HomeMy WebLinkAbout310691_Plan of Action_20180918�t a 0AE olOle PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Fa'cility Number: 31-691 Facility Name: Tripple M County: Duplin Certified Operator Nar Tempary Morris Murphy Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1. Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: TM Spillway(Y or N): N Level(inches): 10 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. ' *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/18/2018 I hereby certify that I have reviewed the information listed above and included attached Plan of Action, and to the best of my knowledge and ability, the infor accurate and correct. Morris Murphy Phone: Facility Owner/Manager (print) Date: 10/1/2018 Facility Owner/Manager (signature) PLAN, OF ACTION; (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 5 DAY DRAW -DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): TM 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid, level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d Y, 7.48 gallons/ft3 3. Projected volume of waste -liquid produced during draw down period 10.0 inches 19.0 inches 9.0 inches 501399 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd # 3520 certified herd # 3520 actual waste produced = current herd # x line g = 116329 ft� certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 54250 ft3 k. (lines h + i + j) x 7.48 x 5 days/line f= 35443 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/1/2018 1.83 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 982.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PLAN OF ACTION. (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): TM 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period, according to structural design g. volume of waste produced according to structural design h. current herd # 1 26401 certified herd #1 2640 actual waste produced = current herd # x line g = certified herd # i. volume of wash•water according to structural design j.= excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 10.0 inches 12.0 inches 2.0 inches 89376 ft2 11,1422 gallons 180 days. 116329 ft3 116329 ft3 Oft3 54250 ft3 35443 gallons 146865 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21 /00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: TM line I = 146865 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: lined = gallons n.lines 1+2+3+4+5+6= o. line n / 27154 = 146865, gallons 5.41 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. mapmum application rate (in/hr) w. mabmum application amount (inches) 5558 1 autryville bermudagrass 6.3 275 1 0.96 5558 la autryville bermudagrass 6.6. 253.69 1 0.96 5558 1 b autryville bermudagrass 3.7 144.59 1 0.96 5558 1c autryville bermudagrass; 6.6 211.18 1 0.96 5558 1d autryville bermudagrass 2.7 275, 1 - 0.96 5558 le autryville bermudagrass 6.60 275 1 0.96 5558 1f autryville bermudagrass 2.60 275 1 0.96 x. total acres available during 5 day draw down (sum of column t) = 28.50 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21100 F Y. line o = 0.19 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y; list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recaicwate new n arauuc ioaa 4asea on new intormatlom. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in Belo; "tratticamity" across sous; will soils absorb application without runoff, etc. Heavy RainFall from Hurrican Florance. All fields in good conditions. 2. Date, and, amount of last rainfall event? DATE: 09/16/18 AMOUNT: 3.00 inches 6. Uates oT last waste application event per nela: 4. Given optimum soil and weather conditions; is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal i.e. winter)'application rates within 5 days? Yes 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposea cnanges in application rates ana amounts; ana any otner information Tor All pulls will be made in a manner so as not to allow runoff or ponding. PoA (5 Day) 2/21/00