Loading...
HomeMy WebLinkAbout770004_Inspection_20181213Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: p® County: i ec./Region: 420 Farm Name: Pe e. Ow-- fyh Owner Name: 7%,"�, Wj' /('tjtAl Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: /4"' "W W t f 44^ -50 i Title: Phone: Onsite Representative: Integrator: i�, Y Geg ke Certified Operator: Back-up Operator: Location of Farm: Latitude: DischarEes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: Certification Number: Certification Number: Longitude: ❑ Yes `i-' No ❑ NA ❑ NE a. Was the conveyance man-made? ❑ Yes ❑ No [4 NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No 1� NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Ea No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili .Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? []Yes �3No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No NA ❑ NE Struc7e 1 Structure 2 Structure 3 Structure 4 I Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes UM No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Q No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [!�3No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 0 Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc. ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes []No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA NE the appropriate box. ❑WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements Mother: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA © NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ WeathJ Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge S y 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA ENE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA V NE Page 2 of 3 21412015 Continued acili Number: jDate of Inspection: I A-113 ME 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) ❑ NA NE ❑ NA NNE ❑ Yes ❑ No ❑ NA ® NE ❑ Yes ❑ No ❑ NA M NE ❑ Yes ❑ No ❑ NA NNE ❑ Yes []No ❑ NA �] NE ❑ Yes ❑ No ❑ NA )O NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 34. Does the facility require a follow-up visit by the same agency? $ Yes Reviewer/Inspector Name: Reviewer/Inspector Signatut Page 3 of 3 ❑ No ❑ NA ;] NE ❑ No ❑ NA [21 NE ❑No ❑NA nNE ❑No ❑NA ❑NE Phone: gio'�'�I33' 33ca Date: % Z / O 21412015