Loading...
HomeMy WebLinkAbout20190627 Ver 1_More Info Response Letter_20190618ENVIRONMENTAL SERVICES, INC. A lrerracon COMPANY 4901 Trademark Drive Raleigh, North Carolina 27610 P (919) 212 1760 F (919) 2121707 environmentalservicesinc.com June 18, 2019 Sue Homewood NC Division of Water Resources 450 W. Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Re: Erwin 230kV-Buies Creek Switch Harnett County, NC Ms. Homewood: ESI is serving as the environmental consultant for this Duke Energy project. I am submitting the enclosed information in response to your email to Mr. Thomas Williams on June 4, 2019. The project engineering team has reviewed your request and is proposing to use a pump around method to be able to work in the dry while the road crossing culvert is installed. A schematic and sequence of this process is included herein. Additionally, the pump around method is not anticipated to result in any additional permanent or temporary impacts. The engineer states that the upstream dam location for the pump around will coincide with the upstream inlet protection location for the culvert. I have included a copy from the erosion control plan prepared by the engineer. I trust that this additional information will provide you with the necessary information to continue your review of the 401 WQC request. Please let me know if you have any further questions or if I can be of any assistance. Sincerely, ��7 1�6 U4r Jeffery Harbour, PWS Department Manager II Enclosures PU"–AROUND PRACTICK DESCRIPTION: The cork should c nsisl. of installing a temporary pump -d and ®upporl.ing mcasurea to divert Nor Around in–stream construction sites. tMPLEHENTATION SMIJENCE: Sediment control measures, pump–Around practices, and associated channel and bank mnskruction should he complaF d in the fonm ing sequence (refer to Detail 2/967)- 1 Construction should not begin until all sediment and erosion control measures have been installed and approved by the engineer and the sediment control inspector. The contractor should stay wnthin the limits of the disturbance as shown on the plane and minimise disturbance within the work area whenever possible. 2 IIpon installation of all sediment control measures and approval by the sediment contra] Inspector, the contractor should begin work at the upstream section and proceed downstreem beginning with the establishment of stabilized construction eatrenom. In some cages, work may begin downstream If appropriate. The sequence of cum ix—Livu must be followed ..leas the w tractor gets —itten epp-1 fur dcvintione from the engineer or local authorltp. York should not be conducted in the channel during rem event.. 3 Sandhog dikes should be situated at the upstream and downstream ends of the work area as shown on the plans, and stream flow should be pumped around the work Area. The pump should discharge onto a stable velocity dissipater made of riprap. 4 Excavated topseD and subsoil should be kept separate, placed on the upland side of the excavation, and replaced in their natural order. 5 All construction should take place during stream low flows. The length of construction time should be limited to a maximum of 2 days for each erossing. 8 Water from the work area should be pumped to a dewatering bag as shown in detail 3.25. The measure should be located such that the water drains hack into the channel below the downstream sandbag dike. 7 Traversing a channel reach with equipment within the work area where no work is proposed should be avoided. If equipment has to traverse such A reach ler Access to another area, o then limber mats r similar me should be used tom — disturbance to the channel Temporary stream crossings should be used only when aeceesary and only where noted on the plana or specified. 8 All stream restorationmeasures should be installed as indicated by the plaus and all banl graded in accordance with the grading plans and typical cross—Hans. All grading must be stabilized at the end of each day with seed and mulch or seed and matting as specified on the plane. 9 Atter an Area fs completed and stabilized, the clean wAter dike should be removed. After the tint sediment flush. a new clean water dike should be established upstream from the old sediment dike. Fine.11y, upon establishment of a naw sediment dike below the old one, the old sediment dike should he removed_ In The contractor 1s responsible for providing ac- to and maintaining all .mein. and sediment control devices until the sediment control inspector approves their removal. PUMP -AROUND PRACTICE PLAN VIEW Silt Bag strea m diversion pumps F discharge hoses P Intake dewatering pump hose f�l�owfi INTAKE HOSE fOW sediment dike clean woler dike -,'..' ... .. .I '.. '� ... sump–hole pumpsshould dieohorge onto a stable 711 IL� WORK AREA or pool (12" to 18" deep dissipatcr made of rip rap LENGTH NOT TO EXCEED w/ 2' diameter) THAT WHICH CAN BE COMPLETED IN ONE DAY SECTION A—A i�us sheeting 1 3E1 work area S hose flow1 foot (2 fact minimum) � cross section of sandbag dike PU"–AROUND PRACTICK DESCRIPTION: The cork should c nsisl. of installing a temporary pump -d and ®upporl.ing mcasurea to divert Nor Around in–stream construction sites. tMPLEHENTATION SMIJENCE: Sediment control measures, pump–Around practices, and associated channel and bank mnskruction should he complaF d in the fonm ing sequence (refer to Detail 2/967)- 1 Construction should not begin until all sediment and erosion control measures have been installed and approved by the engineer and the sediment control inspector. The contractor should stay wnthin the limits of the disturbance as shown on the plane and minimise disturbance within the work area whenever possible. 2 IIpon installation of all sediment control measures and approval by the sediment contra] Inspector, the contractor should begin work at the upstream section and proceed downstreem beginning with the establishment of stabilized construction eatrenom. In some cages, work may begin downstream If appropriate. The sequence of cum ix—Livu must be followed ..leas the w tractor gets —itten epp-1 fur dcvintione from the engineer or local authorltp. York should not be conducted in the channel during rem event.. 3 Sandhog dikes should be situated at the upstream and downstream ends of the work area as shown on the plans, and stream flow should be pumped around the work Area. The pump should discharge onto a stable velocity dissipater made of riprap. 4 Excavated topseD and subsoil should be kept separate, placed on the upland side of the excavation, and replaced in their natural order. 5 All construction should take place during stream low flows. The length of construction time should be limited to a maximum of 2 days for each erossing. 8 Water from the work area should be pumped to a dewatering bag as shown in detail 3.25. The measure should be located such that the water drains hack into the channel below the downstream sandbag dike. 7 Traversing a channel reach with equipment within the work area where no work is proposed should be avoided. If equipment has to traverse such A reach ler Access to another area, o then limber mats r similar me should be used tom — disturbance to the channel Temporary stream crossings should be used only when aeceesary and only where noted on the plana or specified. 8 All stream restorationmeasures should be installed as indicated by the plaus and all banl graded in accordance with the grading plans and typical cross—Hans. All grading must be stabilized at the end of each day with seed and mulch or seed and matting as specified on the plane. 9 Atter an Area fs completed and stabilized, the clean wAter dike should be removed. After the tint sediment flush. a new clean water dike should be established upstream from the old sediment dike. Fine.11y, upon establishment of a naw sediment dike below the old one, the old sediment dike should he removed_ In The contractor 1s responsible for providing ac- to and maintaining all .mein. and sediment control devices until the sediment control inspector approves their removal. V-71 ���� PENNY EDWIN iENT \pZ\ PIN: 0680-6556.000 i \ l�� `� l \ \ \� \ \ \ 2140 N 27E ° COATS, NG27521 ( �r 2J° �� to ��, \ `� \ G` f ��Ily- \ \ � \ \ � � - \ �.' by � `'� "D , Z - / ./ ER� �1NE �' �� - � � 1 � \ ' • � � \ \ � \ ti� \ � ) � \ � I \ � � GPROP ,J f \ l f�aZ ���� l \ \ qq tip/ rJ f �r�/ to \ S10ESE ♦CY ♦ \ 10 1010N 1 Z \\ EXISTING TREELINE (TYP.) / / \ \ \ \ \ 1 \ \ a s ♦♦ / �/ �, \\\ \� \\ \\\\\\ \ \ \ \ \ PE YEDWINK'ENT-, -�l ` ` Hyl _ i ♦ \ , \ 1 1 I PIN: g( 5636.000 \ 1 / G/ \ �� EXISTING 100' DUKE_ENERGY PROGRE� - - - - - - . - ' / \ \ �� \ \\ \\ \ \ \ \\ \ I 1 ) ` \ 214aNr,27E C TITAN§MtSStONTNE RIGHT-OF-WAY \ \ `\ \� \ \ \ \ \ I \ l / 1 \ (t 1 I Z \ / f� L� COATS, NN�27521 o / 200 -D y (TYP, S �� I i ----�----------- �J `� \---------- \— I l �i��~� — _ - --- �,` �� �--m—� ---- --------- - --_ _ ---\ / -SW --9---�- I ! --- STIR 237\ �M= —� ----------- - m m -'-� / 6 =mom-(n� �\e - _--- - - -uE UE ST SW I \\ 6 % v SW 237-1 V a7 �- - 221- \ 222- I I \\ V1 1 \ V A\ � / EXISTINf 4 A A A V A or u yn- HARRIS PLANT-ERWIN23�TkV LINE ��`— 9 ���� / \ STR1uE UE 9 -/ / 1 \\ \\\\ \\\\ \\ \ \ --- -WETLAND ter/ ---- - ----\ \ \ \�o \\ \\\1 -� �E - - - - - - �— - o - - - HARRIS PLANT ERWI 230kV LINE \ \ \\\ \\ \ \\ \ ✓ (TYP.) \ \ \ O 3 31, 22S X224 - - \ 2\ 2� / A �� / - 221 - - 1 \\� \ - — \ �- \ �� �2- ue trf �\A kx 6 \ � LSTIR PT --\ X222 \� `t0 \ 220 - I_ ---�-� �� �� comic - -219- 22c-- I 1 J` \ �\\ \\ °�. 1 �D� D— — ! — — i n n — m J \ / / 1 I \ \ \ \ \ \ \ \ \ \ \ X205 _� \ \ \ 1 CL --� ^�^ — — — — — — — — — — 1 279 I--- _ — -�---\ —�-- r� JUP N T 0 ✓ v \ v — OD — I ) \ \ \ �'�f DOUBLERO SILT / �� O \ \ M M \ rn RANDALL FERNANDgMADRIGAL i e �� \ v FENCE (TYP.) \ �o. P� / �� cp I- vICTOG68�0-55-5471.006 I/kAL JANDRA MAbRIC,AL- \ 7' \ \ PPROXIMATE N 9 s \% PE MANENTSTOCKPIL� ��� Z�� _ 2j� SEE INSET THIS PAGE (TY�.) J, NC 27E C oLw �� 1 1 A \ LOC T.CN (TYP.) 9 \ ?. I V L, k° , o l \� ��C� — vim. \ \ \ \ 22 ^ / \ A� \ 1 ) r / cI LINGTON, NC 27546 ti �� J v 'v A 0 rye\ v v (� EXISTING DRAINAGE , \ \ \ �? / 1 f J� �n \ \ FEATURE C- NTERLINE , \ \ \ u� t� '\�� �STR2 �' sF \ v V A \ S 1 L / ��� � �J �l Z \ \ /G1 _� RANDALLFERNANDO� A`D-RIG�L`8E v \ \ � 2 \\ �� \\ , I \ I ° _ A -VICTORIA ALEJANDRA MADRIGAL A \ V PIN: 0680-55-7201.600 \ \ � � _ \ \ �Av \ v °J � c_� `ten � � \ \ V v � � � -. 5 �' V I � ✓� f' "`� �� ` � � � � / F� ��� n A �n �� V A \ 27 18027E V A A/ A \ s� LILLINGTON, NC,2��46 _ d a r I Q A 2 EXISTl�1G FENCE (T Y. -�\ 1 \ o `275�\ 4, -\ \ \\ \ \I A- >) X. RIPRAP�(TYP.) ♦ \ SJ �\L v A \ '3 v �� `v \ 6 V v l \ \ ♦ iR c } \ cs1 \ \ \ sw 238 -1 of r \ w \ \ \ \ d 1 \ v 0 10 12' EDGE OF GRAVEL (TYP.) \ \ EI NG SUBSTATION \ I r \ \ \ l (CHAD C�HRI\ 1 \ { \ \ -2 o, I Hw loo ST)OPI-InTUkLNG O ) r \ \ o \ \ / DIRECT DISTURBED AREA = 1.28 AC. (POLE INSTALLATION, PERMANENT ACCESS, GRADING, TRENCHING, SWITCH PADS) EXISTING ROW AREA* = 1.73 AC. TOTAL DISTURBED AREA = 3.01 AC. *THESE VALUES DO NOT INCLUDE DIRECT DISTURBED AREA. INLET PROTECTION (TYP.) \ EG: 216.0 S ( P \ I 6 Z \ JA SCAR OLL TU LINIGT N \ SP __z \I \ \ INVERT: 215.40 \ j I \ C \ \ Cj ��-0z�'` \ \ \ I\ / C, l l� \ \ \ P�N�680-64-72 8.000 1 �, \ 1 \ \ ? ° 1 d \ 6 \ \\ \ \ C ) \ \ \ \ �`� X384 R/ICLAIM ROAD \ \ \ F -218 - - ✓ \ \ Z 9 P �OSE612� f \ \ 1 y l / \ \ `Z \ 1 A�ESS DRi TYP. \ \ � \ COAL`S) NC,2752 Sr ( \ \ A �- �\ �� (TYP.) \ \ I I ���111E IVERGY PR�GRE°S, , LLC vV A \l \� L �) \ SP�SFv SF \ o \ \ , ,,, S \ 1 �a S I Il 1 1 � :0680=6 -0848.0,0(6 � � �\/\ \ \ \ -�-z, �� \\\\\\\ \ \ I \ x Jsr \J) I// ILLIN6TN NC 2754cmn6 \° \IL to I �? \ V A Iz J 1 / l 1 �40 \AS 40 9D� \ I I I I / / ) v LIMITS OF a �/ �k 1 \ V A \ \ \\ \V �\ DISTt_RBQNCE \ I I I II I I ) /� EXISTING / A A\ WHERRY LEIGH WHITE TYP.) �/ I 1) �EIX TI/NG RAINA��� �/ WETLANID 217 ///\ \ SILT FENCE \ PIN: 0680-54-3929.000 \ \ \ 3 f� \ ` - ATURE �NTERLgNE ) (TYP.)- / / sF I \ \ (TYP.) \ \\ \\ \�\ \ \ 9 \ ��J— x. 6 \ 1714 NC 277 \ \ Q \ 22 / ti \ \ 205- / - \ � OS LILLINGTQ(d; NC 21546 \ \ \ \ 6 ���� / lJ \ C� �) \ "/ D�z� \\ \ \ - - - - \ / x ?5 LF 36" CLASS V RCPT ( / I 3�� @�1.7% I n \ J \ J \ I i 3 (7�" EMBEDMENT) /30 1 \ \ \ \ \ `� �° �° L�\\ \\\ \ 6 22r�/\1 \ I \ \ \\ \227 \ \ pn \ LOCATE SILT FENCE 0 6 L 5 CLASS V \ 227 \ / \ 3� I 1 \ OUTLETS ATALL LOW \ - �� Z n 1 \\\ �2� - \6� HW -100 \ POINTS (TYP. \ I ( °C�\05 - I I 1 \ \ \ l C� N\ I N2�. 5- 8226 ) r\ v p� - �� EG: 215.38/ 1 o / 22 I I ) 14.97 ) \ L L 1 �S L O T\ � INVERT: 3n _\ �227 \ �� \ EXISTINGUBS�Al�I ) L �' yy � V A6 � AI A �Acc\E}s Rlv�OrYP.� i ✓ _ 77 GRAPHIC SCALE 0 10 20 40 N CAR N 1 inch = 20 ft. \ �� \� •Q _ yam: NC GRID (NAD83) _ _ — �� \ JCI._ r - 1 • CONSTR CTIUN \ ! 33728 \ ENTRANCE\ \ VTYP.Y \ ~ ` \ \ �i A• :�t; ��•• NC GRID (NAD83) A. L \ \ \ \ \ \ �'���nnu������ GRAPHIC SCALE \ 1 1 1 C� 0 30 60 120 CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION a ! f oGr hZ �� �\ \� �� \\ �\ \ \ 1inch=60 ft. OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE /.y� \ \ \ \ \ — — PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION Know what s below. THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811 ". f ) 4 � \ \ \ iREPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. Call before you dg. X EROSION CONTROL LEGEND 'll1lll1ll' SILT FENCE OUTLET —SF—SF—SF— SILT FENCE LD LD LIMITS OF DISTURBANCE WOODED AREA CONSTRUCTION ENTRANCE/EXIT The John R. McAdams Company, Inc. 3430 Toringdon Way Suite 110 Charlotte, NC 28277 phone 704. 527. 0800 fax 919. 361. 2269 license number: C-0293, C-187 MADAMSwww.mcadamsco.com