PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
A DRAW DOWN P.ERIOaD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JB1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
1 7.0 inches
19.0 inches
12.0 inches
40896 ftz
305902 gallons
180 days
g. volume of waste produced according to structural design 48581 Jft3
h. current herd # 1470 certified herd # 1470
actual waste produced = current herd # x line g = 48581 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/1/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Oft3
25375 1 ft3
15366 gallons
1.50 Ibs/1000 gal.
481.9 lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
5 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JB2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 7.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 12.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) i 40546 ft2
e. line c/12 x line d x 7.48 gallons/ft'
303284 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period, according to structural design. 1,80 days
g. volume of waste produced according to structural design 1 48581 ft3
h. current herd # 1470 certified herd # 1470
actual waste produced = current herd # x line g = 48581 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/1/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
I 0 ft3
25083 ft3
i 15306 gallons
1.43 Ibs/1000 gal.
455.6 lbs. PAN
PLAN OF ACTION (PoA) FOR HIGH -FREEBOARD AT ANIMAL FACILITIES
5 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): F JB3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 8.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 11.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 114441 ftz
e. line c/12 x line d x 7.48 gallons/ft3 78468 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 46188 ft3
h. current herd # 2400 certified herd #1 2400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 daystline f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 6/1/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
46188 ft'
01ft3
215541 ft3
14075 gallons
1.32 Ibs/1000 gal.
122.2 lbs. PAN
•r r
i
PLAN OF ACTION (POA). FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW .DOWN PERIOD
I. TOTAL VOLUME TO, BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JB1
2. Current liquid volume in structural freeboard
a. current liquid level according to marker
b. designed structural freeboard zone
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
8.0 inches
12.0 inches
4.0 inches
40896 ft2
101967 gallons
180 days
g. volume, of waste produced according to structural design 48581 ft3
h. current herd # 1470 certified herd # 1470
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 days/line f =
4. Total volume of waste to be land applied during 5 day draw down
1. total volume to be land applied line e + line k =
48581 ftj
0 ft3
25375 ft3
15366 gallons
117334 gallons
r
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click -on the next Structure tab shown below)
PoA (5 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
1. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JB2
2. Current liquid volume in structural freeboard
a. current liquid level according to marker 7.0 inches
b. designed structural freeboard zone 12.0 inches
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) = 5.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 40546 ft2
e. line c/12 x line d x 7.48 gallons/ft3 126368 gallons
3. Projected volume of waste liquid produced during draw down -period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design Oft3
h. current herd # 1470 certified herd # 1470
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation -according to design
k. (lines h + i + j) x 7.48 x 5 daysiline f =
4. Total volume of waste to be land applied during 5 day draw down,
1. total volume to be land applied line e + line k =
ft3
1 W
250831 ft3
5212 gallons
13158or gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below)
PoA (5 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
FIVE (5) DAY DRAW DOWN PERIOD
I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JB3
2. Current liquid volume in structural freeboard
a. current liquid level according to marker 8.0 inches
b. designed structural freeboard zone- 12.0 inches
(Normally 12 inches or greater)
c. line b - line a (inches within structural freeboard) = 4.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 11444 ftz
e. line G12 x line d x 7.48 gallonstfe 28534 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 461881 ft3
h. current herd # 2400 certified herd # 2400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 5 daystline f =
4. Total volume of waste to be land applied during 5 day draw down
1. total volume to be land applied line e + line k =
46188 ft'
0 ft3
21554 ft3
14075 gallons
42609 gallons
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN
THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the'next Structure tab shown below)
PoA (5 Day) 2/21/00