HomeMy WebLinkAbout310017_Plan of Action_20190422x aol� po�a�
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-17 County: Duplin
Facility Name: DM Section 2
Certified Operator Name: AJ Linton Operator Number: 18625
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon Lagoon Lagoon 3 Lagoon Lagoon 5
'2-1 2-2 2-3 2-4
no no no no
18 30 20 24
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 4/25/2019
r I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Ironside Investment Management Phone:
Facility Owner/Manager (print)
CY
Facility Owner/Manager (signature)
910-285-1357
Date: 4/22/2019
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2-1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard `
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/W
3. Projected volume of waste liquid produced during draw down period
18.0 inches
19.0 inches
1.0 inches
172931 ft2
107794 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 2611051 ft3
h. current herd # 7920 certified herd # 7920
actual waste produced = current herd # x line g = 261105 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 4/1/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
0 ft3
100876 ft3
451270 gallons
3.69 Ibs/1000 gal.
2062.9 Ibs. PAN
r
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2-2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
30.0 inches
19.0 inches
-11 inches
225000 ft2
-1542750 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 261105 ft3
h. current herd # 7920 certified herd # 7920
actual waste produced = current herd # x line g = 261105 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k., (lines h + i + j) x 7.48 x .30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 4/1/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
171529 ft3
156737 ft3
734749 gallons
1.99 1 Ibs/1000 gal.
-1608 Ibs. PAN
t7�
r
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2-3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 20.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ -1 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 219336 ft2
e. line c/12 x line d x 7.48 gallons/W-136719 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 26110b W
h. current herd # F--7-92-0-1 certified herd # 7920
actual waste produced = current herd # x line g = 261105 W
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 4/1/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
171529 W
F---1567371 W
734749 gallons
2.68 Ibs/1000 gal.
1602.7 Ibs. PAN
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2-4
2. Current liquid volume in 25 yr./24 hr. storm storage &'structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ -5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 208146 ft2
e. line c/12 x line d x 7.48 gallons/ft3-648722 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 1953072 ft3
h. current herd # 7920 certified herd # 7920
actual waste produced = current herd # x line g = 1953072 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated. 4/1/2019
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
0 ft3
149042 ft3
2620635 gallons
2.20 Ibs/1000 gal.
4338.2 Ibs. PAN
II.. TOTAL
POUNDS OF PAN STORED WITHIN STRUCTURAL
FREEBOARD AND/OR 25 YRJ24'
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 2-1
line m =
2062.9 lb PAN
2.
Structure ID: 2-2
line m =
-1608 lb PAN
3.
Structure ID: 2-3
line m =
1602.7 lb PAN
4.
Structure ID: .2-4
line m =
4338.2 lb PAN
5.
Structure ID.
line m =
lb PAN
6.
Structure ID-
line m =
lb PAN
n.lines1+2+3+4+5+6= 6396.0lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRion no NOT I IST FIFI nS Tr) WHICH PAN CANN()T RF APPI IFn nI IRINI; THIS 3n nAY PFRIr)n
o. tract #
i
p. field #
q. crop
-
r. acres
s remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column rx s
u. application window
-
3-10
Bermuda
55
211.00
116050
Mar -Sep
19-28
Bermuda
59
211.00
124490
Mar -Sep
I
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
r
v. Total PAN available for all fields (sum of column t) = 24054.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (linen from section II) = 6396.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 24054.0 lb. PAN
y. Overall PAN balance (w - x) _ -17658 lb. PAN
ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
ased on new information. If new fields are to be included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
:ceiving facility.
NARRATIVE:
Irrigation onto existing spray fields'will begin as weather and field conditions permit. There is sufficient land and
PAN available.
PoA (30 Day) 2/21/00