Loading...
HomeMy WebLinkAbout310173_Plan of Action_20190124PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-173 County: Duplin Facility Name: Mag 1-2 Certified Operator Name: AJ Linton Operator Number: 18625 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon Name/ID: Mag 1 ` Mag 1 2nd Mag 1 3rd Mag 2 Spillway(Y or N): no no yes no Level(inches): 20 93 34 18, 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. _ Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/4/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ironside Investment Management Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-285-1357 Date: 1 /24/2019 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES' 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Imag 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 20.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c line b - line a (inches in red zone) _ -1 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 268059 ft2 e. line c/12 x line d x 7.48 gallons/ft3-167090 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 269777 ft3 h. current herd # 3500 certified herd # 3500 actual waste produced = current herd # x line g = 269777 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design Oft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 336322 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 4/1/2019 1.42 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 240.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 C) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): IMag 2 2 Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24,hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/fta 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 210148 ft2 130992 gallons f. temporary storage period according to structural design 110 days g. volume of waste produced according to structural design 269777 fta h. current herd # 3500 certified herd # 3500 actual waste produced = current herd # x line g = 269777 fta certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down,period I. current waste analysis dated 4/1/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 122586 fta 800421 gallons 0.82 Ibs/1000 gal. 763.8 Ibs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): IMag 1 Tertiary 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 34.0 inches 28.8 inches -5 inches 268059 ftz -868869 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 811548 ft3 h. current herd # 7000 certified herd # 7000 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x ' 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 4/1/2019 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 811548 ft3 535380 ft3 308678 ft3 2063989 gallons 0.04 Ibs/1000 gal. 47.8 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Mag 1 line m = 2403 lb PAN 2. Structure ID: Mag 2 line m = 763.8 lb PAN 3. Structure ID: Mag 1 Tertiary line m = 47.8 lb PAN 4. Structure ID: line m = lb PAN 5 Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5-+ 6 = 1051.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n DAY PERIOD_ o tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column rx s u application wridowl 1 Bermuda 3.8 248.00 9424 Mar - Se 4-7 Bermuda 14 276.00 3864.0 Mar -Se 23a-24b Bermuda 21.00 27600 5796.0 Mar -Sep 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 10602.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1051.9 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 10602.4 lb. PAN y. Overall PAN balance (w - x) _ -9551 lb. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are -to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to nother permitted facility, provide Information regarding the herd population and lagoon freeboard levels at the :celving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and PAN available. The Mag 1 Jagoon may be transferred to the second and third stages If needed. PoA (30 Day) 2121/00