Loading...
HomeMy WebLinkAbout20190786 Ver 1_SF830167_HYD_SMPv2.07_20180329(Oct 2016)_20190614(Version 2.07; Released October 2016) North Carolina Department of Transportation Highway Stormwater Program =� STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: 17BP.10.R.157 TIP No.: SF-830167 County(ies): Stanly Page 1 of 1 General Project Information WBS Element: 17BP.10.R.157 ITIP Number: SF-830167 Project Type: Bridge Replacement Date: 3/29/2018 NCDOT Contact: Marc Shown Contractor / Desi ner: STV En iners Inc. / Shirshant Sharma Address: 1020 Birch Ridge Drive Raleight, NC 27610 Address: 900 West Trade Street, Ste. 715 Charlotte, NC 28202 Phone: 919 707-6751 Phone: 704 816-2556 Email: mshown(@ncdot.gov Email: Shirshant.Sharma@stvinc.com City/Town: Albemarle Count ies : Stanl River Basin(s): Yadkin -Pee Dee ICAMA County? I No Wetlands within Project Limits? No Project Description Project Length (lin. miles or feet): 0.07 Surrounding Land Use: JRural, wooded, agricultural ANIM Proposed Project Existing Site Project Built -Upon Area ac. 0.3 ac. 0.2 ac. Typical Cross Section Description: Bridge : Two I V lanes, 2'-11" paved shoulders Approach: Two 10' lanes, 2'-11" paved shoulders Bridge: Two 10' lanes, no shoulders Approach: Two 10' lanes, grass shoulders Annual Avg Daily Traffic (veh/hr/day): Design/Future: 4200 Year: 2025 Existing: 2100 Year: 2013 General Project Narrative: (Description of Minimization of Water Quality Impacts) The existing single span 30'-7" bridge over Town Creek on SR 1421 (Bethany Rd) is being replaced with a single span (1 @70') 24" cored slab bridge. The bridge will be normal crown at 2.0% with 11' travel lanes and 2'-11" shoulders, 27"-10" clear width and 30'-0" OTO width. The existing bridge structure will be removed. Overall drainage patterns will be maintained. There are roadside ditches that flow towards the bridge on either side of the structure. The proposed design will interfere with three of the existing ditches flow patterns, and proposed ditches will be used to maintain flow to the bridge, and down the floodbench. On the begin side of the bridge, traffic bearing 2GI drainage inlets were placed on both sides of the roadway to pick up runoff from the bridge. Class -II rip rap abutment protection on both banks of the stream is also proposed to prevent future erosion and stream migration. Deck drains were placed on both sides of stream; discharging onto the rip rap abutment. Deck drains are needed to prevent stormwater spread from entering the roadway. No dissipator pads were used because the Class-ll rip rap will prevent erosion and dissipate flow. Dual proposed water line crossing construction will also be performed as part of this project which will cross the stream upstream of the proposed bridge. The work area shall be cordoned off with impervious dikes and pump around operation and the sediment laden water within the work area shall be filtered out using a special stilling basin. Waterbody Information Surface Water Body 1 : Town Creek NCDWR Stream Index No.: 13-17-31-1-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? iYes I Deck Drains Discharge Over Buffer? iYes Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? IN2 (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative)