HomeMy WebLinkAbout20190785 Ver 1_SR 1779_Wetland Impact Summary Sheet_20190613WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Bank
Stabilization
(ft)
SITE #1
N/A
Dewatering
10
SITE #2
N/A
Ditch (Stream) Excavation
180
TOTALS*:
180
10
*Rounded totals are sum of actual impacts
NOTES:
20131024