert D; Beckwith, Loretta A CIV USARMY CESAW (US); Turchy,
Michael A; Johnna Kashmer; Wanucha, Dave; Moore, Kevin E; dgrahm@regiond.org;
Akabi-Davis, William M; Berry, Michelle G; Staley, Mark K;
mike.perkarek@mottmac.com; Anderson, Brook E; Greene, Richard G; Jamison, John;
Smith, Caleb; claire_ellwanger (claire_ellwanger@fws.gov)
Subject:\[External\] RE: R-2615 CP1 and 2 merger Meeting Summary
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning Martha,
Thank you for providing the draft meeting summary.
The first bullet point on page 2 currently reads:
The team discussed if it was necessary to make the purpose and need specific to the main line so any alternative
selected will have a Level of Service (LOS) D or better. It was noted that with the relatively even distribution of
unsignalized intersections along the project corridor, their overall LOS reflects the generally flow in the corridor.
As I recall, this discussion was based on the following statement we included in the merger packet:
“The project’s primary objective is to achieve an overall level of service (LOS) D or better for the corridor in
design year 2045 during the highest average weekday traffic conditions.”
2 comments:
I am not sure if the draft bullet point above sufficiently captures the discussion during the
st
meeting. Please verify, and clarify the 1 sentence as appropriate.
I do not understand what exactly we’re trying to state/explain with the second sentence (in the bullet
point above from the draft meeting summary). Please coordinate with the appropriate traffic /
performance metric personnel, and modify this sentence so that it can be understood by non-traffic
folks.
Thank you,
Donnie
Donnie Brew
Preconstruction & Environment Engineer
1
Federal Highway Administration
310 New Bern Ave, Suite 410
Raleigh, NC 27601
donnie.brew@dot.gov
919-747-7017
***Please consider the environment before printing this email.***
From: Martha Register \[mailto:mregister@simpsonengr.com\]
Sent: Friday, June 07, 2019 3:30 PM
To: Beckwith, Loretta A CIV USARMY CESAW (US) <Loretta.A.Beckwith@usace.army.mil>; Brew, Donnie (FHWA)
<Donnie.Brew@dot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; marella.buncick@fws.org;
robert.patterson@ncdenr.gov; dgrahm@regiond.org; Moore, Kevin E <kmoore@ncdot.gov>; Anderson, Brook E
<beanderson@ncdot.gov>; mgberry@ncdot.gov; Turchy, Michael A <maturchy@ncdot.gov>; mstaley@ncdot.gov;
Akabi-Davis, William M <wakabidavis@ncdot.gov>; Smith, Caleb <chgsmith@ncdot.gov>; Greene, Richard G
<rggreene@ncdot.gov>; mike.perkarek@mottmac.com; Martin, David <David.Martin@mottmac.com>; Johnna Kashmer
<jkashmer@simpsonengr.com>; Jamison, John <johnjamison@ncdot.gov>
Cc: McLeary, Verrol <vmcleary1@ncdot.gov>; nadima@ncdot.gov; Robinson, Beverly G <brobinson@ncdot.gov>
Subject: R-2615 CP1 and 2 merger Meeting Summary
All,
https://connect.ncdot.gov/site/Preconstruction/division/div11/R-
2615/Project%20Development%20Collaboration/Forms/AllItems.aspx?InitialTabId=Ribbon%2ERead&VisibilityContext=
WSSTabPersistence
Please use the link to access the meeting summary for R-2615 CP1 and 2 merger meeting from May 16. Please let me
know if you have comments.