Loading...
HomeMy WebLinkAbout310253_Plan of Action_20181220 (2)PLAN OF ACTION JPoALO KID-, GH FREEBOARD AT ANIMAL FACILITIES S DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): TQ 2. Current liquid volume in structural freeboard a. current liquid level according to marker b.. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches'within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 10.0 inches 12.0 inches 2.0 inches 65070 ftz 81121 gallons 180 days g. volume of waste produced according to structural design 95178 ft3, h. current herd # 1580 certified herd # 2880 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall, over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 52216 ft' ft3 37520 ft3 18645 gallons 99766 gallons 1?GDCAT cECT�A ono NC �w' H WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN Structure tab shown below) PoA (5 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 5 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): F TQ 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 9.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 65070 fl? e. line c/12 x line d x 7.48 gallons/ft3 365043 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 95178 Ift3 h. current herd # 1580 certified herd # 2880 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 6/8/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 52216 ft3 Offs 37520 ft3 18645 gallons 2.44 Ibs/1000 gal. 936.2 lbs. PAN II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURE" 1. structure.ID: TQ line I = 99766 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n.lines 1+2+3+4+5+6= o. line n / 27164 = 99766 gallons 3.67- acre -inches -5 DAY DRAW DOWN PERIOD"2 i' n!.c `I1 s = _ :`; �r� Ij � `" ', 4r-aulic leading capacities, applications cannot exceed _ ng to its certified waste plan. 2Fields with no remaining PAN balance- no receiving cron, anri/Or OOrnnlataly gati Irntari 2re p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. mmdmum application rate Cin/hr) w. maramum application amount (inches) 5193 h2 norfolk bermudagrass 1.55 200 1 0.96 5193 h3 norfolk bermudagrass 1.27 200 1 0.96 5193 h4 norfolk bermudagrass 1.32 200 1 0.96 5193 h5 norfolk bermudagrass 2.64 200 1 0.96 5193 h7a norfolk bermudagrass 1.83 2001 1 0.96 5193 h7h-nnrfo.lk bermudagrass 0.90 200 1 0.96 5193 , h8 ncrfc,k bc.":Udagrass 2.32 200 1 0.96 5193 h9 norfolk bermudagra�is 2.62 18U 0.96 5193 h1!n---nnrfOlk - bermudagrass 2.50 200 1 0.96 5193 h10b norfolk bermudarass 1.49 190 1 0.96 X. total acres availeh'^ ��^�;, ° �_� ar.....,_..._ ,.s,...i...-_ a� _ 18.44 Acrctc _, z.w,z.. TO of LAND APPLIED PER ACRE ". ;5 Day) 2/21/00 y. line o 0.20 inches per acre to be -applied within 5 days line x If unable to land apply hydraulic load listed in line y; list course of action here including pump and haul, depopulation, herd reduction;=etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. .o land',apply hydraulic load: scribe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in -field; "trafficabili " across soils; will, soils absorb application without runoff, etc. Heavy RainFall from Hurrican Florance. All fields in good conditions. to and amount of last raintall event"? DATE: 1 09/16/18 3. Dates of last waste application event per field: AMOUNT: 13.00 inches 4. vlven optimum son and weather conditions, is imgation equipment capaole.ot applying the volume in line'"h" at appropriate- season6l i.e. winter application rates within 5 days? Yes I 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrinn.inn event; changes made in gun sizes, nozzles, "o" rings, operating time, .travel speed, etc. to Meet proposed changes In application rates and amounts; and any other Information -tor consideration. All, pulls will be made in a manner so as not to allow runoff or ponding.. PoA (5 Day) 2/21/00