Loading...
HomeMy WebLinkAboutSW3190201_AddInfo_20190327ROY COOPER Governor MICHAEL S. REGAN Secretary S. DAN]EL SMITH Interim Director Mr. Daniel Renckens Bohler Engineering 1927 S. Tyron Street, Suite 310 Charlotte, NC 28203 NORTH CAROLINA £nvironmentaI Qua[ity March 27, 2019 Subject: Request for Additional Information Stormwater Permit No. SW3190201 O'Reilly Auto Parts, Wingate, NC Union County Dear Mr. Renckens: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on February 5, 2019. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The bioretention cell must be sized using a volume based calculation rather than a routing calculation. Information can be found in Part B of our Stormwater Design Manual. 2. Please correct the following inaccuracies on the Supplement EZ form: a. The side slopes of the SCM are listed as 2:1 rather than 3:1 as shown on the plan and required by the MDCs. b. The Supplement EZ form shows that the depth to the seasonal high water table is ">1.5 feet." According to Bioretention MDC 1, the minimum separation is 2 feet. c. The surface area listed must be the area at the planted surface of the bioretention cell. d. The ponding depth is listed incorrectly. e. Mulch is not an acceptable form of organic matter for the bioretention media mix. 3. Please submit a USGS map identifying the site location. 4. Please provide calculations showing that the inlet protection for the bioretention cell is sufficient to prevent erosion from the peak flow during the 10-year storm. QNorth Carolina Department of Environmental Quality f Division of Energy, Mineral and Land Resources E512 North Salisbury Street 1 1612 Mat] Service Center Raleigh. North Carolina 27699-1612 NORTH Gi�C.'LIhT � oevem aMorem�RR�m,lms� r 919.707.9200 5. Please show a maintenance access and easement that meets the requirements of General MDCs 8 and 9. 6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hltps:Hedocs.deq.nc.gov/Forms/SW ProjectSubmittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 26, 2019, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3190201 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen(cncdenr.gov or (919) 707-3649. Sincerely, Gl9' A --- Corey Anen Environmental Engineer Stormwater Program cc: Mooresville Regional Office