Loading...
HomeMy WebLinkAbout710070_Plan of Action_20190422h q 6 ia ob k"b aL PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-70 Facility Name: Pender1&2 Certified Operator Name Chase Deaver County: Pender Operator Number: 1002647 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 no no 31 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 4/25/2019 I hereby certify that I have reviewed the information listed above and included within the f attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ironside Investment Management Phone: Facility Owner/Manager (print) Facility Owner/Manager (signature) , Date: 910-285-1357 4/22/2019 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JPenderl 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 31.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) _ -12 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 214764 ft2 e. line c/12 x line d x 7.48 gallons/ft3-1606435 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 90 days g. volume of waste produced according to structural design 190409 ft3 h. current herd # 3600 certified herd #1 3600 actual waste produced = current herd # x line g = 190409 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 4/1/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 0 ft3 474753 gallons 2.13 1 Ibs/1000 gal. -2410 Ibs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JPender2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr..storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 1 3119371 ft2 e. line c/12 x line d x 7.48 gallons/ft3 194441 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1$0 days g. volume of waste produced according to structural design 380819 ft3 h. current herd # 3600 certified herd # 3600 actual waste produced = current herd # x line g = 380819 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 4/1/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click,on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 ft3 474754 gallons 1.66 1 Ibs/1000 gal. 1110.9 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 " HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Pender 1 line m = -2410 lb PAN 2. Structure ID: Pender 2 line m = 1110.9 lb PAN 3. Structure ID: line m = -lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6=-1300lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOn_ DO NOT LIST FIFI_DR TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lblacre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s u application wndow' P1 Bermuda 24 275.00 6600.0 Mar - Se P14 Bermuda 44 27500 12100.0 Mar -Sep P2 Bermuda 24 275.00 6600.0 Mar -Sep 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 25300.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ -1300 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 25300.7 lb. PAN y. Overall PAN balance (w - x) _ -26600 lb. PAN Ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the sceiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There Is sufficient land and PAN available. PoA (30 Day) 2/21/00