Loading...
HomeMy WebLinkAbout830014_Inspection_20181214i ype of visit: ! uompnance inspection v Lpperation xeview ki structure r,vamation l.j i ecnnicai Assistance Reason for Visit: i Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: i Z/ /M //Q Arrival Time: I Departure Time: �County:sCgr49r V Region: Farm Name: �r r4SO01 Owner Email: Owner Name: % (r 6�4' o n Phone: Mailing Address: Physical Address: Facility Contact: _(?.- Cj'_' �5 O h Title: Phone: Onsite Representative: N Integrator: Certified Operator: n Back-up Operator: Location of Farm: Latitude: DischarEes and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Certification Number: 17&X_5_ Certification Number: b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ® No ❑ Yes®` No �e] NA ❑ NE ®NA ❑NE NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412015 Continued Facili Number: - Date of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [:]Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ® NA ❑ NE Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 Structure 2 220 Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) Structure 5 Structure 6 ❑ Yes X No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes PD No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [�3 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [P No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window /❑ Evidence of) ❑ Wind Drift Application Outside of Approved Area 12. Crop TYPe(s): _�S4�l/� 6�-aSS (mila, . Sip, . C,,,t_L Oil 13. Soil T e s 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes P No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents (10 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ® No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ® No ❑ NA ❑ NE the appropriate box. ❑WUP El Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes P No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? [—]Yes ® No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 21412015 Continued j Facility Number: - / Date of Inspection: f 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 9a No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes P No ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Q ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Phone: 0 300 Date: lI IS 21412015