PLAN OF ACTION(Poa) FOR HIGH FREEBOARD ATANIMAL FACILITIES
Facility Number:
Facility Name:
31-386
Edward Brock Farm
County: Duplin
Certified Operator Name: Melissa Wallace Operator Number. AWA 17319
1. Current liquid level(s) in inches as measured from the current liquid' level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1, Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1 2
N N
14 20
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
Within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population forthe receiving facility
3. Earliest possible date to begin land application of waste: 3/13/19
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Edward Brock
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone: 910-271-1746
Date: 3/18/19
r
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR:/24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1 line m =
299.8 lb PAN
2. Structure ID: Lagoon 2 line m =
417.9 lb PAN
3. Structure ID: line m =
lb PAN
4. Structure ID: line m =
lb PAN
5. Structure ID: line m =
lb PAN
6. Structure ID: line m =
lb PAN
n. lines 1 +2+3+4+5+6=
717.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFPIrin nr) AIr1T I IQT FIFI nQ Tr) %A114ir W PAAI CAMMnT RF APPI IPn nIIPIAIr: TNIQ
4rl nAv PFRIr)n
0. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(Iblacre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
4776
1-11A
bermuda rass
0.56
235.00
131.6
Mar -Oct
4787
H1
bermuda rass
1.761
235.00
413.6
Mar -Oct
4787
H2
bermuda rass
2.31
235.00
542.9
Mar -Oct
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1088.1 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 717.7 lb. PAN
,x. Crop's remaining PAN balance (line v from section III) = 1088.1 lb. PAN
y. Overall PAN balance (w - x) = -370 ' lb. PAN
PoA (30 Day) 2/21100
!4
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): La oon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr.124 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
14.0 inches
19.0 inches
5.0 inches
64476J ft2
200950 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 712101
ft3
h. current herd # 2598 certified herd #1 2160
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash wateraccording to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/4/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
85650 ft3
0 ft3
39462.51 ft3
155973 gallons
0.84 Ibs/1000 gal.
299.8 Ibs. PAN
1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Eagoon 2
2. Current liquid volume in-25 yr./24 hr_ storm storage & structural freeboard
a. current liquid level according to marker 20.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 27.0 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural -freeboard elevation) 90816 ftZ
e. line c/12 x line d x 7.48 gallons/ft3 396260 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 79123 ft3
h. current herd # 2444 certified herd #1 2400
actual waste produced = current herd # x line g =
certified herd #
1
i. volume of wash wateraccording to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/4/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
80574 ft3
0 1 ft3
67095 ft3
184094 gallons
0.72 Ibs/1000 gal.
417.9 lbs. PAN