HomeMy WebLinkAbout710102_Plan of Action_20190130 ZW PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 1� County: Pender WWI Facility Name: Wolf and Pack Certified Operator Name: Randy Ingram Operator Number: 1000309 1. Current liquid level(s) in'inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon ito the bottom of the spillway for lagoons with spillways. Lagoon Lagoon Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: Wolf Pack Spillway(Y or N): no no Level(inches): 20 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop, information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation ` *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 1 3. Earliest possible date to begin land application of waste: 2/1/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Pure Country Farms Phone: 910-285-1357 Facility Owner/Manager(print) Date: 1/30/2019 Facility Owner/Manager(signature) r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE _1. Structure Name/Identifier(ID). 1wolf 2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard a. current liquid level according to marker 20 inches b. designed 25 yr./24 hr. storm &structural freeboard 1 19.0 inches c. line b -line a (inches in red zone) _ -1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 329076 ftZ e. line c/12 x line d x 7.48 gallons/ft3 -205124 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 427874 ft3 h. current herd# 3-7-0-0-1 certified herd# 3700 actual waste produced = current herd# x line g = 427874 W certified herd# i. volume of wash water according to structural design Offs J. excess rainfall over evaporation according to design 196000 ft3 k. (lines h + i +j)x 7.48 x 30 days/line f= 777763 gallons 4. Total PAN to be land applied during draw down period I. current-waste analysis dated 12/14/2018 0.78 Ibs/1000 gal. m. ((lines e+ k)/1000)x line 1= 446.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): Pack 2. Current liquid volume in 25 yr./24 hr. storm storage&structural'freeboard ,a. current liquid level according to marker 18 inches b, designed 25 yrJ24 hr. storm'&structural freeboard 19.0 inches c. line b-line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 331016 ft2 e" line c/1'2 x line d x 7.48 gallons/ft3 206333 gallons 3. Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 380819 ft3 h. current herd# 3600 certified herd# - 3600 actual waste produced = current herd# x line g = 380819 ft' certified herd# i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 197166 ft3 k. (lines h + i +,j)x 7.48 x 30 days/line f= 720555 gallons 4. Total PAN to be land-applied during draw down period , I. current waste analysis dated 12/14/2018 0.89 Ibs/1000 gal m. ((lines e+ k)/1000)x line 1= 824.9 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab-shown below) PoA(30 Day) 2/21/00 � a It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID- Wolf line m= 446.7 lb PAN 2. Structure ID: Pack line m= 824.9 lb PAN 3. Structure ID: line m= lb PAN 4. Structure ID- line m= lb PAN 5. Structure ID: line m=-' lb PAN 6. Structure ID: line m= lb PAN n. lines 1 +2+3+4+5+6= 12716lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o.tract# p.field# q crop r.acres s remaining IRR t TOTAL PAN u application vnndowl 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s' Al Cover 26.6 30.00 798.0 Se -Mar A2 Cover 22.1 30.00 663.0 Se -Mar B1 Cover 10.70 3000 321.0 Se -Mar B2 Cover 12.50 3000 375.0 Se -Mar B3 Cover 17.80 3000 534.0 Se -Mar C1 Cover 4220 3000 1266.0 Se -Mar C2 Cover 37.30 3000 1119.0 Se -Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 5076.0 lb.PAN IV:FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line in from section 11)= 1271 6 lb.PAN x. Crop's remaining PAN balance(line v from section III)= 5076 0 Ib.PAN y. Overall PAN balance(w-x)_ -3804 lb.PAN Line y must show as a deficit. If line y does not show as a deficit,list course of action here Including pump and haul,depopulation, herd reduction,etc. For pump&haul and herd reduction options,recalculate new PAN based on new information. If new fields are to be Included as an option for lowering lagoon level,add these fields to the PAN balance table and recalculate the overall PAN balance If animal waste is to be hauled to another permitted facility,provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit.There is sufficient land and PAN available. PoA(30 Day)2/21/00 i