HomeMy WebLinkAbout310173_Plan of Action_20190124 (2)C�hYuuA i�24�1ti
� 2oV17 aoot�
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-173 County: Duplin
Facility Name: Mag 1-2
Certified Operator Name: AJ Linton Operator Number: 18625
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon
Lagoon Name/ID: Mag 1 Mag 1 2nd Mag 1 3rd Mag 2
Spillway(Y or N): no no yes no
Level(inches): 18 24 42 15
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached: Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule -with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 2/4/2019
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Ironside Investment Management Phone:
Facility Owner/Manager (print)
910-285-1357
Date: 1/24/2019
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Ma 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 268059 ftz
e. line c/12 x line d x 7.48 gallons/ft3 167090 gallons
• 3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 1 269777 ft3
h. current herd # 3500 certified herd # 3500
actual waste produced = current herd # x line g = 269777 ft3
certified herd #
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design Oft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 336322 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/18/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below) .
PoA (30 Day) 2/21/00
0.87 Ibs/1000 gal.
438.0 Ibs. PAN
- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JIMag 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
15.0 inches
19.0 inches
4.0 inches
210148 ft2
e. line c/12 x line d x 7.48 gallons/ft3 523969 gallons
3. Projected volume of waste liquid produced during draw down period
0
f. temporary storage period according to structural design 110 days
g. volume of waste produced according to structural design 269777 ft3
h. current herd # 1 35001 certified herd # 3500
actual waste produced = current herd # x line g = 269777 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall'over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I.` current waste analysis dated 12/18/2018
m. ((lines e + k)/1000) x line I = -
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21100
0 ft3
122586 ft3
800421 gallons
0.07 Ibs/1000 gal.
92.7 Ibs. PAN
}
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): IMag 1 Tertiary
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 28.8 inches
c. line b - line a (inches in red zone) = 4.8 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 268059 ft2
e. line c/12 x line d x 7.48 gallons/W 802033 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design F 811548 W
h. current herd # F---7-0-0-0-1 certified herd # 7000
actual waste produced = current herd # x line g = 811548 ft'i
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/18/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
535380 W
308678 W
2063989 gallons
0. 121 Ibs/1000 gal.
343.9 Ibs. PAN
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Mag 1
line m =
438.0 lb PAN
2.
Structure ID: Mag 2
line m =
927 lb PAN
3.
Structure ID: Mag 1 Tertiary
line m =
343.9 lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure'ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines1+2+3+4+5+6= 8746lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rx s
u application window'
1,4-7,35b,36
Small grain
24
50.00
1200.0
Se - Mar
18-22
Cover
43
30.00
1290.0
Se - Mar
Y
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2490.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 874.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 2490.0 lb. PAN
y. Overall PAN balance (w - x) _ -1615 lb. PAN
ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
ased on new information. If new fields are to be Included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
sceiving facility.
NARRATIVE:
Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and
PAN available. The Mag 1 lagoon may be transferred to the second and third stages if needed.
PoA (30 Day) 2/21/00