Loading...
HomeMy WebLinkAbout260025_Inspection_20190522Type of Visit: ®Compliance Inspection U Operation Review () Structure Evaluation U 'Technical Assistance I Reason for Visit: 4D4outine 0 Complaint 0 Follow-up 0 Referral,0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: eparture Time: County: Farm Name: iL>C^ V; .,ems' ur�^� Owner Email: Owner Name: Z c.t S 5 a r) d A tj oo LP Phone: Mailing Address: Physical Address: Region: Facility Contact: C-, CAc A 0 A-1 Title: Phone: Onsite Representative: j� Integrator:22 Certified Operator: ' S 5 e Uy d e V LjC c' a Certification Number: / Back-up Operator: Location of Farm: Latitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Certification Number: d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yes [EjNo___Q NA ❑ NE [:]Yes ❑ No ED-N* ❑ NE [:]Yes [-]No E]-IqX ❑ NE ❑ Yes ❑ No ❑ NE ❑ Yes [D-11;ro— ❑ NA ❑ NE ❑ Yes []- 0�—❑ NA ❑ NE Page 1 of 3 21412015 Continued Facility Number: Z - Z , J Date of Inspection: 2 .plt Si Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑-I'Vo— ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 2-5 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑-N-o- ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environm rest, notify DWR 7. Do any of the structures need maintenance or improvement? es J J ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes �o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [3-lgo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ©-N'o__ ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [�t l�o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 0 Nk V-n 1 � 1 � _eJ' A Ln& 6 t- 13. Soil Type(s): Lit ke- I cc o,-t 14. Do the receiving crops differ from those designated in the CAWMP? [:]Yes E]-No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? [-]Yes [3-Ko ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes 02 o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Io ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ©-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ®'No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes EJ O ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1 " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes TNo o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of inspection: jZZ r4 c 24. Didthe facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Eq-No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes � ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Fd6 ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [c]-Mt— ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? S �Calc _S "t'/ , C- - 3 D -1 � t --- 3 ' �( ffC­" lv-.�-C­ (g zj'o"l,c� C:� l—'T jC�0t'f Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 [—]Yes P ' o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 2'190 ❑ NA ❑ NE ❑ Yes Eq No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Phone.-q� � � 3 Date: 214120 S