HomeMy WebLinkAbout770004_Inspection_20190124Type of Visit: • Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: • Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: Q ° ( County: � �t I I Region
Farm Name: ! p� k' f' 1 Owner Email:
Owner Name: 1 O M tVi H W r 1 1 1 Q M50 h Phone:
Mailing Address:
Physical Address:
Facility Contact: A222�WA �� / // a l Title:
Onsite Representative: ✓��% W i ��/ �l'1 SD
Certified Operator:
Back-up Operator:
Location of Farm: Latitude:
Discharaes and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Phone:
Integrator: � �j�/��e1
Certification Number:
Certification Number:
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
❑ Yes No ❑ NA ❑ NE
❑ Yes ❑ No NA ❑ NE
❑ Yes ❑ No NA ❑ NE
❑ Yes ❑ No
❑ Yes No
❑ Yes No
® NA ❑ NE
�] NA ❑ NE
❑ NA ❑ NE
Page 1 of 3 21412015 Continued
Vacility Number: jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard? ❑ Yes
Struc re 1 Structure 2 Structure 3 Structure 4 Structure 5
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): D
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
® No ❑ NA ❑ NE
❑ No NA ❑ NE
Structure 6
❑ Yes r No
❑ Yes to No
❑NA ❑NE
❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes tf� No ❑ NA ❑ NE
maintenance or improvement?
Waste Annlication
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement? 0
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes I? No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑`OEvidence of Wind Drift ❑ Application Outside of Appro d Are
12. Crop TYPe(s) LA►'1�� / ; S KT�" f �'' S h'i:� i"�1 "J ` . �'l/S
f
13. Soil Type(s): j a2v!! i
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes No ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
M No
❑ NA
❑ NE
❑ Yes
t] No
❑ NA
❑ NE
❑ Yes
fn No
❑ NA
❑ NE
❑ Yes
r No
❑ NA
❑ NE
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes M No
❑ Waste Application ❑Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 21412015 Continued
facility plumber: -Lf Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[P No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
� No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
0 No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[P No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No ❑ NA ❑ NE
Reviewer/Inspector Name:
Reviewer/Inspector Si
Page 3 of 3
Phone: 3?01�
Date: 2'
21412015