HomeMy WebLinkAbout470029_Inspection_20181212Type of Visit: Q Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: pr County: li� Region:
Farm Name: 5, IJ4 )qtv,*' M Owner Email:
Owner Name: �-%��Q j� S"�C% LL6 Phone:
Mailing Address:
Physical Address:
Facility Contact: --J-05-e Title: Phone:
Onsite Representative: Integrator: � , `e.Id
Certified Operator: Certification Number: 9F o'yj
Back-up Operator:
Location of Farm:
Latitude:
Dischar¢es and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
Certification Number:
Longitude:
❑ Yes MNo ❑ NA ❑ NE
❑ Yes
❑ No
0 NA
❑ NE
[]Yes
❑ No
r�O" NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge?
Page l of 3 21412015 Continued
Faeffity Number: - Date of Inspection: y
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
O� No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
t NA
❑ NE
Structure 1 Strucizf 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
® No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
TP
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
� No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
T No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
R] No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
[ No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes I No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ( ❑/ Evidence of Wind Drift
,Q ❑ Application Outside of Approved Area ,ry ' _ /
12. Crop Type(s): �V1 I �% , 7B-+-i/x3zz C 1 (�1 1 &o't4 �K(4�-../'i' 6;0'-J1e�'1�07
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes No
❑ NA
❑ NE
❑ Yes No
❑ NA
❑ NE
❑ Yes No
❑ NA
❑ NE
❑ Yes No
❑ NA
❑ NE
❑ Yes
® No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No
❑ Waste Application ❑ Weekly Freeboard ElWaste Analysis ❑ Soil Analysis ❑ Waste Tr nsfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? [:]Yes No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑NA ❑NE
❑NA ❑NE
Page 2 of 3 21412015 Continued
IFAMity Number: - jDate of inspection: 2
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
[!�No
❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
mNo
❑ NA ❑ NE
the appropriate box(es) below.
T
❑ Failure to complete annual sludge survey []Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
�3 No
❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
RR No
❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
❑ Yes
No
❑ NA
❑ NE
❑ Yes
® No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
❑ Yes LpVpjn No ❑ NA ❑ NE
❑ Yes E� No
❑ Yes] No
❑ Yes No
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
Phone: l "h
Date: i
21412015