Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6190505_PLANS - CARGILL N-S ROAD (AGENCY REVIEW 5-9-2019)
SITE CONSTRUCTION PLANS FOR: CARGILL NORTH -SOUTH ROADWAY AND TRUCK QUEUE LOT OWNER CARGILL, INC FAYETTEVILLE PLANT 1579 UNDERWOOD ROAD FAYETTEVILLE, NC 28312 PROJECT CONTACT: ANDY SEIFERT ANDY_SEIFERT@CARGILL.COM SHEET INDEX 1 COVER SHEET 2 OVERALL PLAN 3 WETLAND IMPACT MAP 4 PLAN / PROFILE N-S ROADWAY STA 100+00 TO STA 114+00 5 PLAN / PROFILE N-S ROADWAY STA 114+00 TO 118+04 UTILITY PLAN FOR NEW RESTROOM 6 PLAN / PROFILE TRUCK QUEUE DRIVE STA 200+00 TO STA 214+04 7 GRADING PLAN - NORTHERN PORTION 8 GRADING PLAN - SOUTHERN PORTION 9 EROSION CONTROL PLAN 10 EROSION CONTROL NOTES 11 ROADWAY SECTIONS / TRUCK QUEUE TYPICAL DIMENSIONS / PAVEMENT DESIGN 12 NCDOT STANDARD DRAWINGS 13 NCDOT STANDARD DRAWINGS / CONSTRUCTION DETAILS 14 CONSTRUCTION DETAILS 15 CONSTRUCTION DETAILS North �arvlina www.nc8l�.ykg� 1579 UNDERWOOD ROAD FAYETTEVILLE, NORTH CAROLINA Q� a ° adROAD Q > �0 W V H U V�P� PEPPERCHASE Q� r1 GS+� Car ill W���R° vNpER W U W W 5 v m � i� LOCATION MAP Z 0 SCALE: 1" = 11000- MAY 91 2019 J THOMAs ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 LEGEND OF ABBREVIATIONS BC BACK OF CURB LP LIGHT POLE OR LOW POINT CB CATCH BASIN N/F NOW OR FORMERLY CO CLEAN OUT P.E. PERMANENT EASEMENT CPP CORRUGATED PLASTIC PIPE PVC POLYVINYL CHLORIDE PIPE CMP CORRUGATED METAL PIPE PP POWER POLE C & G CURB & GUTTER RCP REINFORCED CONCRETE PIPE DI DROP INLET RRX RAILROAD CROSSING DIP DUCTILE IRON PIPE R / W RIGHT OF WAY EG EDGE OF GRAVEL SS OR SAN SANITARY SEWER EP EDGE OF PAVEMENT SSMH SANITARY SEWER MANHOLE EB ELECTRICAL BOX TIC TOP OF CURB EV ELECTRICAL VAULT T.C.E. TEMPORARY CONSTRUCTION EASEMENT EL ELEVATION TMH TELECOMMUNICATION MANHOLE ECM EXISTING CONCRETE MONUMENT TF TRANSFORMER EIP EXISTING IRON PIN TP TELEPHONE PEDESTAL EPK EXISTING PK NAIL TS TOP OF SIDEWALK FO FIBER OPTIC TSP TRAFFIC SIGNAL POLE FOM FIBER OPTIC MARKER TW TOP OF WALL FOB FIBER OPTIC BOX UC UNDERGROUND COMMUNICATIONS FH FIRE HYDRANT VB VALVE BOX GUY GUY WIRE WM WATER METER HP HIGH POINT WV WATER VALVE INV INVERT WCR WHEELCHAIR RAMP JB JUNCTION BOX (STORM) YI YARD INLET IPS IRON PIN SET LEGEND OF SYMBOLS AND LINES PROPERTY CORNER UTILITY POLE LIGHT POLE TELEPHONE PEDESTAL GATE VALVE WATER METER FIRE HYDRANT SEWER MANHOLE SEWER CLEANOUT CATCH BASIN YARD INLET/DROP INLET STORM JUNCTION BOX / MH HANDICAP SPOT ELEVATION SIGN ALIGNMENT CHANGE PVI DELTA O 0 6 ®WM • 0 x 100.00 0 SIGN O A A NOTE: EXISTING FEATURES ARE SHOWN SHADED. RIGHT OF WAY PROPERTY LINE (ADJACENT) BUILDING SETBACK LINE CENTER LINE LIMIT OF DISTURBANCE UNDERGROUND ELECTRIC LINE OVERHEAD ELECTRIC LINE SANITARY SEWER (GRAVITY) SANITARY SEWER (FORCEMAIN) STORM DRAIN PIPE WATER LINE GAS LINE COMMUNICATIONS LINE FIBER OPTIC LINE FENCE LINE TREE LINE DRAINAGE FLOW CURB AND GUTTER CURB AND GUTTER (SPILL) CONCRETE PAVEMENT ASPHALT PAVEMENT GRAVELSURFACE AGENCY REVIEW ONLY project no. 18-010 UE OHE SAN FM GAS FO ir BUILT UPON AREA SUMMARY 11 PROPERTY SF AC 2,598,790 59.66 JURISDICTIONAL WATERS LOCATED ON THE PROPERTY 115,000 2.64 EXISTING B.U.A. 871,170 20.00 PROJECT AREA (PROPERTY MINUS JD WATERS AND EX. B.U.A.) (CALCULATION PER 15A NCAC 02H .1003(1)(b)) 1,612,620 37.02 EXISTING B.U.A. TO BE REMOVED BY THIS PROJECT 4,500 0.10 PROPOSED B.U.A. 381,660 8.76 oB.U.A. - EXISTING B.U.A. TO BE REMOVEMF DIVIDED BY PROJECT AREA))23.4% N /F JOHN B SMITH, JR, CURTIS B & SUELLEN S CARTER TRUSTEES 0448-67-8942 y, i NOTES \ / / 1. THIS PROJECT IS FOR CONSTRUCTION OF A NEW ENTRANCE ROADWAY / \ (NORTH -SOUTH ROADWAY) INTO THE CARGILL FAYETTEVILL PLANT AND A NEW TRUCK QUEUE PAVED LOT. THE N-S ROADWAY WILL HAVE CONNECTION TO OILSEED ROAD (SR 2663) AND WILL REQUIRE A DRIVEWAY PERMIT FROM NCDOT. CONTRACTOR TO COORDINATE PLANNED PLANT EQUIPMENT, SUCH AS PROBING \ STATION, WITH THE CONSTRUCTION OF THIS PROJECT. I \ NORTH 2• EXISTING 'BASE' INFORMATION SHOWN ON THESE CONSTRUCTION PLANS IS DERIVED FROM SURVEY INFORMATION PROVIDED BY CARGILL. THIS 'BASE' \ INFORMATION SHOWN REPRESENTS A COLLABORATION OF SURVEYS FROM VARIOUS DATES. SURVEYS ARE ON NAD 83 AND NAVD 88 DATUMS. FOR CLARITY, NOT ALL SURVEY INFORMATION PROVIDED BY CARGILL IS SHOWN ON THESE I PLANS. THE CONTRACTOR IS URGED TO REVIEW ALL AVAILABLE SURVEY DATA PROVIDED BY CARGILL PRIOR TO BEGINNING WORK. NO FIELD SURVEY HAS BEEN �\ CONDUCTED BY J THOMAS ENGINEERING FOR THE PREPARATION OF THESE \ 1\ CONSTRUCTION PLANS. X f 3. PROPOSED LIMIT OF DISTURBANCE IS GREATER THAN ONE ACRE. A NCDEQ EROSION CONTROL PERMIT IS REQUIRED PRIOR TO BEGINNING LAND C x \ DISTURBANCE. z rl r 4. JURISDICTIONAL WATERS TO BE IMPACTED BY THIS PROJECT. A US ARMY CORPS X \� OF ENGINEERS 404 PERMIT AND NCDEQ 401 CERTIFICATION REQUIRED PRIOR TO 1 ANY IMPACTS TO THESE WATERS. \+ \ 5. DEMOLITIONED ITEMS TO BE DISPOSED IN ACCORDANCE WITH LOCAL 7J REQUIREMENTS. 0 6. CONTRACTOR SHALL NOT REMOVE EXISTING TREES / LANDSCAPING UNLESS A CONFLICT WITH NEW CONSTRUCTION AND APPROVED BY THE OWNER. 7. OWNER RESPONSIBLE FOR OBTAINING TEMPORARY CONSTRUCTION EASEMENT o (OR AGREEMENT) FROM ADJACENT PROPERTY OWNER(S) FOR ANY WORK THAT MAY BE REQUIRED ON PRIVATE / PUBLIC PROPERTY(S). 8. UNDERGROUND UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE. ADDITIONAL UTILITIES MAY BE PRESENT WITHIN THE WORK AREA. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO BEGINNING WORK. \ 9. CONTRACTOR TO CONTACT POWER COMPANY WHEN EXCAVATING WITHIN 15, OF � A � THEIR POWER POLES. \ \ 10. CONTRACTOR TO REVIEW SITE ACCESS, MATERIAL STORAGE, AND STAGING AREAS WITH OWNER PRIOR TO BEGINNING WORK SO TO MINIMIZE INTERFERENCE WITH PLANT OPERATIONS. - 1 \0 11. CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THESE PLANS WITH ACTUAL FIELD CONDITIONS. NOTIFY THE ENGINEER OF ANY DISCREPANCIES FOUND. I o O O \ 12. SITE LIGHTING DESIGN BY OTHERS. 1 \ 13. STRUCTURAL ENGINEERING FOR ANY PROPOSED STRUCTURES BY OTHERS. \ o 14. CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS (EXCEPT AREAS SPECIFIED TO BE PLANTED WITH SOD) UPON COMPLETION OF CONSTRUCTION. SPECIES SHALL BE SIMILAR TO EXISTING GRASS ON -SITE. \15. POURED IN PLACE CONCRETE SHALL HAVE MINIMUM COMPRESSIVE STRENGTH OF 1 EXISTING \ j \ 4,000 PSI, UNLESS SPECIFIED OTHERWISE. DUMPSTER \` CONNECT TO EXISTIN \ \16. PAVEMENT MARKINGS ARE OWNER OPTION. G O O\ UNDERWOOD ROAD F j I I (PRIVATE) ---- — f EXISTING DRIVEWAY (TO BE REMOVED) �00 u- U° O� moo o a �m STA 118+04 = \ C/L EX UNDERWOOD RD �� \ .\t� LOT 11 GRAVEL EXISTING \ 1 EMPLOYEEYEE PARKING \ STA 106+00 = / A STA 200+00 a A. SEE DETAIL A-10 ON SHEET 10 A-IO t < < — \ \ FOR ROADWAY TYPICAL SECTION \ NEW DRIVEWAY TO { AT THIS LOCATION f + a xX x� EMPLOYEE PARKING \ — — 100 00 PLANT EXIT LANE n n ^ ^ x x x x LANDSCAPE ISLAND MEAL TRUCK LOT CONNECT TO EXISTING r X x� x� (20 SPACES) EXISTING OFFICE / MAINTENANCE x OILSEED ROAD �► PLANT ENTRANCE LANE n x� x x x BUILDING (NCDOT) I MEAL TRUCK LANE G � X \ � � x BEAN TRUCK LOT (60 SPACES) �� �► BEAN TRUCK LANE D 10 r X a x� x� X " NEW RESTROOM — ---- X x � x x x X x �� �; (BY OTHERS) x x xX — A 10 x X � STA 214+03 = C/L EX UNDERWOOD RD J\\`� > C-La Y> y� y> ..y �y �y �y PROBE ISLAND 210+ —► I \ C �_ I TRUCK QUEUE DRIVE —�� -- — _ — D-10 _ �� CONNECT TO EXISTING SEE DETAIL E-10 ON SHEET 10 FOR — _ _ �� UNDERWOOD ROAD TYPICAL DIMENSIONS OF TRUCK ---- ------ I \ (PRIVATE) I QUEUE SPACES AND DRIVE AISLE /I � I PROBE OPERATOR BOOTH I GRAVEL LOT I SEE DETAIL D-10 ON I \ C-10 JURISDICTIONAL WATERS (BY OTHERS) SHEET 10 FOR ROADWAY I -- J TYPICAL SECTION AT EXISTING DRIVEWAY TURNOUT SEE DETAIL C-10 ON SHEET 10 L -- — — — — THIS LOCATION p� (TO BE REMOVED) FOR ROADWAY TYPICAL SECTION \ \ AT THIS LOCATION \ GRADER'S TRAILER — (BY OTHERS) o CD ob I K \ O CARGILL INCORPORATED \ z 0448-68-0915 i \ L1J x\ un 0 \� 0 1 \ o N /F x CILBERT SMITH FAMILY, LLC 1 0448-68-0414 \ I C / 1 1 0 0 x 10' FUTURE ROAD R/W_ __.--.--.--.---- — — --- — a —— x x X X X x x� X X X� x —.-- — .--.— — ------- X X x X -- — ___ — — X x x— -- — — — — — X x x x x — — ¢�X EXISTING PLANT a \� x / � o � o x x x x x - x 13 --- --- ----- --- ------ --- --- --- --- ----- --- --- --- --- --- — -- RE g TO MIDDLE ROAD 100 0 50 100 200 SCALE: 1" = 100' 101 rn 0 ti U) Z O W Z3 W O' rn 0 ti U) Z O W Z3 W O' DITCH 'A' m (SEE GRADING PLAN) I ROCK OUTLET PROTECTION (NCDOT STD DWG 876.02) cni CONC. HEADWALL 0 (NCDOT STD DWG 838.01) + STA 115+87, 52' L INV EL OUT = 85.5 w a w N � a S08° 00' 37"E 393.63' 18" STORM U 1 (PPER 0 115+00 d +00 --- - C/L --- A N-5 R�ApW -n — LU Z � J U m G I II II II II II I I I 110 105 100 95 .N 85 75 70 Ln N N NOTES 1 1 �a I ROCK OUTLET i PROTECTION I (NCDOT STD o� �z DWG 876.02) J / C. HEADWALL (NCDOT STD DWG 838.01)— — 0, STA 117+04, 42' L / w INV EL OUT_7� 85.5 3 — SHOULDER +00 . --___ -- 18" S RM TRUCK SCALE _ _SH_OULDER — o ISIDE DITCH o 1. SEE SHEETS 7 AND 8 FOR MORE INFORMATION ON GRADING. 2. PAVEMENT MARKINGS SHOWN ON THESE PLANS ARE OWNER OPTION. I CONNECTION TO UNDERWOOD ROAD (PRIVATE) STA: 117+90.1 OFFSET: 0.0' L STOP BAR AND no STOP SIGN 0 s CONC. HEADWALL Q (NCDOT STD DWG 838.01) R1 STA 117+04, 26' R INV EL IN = 85.9 GG � O REMOVE EXISTING Q DRIVEWAY REMOVE EXISTING X 70 18" DRAINAGE PIPE AND RIP RAP \n Q 00�— \U L m 5 VERTICAL SCALE: 1" = 5- 0 50 0 25 50 100 HORIZONTAL SCALE: 1" = 50' POINT STA: 117+32.31 LOW LOW POINT EL= 88.40' PVI STA: 117+30.00 PVI EL= 88.10' K= 41.56 100.00, VC pop PROPOSED CENTERLINE GRADE EXISTING GROUND oa �° SIDE DITCH (R) L = 60' D = 1' SS = 6:1 LINER: GRASS SIDE DITCH (R) L = 115' D = 1' SS = 6:1 LINER: GRASS SIDE DITCH (R) L = 130' D = V SS = 6:1 LINER: GRASS YI 01 NCDOT STD DWG SIDE DITCH (R) L = 110' EXISTING 16" (APPROXIMAT 840.04 5+30 34' RT EL = 88.0 THROAT INV OUT EL = 86.0 100 LF - 18" RCP @ 0.5% (YI 01 - OUTLET) CONC. HEADWALL EXISTING PROPOSED CENTERLINE SS = 6:1 LINER: GRASS A68 LF - 18" RCP (CLASS IV) STA 117+04 @ 0.6% GROUND GRADE co CD06 CD co W C � co M 00 C00 o00 rr n 600 aD co O0 �W r. ,M CD � rn 00 CD co o W O000 '0 0 0o 114+00 115+00 116+00 117+00 110 105 100 95 90 85 WATER MAIN 80 75 70 118+00 118+50 'JNINNtld `JNINatld � V �wNavd � V 0 o w , NwO Nw, o 4 w w w w w G w wow ° CONNECT TO EXISTING DOMESTIC SERVICE (2" PVC) ° SAWCUT AND REPAIR CONCRETE WITH APPROPRIATE FITTING SIDEWALK AS REQUIRED ., CROSS EXISTING 8" FIRE PROTECTION LINE e EXISTING OFFICE / MAINTENANCE BUILDING EX. CO INV EL = 86.6 EXTEND EXISTING SANITARY a gPN EXTEND EXISTING SEWER SERVICE (4" PVC) o DOMESTIC WATER SERVICE — J (1" PE TUBING) NEW CLEANOUT — INV EL = 87.0 RELOCATE EXISTING UTILITIES WHERE CONFLICTS WITH NEW ° CONSTRUCTION ° SPN SAN J. — 1 03 W ❑w 1 1 NEW RESTROOM O� (12' X 24') (FIFE 91.5) W w w W (BY OTHERS) 212+00 21211+00 TRUCK QUEUE DRIVE 0+ �. UTILITY PLAN FOR NEW RESTROOM 30 0 15 30 60 SCALE: 1" = 30' J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J W a Z W J O o a °C + o Q � O V V ,--1 0� ~= Qc~n oc Z� �w � JW w�i� J o _JO a0 J Z Z~ W W Q J J � o z Q >~ CL + \;1-O oC a � LU� z�LL (� �O aQQ Z LL 2 a < Q I --I LU () Z) V oC O Z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: SEE SCALE BAR JRT Sheet: Designed by: JRT 5 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 N-S ROADWAY SEE SHEETS 4 AND 5 ROADWAY INTERSECTION STA 106+00 = STA 200+00 ' 1lokoo I p9koo Rp EX. EMP OY E A KI G — I — ' -P�V� ^ I X xAOO o I Z z 0540OOW IR w z x a ,ko° ^ ^ ^ X x' o 0 o O X ,( < < < o 4 106 p0 O � ro _ ^ X �. . X Q \ ^ ^ X^ XX X X XX X X f X X X X `< X EXISTING < < < LOADING/UNLOADING LL < PAD 2ook98,2 X X X X X X EXISTING OFFICE BUIL I G MAINTENANCE „ . DI 03 °: \ S72° 40' 44 W PC 5! P. X X X X X %� v 98.21' N ^ X �` X X X X X X CONNECT NEW SIDEWALK x X X X X X X TO EXISTING SIDEWALK — — YI 02 DRAINAGE FLOW 00 X X (SEE GRADING PLAN) END CONCRETE GUTTER 7 AT EXISTING SIDEWALK X X X X X X X X oI N X %� X X `< X TAPER TOP OF C& G X w d X o X X X X X 18" STORM n NEW RESTROOM (SEE GRADING PLAN) z N. (BY OTHERS) - CONNECTION TO TAPER TOP OFC&G/ cn > > SIDEWALK % 6 CONCRETE SIDEWALK w UN (PRIVATE) D ROAD (PRIVATE) ?x ~a % y 2 - 6" 'SPILL' C & G ;n 214+0 3 > > y > %� y y 1076.74' 2230 LY - TRENCH DRAIN �'� 211+00 C/L �� 213+00 - X � y 212+00 ; `� _STA.213+90.2 i y y y y v `� v 209+00 SEE NOTE #3 210 0 in a X OFFSET: 0.0' i y v 207+00 208+00 __ -( i --_) -4 �� 20:1 EP TAPE w 206+00 �� EP a STOP BAR AND 205+00 — — — — 203+00 204+00 - f - --- +-- c/L � —� � TRUCK QUEUE RIVE ' -- 8:1 EP TAPER �� 5 TAPER STOP SIGN PC STA: 200+98.21� � EP — — — — _ — — � g.i EP _ g►-IOULDER \ — — — — — — — — _ — CONCRETE ISLAND STA: 211+87.8 \ co \ \ PT STA: 203+26.73 SHOULDER - — — — — - (FOR PROBE I \ OFFSET: 5. 0' R R= 175.00' o ------ ----- 1 sTA: z13+o5.1 L = 228.52' __—_______----- II y — — — STA: 207+27.8 STA: 210+27.8 OFFSET: 15.0' R \ ', T = 133.84' OFFSET: 10.0' R OFFSET: 35.0' R 1 T = 13 49' 10" -- --- TA. 209+27.8 1 STA: 213+45.1 _ OFFSET: 35.0' R I PROBE OPERATOR OFFSET: 17.0' R —� BOOTH (BY OTHERS) 7> GRADER'S TRAILER 1 � OTHERS) JURISDICTIONAL WATERS � (BY I---------� � DRAINAGE FLOW L — 0 18" STORM (SEE GRADING PLAN) DITCH 'B' (SEE GRADING PLAN) CONC. HEADWALL (NCDOT STD DWG 838.01) STA 210+18, 99' R \ INV EL OUT = 85.5 110 105 100 0' 1 85 .I 75 a C C NOTES 1. SEE SHEETS 7 AND 8 FOR MORE INFORMATION ON GRADING. 2. PAVEMENT MARKINGS SHOWN ON THESE PLANS ARE OWNER OPTION. 3. SEE DETAIL D-13 FOR TRENCH DRAIN. GRATE TO BE NEENAH TYPE R-4999-CX, TYPE 'C' GRATE, OR EQUAL. SLOPE INVERT OF CONCRETE TROUGH @ 2% TOWARD OUTLET PIPE. 5 VERTICAL SCALE: 1" = 5' NORTH 0 50 0 25 50 100 HORIZONTAL SCALE: 1" = 50' 1� NM V M� 0 00 nf� 0 ON V �O NO O 000 O ntp O �CD Nit• �� nN 0M NM N N N O N V OCO N �00 fM �Cn M Oft• M co M �N l Mr" 00 l 00 It� O O N O 00 O 00) O 0)On O O 000 O O ON O O O O O W ON 0 O O00 O O 000 O O M00 O O 000 00 O Oa0 c O ON 0 O ON O O ON O O ON 00 O 000 0 O 00 O O 00 00 O O 0 0 N Cn 0 O ON O O 0M O O 00) O O 00n O 003) O 00 O 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00 212+00 213+00 110 105 100 95 85 75 70 N C)) 214+00 J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL o J W a O 3 ? W o N a W < 14 V V O ~ W LU 00 J Jp a0 �+ J Z LL0 WZ Q J N J� i2Q z Q � LU� z w o V o �J> QLUV a1--q Q 0 _ LLZ JLU LU D O W O' N m ' � U V ~ O Z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: SEE SCALE BAR JRT Sheet: Designed by: JRT 6 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 i � 1 U� \ I lr l �1 i �Q o a 85 �w Q i a SIDE DITCH (SEE SHEET 4)00 '0 � CO _ \\ N 91 90 89 88 ---_ I 89 104+00_ \ EP of 0 Of00 ~ °I 89.2 LP 0 0 N n 8 61 88. C" E P 87.5 0) Y- 90.2 f i 1 REMOVE EXISTING ROADWAY STUBOUT RESTORE ROADSIDE SHOULDER AND SIDE DITCH 1 \ r ' -qqq� i Qft �91 � 1 \ \ 1 J THOMAS ENGINEERING, INC. z \ CIVIL ENGINEERING & PLANNING aQ �w w< �Q 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com / license no. C-3389 09-11 ID — / 108+00 , 93 106+p0 r� ^ X x^ x x x x < - < ***4 6 92 � N ? xxX X X 91.5 0 0 90 �\ x x x x x \� x x �C N oo oo it 91 ' 00 92 a 95.3 93 q11+00 No HP o 9A 95 110+00 i PROFESSIONAL ENGINEER'S SEAL 1 ^ ^ x x O < 94 W Q 3 x W J ^ ^ z x x xN 0 O V W 1--I 9 V V 3 2 x x x Z z X x x J •� J o Q w Z JaZ W � Q J > oc x x Q > ~ z x x x SEE SHEET 8 FOR CONTINUATION Q W OF GRADING PLAN TO THE SOUTH LU - g0 O Q i2 _-x ----- - --- x x x .� x LL Z z � Q li i - , O m c� > yy y v y i u 206I00 207 205I 00 _ _ _ ----------- _ O203+00 204+00 - 00.0 90 LP 88 87 86 ----------- REVISIONS 87 R _ DITCH EXCAVATE EXISTING JURISDICTIONAL DITCH FOR BW = 5' IMPROVED SITE DRAINAGE AND STABLE SIDE SS = 4:1 SLOPES (USACE AND NCDEQ PERMIT REQUIRED) LINER: PER WETLAND RESTORATION PLAN 90 AGENCY REVIEW ONLY NORTH Scale: Drawn by: SEE SCALE BAR JRT Sheet: Designed by: JRT Reviewed by: 40 0 20 40 80 7 of 1 5 JRT Project Number: Date: SCALE: 1" = 40' 18-010 09 MAY 2019 ti Z Q W Z) W Z) O' x l KUS I LLS \\a. I I 0 48-67-8942 N /F A MO L KIVFTT 0448- 8 TCOTRIBUTARY . J���) ■ LOCKS_CREEK - - -� 0 O 7t/ I TEMPORARY SILT CHECK • ♦ - - �`(NCDOT STD DWG 1633.01) : \ - \ TEMPORARY SKIMMER BASIN 02 ■ • \ m ( NOTES DA=5AC � • �. �. \ _ • m 1. THIS PLAN SHOWS THE TEMPORARY EROSION CONTROL MEASURES TO BE • i U ■ • .i ` \ INSTALLED AND MAINTAINED DURING CONSTRUCTION. ` _� ■ • • I� I O 2. LIMIT OF DISTURBANCE = 19.2 AC +/-. NCDEQ EROSION CONTROL PERMIT I �- ti i ■ ■ x� - • I I\- \ REQUIRED. r l x ■ mx a_ y ■�i► �,� ■ * ` w Z 3. SEE SHEET 10 FOR THE CONSTRUCTION SEQUENCE, MAINTENANCE PLAN, - _ > / IA ,STOCK-�-- �= 89 $ 87 eb J AND SPECIFICATIONS. _�� ♦ O _ es= m aw �� \/ 4. OFF -SITE BORROW / WASTE SITES MUST COMPLY WITH NCDEQ RULES AND ��- ♦ o TEMPORARY' REGULATIONS FOR LAND DISTURBANCE. / TD CONSTRUCTION J ♦ TD 01 90 \ ENTRANCE 5. CONTRACTOR MAY NEED TO FIELD ADJUST PROPOSED SEDIMENT BASIN ELEVATIONS TO FIT ACTUAL FIELD CONDITIONS 9 . I ,/ ♦/• To 01 1/ / - - 93 - - - - - - - - - - \ \ 6. CONTRACTOR TO KEEP ALL CONSTRUCTION/STORAGE OPERATIONS WITHIN ♦ LIMIT OF DISTURBANCE. s's , - - - - / / - - ♦ ♦ �° 94 9 • ■ 7. JURISDICTIONAL STREAMS AND WETLANDS HAVE BEEN IDENTIFIED BY THE ;a -�� - eg �_ • OWNER AS BEING WITHIN THE LIMITS OF DISTURBANCE. PERMITS FOR THE ♦ 85 i' _ --- P m W • PROPOSED IMPACTS TO THESE FEATURES MUST BE OBTAINED PRIOR TO 1 TEMPORARY ♦� 3 Z * ■ ■ ■ ■ ■ ■ ■ DISTURBANCE. ♦ a / 90PIPE INLET PROTECTION • i - SILT FENCE ♦ 96 ♦ / / / I M ob qry I NCDOT STD DWG 1635.02 ■ 1 0 I \ -- - -- (�'�) ♦ ♦ 0 S. CUT/FILL SLOPES FOR TEMPORARY MEASURES SHALL BE 2:1 MAXIMUM. LIMIT GF-DISTURBANCE ♦ TEMP. BOX INLET (19.2 AC) ♦ ♦ x/ ` PROTECTION - - ♦ ��' � � � � 0 9. NO FILL IS ALLOWED IN THE 100-YEAR FLOODPLAIN UNLESS A FLOODPLAIN - - - ♦ �� ( C T STD D G 1632.03) m _ ---�- ♦ - 9d ^ `X \\ I° I� PQ I I Z o DEVELOPMENT PERMIT IS OBTAINED FROM CUMBERLAND COUNTY. X ♦ ♦ ♦ _ _ 10. THIS PROPERTY IS LOCATED IN THE CAPE FEAR RIVER BASIN. SITE DRAINS y � -- ♦ ,- / / 94 �, z ♦ • �� n m �- " TO TRIBUTARY CAPE FEAR, A CLASS WSIV WATERS AND TO TRIBUTARY • • ♦� ^ ^ X � QQq _ P LOCKS CREEK, A CLASS 'C' WATERS. 1, • • ♦ ■m ■ ■ ■ ■ ■ ■ ■ • ■ ■ ■ ■ ■ ■ ■ ■ • -, '� < < < -® m . 11. THE MAJORITY SOIL TYPES (ACCORDING TO THE NRCS MAP) ON THE SITE 91 - 92 _ 93, 93 \ \ \ yp ARE: • N• � -- ' '. X X � 53% Ro (ROANOKE AND WARNE SOILS) x x X O f 33% AaA (ALTAVISTA FINE SANDY LOAM) x �x xX .c '� �� TEMP. BOX IN ET _ p� "� 13% WmB (WICKHAM FINE SANDY LOAM) PROTECTI N ° (NCDOT STD DWG 1632.0i) 12. ROLLED EROSION CONTROL PRODUCT (RECP) SHALL BE NORTH AMERICAN o X X TEMP. BOX INLET 9: 92 X X 9z I PROTECTION o • GREEN (N.A.G.) OR EQUAL AND INSTALLED PER MANUFACTURER'S 00 0 90 . x�` xX XX X XX Xx xx X ■ (NCDOT STD DWG 1632.03) i RECOMMENDATIONS OR NCDOT STANDARD DRAWING 1631.01. DITCH oa o e, A X .� X �\ ,,`„ LINERS SHALL BE N.A.G. S75BN, OR EQUAL. ----- - 90 \ X xX xX �� ©gp0 ■ / 91 13. THE DISTURBED CHANNEL AREA IN THE LOCATION OF TEMPORARY SEDIMENT --------------- X X x x X x .� I - -- ■ ■ �-j- 1 I \ BASIN 01 (SURFACE WATER IMPACT AREA #3) WILL BE RESTORED AT THE xX x X x Xx .� X '� X w 91 •_■ ■ ■ ■ • ■ - \ END OF PROJECT CONSTRUCTION. I I TEMPORARY --- CONSTRUCTION ENTRAPdi'E' \�------------------------------------------- F \ 87 n -- mx I ♦ • 89 m - m ___ V 66 867 T E \ pc J 8g I 9♦ m a � 00 0000000 • . m ex - - _ - - ... ...m •�URrsa iaN+aL• wA m I m 0 00 00000 � • - ■ ■ ■ ■ ■ ■ ■ --- 00000000000 ■ ."■ ■ ■ ■ ■ ■__ ■ m ■ ■ • 8 6 8 ♦ ♦ TEMPORARY 0000000000 � � • e 886 TEMPORARY CONCRETE • • • Bs ♦ ♦ 1 CONSTRUCTION ♦ ♦ ♦ ♦ WASHOUT AREA • • • ♦ ♦ ENTRANCE • ♦ - ��.,;\\ - l IMIT OF DISTURBANCE 68 • EROSION CONTROL LEGEND 2 AC) m o m N ' m m a I 1 ■ • zw x • • ¢ dTOE OF BERM i ■ ■ ¢ �� TOP OF BERM C A R G I L_ L INCORPORATE TEMP. SKIMMER BASIN WIER ■ �,i BAFFLE II 11 �' „ro I • x n SKIMMER a b cn �- v • \ TEMP. SILT FENCE m � I ■ 1 \ i m m � • TEMP. SILT FENCE OUTLET O• TE PORARY SEDIMENT BASIN 01 I■ zs x TEMP. BOX INLET PROTECTION -I N /F DA - 20 AC ■ 1 q\ ■ x GILBENT SMITH FAMILY, LLC \ ■ � I■�s , TEMP. DIVERSION DITCH TD�� 0448-68-0414 P m• ■ ■ ♦ GUTTER GUARD Ix TEMPORARY SALT FENCE (TYP) �'� -• ♦ LIMIT OF DISTURBANCE ■ ■ ■ ■ ■ ■ • x� • • TEMP. SILT CHECK I m PIPE OUTLET i INV OUT EL = 84.5 ■ � m• 9 �' � TEMP. COIR FIBER WATTLE oe • TEMPORARY SILT CHECK ■ ■ - ■ --' M a 3anin RECP /DITCH LINER /MATTING (NCDOT STD DWG 1634.01 . - I - -`- x X ® ROCK LINER/ PROTECTION x ® X x x x x ■ / -- --- -'- - x ---- TEMP. CONSTRUCTION ENTRANCE m/ bS - x x m ___---- da•s M a TEMP. PIPE INLET PROTECTION -- - ---- --- - - TRIBUTARY s----------- -- _ = m - Q:S� CAPE FEAR TEMPORARY SEDIMENT BASIN SCHEDULE DRAINAGE 10 YEAR S.A. S.A. AVE DIMS. @ TOP VOLUME VOLUME BASIN BOTTOM / TOP OF TOP OF RISER E. SPILLWAY TOP OF BERM OUTLET RISER OUTLET BARREL E. SPILLWAY SKIMMER PIPE ORIFICE SKIMMER NAME AREA FLOW REQUIRED PROVIDED OF STORAGE REQUIRED PROVIDED DEPTH BARREL INV. ELEV STORAGE ELEV ELEV ELEV PIPE SIZE PIPE SIZE WIDTH SIZE DIAMETER DEWATERING TIME (AC) (CFS) (SF) (SF) (FT) (CF) (CF) (FT) (FT) (FT) (FT) (FT) (FT) (IN) (IN) (FT) (IN) (IN) (DAYS) BASIN 01 20 50 21,750 24,500 110 X 230 25,200 45,400 2.0 85.0 87.0 88.0 89.0 91.0 42 30 20 4 3 4 TEMPORARY SKIMMER BASIN SCHEDULE DRAINAGE 10 YEAR S.A. S.A. DIMS. @ BASIN DIMS.@ TOP OF VOLUME VOLUME BASIN BOTTOM TOP OF TOP OF BERM ORIFICE BASIN NAME AREA FLOW REQUIRED PROVIDED BOTTOM STORAGE REQUIRED PROVIDED DEPTH ELEV STORAGE ELEV WEIR ELEV ELEV WEIR LENGTH SKIMMER PIPE DIAMETER DRAWDOWN (AC) (CFS) (SF) (SF) (FT) (FT) (CF) (CF) (FT) (FT) (FT) (FT) (FT) (FT) SIZE (IN) (IN) TIME (DAYS) BASIN 01 5.0 16 5,200 5,500 42 X 102 50 X 110 9,000 9,800 2.0 85.0 87.0 87.5 89.0 20 2 1Y" 4 TEMPORARY DIVERSION SCHEDULE DIVERSION DRAINAGE 10 - YEAR BOTTOM WIDTH DEPTH LENGTH SIDE SLOPE AVE. SHEAR NO. AREA (AC) FLOW (CFS) BW (FT) D (FT) (FT) Z SLOPE (%) (LB/FT-2) LINER 01 3.0 9 0 1.0 470 4 1 0.6 N.A.G. S75BN :1 1 41 :1 160 •1 J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J a W 3 ? W J O a � U U D �2 z Q oC Z J J � ao 0 J Z Z oC W � Q > ~ O W Z a � U z �D V o �O 04 Q LU U U) � O Q Q O � LL Z 0� w = a � J D � O W N m 1 U oC O Z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: SEE SCALE BAR JRT Sheet: Designed by: JRT 9 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 Q) CONSTRUCTION SEQUENCE 1. PROJECT NARRATIVE: THESE PLANS ARE FOR THE CONSTRUCTION OF A NEW ROADWAY (NORTH -SOUTH ROADWAY) AND TRUCK QUEUE LOT ON THE CARGILL PROPERTY. 2. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF INSPECTION PROGRAM: THE SEDIMENT POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A 54.1 AND 15A NCAC 413.0131. THE SELF INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FORM HTTP://WWW.DLR.ENR.STATE.NC.US/PAGES/SEDIMENTATION_NEW.HTML. IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT NCDEQ AT 919-791-4200. 3. NPDES STORMWATER NCGO1 PERMIT REQUIRED FOR THIS PROJECT IN ADDITION TO THE NCDEQ LAND DISTURBANCE PERMIT. SEE THE NCDEQ STANDARD DETAILS ON SHEET 15 FOR SPECIFIC REQUIREMENTS: 'NCG01 SELF INSPECTION, RECORDKEEPING, AND REPORTING' AND 'NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING'. 4. KEEP NCDEQ LAND DISTURBANCE PERMIT AT SITE. 5. JURISDICTIONAL WATERS HAVE BEEN IDENTIFIED AND LOCATED ON THE PROPERTY BY THE OWNER. THE MAPPED LOCATION OF THESE JURISDICTIONAL WATERS, PROVIDED BY THE OWNER, ARE SHOWN ON THE PLANS. SOME OF THE JURISDICTIONAL WATERS WILL BE IMPACTED AS A RESULT OF THIS PROJECT. THOSE IMPACTS WILL BE PERMITTED THROUGH THE USACE AND NCDEQ. PHASE 1 6. CONTACT THE FAYETTEVILLE REGIONAL OFFICE OF NCDENQ LAND QUALITY (910-433-3300) PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. 7. STAKE THE LOCATION OF THE JURISDICTIONAL WATERS/WETLANDS WITHIN 100 FEET OF THE PROJECT LIMITS OF DISTURBANCE. ONLY IMPACTS PERMITTED UNDER USACE 404 PERMIT AND NCDEQ 401 CERTIFICATION WILL BE ALLOWED. CONTRACTOR TO REVIEW THE PROVISIONS IN THOSE PERMITS CAREFULLY FOR BEGINNING WORK. CLEAR AND GRADE ONLY IN AREAS WHERE EROSION CONTROL MEASURES WILL BE INSTALLED. 8. INSTALL THE TEMPORARY CONSTRUCTION ENTRANCES AS SHOWN ON THE EROSION CONTROL PLAN. 9. INSTALL TEMPORARY SILT FENCE ALONG LOWER SIDES OF LIMIT OF DISTURBANCE AS SHOWN ON EROSION CONTROL PLAN. 10. INSTALL THE TWO (2) TEMPORARY SILT CHECKS IN THE TWO DRAINAGEWAYS AT THE EDGE OF THE LIMIT OF DISTURBANCE AS SHOWN ON THE EROSION CONTROL PLAN. 11. CONSTRUCT SEDIMENT BASINS 01 AND SKIMMER BASIN 02. STABILIZE BASIN WITH ROCK PROTECTION OR LINERS WHERE CALLED FOR ON THE PLAN AND TEMPORARY / PERMANENT SEEDING (PER SCHEDULE) ON REMAINING BASIN SLOPES. INSTALL ROCK OUTLET PROTECTION BELOW PIPE OUTLETS. 12. INSTALL TEMPORARY DIVERSIONS 01 - 02. THESE DIVERSIONS WILL CONVEY ON -SITE RUNOFF TO THE SKIMMER BASINS. STABILIZE WITH LINER AS SPECIFIED ON EROSION CONTROL PLAN IMMEDIATELY UPON INSTALLATION OF THESE DIVERSIONS. 13. REMOVE TOPSOIL WITHIN LIMITS OF DISTURBANCE AND STOCKPILE IN AREA(S) SHOWN ON THE PLAN. 14. ROUGH GRADE SITE. UNDERCUT IS LIKELY. UNDERCUT AND FILL MATERIAL BROUGHT TO THE SITE MAY BE STOCKPILED IN THE AREA(S) SHOWN ON THE PLAN. BORROW / DISPOSAL SITES MUST COMPLY WITH NCEQ LQS REQUIREMENTS. 15. PERFORM SOILS TEST TO DETERMINE THE SOIL AMENDMENTS AND RATES THAT WILL BE REQUIRED FOR SEEDING. 16. INSTALL STORM DRAINAGE SYSTEM, INCLUDING PIPES AND DITCHES. INSTALL THE ROCK OUTLET PROTECTION AT THE DOWNSTREAM OF EACH PIPE. IMMEDIATELY INSTALL TEMPORARY INLET PROTECTION AROUND EACH BOX AND PIPE INLET UPON COMPLETION AND IMMEDIATELY INSTALL DITCH MATTING AS SHOWN ON THE EROSION CONTROL PLAN. 17. FINE GRADE SITE. 18. INSTALL STONE BASE COURSE FOR ASPHALT AND CONCRETE PAVEMENT. 19. INSTALL CONCRETE PAVEMENT IN LOCATIONS AS SPECIFIED ON PLANS OR BY OWNER. INSTALL AT TEMPORARY CONCRETE WASHOUT AREA PER THE EROSION CONTROL PLAN. 18. INSTALL PAVEMENT INTERMEDIATE COURSE. 19. INSTALL ASB SHOULDERS. 20. INSTALL GRAVEL AREAS. 21. FINE GRADE AREAS OUTSIDE OF THE PAVED AREAS AND RE -SPREAD TOPSOIL. IMMEDIATELY SEED DISTURBED AREAS NOT RECEIVING PAVEMENT OR OTHER LANDSCAPE COVER. SEED PER THE SEEDING SCHEDULE (PERMANENT OR TEMPORARY) PROVIDED ON THIS SHEET. NOTE: PERMANENT GROUND COVER IS REQUIRED PER THE SCHEDULE UNDER 'TEMPORARY SEEDING' AND 'PERMANENT SEEDING' ON THIS SHEET. SEE 'NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING' STANDARD DETAIL ON SHEET 15 FOR NCGO1 REQUIREMENTS. 22. CLEAN CONCRETE WASHOUT AREA AND REMOVE. 23. REMOVE TEMPORARY DIVERSIONS, AND SKIMMER / SEDIMENT BASINS. PUMP STANDING WATER OUT OF SKIMMER BASINS AS REQUIRED. PUMP EFFLUENT SHALL BE DISCHARGED TO FILTER BAG. 24. GRADE ACCORDING TO THE PROPOSED CONTOURS (SEE GRADING PLAN ON SHEETS 7 AND 8) IN THE AREAS WHERE THE EROSION CONTROL MEASURES HAVE BEEN REMOVED. IMMEDIATELY STABILIZE THE OTHER DISTURBED AREAS WHERE THE EROSION CONTROL MEASURES WERE REMOVED PER THE PERMANENT SEEDING SCHEDULE PROVIDED ON THIS SHEET. 25. RESTORE JURISDICTIONAL WATERS (DITCH) PER WETLAND RESTORATION PLAN. 26. INSTALL PAVEMENT SURFACE COURSE. 27. CALL FOR INSPECTION FROM NCDEQ LAND QUALITY AFTER COMPLETION OF PHASE 1. PHASE 2 28. ONCE ACCEPTABLE TO NCDQ LQS, REMOVE THE TWO (2) TEMPORARY SILT CHECKS AT THE DOWNSTREAM OF EACH DRAINAGEWAY. 29. REMOVE THE REMAINING SILT FENCE ALONG THE DOWNSTREAM PERIMETER OF THE SITE. 30. REMOVE THE INLET PROTECTION AROUND BOX AND PIPE INLETS. PROVIDE PERMANENT GROUND COVER IN THESE AREAS. 31. PROVIDE PERMANENT SEEDING, IF TEMPORARY SEEDING WAS DONE IN PHASE 1. ENSURE A GOOD THICK STAND OF GRASS COVER. MAINTENANCE PLAN THE SITE GRADING CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EROSION CONTROL DEVICES THROUGHOUT THE PROJECT DURATION. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL OR RAINFALL > 0.5 INCHES IN 24 HOURS BUT IN NO CASE LESS THAN ONCE EVERY 7 CALENDAR DAYS. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES AS DESIGNED. RECORDS OF INSPECTIONS FOR PREVIOUS 30 DAYS SHALL REMAIN ON SITE AND AVAILABLE FOR AGENCY INSPECTORS DURING NORMAL WORKING HOURS. SKIMMER BASINS: SEE SHEET 15 BAFFLES: SEE SHEET 15 ROLLED EROSION CONTROL PRODUCTS (RECP): SEE SHEET 15 SEDIMENT FILTER BAG: PER MANUFACTURER'S RECOMMENDED SCHEDULE. SILT FENCE: 1. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE FENCE SHALL BE REPAIRED AS REQUIRED TO MAINTAIN A SUFFICIENT BARRIER. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, DECOMPOSE, TEAR, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. AFTER ALL AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT. GRADE AREA TO GRADING PLAN OR BLEND WITH ADJACENT GRADES. STABILIZE AREA. SILT FENCE OUTLET: 1. CLEAR THE HARDWARE CLOTH OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. BE CAREFUL NOT TO DAMAGE OR UNDERCUT THE HARDWARE CLOTH. 2. REPLACE STONE AS NEEDED. TEMPORARY INLET PROTECTION: 1. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. BE CAREFUL NOT TO DAMAGE OR UNDERCUT THE WIRE MESH. 2. REPLACE STONE AS NEEDED. CHECK DAM WITH WEIR: 1. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHECK DAM. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM FROM EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAM AS NEEDED TO: PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO THE DAM AS NEEDED TO MAINTAIN THE DESIGN DIMENSIONS. CONSTRUCTION ENTRANCE: 1. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. 2. IMMEDIATELY REMOVE ALL MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY DIVERSIONS: 1. IMMEDIATELY REMOVE EXCESS SEDIMENT FROM FLOW AREA AND REPAIR DIVERSION RIDGE. 2. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 3. AFTER ALL AREAS HAVE BEEN STABILIZED REMOVE THE RIDGE AND THE CHANNEL AND GRADE ACCORDING TO GRADING PLAN OR BLEND WITH ADJACENT GRADES. STABILIZE AREA. RIP RAP LINED DITCHES/CHANNELS/OUTLETS: 1. PAY CLOSE ATTENTION TO INLET AND OUTLET SECTIONS WHERE CONCENTRATED FLOW ENTERS. 2. INSPECT FOR INDICATIONS OF DISPLACED ROCK, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. 3. MAINTAIN VEGETATION ADJACENT TO THE ROCK LINING IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR. GRASS LINED DITCHES/CHANNELS/SWALES: 1. DURING GRASS ESTABLISHMENT PERIOD, INSPECT AFTER EVERY RAINFALL. 2. AFTER GRASS HAS ESTABLISHED, INSPECT PERIODICALLY AND AFTER HEAVY RAINFALL. IMMEDIATELY MAKE REPAIRS. 3. PAY CLOSE ATTENTION TO INLET AND OUTLET SECTIONS WHERE CONCENTRATED FLOW ENTERS. 4. GRASS SHOULD BE MAINTAINED IN A HEALTHY VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION. BUILDING WASTES HANDLING: 1. SEE 'NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING' STANDARD DETAIL ON SHEET 15 FOR NCGO1 REQUIREMENTS. TEMPORARY SEEDING PROVIDE TEMPORARY SEEDING TO ALL DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE WITHIN THE FOLLOWING SCHEDULE: PERMANENT DITCHES --> IMMEDIATELY SLOPES 4:1 AND STEEPER --> 7 DAYS ALL OTHER AREAS --> 14 DAYS PERFORM SOIL TESTING AFTER ROUGH GRADING IS COMPLETE OF THE TOPSOIL THAT WILL BE SPREAD OVER THE AREAS TO BE SEEDED. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES. SEEDBED PREPARATION: LIME: APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE SOIL PH IS NOT KNOWN, APPLY AT A RATE OF 1 TO 1 Y2 TONS PER ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS PER ACRE OF FINE -TEXTURED SOILS. APPLY LIME UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH PH HIGHER THAN 6 DO NOT NEED LIME. FERTILIZER: FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS WITH A MINIMUM APPLICATION OF 4,000 LBS / ACRE. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. SURFACE ROUGHENING: IF AREAS TO BE SEEDED BECOME HARDENED, SEALED, OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. PLANT SELECTION: SELECT THE APPROPRIATE SPECIES BASED ON THE PLANTING SEASON. SEEDING: APPLY SEED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES. BROADCAST SEEDING AND HYDROSEEDING IS ACCEPTABLE ON STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES ON MORE THAN %2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD NOT INCLUDE A WOOD FIBER MULCH. MULCHING: MULCHING IS REQUIRED UNDER THE FOLLOWING CONDITIONS: • SEEDING IN FALL (WOOD FIBER MULCHES NOT ACCEPTABLE) • SLOPES STEEPER THAN 3:1 • EXCESSIVELY HOT OR DRY WEATHER • ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND) • AREAS RECEIVING CONCENTRATED FLOW. FOR CONCENTRATED FLOW AREAS (DITCHES, CHANNELS, SWALES, ETC.) ANCHOR MULCH WITH NETTING AND LIQUID ASPHALT AT A RATE OF 0.10 GALLON PER SQUARE YARD (10 GAL / 1000 SQ FT). MAINTENANCE: CONTRACTOR TO MONITOR GRASS ESTABLISHMENT. PROMPTLY RESEEED AREAS WHERE A HEALTHY, DENSE GROWTH DOES NOT ESTABLISH. CONTRACTOR MAY NEED TO PROVIDE NETTING OR TEMPORARY LINERS TO AREAS WHERE GRASS CANNOT BE ESTABLISHED DUE TO EROSION. PERMANENT SEEDING PROVIDE PERMANENT SEEDING TO ALL DENUDED AREAS THAT WILL NOT BE COVERED BY PAVING, BUILDINGS, OR OTHER LANDSCAPING. AREAS RECEIVING PERMANENT VEGETATION MUST BE STABILIZED WITHIN THE FOLLOWING TIMEFRAMES AFTER FINAL GRADE IS REACHED, UNLESS TEMPORARY STABILIZATION IS APPLIED. PERMANENT DITCHES --> IMMEDIATELY SLOPES 4:1 AND STEEPER --> 7 DAYS ALL OTHER AREAS --> 14 DAYS PERFORM SOIL TESTING OF THE TOPSOIL THAT WILL BE USED FOR THE SEEDBED TO DETERMINE THE SOIL AMENDMENTS REQUIRED. COMPLETE GRADING BEFORE PREPARING SEEDBEDS. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES. SEEDBED REQUIREMENTS: THE SOIL SHOULD MEET THE FOLLOWING MINIMUM CRITERIA FOR VEGETATION ESTABLISHMENT: • ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST 0.05 INCHES OF WATER TO 1 INCH OF SOIL • SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION. • SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE DEPTH OF ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. • A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0-6.5. • NO LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, AND TRASH. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDROSEEDED. IF THE ABOVE CRITERIA CANNOT BE MET, SPECIAL SOIL CONDITIONERS OR TOPSOIL MAY BE APPLIED. SEEDBED PREPARATION: LIME: APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. WHERE SOIL TESTS ARE NOT AVAILABLE, APPLY GROUND LIMESTONE AT A RATE OF 3,500 LBS / ACRE. FERTILIZER: FERTILIZE ACCORDING TO SOIL TEST RECOMMENDATIONS. WHERE SOIL TESTS ARE NOT AVAILABLE, APPLY 10-10-10 FERTILIZER AT A RATE OF 1,000 LBS / ACRE. SURFACE ROUGHENING: IF AREAS TO BE SEEDED BECOME HARDENED, SEALED, OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. PLANT SELECTION: SEE RECOMMENDED SEEDING MIXTURE ON THE TABLE SHOWN ON THIS SHEET. CONTRACTOR TO CONSULT THE SEED SUPPLIER FOR THIS PROJECT TO DETERMINE IF THE RECOMMENDED SEEDING MIXTURE AND SOIL AMENDMENTS SPECIFIED BY THIS PLAN IS APPROPRIATE. THE FINAL SEEDING MIXTURE SELECTED SHALL BE APPROPRIATE BASED ON THE PLANTING SEASON, SOIL TYPE, SLOPES, AND LAND USES. CONSULT WITH ENGINEER IF THE SEED SUPPLIER RECOMMENDS A MIXTURE THAT IS DIFFERENT THAN THAT SPECIFIED ON THIS PLAN. SEEDING: USE CERTIFIED SEED (INSPECTED BY THE NORTH CAROLINA CROP IMPROVEMENT ASSOCIATION). APPLY SEED WITH A BROADCAST SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. USE SEEDING RATES GIVEN IN TABLES. WHEN USING A DRILL OR CULTIPACKER SEEDER, SMALL GRAINS SHOULD BE PLANTED NO MORE THAN ONE INCH DEEP AND GRASSES AND LEGUMES ON MORE THAN 1/2 INCH. WHEN BROADCAST SEEDING, SUBDIVIDE AREA INTO WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA AND APPLY THE REMAINING SEED IN THE SAME MANNER BUT AT RIGHT ANGLES TO THE FIRST PASS. COVER SEED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRM WITH A ROLLER OR CULTIPACKER. MULCH AREAS IMMEDIATELY AFTER SEEDING WITH SMALL GRAIN STRAW AT A RATE OF 4,000 LBS / ACRE. ANCHOR MULCH WITH NETTING OR LIQUID ASPHALT AT A RATE OF 400 GAL / ACRE. ROLLED EROSION CONTROL MATTING: PROVIDE ROLLED EROSION CONTROL MATTING ON SLOPES 2:1 OR STEEPER AND GRASS LINED SWALES / DITCHES / CHANNELS AFTER SEEDING IS COMPLETE. USE MULCH FOR ALL OTHER AREAS SEEDED. HYDROSEEDING: NO HYDROSEEDING FOR THIS PROJECT. MAINTENANCE: IRRIGATE DURING DRY PERIODS OR TO SPEED DEVELOPMENT OF FULL COVER. IF STAND IS INADEQUATE, RE -SEED WHERE BARE SPOTS OR THIN COVER EXISTS. RE-EVALUATE SEED TYPE CHOICE AND QUANTITIES OF LIME AND FERTILIZER. CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. Table 6.1Ob Temporary Seeding Recommendations for Summer Seeding mixture species Rate (Iblacre) German millet 40 In the Piedment and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. Seeding dates Mountains -May 15 - Aug. 15 Piedmont -May 1 -Aug. 15 Coastal Plain -Apr. 15 - Aug. 15 Soil amendments Follow recommendations of soil tests or apply 4,000Ib/acre ground agricultural limestone and 750 Iblacre 10-10-10 fertilizer. Mulch Apply 4.000Iblacre straw. Anchor straw by tacking with asphalt, netting, Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10c Seeding mixture Temporary Seeding Species Rate (Iblacre) Recommendations for Fail Rye (grain) 120 Seeding dates Mountains --Aug. 15 . Dec. 15 Coastal Plain and Piedmont --Aug. 15 - Dec. 30 Soil amendments Follow soil tests or apply .4,000blacre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 Iblacre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15. overseed with 50 Iblacre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. Table 6.10a Temporary Seeding Recommendations for Late Winter and Early Spring Seeding mixture Species Rate (Iblacre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding dates Mountains ---Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont -Jan. 1 - May 1 Coastal Plain -Dec. 1 -Apr. 15 Soil amendments Follow recommendations of soil tests or apply 4,000 Iblacre ground agricultural limestone and 750 Iblacre 10-10-10 fertilizer. Mulch Apply 4,000 Iblacre straw. Anchor straw by tacking with asphalt, netting, Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. RECOMMENDED PERMANENT SEEDING MIXTURE SEED TYPE SEEDING RATE SEEDING SEASON TALL FESCUE (BLEND) 200 LBS / ACRE SEPTEMBER - MARCH RYE GRAIN 40 LBS / ACRE SEPTEMBER - MARCH TALL FESCUE (BLEND) 200 LBS / ACRE MARCH - SEPTEMBER BERMUDAGRASS 25 LBS / ACRE MARCH - SEPTEMBER J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J a W 3 Z W J D 0 a V V cry 2 W Z O � Q � z J Q J0 a IJ Z Z O Q J oC Z z ui U V o �0 0 Q LUV � 1.� Q Z O 2 U. J W � O W N 1 ca V O Z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: NTS JRT Sheet: Designed by: JRT 10 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 ii VARIES 6: 1 Mn U VARIES 8' I SOD / LANDSCAPING 15, 2.5' 25' PLANT EXIT LANE LANDSCAPED ISLAND III/FT 1/4"/FT � 1/4"/FT \J PRjESXi � � '— — — — — — — — — — ---- — SHOULDER PROFILE GRADE —/ (NCDOT ASB, 10" THICK 2'-6" 'SPILL' C & G 'SPILL' ROADWAY 2'-6" C & G (SEE DETAIL F-11 AND G-11 FOR PAVEMENT DESIGN) DITCH, IF SPECIFIED (SEE GRADING PLAN) TRUCK QUEUE SPACE I EX. BUILDING it VARIES 6: 1 M, .'. U 90, 2.5' 15' PLANT ENTRANCE LANE A-11 ROADWAY TYPICAL SECTION SCALE: 1" = 5' VARIES i 8' i 30' 8' VARIES, SEE GRADING PLAN J PRIES, 1 6..i MAXi i SHOULDER (NCDOT ASB, 10" THICK) — DITCH, IF SPECIFIED (SEE GRADING PLAN) U NORTHBOUND LANE 1/4"/FT SOUTHBOUND LANE 1/4"/FT PROFILE GRADE ROADWAY (SEE DETAIL F-11 AND G-11 FOR PAVEMENT DESIGN) SHOULDER (NCDOT ASB, 10" THICK) B-11 ROADWAY TYPICAL SECTION ill =5' 3' 20' SOUTHB UND LANE EX. CONCRETE SIDEWALK 10, 10, HALF LANE HALF LANE VARIES - SEE GRADING PLAN VARIES - SEE GRADING PLAN (1/8"/FT M 1 8" 8' 1 FT VARIES, SEE GRADING PLAN ') (/ �FT MIN.) 17FT VARIES, SEE GRADING PLAN (10:1 MAX) 7 PROFILE GRADE SHOULDER NCDOT ASB GRADATION SPEC (8" STONE) Sieve Percent Passim 7.ROADWAY (SEE DETAIL F-11 AND G-11 FOR PAVEMENT DESIGN) 1 1/2" 100 1/2" 55 - 95 #4 35 - 74 F&-711 ROADWAY TYPICAL SECTION 1"=5' U I VARIES, 37' MIN. 32.5' VARIES, SEE GRADING PLAN (6:1 MAX) 6' 1/4"/FT LANDSCAPED CONCRETE SIDEWALK 2'-6" 'SPILL' C & G NORTHBOUND LANE 1/4"/FT VARIES NCDOT ASB GRADATION SPEC Sieve Percent Passing 1 1:`2" 100 1 '2" 55 - 95 ;A 35-74 SOUTHBOUND LANE 1/4"/FT -- PROFILE GRADE ROADWAY (SEE DETAIL F-11 AND G-11 FOR PAVEMENT DESIGN) D-11 ROADWAY TYPICAL SECTION ill =5' >a EX. DITCH/ VARIES PROBE STATION TAPER 15' MEAL TRUCK LANE 1/4"/FT -► ROADWAY (SEE DETAIL F-11 AND G-11 FOR PAVEMENT DESIGN) EXCAVATE EX. DITCH FOR IMPROVED DRAINAGE AND STABLE SIDESLOPES 8' 1 "/FT VARIES 6MA, 6 1j SHOULDER (NCDOT ASB, 10" THICK) DITCH, IF SPECIFIED NCDOT ASB GRADATION SPEC (SEE GRADING PLAN) Sieve Percent Passim 1 1/2" 100 1/2" 55 - 95 #4 35 - 74 J 10" 6" 3.: 1 15' BEAN TRUCK LANE SHOULDER (NCDOT ASB, 10" THICK) 8' V VARIES, SEE GRADING PLAN 1�� in VARIE==MAX) NCDOT ASB GRADATION SPEC Sieve Percent Passing 100 1 2" 55 - 95 04 3 5 - 74 18' MEN E-11 TRUCK QUEUE DIMENSIONS 1"=20' 10" PORTLAND CEMENT CONCRETE (4,000 PSI COMPRESSIVE, 650 PSI FLEX) 6" NCDOT CABC, TYPE I OR II HIGH STRENGTH GEOTEXTILE FABRIC (MIRAFI HP 270, OR EQUAL) (SEE NOTE 3) SUBGRADE (98% MIN. STANDARD PROCTOR, WITHIN V BELOW TOP OF SUBGRADE ELEVATION) (95% MIN. STANDARD PROCTOR, GREATER THAN 1' BELOW TOP OF SUBGRADE ELEVATION) NOTES: 1. CONTRACTOR TO SUBMIT A PLAN SHOWING TYPE AND LOCATION OF JOINTS TO OWNER FOR APPROVAL. 2. SEAL JOINTS WITH A MONOELASTIC MATERIAL. 3. USE GEOTEXTILE FABRIC WHERE SPECIFIED IN FIELD BY OWNER'S GEOTECHNICAL CONSULTANT. 4. SEE OWNER'S GEOTECHNICAL REPORT FOR MORE INFORMATION ON CONSTRUCTION SPECIFICATIONS. FF-1-11CONCRETE PAVEMENT NTS 2" ASPHALT SURFACE COURSE, NCDOT TYPE S12.5C 3.5" ASPHALT INTERMEDIATE COURSE, NCDOT TYPE 119.00 12" CABC, NCDOT TYPE I OR II HIGH STRENGTH GEOTEXTILE FABRIC (MIRAFI HP 270, OR EQUAL) (SEE NOTE 1) SUBGRADE (98% MIN. STANDARD PROCTOR, WITHIN 1' BELOW TOP OF SUBGRADE ELEVATION) (95% MIN. STANDARD PROCTOR, GREATER THAN 1' BELOW TOP OF SUBGRADE ELEVATION) NOTES: 1. USE GEOTEXTILE FABRIC WHERE SPECIFIED IN FIELD BY OWNER'S GEOTECHNICAL CONSULTANT. 2. SEE OWNER'S GEOTECHNICAL REPORT FOR MORE INFORMATION ON CONSTRUCTION SPECIFICATIONS. G-11 L ASPHALT PAVEMENT NTS J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL � z O 0 J a W Z LV J W 2: O a o Q J U U U 3 I --I Z� W �((znn J p a 0 � V ,_ i J Z u, WZ w0 - CY Z Q W D U 2:V o �O �> a Wv �a O LL Z = a z J O ~ O W N ca ui U Q � O � Z Q O Q REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: SEE DETAIL JRT Sheet: Designed by: JRT 11 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 TOP OF PILL TOP OF FILL TOP OF FILL v FLEXIBLE PIPE Q COv ccv q0 d C Round Corrugated Steel Pipe Round Cprruoeted Aluminum PL a d~ d d Q Q d Q d a • AP zH� a GENERAL NOTES: zH CC: U 2 2j3. x 1�. corrugation • 2 p13 x Y¢ corrugation * CC U ACC U CCfi CROUND LINE N OApU1G LINE H DROIl1O LINE H 1••1 2 L'3 . H-I Z7 LD SLOPE R6 INDICATED ON PLAN$ W J O HY If O�uj2Z Diameter Minimum cover Maximum Height of Cover [feetl Diameter Minimum cover Maximum HeiGht of Gayer [feet, OW o B O 00 CHAMFER ALL CORNERS 1 OR HAVE A RADIUS OF ,'", 00 2Z CC IL ^ BELL END OF PIPE i - - - Inches in011e3 GB 18 14 12 10 8 inches inches GBj 16 14 12 10 8 W LL ^ W w - -s.aa.,F" - - - - N",, r".� s+rraPrz,r. _ - �" -,rr_ ar+rrs+r�n - - - - an,-.�,rrr•- W LL ^ �� L� I } _ - - - L� L� ( 1 - W d w TG FACE GF WALL F x 3 H-c�3 cs ,2 ,2 204 258 12 ,2 123 ,65 218 281 S" �c.D c7 _ ❑rs PLACE 2 #6 "Y" BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42" COMPACT AFTER COMPACT AFTER F = H" Z 1� 15 12 192 204 15 12 &8 123 174 224 27s F = F Y 1•" 3 F = F ++ r1 F = F Z 1•" A PIPE IS PLAGEP - " - PIPE es PLACED to 12 ,35 lag 23g 18 2 el 102 1aa 187 228 co cD NF w AND OVER WITH A MINIMUM OF 3 COVER AND A LENGTH OF 6 LESS THAN hF o W a Pawn To _ PLACErENr OF "� TTPE 2 �,�, PI. P OF ©O C 21 12 116 145 204 21 , 2 88 87 123 160 19s 0 p Cn Q I - F Q p OnENDWALL LENGTH. O O Do _ PILL _ GEOTENTILE FILL z ,N.,� 24 12 1DD 126 178 24 12 60 76 100 139 171 z I x Mo - Z ,.., R z HH - [.0.fa YIN. F> 30 12 79 100 142 27 12 67 95 123 151 F7 ^-+ I 3.+'1 CON.• Q r' r HH H-M PIPE #4-BARS a CONSTRUCT BOTTOM SLAB WITH FORMS. a HH WRIT L - A CL 36 12 65 83 117 1S2 so 12 SO SS 1 T 1 136 IL •■ I. D.1O MIN. ,� L.D. 7a MLw. u r c rr d r-„ THAN _ rH = "y,- ,r EARTX w ❑ LI•I ❑ ` �- W ❑ W ❑ NOT LESS TMWM G' 42 12 56 70 10D }SO 960 S6 12 54 71 92 113 I I G ❑ NOT LESS THAN e" 1t' PER Farr OF W 0 48 12 48 al 87 113 139 42 12 so 79 Sa O 1 DO NOT INTERPRET WALL THICKNESS (T) SHOWN FOR THE THICKNESS O.G. H G' BUT HOT iMom 12 RDCX NORO.D..3, 54 r2 64 77 100 123 48 12' 52. 68 84 - - �- ACCEPTABLE, BUT IS USED IN COMPUTING ENDWALL QUANTITIES. NORMAL EARTH FOUNDATION AS DIRECTED SI EN __ 90 12 69 90 lit 54 12 46 5D 74 ROCK FOUNDATION1- UNSUITABLE MATERIAL FOUNDATION eG 12 7 1a0 60 2 SD 62 PLAN 12 WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM PIPE IN TRENCH 72 12 74 D7 66 12 51 TOP OF FILL TOP OR FILL TOP OP FILLe 78 12 81 72 12 41 FOOTING OF THE PIPE PLACE BAR 'Y' DOWELS IN THE BASE AS SHOWN ON PLANS. Z 84 12 as 3C (IF CORNET. JOINT IS USED) DOWEL W SPACE BARS APPROXIMATELY ON 12" CENTERS UNLESS OTHERWISE DIRECTED W O O G M D END ELEVATION BAR-r'X" _j(a BY THE ENGINEER. � Vi ~ •• FOR DIFFERENT CORRUGATIONS AND ARCH PIPES REFER TO X GC F ' R N H O ~ ROADWAY DESIGN MANUAL OR MANUFACTURERS SPECIFICATION. o H O = �. W O = W LL J w w W y WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION .JOINT AT THE BOTTOM n W w ORDUND LINE @a Il)' L11E - Mlx. p.p T. O.D MIN. O.D. MIX O-D. Rw. O.D. YIN. O-D s�- GROUND LINE TYPE 2 _ - _ _ !, OEUTE'n - _ _ - - !• s e .r 1�11 •r - q rr�Hr „ "C01PficY AFTER _ - PIPE I8 PLACID I I RIlOR TO �I. D. 7B MIN, PLACEMEMr OF NOT LESS THAN e` Ip r ,N _r ,• FILL _ NOT LEBB TwTx e^ I+rJ - e.n.. s' -",I� I.D. LB RUN. f r - rr P� �rlv mRECTE.D T AFTER I.O.1a KIN. NOT LE5" i11AN 5" YIN. O.P. _ MLR. "O.O. BY ExOTN[ER 2 J HH a m � W Z ❑ lL ,,,M ❑ W d O ❑x '•-' 4 M HO-M REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS CSP - AA$NTO Y36 - CRAP - AASHTO M294 HOPE (MinimuRl fill) 2' for pipe Di6meter9. Z 12" and 5 8O" HOPE - 0.R$HTG Y2D4 Maximum fill 20' for pipe diameters 5 2d" I 1 P P PVC - ASTY F9d9 or AASHTO YSD4 17' for pipe Dienete P6. L 30" and S 60" PVC - (MlnimUm fill] 2, for pipe diameters ? 12" and 5 36" ROTES: FILL HEIGHTS SHORN WERE CALCULATED USING • (Maximum fill] 30' for pipe diameterM ? 12" ands 36' AASHTO LRFO BRIDGE DESIGN SPECIFICATIONS r.:P 2 J C✓) Hy .� LU F d N Z ❑ H 1..( ❑ F IC W = d CS ❑ �' I"I d A W I I I I I I I I I I I I I I I I I I I _ - - - - �- - - t- - - ]OWEL L DOWELS IN EK WeLL WITH IEINF0a6EN COMGRETE PIPE z J � O v LL ' ❑ J W W ❑ J Ni DL LS a IRA HH d d O- ❑ Z W 0D OF THE PIPE AND POUR THE BASE SEPARATELY LEAVE THE POUR nl UGH . fr r+ USE CLASS B CONCRETE. Z J '_P O v r ::- J W W ❑ J CL IL = a F4 H d iL d ❑ ¢ g W 00 LOC. PIPE DIA. SINGLE PIPE DOUBLE PIPE 15 " ,8 " 24 30 „ SS 42" 48 15 " 7a 29 " SG 38 " 42' 4g " BARS "X"' "x" "x" 'x" "X" "X" Y• "x" Y• "x" "%" "%" x" 'x" "x" Y. "X" Y* G CITY. 2 - 2 2 - 2 3 - 3 3 - 3 4 - 4 4 d 2 S - 5 2 2 2 3 3 4 4 2 5 3 - - +J 2 M GTY. 1 1 2 2 z 2 G GTY. 2 2 3 3 a 4 TOTAL L89. 9 9 14 ld 99 5S 65 12 12 19 19 23 77 92 A vR10x r0 L14" PER FOOT Of 'H' F • FILL HEIGHT IS MEASURED FROM THE TOP OF THE PIPE 1 kqT LESS T` YINIMW COVER FOR ALL SIDE DRAIN PIPE H �- OPTIONAL- CONSTRUCTION JOINT ~ W ~ W PiACFMENT OF BUT MUAIJ 12' V7 FILL NORMAL EARTH FOUNDATION ROCK FOUNDATION NOR CURE TIUH 2d UNSUITABLE MATERIAL FOUNDATION LL TO THE BOTTOM OF THE PAVEMENT STRUCTURE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS LL J c LL ELEVATION RIGID PIPE OTE GENERAL MS: DO NOT OPERATE I4FAVY IOUTPMENT OVER ANY PIPE CULVERT UNTIL TNF PIPE CULVERT HAS ® Q O RGP - - (Minimum fill) 1' for Class IV 6 CLASS V d O T.D. - THE MAx IMJM HORTTOTA. INS70F DIAMETER nWHISIOW BEEN PROPERLY EACLRILLED AND COVERED WITH AT LEAST 5'FEET Of APPRW® MATERIAL. 2' for Clean III A CLaeB II a Z O.D. - THE MAXIMUM HORIZONTAL OU131DE DIAMETER DIMENSION. - • - - SPRINGIAE OF PIPE I• . REFER TO THE FOLLOWING FOR PIPE SPECIFICATIONS LC ` r H - THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT SELECT BACKFILL MATERIAL CLOW III OR CLASS II, " (Ma%iMum fill] 1D' Class II pipe RCP - AA$HTG Y17O Al, THE PIPE FROM THE TOP OF THE PIPE TO THE TOP BELOW SPRINGLINE. 'TAT 20' - Class III pipe 30' C1asa IV OF THE EMAANIGENT AT POINT. ® FFPROIfEO' .WTI IARLE LOCAL MATERIAL ARKNE SPRINGLINE. pipe 40' - 01a5G V pipe - TAME CARE To FULLY MKIPACr HAUNCH ZONE OF PIPE RACKFILL. UNDISTURBED EARTH MATERIAL I NOTES: FILL HEIGHTS SHOWN WERE CALCULATED USING (FOP f131S 40` a eG' U6B LRFD Direct I>t361gn Method) LOOSELY PLACED SELECT MATERIAL CLASS [II GR CLASS II. TTPE 1 SELECT MATERIAL CLAaa Y OR YL FOR FOUID117IOM CONOITIONIIM ENCAPSULATE AASHT0 LRFD BRIDGE DESIGN SPECIFICATIONS DIMEMBIOMS AND GONGNETE OUAPRITIES USING CONCRETE PIPE COMMON DIMENSIONS SINGLE PIPE DOUBLE PIPE D H 8 G T S L YD4 M L M. 15" 3'-3" }' B" 2' 9" 214" 9Y2" 5'-6" 0.7 2'-2" 7'-8" 1.0 1S" W-7" 1'-10" 3'-2' 23y" 10' V-4" 1.0 2'-7" V-11" 1.3 24" 4'-2" 2' t • a' ®•• s" 10" 8'-0" is 3'-51, 11'-5" 2.0 SD' 5'-0' 2'-6' 4' 7" 4%,r IlY2" 9'_2" 2.3 4'-8" 13'-5" 3.1 W" W-S" 2'-B" S'-a" 444" 11 �" IT"-0" 3.4 6'-0' 16'-U" 4.9 42" W-2" V-1" W-4" 51a1" 111 "12%6' 4.5 6`•1D" ,8"•S" e.G 48" B'-9" S'-5' 7'-2" 51T{" I 14'-4" 8.0 o CC W we i.i = CrIn z CC = LI7 r car aQ FOR PIPE BEppLING. LEAVE SECTION DIRECTLY BENEATH PIPE MIT}, TYPE Y GEOTEMTIlE AS DIRECTED BY THE EH6INEER. SHEET 2 OF • FILL HEIGHT I$ MEASURED FROM THE TOP OF THE PIPE SHEET OF SXE ET 1 CIF S SXE ET s CIF 3 IIICdPAOTED A9 PIPE $EATINfb AND BAL'SF ELL BILL V MINIMUM COVER FOR ALL SIDE DRAIN PIPE •BEE SHEET 3 eel p y� MOOMPLISH COMPACTION. 30D " D TO THE BOTTOM OF THE PAVEMENT STRUCTURE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS ��� " O 1 B38 . 01 BSS - D li Y _j V 2' WEEP HOLES PLAN 2br-U I L An A- A NOTES: USE PLAN "B" CONCRETE THROUMODUT. z PRONME ALL CATCH BASINS OVER S'-B' IN OEM WM S-EP9 12' ¢ ED ON CENTER. USE STEPS WH CH COMPLY WITH STD. DRAMINO 840.88. I- d OPFOAAL CONeTHUCTIOW - MONOLITHIC POLAR, 2' K01MAY, OR ■4 AM DOWELS Aird 12" CENTERS AS 01RECTEO BY "HE ENDI NEW- 2 L; USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM BLAU. LL z IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF 80, ADD TO SLAB O CO = AB SHOWN ON STD. NO. 8X0.0U. ^ F U p FOR B'-O' IN HIIONr OR LEIB Use a" MALLS AND BOTTOM BLAB. OVER L=Si W-O" TO 18°-0" IN "EIGHT USE a" HALLS AM BOTTOM SLAG- ADUUST OWA7ITIES ACCORDINGLY. W CONSTRUCT WITH PIPE CROWNS WATCHING. CO!L O U- J d O O INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. In Z Hr < INSTILL STONE CHAINS, OF A MINIMUM OF 1 CUBIC TOOT OF NO. Tam STONE IN A F �° FORM FABRIC HAD OR MNIAP, AT EACH WEEP HOLE OR Aa DIRECTED MY THE ENGINEER, d 0 W CNAMFER ALL EXPOSED CORNERS I" ❑ CRANING NOT TO SCALE. "INCREASE THE SIZE OF THE a" oPENDIO TO a' MM., AS DIRECTE3 BY THE ENGINEER BY ADDING 2- TG THE WALL HTEGHT ABOVE THE TOP ELEVATION, ADJUST GUANTITIES ACCORDINGLY. Z M dJ. IF READ I a POP SLAB a TOP SLAB .j m TOP ELEVATION ��_ CRITTER LINE O = LL #4 SM 2 1 6". ^ CD H LUI CL TOP ELEVATION d a CLR. [❑ a . o 101l" ❑ QGO PIPE 1W1LL "CLR. (THICKNESS VARIES a a ' e4 RAR 2 SEE Narl x U) W _ 0II >_ C6 C4 GTE PART SECTION Y-Y O SECTION Y-Y SHOWING RETAILS AT CIENIKG LU 0 MIR. DIIEMSION6 AND QUANTITTEe FOR CONCRETE CATCH BASIN IBASEO ON NIX. HEIGHT, H1 CC W lox A PIPE REINFdICINa A @Or. aINENBTON6 Cru TDB. CO,C. ]N !Ol[ TOTAL -.'IE9 BDa a aLFee OEUNCTIOR Ix1E PIPE q�4 �- 0 NS =2'-3" MID1H NE1O"r BARS - X BARS • Y BARB - Z e H NO•LFNGTH NO LEMOTH NO LEHOTH F G TUP �. MUITPT-m LN. KDr. IMmN iD C.e. R.D. 4' 9" V-10' P' 1 i 4 3 -O' 8 -D a 4'=3" B 4'-OA 2 4'-O" 4'-6" 9'•9" 5" 0-101 D.191 0. 271 0.271 0.250 a.250 27 27 1.046 1.1M 0,015 0.ma 0.OG2 D.fI46 lu .3 EARS ..X" J 1 " LR. EQUALLY SPACED CLR. F PLAN PRECAST OR CAST IN PLACE TOP SLAB F 04 BANS "Y" HANDLE 1" PIPE SLEEVE n 03 BARS EQUALLY SPACED 112" CLR. SECTION V-V O 94 BARS "Y" 11•j- CLR. EQUALLY SPACED lit" CLR. A3 IIMS "X" I SECTION W-W 11� "CLR NJ RAG. io 2 - 3" X 14" THICK ROUND OR BOWE CUT WASHER ER 2 - HEX NUT 6 I DETAIL OF HANDLE COUNTERSINK PART WHERE HANDLE IS LOCATED 1" AN0 ALLOW HANDLE TO MOVE VERTICALLY. 1" PIPE SLEEVE X 3" LONG. PART SECTION THOU COVER SHOWING HANDLE #4 MR N A Aianm R z �ED N L IL _J OOVj2 �Vd©CCU wiz-�0_j O O In d a Z >C y JUj H y W❑ E] _ N IJJ a m O Z LL v �aW 0 HOi a �8Go cr cc �=r N W m IL N �Or W LU V Z .O V 840.04 I YPLAN WITH GRATE A FRAME REMOVED SECTION X-X WEEP HOLES GENERAL NOTES: LADE CLA89 "B" DONCRETE OADUMbuT. MWIDE ALL DROP INLETS OVER 3`.6" IN UOPTH WITH STEPS' t2" ON CENTER. USE STEPS "ITC" COMPLY WITH STD. CAMINO. 340.06- OPTIOWA CONSTRUCTION • MOHW.TTHTC POUR 2' KEYWAY OR W4 OFF DOWELS AT X 12' CENTERS AS DIRFCTFO BY THE EM NEW - ` UGE FORMS FOR THE CONO':RUCTIION OF THE BOTTOM SLAB. J IF REINF ED ETE PIPE I T IN LA8 F % FIR T LF6 OON WNNO SSE BOTTOMS O BOX, P S AS BROWN MXi $TD. N0, 840.00. T WITH P P 1AT . CDM4TRUC WF S E GRAINS gILN4 SEE STANDARD DRARINO 4110.25 FOR ATTACHMENT OF FRAMES AND GRATES HOT SHORN. INSTALL 2" WEEPHDLES AS DIRECTED BY THE ENBINEER. INSTALL STOWDRAINS, DF A MI MINIM OF 1 GBIC 1{px OF NO. Fall BipeE 1N A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CXAIFER ALL EXPOSED CORNERS 1". ORMING NOT TO SCALE. .vr lnuTlnyl ucn ifwJ IP ELEVATION 840.16 FRAME RATE (SEE NOTE) MAX. PIPE THIS SIDE - 10" °p SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON N. HEIGHT H) DIMENSIONS OF 80X 3 PIPE CUBIC YARDS CONE. IN 90% DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SL AN WALL PER FT Mli P'I a•I"-- C.M. R.C. 12" 9'-a" 2'-0" 2 -0 0. 222 0.22E 0.59E 0.015 0. 028 15" 2 •s 0,648 0=3 0,036 2'-1' 0.703 0,033 0.049 24 s D 0.814 6.as9 0.D05 3D" 3'•O" -2'•O" S -B 0.22E 0.22E 0.925 _ 0.09E 11.127 #4 eAR DOWEL C� �a as HZ4 ccU LL. Z O CDU,2 9-.L r~n ~ o'LA LL ZO2� FN 0Lu I Y� PLAN WITH COPING nEMOVEO �7GWA 114FW A -A GENERAL NOTES; MORTAR JOINTS Y2" +1• ig' THICK. USE CLASS "D" CONCRETE THROU6HOUT. USE FORMS FON CONSTRUCTION OF THE BOTTOM SLAB. USE W4 OM DOWELS AT 12" CENTERS. Y1 DEDUCT FOR PIPEISI FROM T07AL CU. YOS. OF BRICK MASONRY• PROVIDE ALL CATCH BASINS OVER W-S" IN DEPTH WITH STEPS 12' ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. USE BRICK OR CONCRETE BLOCK 1MIGH COMPLIES WITH THE REOLIIREYENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX ADD TO SLAB AS SHORN ON STD. MD. 840.00. F IN HEI HT R LE E ' Y04LL. ER ' " 1N HEIGHT. E GR 8 -0 0 0 88 US 8 OV 8 -0USE 12" WALL TO el -D" FROM TOP LESS, WALL AND 8" WALL FOR THE REMAINIG W-0". OLIANTITES TO BE ADJUSTED ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 PON ATTACHMENT OF FRAMES AND GRATES. 00 NOT USE BRICK MASONRY DROP INLET IN LOCATIONS SUBJECT TO TRAFFIC. GHMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. vT,T•+m LAw+ flW E..EVAT[pl STD- Mo.18 RAN, AND SAW TE SECTIONY-Y DIMENSIONS AND GUANTIT7E8 FOR OXOF INLET BASED ON MEN. "EIGHT X1 K , DIMENSIONS OF BOX 8 PIPE CUBIC YMRBS CONCRETE CUBIC YARDS BRICK MASONRY DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B- _ H BOTTOM SLAS WALL PER FKAT HT._ Y1Q1490�HNYPOP.C•S• MIN- Welun._ H P.C. 12" 3'-O" 2'-0" 2'-0' 0.288 0.313 0.82P 0.029 O.D3P 15" 2`-3" 0.265 0.313 01600 q.031 0.047 ,8" 2'-6" 0.268 D.313 0.673 0.044 0.065 24" 3'-O" DIMS D. 313 0.935 0.078 0. 1T3 S0" 3'-D" _ P'•0" 9'8" 0.260 D.3,S 0.901 0.12E 0..T7G L 6" DOWEL KID LU J CL Na ❑ _ 5 a07 Win= Tn L7 y r F-I CV �mr cc CO S- p `>- 3" "S' BARS B 11" CTa. d� _ o THREADED d F r���_r*4d� d i e " DEPRESSION 1F W� 1fig" M. �'�_ ANCHOR ANCHOR ANCHOR HZW CC ❑ C] 1 BAR CD L. HZ-I Dc C7 U 'tl IiJ�H-I U_JOFy LLJ," ' LLJON ,' • 7T�6" 1' - 7�tR" 1� H F ►1 o 8 ° x z GRATE AND FRAME GRATE AND FRAME GRATE AND FRAME 1 " DIA. o o n x z O o ° x z O o T' x z II _ 1 1r+ FG o G - }�04 OD 41 C� L� O' I� m� W C.] 9" "r" BANG M 11 "Ora. 6" BAR DIMENS10N5 ARE OUT TO CUT "a" GARB N,1 Q ❑ O is d z " r CD N ❑ SPACE DOWEL "C" BARS AT A MAXIMUM OF 12" CENTERS. CD N ❑ z NOTE: PRECAST z❑ z F Z z z Hy d h•i U HH Q MAXIMUM DEPTH OF THIS UNIT AS SHOWN I5 12'. HH Q � _ ❑ CONSTRUCT GRATED DROP INLET TO COINCIDE WITH NORMAL CONCRETE � I� � v � O „ �, 4 a OR SUPERELEVATED SHOULDER OR PAVEMENT SLOPE. CONSTRUCTION 4 LL •... 1 _ � CONSTRUCT THE JUNCTION BOX IN ACCORDANCE WITH _ ''�, ❑ W ❑ CONCRETE ❑ d d ❑ ' .r SECTIONS 830, 832. 834 AND 840 OF THE STANDARD SPECIFICATIONS. I,,- I ff I +, I r+ © N CONSTRUCTION ❑ O 0, .' _ - 4'-9" ❑ LU ❑ In '_ 9$" ac pc Q. D[ °° ee O w cc 17 w 3 3 2'-3$$" d d EL a 16" ' W 'w r 3 a" N N I �.•�1' I I 1„S+r j g„ I W, a. Q LL �� H , BRICK MASONRY F d1 ' ..n. STEPS - SEE ❑ ❑ SECTION M- I„ ❑LLI� i g DID. 4 I 4+, CONSTRUCTION ~ W �� GENERAL NOTES N v'. •. m rA H- V1 H Do 3 _2 _� J_ a J w DIA.„,+ '¢ = o ;• a 2 a m a m x DIA. DIA. t] U 12 PIPES SHOW Li w w Z i SEE INSET "A"' FOR ILLUSTRATION Neel ZI) Neel Tn F•1 H 2 rr 7�, I i plRl••••POSEB ONLY Q J Q LL O 21/S" I i :2 "- C7 d 1 U+ I 1 © O l v SMOTE" O LL C7 ccLu GC I 6'•B" ° INSET "A'r LL p a o 3'-1 "' 2'1�$+ N N cc Cb MASONRY ANCHOR CONCRETE ANCHOR PRECAST FRAME AND GRATE INSTALLATION COLL a PLAN OF BOTTOM SLAB CONCRETE BLOCK o ® x F DIA. BOLT WITH PLATE �" DIA. BENT BAR CONCRETE ANCHOR FOR NORMAL CROWN AND O NOTE 1: CONSTRUCT SECTION "B" OF THE PROPOSED WALL 8" THICK. -^ LL f, SUPERELEVATED SECTIONS AND slcrroN ^A" 12" THICK. DIA. BENT BAR NOTE 2: IF PROPOSED STRUCTURE EXCEEDS 12'-0" VERTICAL HEIGHT Aww SECTION E - E SECTION F - F DESIGN WILL BE REQUIRED FOR APPROVAL. 9" SNEE7 7 OF 7 �ia NOTE 3: USE SINGLE EXCEPT DOUBLETMAT STEELING MAYS BEE10 IN LIEU "Y" 64R3 F 111d" SHEET 1 OF 2840.1B OF HOOK BARS IN BASE SLAB. CONCRETE a0TT0Y SLAB SECTION! TOP) -g B40 " 34 840.34 E C70zg APPROVED HC7� LL ��� �� CONCRETE EPDXY rxl xW w g^ f tp LL p BRICK WALL LL O a e "'-^ CO LL "ZO•W GENERAL NOTES- on L` M❑+'WU oorn WASONRY PRECAST noon °° 1 , opmCI oom� z CONCRETE Z W DOWEL "COT 2 USE STANDARD OR JUMBO BRICK FOR WALL CONSTRUCTION. SOLIC r HH WALL r HY 1 + r,-., CONCRETE BRICK OR BLOCK ARE OPTIONAL WALL CONSTRUCTION MATERIAL I I w❑ Lu '_ m W❑ SECTION G - G o y o INCLUDE ALL ADJUSTMENTS TO WALLS, SLABS OR REINFORCING MATERIAL �H I BRICK MASONRY CONCRETE PRECAST CONCRETE IN THE UNIT PRICE BID FOR EACH UNIT. LV$3 a" 1'•41't" F+ CONSTRUCTION CONSTRUCTION CONSTRUCTION OPTIONAL MANHOLE PLAN INSTALL OPTIONAL MANHOLE IN POSITION AS DIRECTED BY THE ENGINEER, PLAN OF FRAME If) SEE GENERAL NOTE s (WITHOUT TOP] CUT OR BEND ALL REBAR CROSSING THIS OPENING TO ALLOW 2" MINIMUM FOR PLACEMENT AND CONCRETE COVERAGE. ENCLOSE THE OPENING WITH R A" BARS TIED TO CAST IRON STEEL INFORMATION 7" 1 7SEE „ FOR MANHOLEDCOVER 6 FRAME TO THE REBAR MAT AND SET SD A MININUM OF 3" CONCRETE COVER IS DETAIL SHOWING ANCHORAGE OF ®'-0„ HOOK 2, RADIUS HOCK X ATTAINED. REFERENCE STD. NO. 840.54 FOR MANHOLE INFORMATION. 0 BRICK MAY BE USED TO oo FRAME FOR GRATED DROP INLET W FINISH GRADE ADJUST FMIff a GDYER go wI PLAN OF GRATING Q w PLAN OF TOP SLAB rl,n BARS TO SURFACE ELEVATION MAX. 1' z PROVIDE JUNCTION BOXES WITH MANHOLES OVER 3'-6" IN DEPTH WITH CAST IRON o Z O UL V) ¢ CONCRETE TOP BUAB LL = O STEPS PLACED ON 72''' CENTERS.REFERENCE STD. NO. 840.68. VARIABLE ¢ to RADIUS 40CI SPIKE 9" - r 0.0E SLOPE d � S d HH�U I I ✓I r3 rx- ''' " ?;: f'i T v3 ':1r.:r3 u.9 2° RADI 5 LL J a HH Z - Q�In= :. _ f JOINT SEALER BASE COURSE VAR. LU O ❑ W•o JOINT FILLER -]SURFACE COURSE 144" RADIUS F x k--- Z W SHOWING EXPANSION JOINT Li J 5" MONOLITHIC CONCRETE ISLAND (SURFACE MOUNTED] „ ON ASPHALT CONCRETE PAVEMENT RADIOS I- i USE ON ISLAND 9' WIDE OR GREATER) d 0 � - { _ G R) w VARIABLE 0 9.1 0.0E SLOPE - --.A°.t- f;%5•�;5•-`ri•s,y,.,.,A,.,M,y, N FOR PAVEMENT DEPTH. r. . JOINT SEALER ".;q KE LA IN ON THE 'T•;• .r Y' .� .3 ✓ .I# ,; . LAST LAYER OF SHOWING GROOVED JOINT PAVEMENT SURFACE 1 COURSE SURFACE COURSE 2" RADIUS PARTIAL LONGITUDINAL SECTIONS BASE COURSE BINDER COURSE 1h" RADIUS o OR EXISTING PAVEMENT LL OF PAVED ISLANDS 5" MONOLETHIG CONCRETE ISLAND (KEYED IN1 y NOTE: ON ASPHALT CONCRETE PAVEMENT a WHEN MONOLITHIC CONCRETE ISLAND IS ON TOP OF SURFACE (USE ON ISLAND LESS THAN 4' WIDE) VARIABLE COURSE, DRIVE 40d SPIKES INTO SURFACE UNDER MCMQLITHIC ❑ ui 1r" x 0" LNG DIA. DEFORM _ CONCRETE ISLAND. STAGGER SPIKES ON 2' CENTERS EACH WAY. BARS ON 24 C STAGGERED B" i•D� ❑ 0.02 SLOPE W IN THE CONCRETE PAVEMENT (ISLAND) AND CONCRETE ISLAND •'+ -+ +•.'..•; :��.':; + •'�.: "• W (MONOLITHIC) PLACE 142" EXPANSION JOINTS AT 30' INTERVALS O AND GROOVED JOINT$ I" DEEP AT 10' INTERVALS BETWEEN 1$$" RADIUS 2" RADIUS Z EXPANSION JOINTS. 5" MONOLITHIC CONCRETE ISLAND X O (SURFACE MOUNTED) ON CONCRETE PAVEMENT O LINE UP THE JOINTS IN THE CONCRETE PAVEMENT (ISLAIO) VARIABLE d WITH THE JOIN73 IN THE CURB OR CURB AND GUTTER. JOINT SEALER FILL AND SEAL THE TOP l" OF THE EXPANSION JOINTS AND JOINT FILLER CURB AND GUTTER 4" CONC. COVER THE EN71HE DEPTH OF GROOVED JOINTS WITH JOINT SEALER. AS CALLED FOR ON 0.02 SLOPE PLANS. FOR JOINTS IN THE CURB AND/OR CURB AND GUTTER, SEE SURFACING - STANDARD NO. 846.01 J,R¢•D n TI a.0 4 BASE COURSE ,1•6 p & `- PAVED CONCRETE ISLAND SHEET , DF , Si�7 i!1 a x n A-+ PLAN OUTLET WIDITCH OUTLET WID DITCH D CLASS '8' RIP RAP CLASS I RIP RAP CLASS W RIP RAP CLASS I RIP RAP TONS 3 - S.Y. TONS - -V- TONS r S.Y. TONS r - 12" 2 5 5 2 5 1 4 2 1 4 15" 2 7 7 3 7 1 5 3 2 8 18" 3 10 3 4 10 2 7 4 2 8 24" 5 14 iB 7 1S 3 11 7 4 12 301, 8 21 21 11 22 5 16 11 7 17 36" 11 28 29 TS 30 7 22 1 16 10 23 42 1S 37 38 20 39 10 28 22 13 30 4 " B 4 9 26 50 28 iT 38 5 a" 60 33 G 2 3 B 21 47 60"' 73 40 75 44 26 56 56" 87 48 89 54 32 67 72' 102 57 104 84 AA1 78 NOTE; FOR CALCULATION PURPOSES _ CLASS B' RIP RAP 100 LE CLASS I RIP RAP 105 LB D SLOPE 1111;1 OR FLATTER H T GEOTE%TILE SECTION A -A PIPE OUTLET WITH DITCH H- RIP RAP TO TOP OF PIPE (MAX. H - D + T) T= 15" CLASS I RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS T- 12" CLASS 'B' RIP RAP, UNLESS OTHERWISE SHOWN ON PLANS 4 X D SECTION B-B PIPE OUTLET WITHOUT DITCH B z 2 d" 4 16 LLJdHyZ OOCO= ^ 0Lo =3 CO I—LL0 W oomd z •>oc I- d 0 LU ❑ U) I- IJJ J Ir o cD U. IL �a ❑ 4 z d F d N Q = o L6 W O N S9 TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. NOTES � 'S' MAX. WITH WIRE 6MAX. WITH WIRE MIDDLE AND VERTICAL WIRES SHALL BE 12Y2 GAUGE MIN. Illall'=11- I ■��� -tl�ll=i1=11=IId1=11�1h�ll�ll:11�11=11�11�1•I•c1h11=lholl�ll. tllflnizeisinisiiiuimiiilONi1"Iiansintii U."IIim'HIMIPILIN ll II�11�11=II�IIoIIvIIFfl=11� - k�0k31k�Tk�f�PTI�IkJfk31 L�H�Tk3 WIRE GEOTEXTILE USE GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. . USE WIRE A MINIMUM OF 32"` IN WIDTH AND WITH A MINIMUM OF 5 LINE WIRES WITH 12" VERTICAL SPACING. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF la"ABOVE GROUND SURFACE. GEOTEXTILE COMPACTED FILL N.} �� )� , II I L-T I I� ,lli�iil�I1=11I STEEL POST - 2'-0" DEPTH EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH z O � HY .t QQ d v LLJHHZ Cox � o 0t F- CC0 U ] J O O y d IY 1ti F N LL ❑ W C7 Cr o W CD = H W LL J IM a U) ❑ +r CL 4 � F U] O R g � W 1605.01 CLASS 'A' STONE B IN. MIN. DEPTH BILL OF MATERIAL MR A a M6 1 2" 9.7 B 14 05 5 6" $0.3 C 26 W4 1 -9" 25.1 Y 14 W5 B -11 101.5 TEEL AL WEI HT 217.15 CU. YDS- CLASS "AA" CONC. 2.8 CU. YDS. BRICK jFT. HT, $" O.'53 CU. YDS. BRICKIF7. HT. 1P" D.94 z ¢ [A Hy ,� d L's NQTES aoN=z 1, PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION °II-U_0 J BY ALL CONSTRUCTION VEHICLES.DC ❑ 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. d o PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY.Uj 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO LU BE DETERMINED BY THE ENGINEER. 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED = o BY THE ENGINEER, 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TD PREVENT VEHICLES Z FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE_ CD z W F•I N �o O z F N Z O 0 J Q W 4 NOTE: PLACE GEOTEXTILE FOR DRAINAGE BENEATH STONE cc 1607.01U .J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919)777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J Q W 3 W J O (Y a V / V V z H� ~ J W Q J p 0 J Z a0 Z W J >- oC 0 Q WZ z V o �O Q LU U) O a p ~o 2 LL a 0 z O W N m 2 � � V I� O REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: NTS JRT Sheet: Designed by: JRT 12 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 oa Fa 18" EXISTING or d� F WIRE MESH 'p.: Q �¢ ~ - z � Lj N C7 LL JOF-I OONxZ STREAM BANK � � � N LL JOI-1 OOyxx / (MIN.) GROUND BACKFILL _ H-I C!S C% LLJQ►y 00a-= b • .' n:'9.• '; [� H-� S? LLJO" OOyxx NOTES wed LL= H ra ov SPEGIAL STILLING BASIN w¢dLL= H cr¢oN - e wgxLL rc��o ❑:o:.:', d,a.:: �.Q a:.: •. :•�] j:.. �; �: a: '•.. W¢aLL= H csCr ~ r2'L V)F ~ ~4w CALL 3 r STAPLE$ ON B H-xH'aW h~LLD p ;C•. •- •0,•- Hx~w �rLL EXCAVATE TEMPORARY DIVERSION WITH NON VERTICAL SIDE SLOPES AND NOT GREATER THAN 1.5:1 SLOPE. LiOJ x o -' ¢LL, a on xN UJ EXISTING TERRAIN J °C v'-' a v N s xaH UJ ='-:%{ :f? 7' CENTERS o- '° a" u ;; T, IN TRENCH }-D �v{gY' xo - v en a N o a :�.' o '. n'4 A :•vd ;a. A Y Y '.p � J °� ¢ 0000 s xFH+ w o a STABILIZE TEMPORARY DIVERSION AS DIRECTED. tD �r �D.M po 9 �• STA.�LE CHECK - :a• 14" WIRE MESH-""'( IMTTINS SMALL BE STAPLES DX p ,•4`?, : Q 0 MATTINGINDTICSES PLACED IN TRENCH 1' CENTERS AND BACKFILLED IN TRENCH : �j: pa'. •4•• tq" WIRE MESH COMPACTED SOIL ��I-�/ 71AGRAV 1 11 DQ. Q•.:• O, :•; O•,• LLI r cc _ �� o p o op ¢ 2' MINIMUM— LQL = 15.0' to 20.0' LVL I Lli ILL = o. SEE NDTE FOR POST DESCRIPTION 1D LOL 0 Q MAXIMUM POST SPACING 4 FT. d FLOW W ¢ A^^ Stapla Check Pattern: 7 'T— T— ~ 3 ¢ Variable* Variable MINIMUM l ! of A p.I a O +r 8 OF SEDIMENT CONTROL STONE ¢ = a J a J 3 I- 4 -f �10" Iq.� Staple f� - 5 J a a 12" NOTES 2' 2' a z a y� cc o GEOTEXTILE FOR ~ sz a USE NO. SEDIMENT DR NO. L STONE FLOIY�. -_-_-Flow FOR 8` TYPICAL r N DRAINAGE NOTES ¢ F IA N J 4- 30' 3' " g� fT J A 4 ~ H (S N= MESNHARDWARECNOTHLWITFINE SEDIMENT 2 WIRE MESH USE 24 GAUGE MINIMUM H [SDENTRp T$TONE CONTROL STONE A INCH MESH OPENINGS. �• 1'-S" ¢ W } 9L USE NO. 5 OR NO. 57 STONE FOR SEDIMENT } FQ•1 Staple 4 x } ¢ ~ PLACE TOP OF WIRE rESNH * A MINIMUM OF ONE FOOT BELOW * SHOULDER OR ANY r Q CONTROL 5TONE, U � C DIAGRAM THE DIVERSION POINT. CLOTH W < J ¢v PROVIDE STABILIZED OUTLET TO STREAM BANK. ¢ MATTING ON SLGPES � GE BOXATTACH HARDWARE TO AVERAGE Box POSTS WITH PLASTIC TIES, WIRE DIMENSION VARIABLE d N CROSS SECTIONAL VIEW WOOD PALLETS MAY BE USED IN LIEU OF STONE W DIAGRAM { �j] arc DIMAVEENSION VARIABLE TREATED FASTENERS, OR OTHER APPROVED TREATED AND GEOTEXTILE AS DIRECTED. A SUFFICIENT NUMBER ATTACHMENT DEVICE. SC OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE NQufl SECTION A -A SEDIMENT CONTROL srgHE. SECTION Y-Y c (= SPECIAL STILLING BASIN ABOVE NATURAL GROUND. THIS DETAIL APPLIES TO STRAW. EXCELSIOR. COIR FIBER WIT AND PE0.LWENT SOIL R?TRFORCEMEHT MAT USE S' STEEL POST, INSTALLED 2' DEEP MINIMUM, AND IRM) INHrALL TION A AS DIRE TED. STAPLES SHALL BE RD. 11 GWOE STEEL WIRE FORMED INTO A "U" SHAPE R[TH A MINIMA TIRW.T I-OT11 OF 1 OF THE SELF -FASTENER MULTI -DIRECTIONAL FLOW MOLE STEEL TYPE. SINGLE -DIRECTIONAL FLOW SHEET S OF 7 Nor TO SCALE SHEET 1 OF 1 INCH NND MDT LESS TWW B INCHES In LEYSTH. NOT TO SCALE SHEET 1 OF 1 SPACE POST A MAXIMUM OF 4'. SHEET 1 DF 1 1630.05 1630.06 1631.01 1632 3 Y 4 NOTES 4 a a a a FLAN( ,L _J o 2 2 z LL J a 2 USE CLASS A EROSION CONTROL STONE U_ J d g 2 B— oa x ILL! $ ao x O N ��v� FOR STRUCTURAL STONE. EARTH BERM ao x g �U v� USE NO. 5 OR NO. 57 STONE FOR Fxrxw 8� e $ }z Fxrx'" SEDIMENT CONTROL STONE. Fxrx'" 01 J SEDIMENT CONTROL STONE y r LL o x o O RA $ $ $ STRUCTURAL STOW .� $ `d 3 SEDIMENT CONTROL F LL v J o o 2 a CONSTRUCT TOP OF BERM A MINIMUM OF PIPE ~ LL O o o a x NOTES $�^� % - :$a' sroxE x ONE FOOT BELOW THE SHOULDER OR A A x USE CLASS I RIP RAP FOR STRUCTURAL$g $ aria Wo a DIVERSION POINT. I L --- - ---i-- .� PLC ip* Wo a NOTES STONE. ° $ 4 PROVIDE A TOTAL SEDIMENT TRAP VOLUME OF 3600t CUBIC FEET PER ACRE c USE NO. 5 OR NO. 57 STONE FOR �$ $ �F�a ;a� Fa R.-Jr USE CLASS B EROSION CONTROL STONE SEDIMENT CONTROL STONE. 3 COIR ON ,,Sg$�$�$ $ �f$?• :: $ Q OF DISTURBED AREA. SOME OF THE REQUIRED VOLUME MAY BE PROVIDED d W rA FOR STRUCTURAL STONE. W$ INSTALL FIBER BAFFLES UPSTREAM SIDE OF SEDIMENT DAM IN aB:L $ � IY IL BY UP OR DOWNSTREAM CONTROLS. d USE NO. 5 OR NO. 57 STONE FOR SEDIMENT $ ,a $ a g FLOW �� STRUCTURAL STONE CONTROL STONE. ff ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1640.01. 9 �$$ $9ia .e ~ a B o U- B 2�2�€9q a LL STRUCTURAL STONE o LL $$ 9 LL1 4 2 $ 9 PLAN z Y 9 x. LL1 F $g8 $ SEDIMENT CONTROL STONE a J :a :a a. PLAN o a o f~IJ a$$ ^b a W z U) a LL1 z U) F 2' MIN. EARTH BERM F 2 0 CHANNEL WIDTH Y N v STRUCTURAL STONE II_00 N uAx J 'a zi wiD"ATIiMIOL 1' MIN I' MIN_Q 12" 4 ;3 4� - �" �. Zr a 12" MIN 12" 18" MIN. R ROADWAY SHOU LDELU = 1•i Q H • z MIN • �:��:b � :�agg.�� ~i 2- 5; x 0 00 00 .o p .o -- -- a IL12' THIr.K SWI.T C DIVERSION POINT Fy� c?•� 18'• MIN. D* c+ FLOW •, ILSECTION SECTION A -A B-B W CONTROL STONE IL - --- _ SC ,. r I T-6" MIN. I 0 0 SEDIMENT CONTROL STONE PIPE D`-24" PIPE MAX. SECTION A -A MEET 1 aF SHEET 1 OF 1 SHEET 1 OF 7 1633.0111634.01111635.02 a CURB AND GUTTER o 0 _ , 0 �000 c� CD 0000�ggo., cs�000�o�c� CP E, n�,.,o�oo 000400�000 �oo�b cc �o � DOo'Y1 �%0 OM o0 00 o c 0 SECTION IN RELATION TO PAVEMENT LAYERS SECTION 'SPILL' C & C NOTES: 1. CURB AND GUTTER TO BE CONSTRUCTED IN 10 FOOT LENGTHS. 2. 1/2" EXPANSION JOINTS SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 50 FEET, AT THE ENDS AND MID -POINT OF RETURNS, AND AT ANY POINT WHERE THE NEW CURB AND GUTTER ABUTS OTHER CONCRETE STRUCTURES. 3. 5' LONG TRANSITIONS SHALL BE PROVIDED BETWEEN NORMAL GUTTER AND 'SPILL' GUTTER, UNLESS OTHERWISE NOTED ON THE PAVING PLANS. 4. 'SPILL' TYPE CURB AND GUTTER SHALL BE USED EVERYWERE IN PROJECT. 5. CURB AND GUTTER SHALL BE PLACED OVER CABC LAYER PER DETAIL. A-13 L 2'- 6" 'SPILL' CONCRETE CURB AND GUTTER NTS BACK OF CURB SCORE FULL WIDTH OF CURB AND GUTTER EDGE OF PAVEMENT 1 N 6" 2'- TOP OF CURB PRnFII F a_ O LLB 2'-640 2'-0" 6-40 '�',F(',TlnN1 F6-_131 METHOD OF TAPERING TOP OF C & G NTS PLAN VIEW NO. 4 PROPOSED SIDEWALK (CONCRETE 3000 P.S.I.) EXPANSION JOINT 0.02'/FT CONTRACTION JOINT _ J CURB AND GUTTER TYPICAL SECTION JOINT FILLER 1/4" SIDEWALK SURFACE 4" .1 /8' RADIUS', 1 /2„ EXPANSION JOINT [C-'131 SIDEWALK ADJACENT CURB AND GUTTER NTS CONCRETE ISLAND (FOR PROBE) D-13 TRENCH DRAIN NTS NOTES: 1. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 50 FEET. 2. ALL CONCRETE TO BE FINISHED WITH CURING COMPOUND. 3. THE CONCRETE THICKNESS SHALL BE 6 INCHES AT LOCATIONS OF DRIVEWAY CROSSINGS AND IN THE HANDICAP RAMPS. J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J a W 3 W J O a � U U V 1 (D ~= z_J oc Z� �a J p Q :c0 w J Z a0 oz Q WZ J O 1 W Z 0 U <� Q LU U cn cn 2 �Z a 00 o H J U � � z O W N 1 m U oC O z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: NTS JRT Sheet: Designed by: JRT 13 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 TOP PR( FILTER FABRIC A NCE CHANNEL WITH \ND CLASS B RIP RAP 'LES J I VIVO HI"fC VIV TOP OF BERM 5 EL = SEE SCHEDULE PROTECT WEIR WITH FILTER WEIR EL - FABRIC AND CLASS B RIP RAP SEE SCHEDULE FILTER FABRIC- _ 4" OR 6" PVC "-III,,��Illllllllii�lll=,�lllillllliillll-III; 5',3'xi 8" 6" THICK STONE APRON LENGTH Q TOP OF STORAGE (SEE SCHEDULE) SKIMMER (SEE DETAIL B-14) 18"MIN RETRIEVAL ROPE --------- 10' x 10' 6" THICK ROCK PAD FOR SKIMMER TO REST ON w w 0 75% OF BOTTOM LENGTH 50% OF BOTTOM LENGTH 25% OF BOTTOM LENGTH- COIR FIBER BAFFLE METAL POST, WOVEN WIRE FABRIC BACKING AND COIR TOP OF FIBER NETTING (TYP.) STORAGE EL = SEE SCHEDULE " 3' -1 i I-I1 BASIN BOTTOM EL = SEE SCHEDULE BOTTOM LENGTH (SEE SCHEDULE) PERSPECTIVE VIEW PERSPECTIVE VIEW 1.5 oFTwF OST FN NOTES: LINE WEIR WITH CLASS B RIP RAP (1.5' THICK) 2 1. NO SILT FENCE ALLOWED. POROUS BAFFLE LIKE JUTE REQUIRED. TOP OF DAM TOP OF BAFFLE SHOULD BE 6" 1=III=III=III=III=III=11- 1 HIGHER THAN THE BOTTOM OF 2. DRIVE STEEL FENCE POST AT LEAST 18" INTO SOLID GROUND THE SPILLWAY :III-11 _ - II 3. WOOD POSTS ARE NOT ACCEPTABLE IIII _ FILTER FC ABRIII= DITCH AND BURY -I'WEIR FILTER FABRIC EDGE 4. USE STAPLES V APART TO ATTACH FABRIC -III-i LENGTH (MIN. 12" OF FABRIC) O "HOG WIRE" (SEE PLAN) BOTTOM OF BAFFLE IN 6" X 6" TRENCH AND 5. BAFFLES SPACED A MAXIMUM OF 8' IN FRONT WEIR SECTION FILLED WITH SOIL AND TWO-THIRDS OF SEDIMENT TRAP (CLOSEST TO RIP -RAP WEIR). COMPACTED LINE CHANNEL WITH CLASS B RIP RAP (1.5' THICK) 2 1 FILTER FABRIC ���11111=- —DITCH AND BURY =III=1 FILTER FABRIC EDGE BOTTOM (MIN. 12" OF FABRIC) WIDTH* *BOTTOM WIDTH SHALL EQUAL THAT OF THE TEMPORARY DIVERSION, HOWEVER SHALL BE 2' MIN. ENTRANCE CHANNEL SECTION NOTES: 1. SEE EROSION CONTROL PLAN FOR BASIN SCHEDULE. CONTRACTOR TO VERIFY FINAL ELEVATIONS WITH ACTUAL FIELD CONDITIONS. 2. THE BERM AND KEY TRENCH SHALL BE CONSTRUCTED OUT OF GOOD CLAY FILL MATERIAL, FREE OF WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL, AND COMPACTED TO 98% OF MAXIMUM DRY DENSITY (8" LIFTS). 3. THE RISER, BARREL, DRAIN, AND TRASH RACK SHALL BE CONSTRUCTED OF CORRUGATED ALUMINUM PIPE, ALUMINIZED STEEL, OR REINFORCED CONCRETE. THE CONTRACTOR SHALL DESIGN THESE STRUCTURAL COMPONENTS. 4. CONSTRUCT THE DAM HEIGHT 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLEMENT. 5. CONSTRUCT THE RISER / BARREL AT THE SAME TIME AS THE BERM EMBANKMENT. CARE SHOULD BE TAKEN TO COMPACT WELL AROUND THE BARREL PIPE. 6. ALL CONNECTIONS SHALL BE WATERTIGHT. 7. A PORTION OF THE RISER SHALL BE SET INSIDE THE CONCRETE ANCHOR WHEN IT IS CAST (AT LEAST 1/2 THE ANCHOR THICKNESS). THE BOTTOM OF THE RISER SHALL BE FILLED WITH CONCRETE TO THE BARREL INVERT LEVEL. RIP RAP OUTLET PROTECTION NCOT STD DWG 876.02 APPROACH CHANNEL 2" PVC DRAIN (NON -PERFORATED) HOG WIRE ATTACHED TO POSTS WITH LENGTHS OF WIRE COIR FIBER BAFFLE INSTALLATION FA__174 TEMPORARY SKIMMER BASIN (BASIN 02) NTS ALL SIDES OF PIPE AND 2'v BELOW BOTTOM OF PIPE 10, TOP WIDTH C/L ANTI -VORTEX PLATES KEY TRENCH (3' BELOW EX. GROUND, 5' WIDE AT BOTTOM) C-14 TEMPORARY SEDIMENT BASIN (BASIN 0 I ) NTS LEVEL PORTION CONTROL SECTION I i _ FLOW WATER SURFACE BERM CONTROL SECTION FREEBOARD (1' MIN) BERM SPILLWAY INVERT ELEV / EXIT SECTOR MIN 20/6 L = 15' EMBANKMENT EMBANKMENT EXTEND LINER V BELOW 22' SPILLWAY INVERT S � NOTE: 100' NEITHER THE LOCATION NOR ALIGNMENT OF THE CONTROL APPROACH PROFILE ALONG CENTERLINE SECTION HAS TO COINCIDE CHANNEL WITH THE CENTERLINE OF THE L = 3' PLAN DAM. EXPANDED SHEET METAL MESH EMERGENCY SPILLWAY (FOR SEDIMENT BASIFL-1-41 NTS VALVE HANDLE FOR POND DRAIN SKIMMER DEWATERING DEVICE (SEE DETAIL B-14) TOP RISER ELEV TOP OF STORAGE ELEV BASIN BOTTOM / BARREL INV. ELEV OVEREXCAVATED 1' FOR �SEDIMENT STORAGE — — — — — — — — — — ATTACH SKIMMER TO POND DRAIN 4" DIA. POND DRAIN WITH VALVE 5' x 5' x 1' THICK CONCRETE ANCHOR 4 RIP RAP LINED 1 WEIR LENGTH (SEE SCHEDULE) _ I RIP RAP OUTLET PROTECTION NCDOT CLASS 'B' RIP RAP CROSS SECTION AT CONTROL SECTION ROCK LINED ENTRANCE CHANNEL (PROTECT WITH CLASS B RIP RAP UNDERLAIN WITH FILTER FABRIC) PVC END CAP F I VI- vlr_vv pvr Fi Rn%Ai END CAP >IN IE "C" ENCLOSURE \TER ENTRY UNIT PVC VENT PIPE *HED PIPE PLANA.) SCHEDULE 40 PVC PIPEE PLATE (SEE PLAN FOR DIA.)N FOR DIA.) FLEXIBLE HOSE END VIEW FRONT VIEW 6-14 SKIMMER DEWATERING DEVICE NTS 75% LENGTH 50% LENGTH 25% LENGTH 4• [BAFFLES WITH METAL POST, @F2 tilyx WOVEN WIRE FABRIC BACKING AOSTSF,y AND COIR FIBER NETTING (TYP.) TOP OF -=III-III 7 STORAGE I �- BOTTOM OF BAFFLE IN 6" X 6" TRENCH AND FILLED WITH SOIL AND PERSPECTIVE VIEW COMPACTED NOTES: TOP OF BAFFLE SHOULD BE 6" HIGHER THAN THE BOTTOM OF THE SPILLWAY HOG WIRE ATTACHED 1. NO SILT FENCE ALLOWED. POROUS BAFFLE LIKE JUTE REQUIRED. TO POSTS WITH LENGTHS OF WIRE 2. DRIVE STEEL FENCE POST AT LEAST 18" INTO SOLID GROUND 3. WOOD POSTS ARE NOT ACCEPTABLE BAFFLE INSTALLATION 4. USE STAPLES V APART TO ATTACH FABRIC 0 "HOG WIRE" 5. BAFFLES SPACED A MAXIMUM OF 8' IN FRONT TWO-THIRDS OF SEDIMENT TRAP (CLOSEST TO RIP -RAP WEIR). D-14 BAFFLE (IN SEDIMENT BASIN) NTS i -77 W M 3 �0 3:1 (TYP) A PLAN NOTES: 1. INSTALL SIGN INDICATING LOCATION OF CONCRETE WASHOUT AREA. 2. AFTER ALL CONCRETE FOR JOB IS PLACED, REMOVE WASTE COLLECTED IN PIT AND DISPOSE OF PROPERLY. TRUCKS UNLOAD FROM HERE 3. INSTALL 10 MIL PLASTIC SHEETING TO LINE WASHOUT AREA AS SHOWN ON THE SECTION. ANCHOR SECURELY IN PLACE. BERM TRUCKS UNLOAD FROM HERE N PLASTIC LINER F-14 TEMPORARY CONCRETE WASHOUT AREA NTS J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919) 777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL O J a W Z W J 0 a U U = J �3 IJ� Z I --I J a0 w J Z Z 0 W J> z 0 Q U Q Z V o O Q W ( j 0 >p z L4L Z p U = a � J O W N 1 ca U O z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: NTS JRT Sheet: Designed by: JRT 14 15 Reviewed by: JRT of Project Number: Date: 18-010 09 MAY 2019 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction, Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than if slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 5O' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones 10 days for Falls Lake Watershed -7 days for perimeter dikes, s-ales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary round stabilization shall be converted to permanent round stabilization as soon as g p l; practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization . T emporary grass seed covered with straw or other mulches and tackifiers A Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting Permanent Stabilization • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch Uniform and evenl distributed ground cover Y 6+ sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed 1, Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC ❑WR List of Approved PAMS/Floccufants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures, 3. Apply flocculants at the concentrations specified in the NCDWR List of Approved PAMS/Flocculonrs and in accordance with the manufacturer's instructions. 4, Provide ponding area for containment of treated Stormwater before discharging offsite. S. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identifyleaks and repair as soon as feasible or remove leaking equipment from the P � g Project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands, 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area, 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. 1, Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2, Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3, Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit, EARTHEN STOCKPILE MANAGEMENT 1 Show stockpile locations on plans. Locate earthen -material stockpile arear at le ast 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with slit fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements, Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. «-. ` ° ��``' t y NORTH CA NA 1� Environmental Quality NCG01 GROUND STABILIZATION AND MATERIALS HANDLING I EFFECTIVE: 04/01/19 ONSIT€ CONCRETE WASIWT STRUCTURE WITH LINER 1.r �r/,/�+"r'"_ kl f,��-� lJ.,jf_--77=2� o v t �� .�.l + I°lfl4c_ - .n..W. n" MAY fl' °� - afi_ml GRAI& L6FJT S�T1111111,12E AWVr CWh%4WIT CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3, Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within tot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6, Locate washouts at [east 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. % Remove leavings from the washout when at approximately 75%capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout, HERBICIDES, PESTICIDESAND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface Ovater. If a spill occurs, clean area immediately. 4, Do not stockpile these materials ons)te. a i - rit v 1. Clear - and sin he area under the cmbanidncn. of all vegetation and Construction � �� P g coot mat. Remove all surface soil containin iti h arnowrts of tic matter Specifications g g or$att and stockpile or dis m of it properly. Haul all ob'ecxiorrable material to the kP Po ProFM Y t dexiill p P aahal dis ptasal area. Place tern orary sedinn:ut control nreasurGs below basin as needed 2. Ewt¢c lira[ fill material fs the cmbanktnent is free of rods, woody ve taticah r amc n.altra aril d uh'er.-1 .hl. onatenal. plea-. ire lilt in , i liit$tuH tot CXOWd 9 iuche5, Mid maahnnc. curupuet it over fill the ernbankrutit 6 inches to allow for settlement 3. Shapethe bmiu to the specified dunensions. Prevent Ilse skinmrii device p g from settling into the mud by excavating a slmlktw pit carder die skiinmer or P rovidb.g a low support under die skinnieror ofstone tbiber. 4. Place the barrel (typically flinch Schedule 40 PVC pipe) on a finrt,. smooth foundal ,n of hmpr. vac irw.anil. Do nun use ota nhal- col arc], es aeohe Fwr t ravel or crttdoed stone as backilli arvmd the i Place the fill material 8 pips, amutd the pipe spillway in 4-inch layers and compact it under and orotmd tho pipe to w Icast the same density as the a4iacem embankment Care must be Laken rrol to raise the pipe ftoin the fimr contact widt its fowidadon when ,mup ping uudtT the pi hounder.. Placea mairnuar depth of 2. feet of compacted backfill ovrer the pipe siillw•ay befure crossing it with tals1=6e1). equipntent In au wive should the pipe conduit be iistaded by cutting a trench through Ux dam after the embankment its cnrnpler.. 5. Assemble the skimmer following the mamufmcuuces instructions, or as designed. 6. Lay if.. iw�s ..thlul skinunm on the Iwteorn of tlx bias in will. Lire. tlexibi, joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the sk hm nor over the excavated pit or support. Be sut+e to attach a rope to the skimmer and anchor it to the side ofthe basin. This will be used to pul[ dha skim.... to d.-,,id. Psi ... intv.nn- 7. Eanism spillways -postal] die spil.hvay in wdLm rl l soil to the greatest extent pc ssihie. fie achievement of planned. diva ious, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. Tlx: spillway should be liuet with lammialad plastic or impermeable geotexlile fabric The fabric must be wide and long enough to covv-r dic bwnom turd silks and extend onto die top of the damn for amclwring in a tree h Tht edprs may Inc secured with 8-bich stapl s or puts. Tat fabric Hooch 1-lit 1111gh t st..l It- [I.. .111P..I -it auto Itch].grirunl. T]m wilt, cif the rihric .mist be muic pits.. not i.nncd Hr xphc tl, cAhmmise water cm gel tuukr 11w fabric. If the laaiglh of Ilex fabric tv insuf it Gieat for the Cmirc I It of ire spillway, multiple &actions, spanning the compl'eie width, may be toed 'Itne upper sectton(s) should overlap (be lower secuorX so that waw cannot Am, under the fabdc. Secure the upper odge and sicks of die fabric in a Ircach with staples or I. (Adapted frwu "A Nianunl for Designing, Installing and Maintaining Skitnmcr Sediment Basins." Pcbruary, 199% J. w, Fairc&htt & Sena), 8. Ink;L:-f)iscluuy'e; w4lcri.no tl.. harm in u rnruarcrto Pn. xnl-.i.l.. tire; temporary slope drains or diversinns with outlet protecrion to divert sediment- laden water W the upper end of the pool area to improve basin trap efficiency (Refemtces! Rurp(1'Gawm1 Ak,., trres and Clsidel P)vrecdm)_ rut. 61t6 9. Erasion coatml--Conshact the structure so that the disturbed area is minimi7,cd. Dncrt swfttce water away from here areas. Compete the embankment belfare tlx area is seared. Stabilim the emergrricy spillway embankment and all other disturbed areas above the crestof the principal spillway bnmediarcly after construction (Refcreno s; Swf7ce.SraN1iwfiou). 10. Install porous baffles as sp,xified is Practice. 6.65, Pmuct Baffles. 11. After all the sediment -producing areas have beenpermumently stabilized, remove the structure and all ire unstable stduuent. Snwoti the area to hbcricl wilh Arc adjoining anrx and stahilvc properly (Rcfcrctivw Sngr •r ,S1abdiaarwn). Maintenance Inspca-t skimmer sctimwnt hasius at ]cast wedcly aril afi,r meth sagpihva 1 (one-half inch or greater) rainfall event and repair immediately. Remove sediment and reslorc the basin to its onigiral dimensions .ben seditnenl woumulat&s to one-half the height of the first baffle. Pull tiro skimmer m one side so dot the sediment widen a nth it can be excavated. £•aacawle the sediment from the entire basin, not just around the skirnmor or the firm cell. Ntake sure vegetation growing in tie bottom of the basin does rot hold down die skintrer. Repair the baffles if they Oro dmiapd- Re-atchor die bafles if water is flowing widemeadh or around them. If tie skinmier is clogged with trash anal fhert is water in dte basin, awially jerking to dte rope will make the skbumeir bob up and do.n and dislodge ire debris and restore flow. if dais dries rxrt weak, poll die skinnier over to die sick of the basin aad remove tho debris. Also check the orilice iis'dc the skimmer to see if it is ckhgged; ifso remove tie debris. If the skims a rani ors baml pipe i, ch egged, tin: enlist scan l.- mcmoved aril the obstruction cleared with a pluuber's snake or by Ruuhnig with water. Bc stue alai replace the arilic. hc1m. repositimiiing ire skkrmrer. Check the fabric lined spillway For damage and make soy required repairs with fabric that spurs the frill width of the spillway. Check the enibaukincnl, spilhvays, and owlet for erosion damage, and itisped the etubank cent for piping and sehlement Nfakc all necessary repairs immediately. Remove all [cosh aria other debris from the skimmer and pail arras. Freezing weather care mull in ice forming in the basin. Some spmial pnc utiens should be tulmn it the wmtcr to pavcmt the skinuncr ficnn plugging with ice. 6.64M SKIMMER BASINS Construction 1. tirade ire basin so that the bottom is level front to back and side to site. 2, install posts or saw horses across the width ofthe swiimenl tin tice Specification P P t?'rac 6.625rviinruri Fence), 3, Stab should be driven m a. & of 24 inches . seed a maximma posts l� . sP of 4 feet all aril imtal&rd u ire sidca .fda:1 a bi m well. T. to of tire. P P fabric should be 6 inches higher than the inircrr ofthe spillway; Tops ofbaAics should be 2 iwls� tow," than tlw top of Ibe terms. 4. l at 1- st th l cows of rxiRl •s h the urn t said outl t dL I Install u+. rue u ctwcm c e sc point llasins less than 20 fort in length may use 2 Kamm- 3, Wbett us add a support wire ox across the to of the measure mg �P to m,writ sagging. P gg $ A 6. Via musmatenal like'ule backrd b coir mains] over a sawhorse er P Op , ! y the top wire. Hammer rebar into the saw4narse legs far anchorbig. The fabric should have five to ten percent openings in die weav& Attach fabric to a rope antl a support struct n, with zip tics, wire, or stnplus. 7. The bottom and sides ofthc fabric should be anchored in a treuch a pinned widi 8-vicli emsiath control matting staples. Ill D. rxn sph" the fabric, but xw a c.rflim[al.: pimv acr s din basin. Ins ct bafles at Ieasl once a week will after each rainfall. , lake an required Make Maintenance Pe y repairs innnediately. Re sum Lo maintainaccess to t e baffles. Slxould die fabric ofa baffle collapse, tear, decompose, or become frtcf ieci , replace it promptly. Retrieve sediment deposits when it reaches half full to pHw ide adequate storage voluac for the nerd mat and to reduce pressure on the baffles. Take uwrn to avoid dL tagi.g the baffles darting clearwut. Sedimerht dapdi should never exceed half the deslgued storage depth. After the corutbuting drainage array has been properly stabilized, remove all baffle materials and unstable se"rem deposits, bring (he area to gmde, atit nabi liza iu References s-d6neidts.N-daat 6-60 Temytorary Se&wv Tiuy 0.61 Sec&rrtenl Basins 6.62Ser&aar1Fac . 6.63 Rani 1)amr 6,648ki..- Se&nw_nl Dwin HeLaughlin, Richard "SvdFacv: Ba0i 10 finirmw,Sedw,w Bash.," N. C Scare UnlversflyCmperwNe Errennon Service Fact Sheet.lGW-439-59, 2005. 54i7 , Brfan. Cln, ofHlgh PoinfEt wn cvuhvisp"yicarions. Th. min, C. S., J Cufarw-, mtdR. A. bfeLoughlrn. 2004- Hyr3nodyrmmic ress smmw of,•atiaar tyl afba,(]ies in a strd+Wn1,*1evian Pond PauacirN ofthaASAE.fbl.47(3).•741.7dp. 6.65.5 TEMPORARY BAFFLES HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers undercover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. Construction Condrucfion w' h . Even if n tl deli d if not properly installed, RiCT s ill roha.l Specifications r' '� y s1C P "� y `� P y not function as desired. Proper installation is im ratrre Ewen if rb' � Rd I>roPe . install if not o r timed and noun ve tation wi11 probably not dot, shed, Pr Pe h Fie Pr , o avdesnred Pit vend a tatwn selattdn is also tin ..raft e gr trey gC pe Gradc the surface of installation areas so that the ground is smooth and loosc. AA hen seeding prior to installation, follow the steps for seed bat preparation, soil amendmentx and seeding m Surface Stabilizabon, 6. L All gullies, rills, and an other disturbed areas must be fine dial ' to installation. Spread Y � �° Pre seed befare RECP installation. (Important: Remove all large rooks, dirt clods, stumps,root grass slum trash and other obstructions from the soil surface s. Fa f� to allow for direct Cori Between the soil svrfmc and ills RECP) Terminal anchor trantdtes we required at RECP ends and intermittent tenches must he constructed across channels of 25-foot intervals.. Tennimil anchor trenches should be a minimum o 12 inches in depth and 6 inches in width f ddpt h , while intermittent trenches creed be only 6 inches deep and 6 irtclws wide. Imiallation fur Slopes- Place the III 2-3 feetawcr the top of the slope aril tau an excav sled end trench measuring approximately 12 inches deep by 6 inches wide. Pin the Iat I foot intervals along the bottom of the lronch, backfill], and compact. Unroll the RECP down (or along) the slope maintaining direct contact between the soil and the I Overlap adjacent rolls a minimum of 3 inches. Pin the RECP to the ground using staples or pins in a 3 foot center -to -center patem Less frequent staplinglpirming. is aceeputble on moderate slopes. ncv. 6 V6 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION are Self -inspections required during normal business hours in accordance with the table P q g below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (d urn rig normal Inspection records must Include: buslisess,outx (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily min gauge observations are made during weekend or good working holiday periods, and no mdividualday rainfall information is order available, record the cumulative rain measurement for those un- 'nended days (art[ this will determine If a $ite inspection is Ieededl. Days m which no rainfall occurred shall be recorded as -Zero.' Till permit" may use another rain -monitoring device ap roved b the Division. (2) E&SC At least once per 1, Identification ofthe measures inspected, Measures 7 calendar days 2. Date and time of the inspection, andwithin 24 3, Name of the person performin g the inspection, hours of a rain 4" Indication of whetherthe measures were operating event? 1.0 inch in property, 24 hours 5. Description of maintenance needs for the measure, fit. Doscri tion, ovidonce, antl date. of corrective actions taken. (3) Stormwater At least once per 1. Idcmthcmton of the dischergc outfalls Inspected, discharge 7calendar days 2. Date and time of the inspection, outfalls [Boast and within 24 3. Name of the person performin g the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as 00 evemcg 1.0 Inch In sheen, floatingor suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Desert ption, evidence, and date of corrective actions taken, (4) Perimeter of At Mast on cc per Nvisible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to cleanup or stabilize the sediment that has left h ors oa ram t 0 the ithorns. ere event> 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. Anexplanation as to the actions taken to control future releases. (5) streams or At least once per I If the stream or wetland has increased visible sedimentation or a wetlandsonsbte 7 calendar days stream hasvisiileinereasedturbidity from, theconstruction or otfsite andwithin 24 activity, then a record of the following shall Abe made: (where hours of a rain L Descrl ptbe n, evldc rice and date of corrective actions taken- and accessible) event? 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional office per Part ill, section C, rem (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of stone measures drainage facilities, wmpletier of all land -disturbing activity, construction or redevelopment, permanent ground covert. 2. Documentation that the required ground stabilization measures have beer ovideci within the requited W q timeframe or an assurance that they will be provided as _.soon ay possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. t "3 �''} NORTH CAROLINA a�f' Environmental Quality .r - fnslallatiors in Chanrurls- Kua ate icrmrna! lrenclu:s (1 _ tnch+as deep oral 6 inchesn'ide) across the channel at the tipper and lower end ofthe lined channel sections. At _S-Cool intervals along the channel anchor the RECP across the charnel either in 6 inch 6 inch trenches or by msstalli Iwo closet by na y spaced roux of anchors Excavate l tttd nag trenches 6 riches die and outdo alon R channel es above water line in which to the outside RECP edges. �g b r � d&es. Platt the Fist RE _r Pat the dowrnsticam end of the chamicl Place the slat of the first RE .P in the terminal trench and in it at 1 foot intervals al the p `� bmtom of the trench. Notes The RECP should be placed upside down in the trench with the roll on the downstream side of the benoh, Once finned and backfi)led the RfiCP is sin I od its P poi b Y wry i PP rig c,va' t to of the trench and unrolli u stream. if the channel is wider than the P � P provided rolls, pine aids of adjacent rolls in the terminal bench, overlapping the ,Awonl rolls a minimum of 3 inches Pin at i foot intCTMIs. badtli11. avid coin ct. Unroll the RECP in the am direction until reaching the first Fro upstream rig intermittent trench. Pold the RECP back over ilsetC Pori rig inom the roll on She do.nisircam side of ills trench, and all[ wing die mat it conform to the trench. Then On the RECP (two layers) to the bottom of the trench, backfill, and compact. Continue up the channel (wrapping over the lop of the imermittent trench) repeating this step.. at odor intermittent trenches, until reaching the upper lean ina I trench. At the upper terminal trench allow the RECP to conform to the trench, PPc � h, secure with pins or staples, backfill, compact and then bring the mat back over the top of the trench and onto the existing mat (2 to 3 feet merlap in the downstream djreclionj, and pin at I foot intervals across the RECP. When starting installation ofa new roll, begin in a trench or shingle -lap ends of ri a minimum of 1 foot with upstream RECP on top to prevent uplifting Place the omsidd edges of the RL•'CP(s) in longitudinal trencius. pin, backfill, alai Cornpxra Anchoring 13tvices-I I gauge, at least 6 inches length by 1 inch width staples or 12 inch m intm wn lcrry*th wooden stakes are racomm etrded for anchoring the RECP to the ground. Drive staples or pins so that the top of the staple or pin is flush with the ground s Iaoc. Anchor each RECP every 3 f6vt along its center. Longitudinal overlaps must be sufficient to accommodate a row of anchors and uniform along the entire length of overbil and anchored every 3 feet along the overlap length. Roll crxls may be spliced by ervcrlapping. I Coot (in the direction of water ll with the upsucanvupslope mat placed on top of the dow'nsucam,' ECP. This overlap should be anchored m 1 foot spacing across cl w lope R the RECR when installing multiplc width mats heal seamed in the factory; all factory slams and field overlaps should be similarly antlered. 6.17.9 PART I I I SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: hani Document Documentation Requirements [a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not slgnificantlydevlate from the ofthe approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&5C Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved I Plan or complete, date and sign an inspection report to indicate completion ofthe construction phase. (c) Ground cover is located and installed Initial and date a copy of tie approved II In accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliaice with approved ground cover specifications. (d) The maintenance and repair Complete, dale and sign a inspection report. requirements for all E&SC Measures have been performed. le) Corrective actions have been taken Initial and date a copy of tie approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action- 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the requiredelements.Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -co records. P q Y hard -copy c All data used to complete the Notice of Intent and older inspection records shall be () P P maintained for a period of three years after project completion and made available upon request. [40 CFR 122.411 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C. REPORTING 1. Occurrences that must be reported Perrrtrees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Cil spills if: i They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-C368 or (919) 733-3300. Occurrence ReportingTlmeframes (After Discovery) and Other Requirements a visible sediment 4 . Within 74 hours an oral all electronic notification. (1 I deposition in a . Within 7 rolendor days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the IoL nittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure conpliance with the federal or state impaired watarsconditibons. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(bl-(q above (c) Anticipated • A report of feast ten days before the date of the bypass, lfpossible. bypasses 140 CFR The report shall include an evaluation of the anticipated quality and 122.41(3 1(rn}1 effect of the bypass, (d) unanticipated Within 24 hours, an oral or electronic notification. asses[40 CFR bypasses Within 7cuferrdardays a report that includes an evaluation of the 122.41(m)(3)] quality and effect ofthe bypass. (a) Noncompliance • Within 24 hours, an oral ar electronic notification. with th a conch ti on s • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger Including exact dates and times, and if the noncompliance has not health orthe been corrected, the anticipated time noncompliance is expectedto emrirenraent[40 continue, and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance, [40 CFR 122.41(l)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING Fgll IL17d Temporary Channel Unam Washington State Department of Ecdlogy overt ft' min. _1 Overdrt channel 2'to alto duringseedbed ation R roper F 6" f Intermittent check slot 51ringle-Icq spliced ends or begin new roll in on irite rnittem check slot Prepwi instal li tempi Excavate dnmuwl to design grade and crass -section i I n depth M 9 �P J► 1.6wjitudinal anchor french Typical Irntallation4� , with erosion control blankets all turf reinfcrcemem mots Longitudinal anchor trench NOTES: L Design velodties exceeding 2 fusee require temporary blankets, mats or similar liners to protect seed and soi I until vegetation becomes established. 2. Gross -lined channels with design velocities exceeding 6 ftlsec should include turf reinforcement mots Il l +.ill Rev. 696 Figure &17e Channel Installation and Slope Installation; Washington State Eodogy Department Lon9ltudnal anchor chor Terminab slo pe e and ¢tdamel anchor trench Stake art 3'-5' intervals r . ;Iilif y l r+ Initial dronnel M P Trnermittem anchor trench check slot NOIll L Check sIors to be oonstructed per manufocturers specillons, 2. Staking all Stapling layout per manufacturers specifications.. Slope surface shall be smooth before If there is a berm of the top of placement for proper sail caerl slope, anchor upsiape of the berm, Ntin. 2" Stapling pm°rern as overlap �`�� � Anchor in 6"x6'Mn Trench. per nxr mufachers _ + and stopk at 12' intervals. recommeride horn. + } On 6" overlap. Staple overlaps mox. 5" sped rig. 0a rat stretch blanketslmotti tight -allow n9 ti gh►' firing mocrerial down to a level area, turn the end under 4' and staple at 12' th a rot is to conform to ory it regularbti es. inRervals- For slopes less than 3KIv, rolls Lime, fertilize, and seed before Installation Plarrhing may be placed in horiiorttal stops. of shrubs, trees, etc should occur after installation 6W &17.11 ROLLED EROSION CONTROL PRODUCTS (R.E.C.P.) EFFECTIVE: 04/01 / 19 Inspect Rolled Erosion Control Products at least weekly and after each Maintenance 1. significant (10. inch or greater) rein fall event repair immediately. 1, Good contact with die ground must be maintainer, and erosion must not occur beneath the Rfi('r. 3. Any areas of the RECP that are damaged or not in close contact with the ound shall be r ired and stapled. sr � led. P 4. rs n if ere teas occurs due ui cxxl � controlled drainage. the problem shall be P } g fixed and the eroded area R rotecled. S Monilm and repair the RECP as necessary until ground cover is cslablished. v. S toe C. Joel. Tltf' Environmental], Inc.��irea'n IttCC References Drag �g �8, Design prirwiplos and applicalicns using rolled erosion control produce:" Storm Water himMerri Manual for Western Washington. Wwhibgtan State Department of Ecology, Water Quality Prog ram -�;iv - hv! 'v t fi htl . v wwvti; tort a rr cows stormwal�r�tmlc�..html P y 8 r� q Erosion Control Tochnology Council, hop ,wwwv.ectc.oM R++, WV J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 (919)777-6010 phone www.jthomasengineering.com license no. C-3389 PROFESSIONAL ENGINEER'S SEAL I- O a W D Z Z W J O W V V 3 �- 2 W Z I- iiiii- J W � J o Ip w a J Z o WZ - a J J ^ >_ z O I it a Il I- QW 1 (J a �- 0 a W V '^ V/ O 0 a z LL Z I a I- J ® ca 1 Z 1"I' V W O Z REVISIONS AGENCY REVIEW ONLY Scale: Drawn by: NTS JRT Sheet: Designed by: JRT 15 15 Reviewed by: JRT of Date: Project Number: 18-010 09 MAY 2019 0) O M Q G •i rL