Loading...
HomeMy WebLinkAbout310035_Plan of Action_20190103ao��000�� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: AWS310035 Facility Name: Waters 1-5 & M&M Rivenbark Certified Operator Name: Derek Brown County: ' Duplin Operator Number: AWA19632 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the -top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lag_ oon-5 2627- 2748 3141. N N N 21 2. Check all applicable items Liquid level is Within the designed structural freeboard elevations of one or'inore structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. - Waste is.to be pumped and hauled to off site locations. Bolume and PAN content of waste -to be pumped and hauled is reflected in -section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to.a site not covered in the facility's CAWMP,. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving. facility 3. Earliest possible date to begin land application of waste: As Conditions Permit I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best,of my knowledge and ability, the information is accurate and correct. Murphy -Brown, LLC/Michael Norris Phone: (910) 293-3434 M Faciity O ner/ anager (print) Date: 1/2/2019 Facility Owner/Manager signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2627 line m = lb PAN 2. Structure ID: 2748 line m = 555.4 lb PAN 3. Structure ID: 3141 line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6 Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 555.4lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPLIED DURING THIS 3n nAY PFQInn o. tract # p. field # Q. crop r. acres s remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s u. application window' 1 Wheat 5.11 69.59 355.6 Sept -April 2 Wheat 1.99 75.45 150.1 Se t-A ril 31 Wheat 2.04 75.45 153.9 Sept -April estate current crop enaing application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 659.7 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 555 4 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 659.7 lb. PAN y. Overall PAN balance (w - x) _ -104 lb. PAN Line y must show as a deficit: If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal'waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NAKKA I IVt: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2627 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker inches b. designed 25 yr./24 hr. storm & structural freeboard 20.3 inches c. line b - line a (inches in red zone) ,= 20.3 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 93000 ft2 e line c/12 x line d x 7.48 gallons/ft3 1175632 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80685 ft3 h. current herd # 2873 certified herd # 2873 actual waste produced = current herd # x line g = 80685 ft' certified herd # i.,volume of wash water according to structural design j excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 �jft3 54250 ft3 168219 gallons lbs/1000 gal. 0 lbs. PAN A PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2748 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation,) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 21.0 inches 21.6 inches 0.6 inches 135512 ftz 50681 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 143901 ft3 h. current herd # 5124 certified herd # 5124 actual waste produced = current herd # x line g = 143901 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30. days/line f= 4, Total PAN:to be land applied during draw down period I. current waste analysis dated 11/16/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) POA (30 Day) 2/21/00 ® ft3 79049 ft3 277944 gallons 1.69 Ibs/1000 gal. 555.4 Ibs. PAN .k . _ PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID): I F 3 441 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a., current liquid level according to marker b. designed 25 yr./24 hr storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period 0 inches 202 inches 20.2 inches 1125 44 ft2 1414399 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 44382 ft3 h. current herd # 4310 certified herd # 4310 actual waste produced = current herd # x line g = 44382 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 ft3 65657 ft3 137182 gallons Olbs/1000 gal. 0 Ibs_ PAN