Loading...
HomeMy WebLinkAbout310173_Plan of Action_20191217sl -4 41q 600 lO ILL - I `7 -(�5 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-173 County: Duplin Facility Name: Mag 1-2 Certified Operator Name: AJ Linton Operator Number: 18625 31-M 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Mag 1 Mag 1 2nd Mag 1 3rd Mag 2 no no yes no 15 84 42 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached.' Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information.' Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 12/24/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ironside Investment Management Phone: 910-285-1357 Facility Owner/Manager (print) Date: 12/1712018 Facility Owner/Manager (signature) 11 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): IMag 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 15.0 inches 19.0 inches 4.0 inches 268059 ft2 668360 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design F 7776193]ft3 h. current herd # 3500 certified herd #1 3500 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/22/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 76193 ft' 01ft3 0W 94987 gallons 0.42 Ibs/1000 gal. 320.6 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID). IMag 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) 15.0 inches 19.0 inches 4.0 inches 210148 ft2 J e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period 523969 gallons f. temporary storage period according to structural design 110 days g. volume of waste produced according to structural design 269777 ft3 h. current herd # 3500 certified herd # 3500 actual waste produced = current -herd # x line g = 269777 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 1 122586 Jft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 800421 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/22/2018 0.52 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 688.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 " II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 ' HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Mag 1 line m = 320.6 lb PAN 2 Structure ID Mag 2 line m = 6887 lb PAN 3. Structure ID line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1009.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column rxs u. application window' 1,4-7,35b,36 Small grain 24' 50.00 1200.0 Mar - Sep 18-22 Cover 43 3000 1290.0 Sep - Mar 'State current crop ending application date or next crop application beginning date for available receiving'crops during 30 day draw down period v. Total PAN available for all fields (sum of columh t) = 2490.0 lb. PAN IV. FACILITYS PoA OVERALL'PAN BALANCE w. Total PAN to be land applied (line In from section II) = 1009.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 249577 lb. PAN y. Overall PAN balance (w - x) _ -1481 lb. PAN Ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fletds are to be included as an option for lowering lagoon level; add these elds to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the �ceiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and PAN available. The Mag 1 lagoon may be transferred to the second and third stages If needed. PoA (30 Day) 2/21/00