Loading...
HomeMy WebLinkAboutNCS000084_BIMS Inspection Report_20190613Compliance Inspection Report Permit: NCS000084 SOC: County: New Hanover Region: Wilmington Contact Person: Jeff W Grizzle Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Effective: 08/01/10 Expiration: 07/31/15 owner: South Atlantic Services Inc Effective: Expiration: Facility: SAS Solar 3527 US Hwy 421 N Title: Vice President Certification: Related Permits: SW8961220 South Atlantic Services Inc - SAS Solar Inspection Date: 06/13/2019 EntryTime: 10:OOAM Primary Inspector: Brian P Lambe Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Wilmington NC 28401 Phone: 910-763-3496 Phone: Exit Time: 11:OOAM Phone: Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000084 Owner - Facility: South Atlantic Services Inc Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Walter Kennedy, Eliza Burton, and Vaughn Rizzo. Reviewed SPPP and inspected facility. Issues to discuss: sump pump documentation and management, used oil room containment. The sump pumps discharge secondary containment. Some is collected for reuse, some discharged to #2 outfall, no evidence of contamination for outfall 2. Suggested documenting sump pump use. The used oil room is inside a warehouse, but there is capability for leaking totes to go outside. Suggest developing a plan for this area. Page 2 of 3 Permit: NCS000084 Owner - Facility: South Atlantic Services Inc Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3