Loading...
HomeMy WebLinkAboutNCC190586_Notice of Termination for DUPLICATE COC_20190614Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/14/2019 1:38:15 PM (NOT Submittal) Approve by Georgoulias, Bethany 6/14/2019 3:17:59 PM (NOT Request Review- NCC190586) • The task was assigned to Georgoulias, Bethany by round robin distribution 6/14/2019 1:38 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 19, 2019 5:00 PM 6/14/2019 1:38 PM LIn a1LUUFF1Widl1 NORTH CAROLINA Ernvlronmental Qualily Certificate of NCC190586 Coverage (COC) Enter the Certificate of Coverage Nurrbeer No. * Information associated with this permit: Project Name Project Heidi Address Brewer Road and Highway 96, Four Oaks, NC County Johnston Latitude 35.4430 Longitude -78.4075 Permittee Listed TKC CCLXXV, LLC Legally Responsible Alan Lewis Individual NC Reference No. NCG01-2019-0586 E&SC Plan ID JOHNS-2019-027 Original NOI 12048 Tracking No. Date COC Issued 6/11/2019 Prior Rescission This field will populate only if 0OChas already been rescinded. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional Ivbre infornation about the basis of this request, if needed. Explanation Duplicate - Project was also approved under COC NCC190587 and will maintain coverage under that permit. Supporting 1pload Supporting Docunentation if applicable. Documentation WstbeFDFfornat Project Close-out Information: Final Close-out Inspection Approval Project Close-out Mast beFDFforrrat Approval Documentation North Carolina General Statute 143-215.613 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained underthis Article or a rule implementing this Article; orwho knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deiceor method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyof a Class 2 misdemeanor which mayinclude a fine not to e)ceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. 'This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Am o � Type Name * ken beuley Title * CFO Organization* The Keith Corp Date * 06/14/2019 Email for dfeatherston@thekeithcorp.com Confirmation * Contact Telephone* 704.319.8134 NOT Certification Construction Stormwater_ Notice of Intent (NOI).pdf 73.56KB Form noi.pdf 68.61 KB Mast be FDF Format