Loading...
HomeMy WebLinkAbout20190788 Ver 1_Minor Variance_20190612K" r_0Water ResourcesENTAL QUALITY 15ANCAC 0213.0233 (8)(b),.0243 (8)(b),.0250 (11)(b), .0259 (8)(b),.0267 (11)(c), .0607 (e)(2) Protection and Maintenance of Riparian Areas Rules - Variance Application E -FORM VAR 10-2018 Submittal Application dated 6/12/2019 A. General Project Information For instructions on how to fill out this form, seethe Major and Minor Variance Help Document posted on DWR's 401 & Buffer Permitting page. Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. 1a. Is this a transportation r Yes project?* r No B. Please Identify Which Riparian Area Protection Rule Applies: 1. Type of Variance: r Major Variance r Minor Variance Link to the 401 and Buffer Permitting Statues and Rules: https://deq.nc.gov/about/divisions/water-resources/water-resources-rules/401- certification-express-review -statutes-rules-guides r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r Jordan Lake Watershed (15A NCAC 0213.0267) C. Applicant/Owner Information ..................................................................................................................................................................................... Who is submitting the application:* F Owner F Applicant other than Owner V Agent Check all that apply. Is there an agent working on the project but not submitting it? r Yes r No Primary Contact: Primary Contact Email: 1. Property Owner: Kevin C Martin This is for w ho should be notified if a payrrent is required. kmartin@sandec.com 1a. Name:* New Trinity Missionary Baptist Church 1b. Title: Deacon (Michael Sims) 1c. Mailing Address:* Street Address 115 S. Robertson St. Address Line 2 Oty Clayton Postal / Zip Code 27528 1d. Telephone:* 919-606-5012 1e. Email Address:* michael@ttcreativegroup.com 3. Agent Information: State / Province / Region NC Country US 3a. Name:* Kevin Martin 3b. Company Affiliation:* Soil & Environmental Consultants, PA 3c. Mailing Address:* Street Address 8412 Falls of Neuse Road, Suite 104 Address Line 2 Oty Raleigh Postal / Zip Code 27615 3d. Telephone:* 9198465900 3e. Email Address:* kmartin@sandec.com 3f. Attach an agent authorization form.* Click the upload button or drag and drop files here to attach docurrent signed owner cert agent auth.pdf 261.56KB FDF Only State / Province / Fbgion North Carolina Country USA D. Project Information ......................................................................................................................................................................................................................................................................................... 1. Project Name:* New Trinity Misionary Baptist Church - New Sanctuary Building (Subdivision, facility, or establishrrent narre) 2. County(ies)* Johnston 3. Property Location: 3a. Property Address:* Street Address 347 W. Main St. and 317 W. Second St. Address Line 2 Oty Clayton F bstal / Zip Code 27528 3b. Latitude: 35.655078 State / Province / Fbgion NC Country US 3c. Longitude: -78.462967 3d. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docurrent CLAYTON USGS.pdf 351.98KB PDF Only * USGS Topo look up 3e. Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Oick the upload button or drag and drop files here to attach docurrent soils map.pdf FDF only 684.56KB Link to Soil Surveys for North Carolina Counties. (Please see instructions in the Help Document to determine the most recent published version.) 4. Property Information: 4a. Parcel Identification Number (PIN) 165916-93-7608 165916-93-7577 4b. Date Property Purchased: 04/11/2006 nTddd/yyyy 4c. Type of B F Book# Page# I Deed 3099 172 -IFMap NA 4d. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document PDF_PRINT_MAP_1560193147.pdf 638.25KB PDF Only 4e. Is your project in one of the 20 Coastal Counties covered under the Coastal Area Management Act (CAMA)?* (' Yes c-- No n 4f. Is the project located within a NC DCM Area of Environmental Concern (AEC)?* f Yes r No r Unknown 5. Stream associated with riparian buffer to be impacted by the proposed activity: Name 11 Water Quality Classification UT of Little Creek C; NSW 7. List any permits/approvals that have been requested or obtained for this project in the past. Date Applied Date Received Permit Type E. Proposed Activity 1. Provide a detailed description of the proposed activity including its purpose:* Redevelopment of existing Church and commercial property to allow for expansion of church. Specifically a new larger Sanctuary to meet the needs of an expanding congregation 2. Attach a site plan as applicable to the project: (lick the upload button or drag and drop files here to attach docurrent buffer variance impacts -New Trinity_6-7-201 9.pdf 237.54KB FDF only *' Below is a link with instructions on what you will need to show on your site plan. http://edocs.deq.nc.gov/WaterResources/O/doc/402224/Pagel.aspx F. Proposed Impacts and Mitigation Information ...................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1. Individually list the square footage of each proposed impact to the protected riparian buffers: 1 a. Site# - Reason 1 b. Buffer 1 c. Stream Name 1d. Mitigation 1 f. Zone 1 1 g. Zone 2 Impact* Required? N/A Temporary No 0.00 0.00 Nbp label (e.g. Finad Crossing 1) (T) Square Feet Square Feet 1h. Total Zone 1 Impacts: 0.00 1i. Total Zone 2 Impacts: 1,042.0 0 Proposed 1 Story Church Permanent UT Little Creek Yes 0.00 774.00 Bldg (P) Square Feet Square Feet IVhp label (e.g. Finad Crossing 1) N/A Temporary No 0.00 0.00 Nbp label (e.g. Finad Crossing 1) (T) Square Feet Square Feet 1h. Total Zone 1 Impacts: 0.00 1i. Total Zone 2 Impacts: 1,042.0 0 Bioretention Cell Permanent UT Little Creek Yes 0.00 268.00 N/hp label (e.g. Finad Crossing 1) (P) Square Feet Square Feet N/A Temporary No 0.00 0.00 Nbp label (e.g. Finad Crossing 1) (T) Square Feet Square Feet 1h. Total Zone 1 Impacts: 0.00 1i. Total Zone 2 Impacts: 1,042.0 0 1j. Total Buffer Impacts: 1,042.0 0 1k. Comments: Calculated Mitigation 11. Zone 1 Total Impact Multiplier Required Mitigation Square Feet Square Feet 0.00 Square Feet 3 0.00 Square Feet 1m. Zone 2 Total Impact Multiplier Required Mitigation 1,042.00 1.50 1,563.00 Square Feet Square Feet 2. Mitigation Information 2a. What is the mitigation plan proposed for this project?* rJ Payment to private mitigation bank r Payment to Division of Mitigation (DMS) Permittee responsible mitigation 2d. Attach statement of availability from mitigation provider.* New Trinity Baptist Church - Buffer SOA 6-11-19.pdf 122.48KB 2f. Comments: G. Stormwater 1. Provide a description of how diffuse flow will be maintained through the protected riparian buffers (e.g., re- planting vegetation or enhancement of existing vegetation, gutter splash pads, level spreader to control of runoff from impervious surfaces, etc.).* Danny Smith and Stephanie Goss previously evaluated the site and determined the limits of existing uses (specifically parking, buildings and driveways) that are exempt from the buffer rules and can continue to be used for their existing use so no stormwater plans are provided for those areas. However the new impervious area will be treated by a bioretention cell (see attached impact maps for location) which will discharge to an existing stormwater collection system. Calculations for the bioretention cell are attached. A significant portion of the new sanctuary will be constructed where existing buildings or other imperviuos surfaces exist. 2. Show the location of diffuse flow measure(s) on your site plan. Qick the upload button or drag and drop files here to attach docurrent New Trinity Missionary Baptist-bioretention cell. pdf 156.94KB FDF only 3. Attach a completed Level Spreader Supplement Form or BMP Supplement Form with all required items for each proposed measure. Click the upload button or drag and drop files here to attach docurrent FDF Only 4. Attach an Operation and Maintenance (O&M) Form for each proposed level spreader or BMP. (lick the upload button or drag and drop files here to attach docurrant PDF Only H. Demonstration of Need for a Variance ^ The variance provision of the riparian buffer rules allows the Division or the Environrrental Ivbnagerrent Corrrrission to grant a variance when there are practical difficulties or unnecessary hardships that prevent compliance with the strict letter of riparian buffer protection. ................................................................................................................................................................................................................................................................................................................................................................................................................................................. 1. Explain how complying with the provisions of the applicable rule would prevent you from securing a reasonable return from or make reasonable use of your property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. The Division will consider whether the variance is the minimum possible deviation from the terms of the applicable Buffer Rule that shall make reasonable use of the property possible.* The sanctuary expansion is need to accommodate the increasing congregation size. The existing sanctuary will remain in use during construction of the new sanctuary then it will be demolished and the new parking lot will go where the old sanctuary was Iocated.They are not even meeting minimum parking requirements for town requirements but are applying for a special use permit for less parking and having shared parking with the church across the street. If not for this even more buffer impact would be required. 2. Explain how the hardship results from application of the Buffer Rule to the property rather from other factors such as deed restrictions or other hardships (e.g. zoning setbacks, floodplains, etc).* The small areas requested to be impacted are actually separated from the undisturbed stream buffer by areas of driveways and parking. Therefore the function of these areas as far as nutrient removal are limited. In addition the areas are currently maintained as a lawn. 3. Explain whether the hardship was caused by the applicant knowingly or unknowingly violating the applicable Buffer Rule.* The site is not currently in violation of the buffer rule 4. Explain how the hardship results from physical nature of the property, such as its size, shape, or topography, which is different form that of neighboring property.* As described above, this is a developed site in downtown Clayton, much of the buffer contains buildings, parking or driveways built long before the rules were adopted. Because of the need to expand the church and the limited area available to do so in proximity to existing church buildings, the proposed expansion is the minimum size that will meet the current and projected needs of the church. The building has been designed to minimize impact size and located so that the least functional area of the zone 2 buffer is impacted. In addition, stormwater from new impervious is being treated by a bioretention cell. Were it not for the variance the Town of Clayton would only require stormwater quantity , not quality, control. 5. Explain how the hardship is rare or unique to the applicant's property, rather than the result of conditions that are widespread.* The segment of stream that is exposed is unique in that upstream of the property the stream is piped in its entirety and down stream it is piped for at least 1200'. For Neuse, Tar -Pamlico, Jordan Lake and Goose Creek only: 6. Did the applicant purchase the property after the effective date of the applicable Buffer Rule and then request a variance?* Yes, but the property has been in existence for so long there are no recorded maps of the property, just deeds. I. Sign and Submit Deed Restrictions By your signature of this application, you certify that all structural stormwater BMPs required by this variance shall be located in recorded drainage easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Applicant's Certification I, certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions will be recorded with all required permit conditions. * V By checking the box and signing the box below I certify that: By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit this form. Print Name:* Kevin C Martin Signature * Submission Date: Autonaticallyfilled in Initial Review Is the project accepted r% Yes r- No for review?* Is the project located r Yes r No r Unknown within a NC DCM Area of Environmental Concern (AEC)?* Is this a public -funded r Yes r No transportation project?* D# * 20190788 Version* Reviewing Office* Raleigh Regional Office - (919) 791-4200 Select Reviewer* Stephanie Goss: eads\szgoss Has payment been r No Payment Needed received?* r Fee Received r Need Fee- send electronic notification SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: 417 a ,..; =0 Please print: Property Owner: i Fes-- PARCEL ID: l � �� " �� 00 I to 5c\ l (o - 4 -7-57 7 0 L S -� � 0 Property Owner: f/ The undersigned, registered property owners of the above noted property, do hereby authorize L _ cG t Yi , of 1 O 1 a f"A V 1 Y\1 oAr- ti (Contractor /Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than prop��e``rty above): -L � 1 Ca. Telephone: Q L �-"""' YV1 i Ci h.Q G'L sem. i, e—c;; ei—V We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Date: ' ' ,�- r C(G'!, Authorized Signature Date: NDSID HOLDINGS Neuse 01 Riparian Buffer Credits Statement of Availability June 11, 2019 New Trinity Missionary Baptist Church Attn: Michael Sims 115 S. Robertson St. Clayton, NC 27528 RE: Availability of Riparian Buffer Credits for the "New Trinity Missionary Baptist Church" project Bank Name: WEI - Neuse 01 Nutrient Offset and Buffer Umbrella Bank Bank Site: Caraway Creek Parcel Bank Sponsor: Wildlands Holdings II, LLC (wholly owned by Wildlands Engineering, Inc.) DWR Project #: 2012-0144v2 Permittee: New Trinity Missionary Baptist Church Riparian Buffer Credits Needed: 0.0036 acres (1563 sq. ft.) Riparian Buffer Credits Available: 0.41 acres (17,828.13 sq. ft.) Neuse 03020201 River Basin Dear Mr. Sims: Wildlands Holdings II, LLC currently has sufficient riparian Buffer credits from the WEI — Neuse 01 Nutrient Offset & Buffer Bank (Caraway Creek Parcel) to satisfy the riparian buffer mitigation requirements related to the above-mentioned project. The project is located within the service area (HUC 03020201) of the Bank. This letter is simply a statement of availability of credits as of the date written. Although current inventory is high, the letter is not a guarantee of availability as credits will be sold on a first come, first serve basis. (note that Wildlands has 5 other banks in the Neuse 01 River Basin and over 10 acres of buffer credits available at the time of this letter.) An invoice for this transaction will be sent upon your request and we will formally reserve both the credits and price quoted for a period of 30 days from the invoice at no cost. Final transfer of the credits will be made upon receipt of a copy of the 401 Water Quality Certification Authorization Certificate from the NC Department of Environmental Quality approving the Riparian Buffer mitigation purchase from the Bank and upon receipt of your payment to Wildlands Holding II, LLC. We will then issue a credit transfer certificate verifying your credit purchase to the North Carolina Division of Water Resources and to you for your records We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at 205-807-0800 or ihazelhoff@wild landseng.com if you have any questions or need any additional Wildlands Holding II, LLC • Wildlands Engineering, Inc • 312 West Millbrook Road, Suite 225, Raleigh, NC 27609 NDSIG HOLDINGS information. Sincerely, ��X Ian M. Hazelhoff Wildlands Engineering, Inc. Land Acquisition ihazelhoff@wild landseng.com 0: (704) 332-7754 ex. 120 M: (205) 807-0800 Cc: Kevin Martin, Soil & Environmental Consultants Wildlands Holding II, LLC • Wildlands Engineering, Inc • 312 West Millbrook Road, Suite 225, Raleigh, NC 27609 Stormwater Calculations New Trinity Missionary Baptist Church Clayton, NC Johnston County Owner - New Trinity Missionary Baptist Church 115 S. Robertson St. Clayton, NC 27528 June 10, 2019 ,'� jj ltjfffj�I• .��Q,�%A CARO��•.•. SEAL 1.6813 6/ 10/ 19 B. R. KORNEGAY, INC. LAND SURVEYING • ENGINEERING • PLANNING 300 E. Walnut Street Goldsboro, North Carolina 27530 (919) 735-5886 Fax: (919) 580-9053 Firm No. F-1054 www.kornegaysep.com PROJECT: New Trinity Missionar Baptist Church WORK ORDER: 160283 DATE: March 21, 2019 POST DEVELOPMENT 1 Bioretention pond ) 0.80 acres = WATERSHED AREA USED FOR CALCULATIONS, A 445 ft =HYDRAULIC LENGTH OF WATERSHED, L 12.7 ft =HEIGHT OF MOST REMOTE POINT ON WATERSHED, H 3.36 min =TIME OF CONCENTRATION, Toc = ((LA3/H)A0.385)/128 0.00 min =multiply Toc by 2 if overland flow, grassed surface 1.35 min =multiply Toc by 0.4 if overland flow, paved surface 0.00 acres = undisturbed WATERSHED AREA 0.20 = undisturbed RUNOFF COEFFICIENT, C 0.42 acres= managed WATERSHED AREA 0.30 = managed RUNOFF COEFFICIENT, C 0.38 acres = impervious WATERSHED AREA 0.90 = impervious RUNOFF COEFFICIENT, C 0.59 = weighted RUNOFF COEFFICIENT, C 0.80 acres TOTAL AREA,A 1 -YEAR, 24-HOUR STORM: 112 = g 20 = h 5.25 in/hr= INTENSITY, I =g/(h+Toc) 2.5 cfs = PEAK RUNOFF, Qpre = CIA BIORETENTION POND RUNOFF VOLUME (First Flush): 0.48 Runoff Coefficient, Rv=0.05+0.9*(la) [la=acres, imp./acres, total] 1.0 in. = Design storm rainfall depth, Rd 1393.9 cf= Required volume of runoff= 3630 x Rd x Rv x Area SURFACE AREA OF BIORETENTION POND (First Flush) 12.0 in =Depth of storage allowed in bioretention pond 1393.9 sf =Required surface area of bioretention pond (volume/depth) 1400.0 sf =Proposed surface area of Bioretention Pond, A B. R. KORNEGAY, INC. LAND SURVEYING - ENGINEERING - PLANNING 300 East Walnut St. Goldsboro, N.C. 27530 phone: (919) 735-5886 fax: (919) 580-9053 Watershed Model Schematic 1 - bioretention cell 2 - bioretention cell E Project: New Trinity bioretention cell.gpw Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Hydrograph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description 1 -Yr 2 -Yr 3 -Yr 5 -Yr 10 -Yr 25 -Yr 50 -Yr 100 -Yr 1 2 Rational Reservoir ------- 1 2.517 0.065 ------- ------- ------- ------- ------- ------- 4.064 0.118 ------- ------- ------- ------- 5.349 0.162 bioretention cell bioretention cell Proj. file: New Trinity bioretention cell.gpw Tuesday, Jun 11, 2019 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 Rational 2.517 1 1 151 ---- ------ ------ bioretention cell 2 Reservoir 0.065 1 2 124 1 319.68 147 bioretention cell New Trinity bioretention cell.gpw Return Period: 1 Year Tuesday, Jun 11, 2019 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 1 bioretention cell Hydrograph type Storm frequency Time interval Drainage area Intensity IDF Curve Q (cfs) 3.00 2.00 1.00 I Hyd No. 1 = Rational = 1 yrs = 1 min = 0.800 ac = 5.333 in/hr = Wayne County_Raleigh.idf bioretention cell Hyd. No. 1 -- 1 Year 1 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact 4 Tuesday, Jun 11, 2019 = 2.517 cfs = 1 min = 151 cuft = 0.59 = 1.00 min = 1/1 Q (cfs) 3.00 2.00 1.00 %- 0.00 2 Time (min) Hydrograph Report 5 Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Hyd. No. 2 bioretention cell Hydrograph type = Reservoir Peak discharge = 0.065 cfs Storm frequency = 1 yrs Time to peak = 2 min Time interval = 1 min Hyd. volume = 124 cuft Inflow hyd. No. = 1 - bioretention cell Max. Elevation = 319.68 ft Reservoir name = bioretention cell Max. Storage = 147 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 3.00 2.00 1.00 0.00 0 20 — Hyd No. 2 bioretention cell Hyd. No. 2 -- 1 Year 40 60 80 100 120 140 160 180 200 Hyd No. 1 Total storage used = 147 cuft Q (cfs) 3.00 2.00 1.00 0.00 220 Time (min) Pond Report s Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Pond No. 1 - bioretention cell Pond Data Trapezoid - Bottom L x W = 40.0 x 35.0 ft, Side slope = 0.00:1, Bottom elev. = 319.50 ft, Depth = 7.85 ft, Voids = 60.00% Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 319.50 1,400 0 0 0.79 320.29 1,400 659 659 1.57 321.07 1,400 659 1,319 2.36 321.86 1,400 659 1,978 3.14 322.64 1,400 659 2,638 3.93 323.43 1,400 659 3,297 4.71 324.21 1,400 659 3,956 5.49 325.00 1,400 659 4,616 6.28 325.78 1,400 659 5,275 7.06 326.57 1,400 659 5,935 7.85 327.35 1,400 659 6,594 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 4.00 15.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 4.00 15.00 0.00 0.00 Crest EI. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 319.50 323.67 0.00 0.00 Weir Type = --- --- --- --- Length (ft) = 7.00 5.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 1.00 1.00 0.00 n/a N -Value = .010 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 1.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Civ B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 319.50 0.00 0.00 --- --- --- --- --- --- 0.000 --- 0.000 0.79 659 320.29 0.33 is 0.00 --- --- --- --- --- --- 0.035 --- 0.366 1.57 1,319 321.07 0.50 is 0.00 --- --- --- --- --- --- 0.038 --- 0.536 2.36 1,978 321.86 0.62 is 0.00 --- --- --- --- --- --- 0.041 --- 0.662 3.14 2,638 322.64 0.72 is 0.00 --- --- --- --- --- --- 0.043 --- 0.768 3.93 3,297 323.43 0.81 is 0.00 --- --- --- --- --- --- 0.046 --- 0.861 4.71 3,956 324.21 0.90 is 0.71 oc --- --- --- --- --- --- 0.049 --- 1.659 5.49 4,616 325.00 0.97 is 2.74 oc --- --- --- --- --- --- 0.051 --- 3.760 6.28 5,275 325.78 1.04 is 7.20 is --- --- --- --- --- --- 0.054 --- 8.293 7.06 5,935 326.57 1.10 is 8.90 is --- --- --- --- --- --- 0.057 --- 10.06 7.85 6,594 327.35 1.16 is 10.33 is --- --- --- --- --- --- 0.060 --- 11.55 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 Rational 4.064 1 1 244 ---- ------ ------ bioretention cell 2 Reservoir 0.118 1 2 208 1 319.79 237 bioretention cell New Trinity bioretention cell.gpw Return Period: 10 Year Tuesday, Jun 11, 2019 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 1 bioretention cell Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.800 ac Intensity = 8.610 in/hr IDF Curve = Wayne County_Raleigh.idf Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 � 0 Hyd No. 1 bioretention cell Hyd. No. 1 -- 10 Year 1 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact 0 Tuesday, Jun 11, 2019 = 4.064 cfs = 1 min = 244 cuft = 0.59 = 1.00 min = 1/1 Q (cfs) 5.00 4.00 3.00 2.00 1.00 %- 0.00 2 Time (min) 9 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Tuesday, Jun 11, 2019 Hyd. No. 2 bioretention cell Hydrograph type = Reservoir Peak discharge = 0.118 cfs Storm frequency = 10 yrs Time to peak = 2 min Time interval = 1 min Hyd. volume = 208 cuft Inflow hyd. No. = 1 - bioretention cell Max. Elevation = 319.79 ft Reservoir name = bioretention cell Max. Storage = 237 cuft Storage Indication method used. Exfiltration extracted from Outflow. bioretention cell Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 20 40 60 80 100 120 140 160 180 200 220 Time (min) Hyd No. 2 Hyd No. 1 Total storage used = 237 cult Hydraflow Rainfall Report Hydraflow Hydrographs by Intelisolve v9.23 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 112.0004 20.0000 1.0000 -------- 2 0.0000 0.0000 0.0000 -------- 3 0.0000 0.0000 0.0000 -------- 5 0.0000 0.0000 0.0000 -------- 10 105.7041 16.8000 0.8710 -------- 25 118.9252 17.6000 0.8582 -------- 50 0.0000 0.0000 0.0000 -------- 100 157.1769 19.6000 0.8692 -------- File name: Wayne County_Raleigh.idf Intensity = B / (Tc + D)^E 10 Tuesday, Jun 11, 2019 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.48 3.73 3.20 2.80 2.49 2.24 2.04 1.87 1.72 1.60 1.49 1.40 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 7.22 6.03 5.19 4.57 4.09 3.71 3.40 3.13 2.91 2.72 2.56 2.41 25 8.19 6.90 5.98 5.29 4.75 4.32 3.97 3.67 3.41 3.20 3.01 2.84 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100 9.71 8.27 7.22 6.42 5.79 5.28 4.86 4.50 4.20 3.93 3.70 3.50 Tc = time in minutes. Values may exceed 60. Precip. file name: Sample.pcp Rainfall Precipitation Table (in) Storm Distribution 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6 -Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff -1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff -2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 3.33 1.75 0.00 2.80 3.90 5.25 6.00 7.10 CoB M c8 AmB �/ NuA 10000of o D * * * DISCLAIMER _ Johnston County assumes no legal responsibility for the information represented here. 0 38 � X00 °J, 23 ti ,11L '� o o6J 83 3ti ti S s 73 925 23 3227 �9F iso �38 so Result 1 o c otic �° � 6J 8 7 03 h° 8 3 s �ti � 200 °� °�1 9227 I( id: 05019020 �224 9198 sJ � , oti Tag: 05019020 �R� is 125 4184 2��° �H o1o9 Owner Name 1: NEW TRINITY MISSIONARY BAPTIST CHURCH X710 0 059 4007 �ti �,Q �`� Owner Name 2: �ti ° a° 033 ti° �� 2004 s 9 �� z1�J S sj. `rj► Mail Address 1: <0 ti O� ti°'°s 6947 sig Mail Address 2: PO BOX 827 099 ° 8997 1926 ti, o U "Y ° '0 Mail Address 3: CLAYTON, NC 27528-0827 titi �924 1 Zo O 390 los o sJ �ti 7 932 o, Book: 05060 998 - Y ti o° o q� �$7 881 �� �q�T83 498 ,° Z onu / ti Page: g 0530 1921 0 875 B' TISTCHU H76 '° ti E. AN (� ISP)) D ° 57 ti� Result 2 do 7 6 3 �0 6 7 's r89 2 0770 �'� �� 91 ' 60 (2.15A) 8732 id: 05019019A S° 60 N iTRIN Y67 4 '2635 Tag: 05019019A 1� 57 `tip ti� X11 970 s Owner Name 1: NEW TRINITY MISSIONARY yo r ) 568 7608 `850 �0 1507 29 2 S6 �'9� Owner Name 2: BAPTIST CHURCH 10 ti (o 53 . 1 'v 8581 �� •1 9° Mail Address 1: 115 ROBERTSON STREET HOCUTT MEMOR . ° 7577 ��91, Mail Address 2: 8\0� 842 (1 '4A) °� 747 s1 9 Mail Address 3: CLAYTON, NC 27520-0000 y zz� 2 4 Book: 03099 \ czAYTON ° 4366 A °5 ��o� Page: 0172 3 335 - °c HO UTT BAPTIST C ti J SRN 6370 P�iIST CHU H ti� /8 1J 9340 ('02749) .S, 3 52 S 3255 �• /a 66 ti 827 °o 21 , s 5147 -9 91 32 824 8179 . 2 `ti 1 b � i 62 OUNTY OF JOHNST J \ �4 0 0 9 69 510 l 9� 719 pJ ` 80,- 0:Scale: Scale:1:2515 - 1 in.= 209.58 feet (The scale is only accurate when printed landscape on a 8 112 x 11 size sheet with no page scaling.) Johnston County GIS June 10, 2019 F-1EXISTING PARKING/DRIVEWAY INSIDE BUFFER EXISTING BUILDING INSIDE BUFFER ® BUFFER 40 020 IMPACT 40 80 1 inch = 40 ft. S MAIN STREET — — — — — — — — — — — — — DROP — — INLET T.O.C.227.88 LANDSCAPE INV. -325.09 O TIMBER EXISTING CONCRETE WALK / Lj 1 v EXISTING rc CRETE PARKING /• / / / z Qi 4 BUILDING CONIC. ' I 1 3 •I-, ' EXIST. GRAVEL / I 3 Y y PARKING AREA LL M 1 N m mLL GROSSINFLOORLDIREA 1 z I Z 4,585 SQUARE FEET to Q (TO BE DEMOLISHED) ',�pQ/ I ILANOSCAPE /r w EXIST. BLOCK WALL a 2O' 3O' / LIMBER 1 m / R ZONE 2 ZONE 1 EXISTING USE 1 X ` / �• 1-7S.F. EXISTING 1 BUILDING 1 I62 ssN� I I EXISTING WIRE > FENCE Z EXISTING BLOCK WALL a 3 a n !v I VJ 1 /. W J W 1 (A (AYDOCK CONC 108 S.F. �G w / I o\ Co m EXISTING CHAIN LINK FENCE BIORETENTION ZONE 3p 2 CELL 2ON - I D —® Q 1 268 S.F. I' _ D -- r ~ EXIST. DROP INLET BIORETENTION CELL IN EXISTING,yQ�e� �l I ./ TOP=330.02 INV. -317.87 I I I I 0 0 0 0 0 USE AREA Z / / o CONIC. I J I ��/ W I 0 0 0 l/ / PROPOSED ONE STORY CHURCH BUILDING GROSS FLOOR AREA = 12,685 SQUARE FEET / J� �F2 7 z / Q 2 I I BUILDING HEIGHT 28.75 FEET r: EXISTING BUILDING V) •� �= w GROSS FLOOR 1 1 326 SEATS w AREA m' w QQ ' a Q orn / 4,379 SQUARE FEET F.F.ELEV=320.68 y I I 774 S.F. ZONE --2 BUFFER IMPACT x/ t /p S ' / V) Z N O ti aXEXIST- I I ' 4 a z / w 4w /' 0o /� INV 15- 11 EXISTING CONCRETE WALK � W--W--W--W--W--W-30" CONIC. CURB &GUTTER—W ER EXIST. 6W WATER LINE WINSIN —W--W--W--W--W--W--W--W--W--W--W--W--W--W--W- W �T.O.C.—S2 CA TCH EXIST. --S--S--S--S--S--S--S--S--S--S--S--S�—S-- 8"3SAN1 SANITARY SEWER 31185 317.95 --S--S-INV=314.95—S--S--S--S�—S--S--S--S--S--S--S--S--S--S--S� SECOND STREET EX. CATCH BASIN EX. CATCH BASIN T.O.C. 318.14 T.O.C.-319.42 30" CONIC. CURB & GUTTER INV=314.38 INV -315.48 G G --G — — G — — G EXISTING CONCRETE WALK EXISTING STORM ® JUNCTION BOX OP-319.17 F INV­ DRAWN BY: SHEET: �I7^�`7 loo', JLK 'rWIIHIITV nQRY DESIGNED BY: vss°</ 9` HL2V N1188110QQPTIIST CHURCH LAND SURVEYING ENGINEERING PLANNING •=� =_ SEAL JLK oF: 3 License Number: F-1054 = = = 16813 — D D �n �n P R O P O S CE D C O D 0� 0 O 3 DATE: WORK ORDER: 300 East Walnut Street �` IJV IJV 6-7-2019 TOWN OF CLAYTON 160283 Goldsboro, N.C. 27530 919 735-5886 Fax: 919 580-9053 i ••�fhGINEE�•�••CP� 0�i ,���������0 ���� ' JOHNSTON COUNTY, N.C. SCALE: CADD DWG: www.korne a se com 9 Y P ) �11iit'"%�, 1 = 40' 160283 F-1EXISTING PARKING/DRIVEWAY INSIDE BUFFER EXISTING BUILDING INSIDE BUFFER ® BUFFER 40 020 IMPACT 40 80 1 inch = 40 ft. S MAIN STREET — — — — — — — — — — — DROP — — — — INLET T.O.C.227.88 INV.-325.09 LANDSCAPE O TIMBER EXISTING CONCRETE WALK / z v EXISTING rc CRETE PARKING /• / / / r?i 4 BUILDING 3 •� CONIC. EXIST. GRAVEL / I PARKING AREA NG GROSSINFLOODING m RLAREA CD Z 4,585 SQUARE FEET 'LANDS Q ape/ /r X —EXIST. BLOCK WALL Q 2O' 3O' / TIMBER m _ � ZONE 2 ZONE 1 / EXISTING USE z i L• EXISTING BUILDING I ssm� /•�• � � I EXISTING WIRE > FENCE Z EXISTING BLOCK WALL 3 • a I !v (� La W (A 3 CONC. = GI EXISTING STORAGE m w BUILDING z a DOCK z 20� I o 5 EXIST. GRAVEL I EXISTING CHAIN LINK FENCE m m '�� ZDNf 2 ,B/ _ %/ ZON I Q I _ D — — D —® EXIST. DROP INLET TOP=330.02 INV.-317.87 /^'i _—r — /• ��G� / F,5:��0 CONIC. I J II EXISTIM W I I SHEDII IppI EXISTING HOUSE GROSS GROSARJEA 2,122 SO. FT. OOlII F_rIIL /* y� "� ZISING /'` IIIIIII IIIIIII x LO FOR EXISTING BUILDINGUDING GROSS FLOOR AREAxSS EA I EXISn oRAREA EXISTING Uj� //�} 4,379 SQUARE FEETR F.F.ELEv=320.68 y 28 SQ. FT. .ELEV=331.17' _ SNG 1,513 SQ. FL CARPORT ��ZQ•�//' a EXIST. GAVEL GRAVEL —S —R E%. CONIC. " r— %/ o — -----Of 0I,15". FIJI I " i---- 'q EXISTING CONCRETE WALK } D O W--W--W--W--W--W-30" CONIC. CURB &GUTTER—W —W--W--W--W--W--W--W--W--W--W--W--W--W--W--W- ER E%ISi. 6W WATER LINE —W WIN31162 SSIN W�T.O.C.A --S--S--S--S--S--S--S--S--S--S--S--S�—S-- EXIST. 8"3SANI iARY SEWER 85 317.95 --S--S-INV=314.95—S--S--S--S�—S--S--S--S--S--S--S--S--S--S--S� SECOND STREET EX. CATCH BASIN T.O.0 =318.14 EX. CATCH BASIN T.O.C.-319.42 30" CONIC. CURB & GUTTER INV=314.38 INV=315.48 G G G G — G — — G — — G EXISTING CONCRETE WALK EXISTING STORM ® JUNCTION BOX NV. TOP-319.17 �� DRAWN BY: SHEET: �� ---iiRo��i <�2: JLK �p2p�p �p �n y��/ �/� nn �p �/ y� e � e o DESIGNED BY: ;.�oFEss�°ti 9` NEW VI% 1rRIINII II I! I! 1188110HAW I! QQPTIIS Il CHURCH LAND SURVEYING ENGINEERING PLANNING SEAL -=� = JLK OF: 3 License Number: F-1054 = n - — 16813 — �MM� �OLIVLIV� D DATE: WORK ORDER: 300 East Walnut Street u� �� LN LI V LI V LI V 6-7-2019 TOWN OF CLAYTON 160283 Goldsboro, N.C. 27530 919 735-5886 Fax: 919 580-9053 i ••�fhGINEE�•�••CP� "'i �..���.... ���� ' JOHNSTON COUNTY, N.C. SCALE: CADD DWG: www.korne a se com 9 Y P ) ) �11ii. "�, 1 = 40' 160283 0 8 4 6 5° 78.45 01 �j �'• ,t a Ded' ation to- ,��t N z,# z IL -MN 9.31'W JA or7a S Q ti LO LO Co - V i existing ditch SO r CO , Vo A. Z_ r � �S� 5°fit • ��\ ��' z Co co Y GJ `f ht 2016, TrirlRtl vi ati 078.466635'W 078.458302'W SCALE 1:7200 0 1000 2000 Feet