HomeMy WebLinkAboutNCG070194_NOD_20190618ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
June 17, 2019
CERTIFIED MAIL: 70171070 0000 1776 2033
RETURN RECEIPT REQUESTED
Quality Stone LLC
Attn: Shane Boyd
3314 US Highway 221 North
Marion, North Carolina 28752
Subject: NOTICE OF DEFICIENCY (NOD-2019-PC-0151)
NPDES Stormwater General Permit NCG070000
Certificate of Coverage NCG070194
Quality Stone LLC
McDowell County
Dear Mr. Boyd:
On June 13, 2019, Isaiah Reed from the Asheville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a compliance inspection for the Quality
Stone facility located at 3314 US Highway 221 North, McDowell County, North Carolina. A
copy of the Compliance Inspection Report is enclosed for your review. The inspection and
file review revealed that the subject facility is covered by NPDES Stormwater General
Permit NCG070000 under Certificate of Coverage NCG070194. Permit coverage authorizes
the discharge of Stormwater from the facility to receiving waters designated as a tributary
of the Catawba River, a Class C waterbody in the Catawba River Basin.
As a result of the site inspection, the following deficiencies are noted:
1) Stormwater Pollution Prevention Plan (SPPP)
A Stormwater Pollution Prevention Plan (SPPP) has not been developed, recorded, or
properly implemented.
2) Qualitative Monitoring
Qualitative monitoring has not been conducted and recorded in accordance with permit
requirements.
Q� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
i.oamcumurva
828.296.4500
Notice of Violations
Quality Stone LLC
Page 2 of 2
Requested Response
You are asked to respond to this office, in writing, within 30 calendar days from receipt of
this notice. Your written response should include a reasonable explanation as to why the
above stated deficiencies have occurred, as well as a Plan of Action to prevent them from
recurring.
Action Items
Immediately begin efforts to meet compliance with General Permit NCG070000, including
but not limited to:
1. Develop, implement, and maintain an acceptable SWPPP.
2. Begin monitoring at all outfalls.
Thank you for your attention to this matter. This office requires that the deficiency, as
noted above and detailed in the enclosed inspection report, be properly resolved.
Failure to address the deficiencies could result in the issuance of a Notice of
Violation, which is subject to a civil penalty assessment of up to $25, 000 per day for
each violation. Should you have any questions or concerns, please contact Isaiah Reed or
myself at (828) 296-4500.
Sincerely,
r_'44
Stanley E. Ai PEGA
Regional Engineer
Land Quality Section
Enclosure:
Inspection Report
ec: Alaina Morman, Environmental Specialist Alaina.mormangncdenr.gov
Stanley E. Aiken- Regional Engineer stan.aiken cgncdenr.gov
Compliance Inspection Report
Permit: NCG070194
SOC:
County: McDowell
Region: Asheville
Contact Person: Benji Boyd
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Effective: 06/01/18 Expiration: 05/31/23 owner: Quality Stone LLC
Effective: Expiration: Facility: Quality Stone
3314 US Hwy 221 N
Inspection Date: 06/13/2019
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Title:
Entry Time: 10:30AM
Certification:
Marion NC 28752
Phone: 828-652-4700
Phone:
Exit Time: 11:30AM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge CDC
Facility Status: Compliant Not Compliant
Question Areas:
Storm water
(See attachment summary)
Page 1 of 3
permit: NCG070194 Owner- Facility: Quality Stone LLC
Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On June 13, 2019 this facility was inspected for compliance. I met with Shane Boyd on site. No Stormwater Pollution
Prevention Plan was available at the time of the inspection, and facility personnel were unaware of the existence of any
SWPPP. Facility personnel were also unaware of any monitoring of the outfalls conducted, or permit compliance
requirements.
The permittee is directed to immediately begin efforts to meet compliance with NCG070000 General permit including but not
limited to:
1. Develop, implement, and maintain an acceptable SWPPP.
2. Begin monitoring at all outfalls.
This facility will be re -inspected on or after July 23, 2019. If the above items have not been addressed, further action will be
taken. Failure to address the deficiencies could result in the issuance of a Notice of Violation, which is subject to a civil
penalty assessment of up to $25, 000 per day for each violation.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
Permit: NCG070194 Owner- Facility: Quality Stone LLC
Inspection Date: 06/13/2019 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ 0 ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ E ❑ ❑
At Does the Plan include a list of significant spills occurring during the past 3 years?
❑ 0 ❑ ❑
At Has the facility evaluated feasible alternatives to current practices?
❑ 0 ❑ ❑
# Does the facility provide all necessary secondary containment? ❑ E ❑ ❑
# Does the Plan include a BMP summary? ❑ 0 ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑0 ❑ ❑
# Does the facility provide and document Employee Training? ❑0 ❑ ❑
# Does the Plan include a list of Responsible Party(s)? ❑ E ❑ ❑
# Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: A Stormwater Polution Prevention Plane (SWPPP) was not available at the time of the
inspection and facility personnel were unaware of the existence of a SWPPP for the facility.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑
Comment: Qualitative Monitoring had not been conducted on site.
Permit and Outfalls
Yes No NA NE
At Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
0 ❑ ❑
# Were all outfalls observed during the inspection?
❑
❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
0 ❑ ❑
Comment
Page 3 of 3