Loading...
HomeMy WebLinkAbout310386_Plan of Action_20190318aal� oos5a PLAN OF ACTION(Poa) FOR HIGH FREEBOARD ATANIMAL FACILITIES Facility Number: Facility Name: 31-386 Edward Brock Farm County: Duplin Certified Operator Name: Melissa Wallace Operator Number. AWA 17319 1. Current liquid level(s) in inches as measured from the current liquid' level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1, Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 N N 14 20 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are Within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population forthe receiving facility 3. Earliest possible date to begin land application of waste: 3/13/19 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Edward Brock Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-271-1746 Date: 3/18/19 r II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR:/24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 line m = 299.8 lb PAN 2. Structure ID: Lagoon 2 line m = 417.9 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 717.7 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFPIrin nr) AIr1T I IQT FIFI nQ Tr) %A114ir W PAAI CAMMnT RF APPI IPn nIIPIAIr: TNIQ 4rl nAv PFRIr)n 0. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 4776 1-11A bermuda rass 0.56 235.00 131.6 Mar -Oct 4787 H1 bermuda rass 1.761 235.00 413.6 Mar -Oct 4787 H2 bermuda rass 2.31 235.00 542.9 Mar -Oct 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1088.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 717.7 lb. PAN ,x. Crop's remaining PAN balance (line v from section III) = 1088.1 lb. PAN y. Overall PAN balance (w - x) = -370 ' lb. PAN PoA (30 Day) 2/21100 !4 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 14.0 inches 19.0 inches 5.0 inches 64476J ft2 200950 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 712101 ft3 h. current herd # 2598 certified herd #1 2160 actual waste produced = current herd # x line g = certified herd # i. volume of wash wateraccording to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 85650 ft3 0 ft3 39462.51 ft3 155973 gallons 0.84 Ibs/1000 gal. 299.8 Ibs. PAN 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Eagoon 2 2. Current liquid volume in-25 yr./24 hr_ storm storage & structural freeboard a. current liquid level according to marker 20.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 27.0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural -freeboard elevation) 90816 ftZ e. line c/12 x line d x 7.48 gallons/ft3 396260 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 79123 ft3 h. current herd # 2444 certified herd #1 2400 actual waste produced = current herd # x line g = certified herd # 1 i. volume of wash wateraccording to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 80574 ft3 0 1 ft3 67095 ft3 184094 gallons 0.72 Ibs/1000 gal. 417.9 lbs. PAN