Loading...
HomeMy WebLinkAboutDraft CP2 concurrence form revised.docxNEPA/404 MERGER TEAM MEETING AGREEMENT Concurrence Point No. 2: Design Option for Detailed Study Project Title: US 421/US 321 from US 321 Junction to SR 1107 (NC 105 Bypass), Watauga Co. STIP No.: R-2615 WBS No.: 44385.1.3 The Merger Team concurred on this date of May 16, 2019, that the following alternatives will be carried forward for detailed study. Preliminary Best -Fit Alternative: Widen US 321/US 421 to include four 12-foot travel lanes, the addition of a 30-foot median and five-foot paved shoulders to accommodate bicycles. Widening will utilize a best -fit design, that will shift the widening to either the east or the west, and/or symmetrically and that is consistent with NCDOT design standards and policy guidelines, as a means of avoiding and/or minimizing impacts to environmental and community features. For the purposes of this meeting a preliminary best -fit alignment was developed to facilitate discussions of the concept. No Build Alternative: This includes routine maintenance and no improvements. Name Agency Date FHWA USEPA USACE (Lead Agency) USFWS NCDOT NCWRC NCDWR NCSHPO HCRPO