Loading...
HomeMy WebLinkAbout20190785 Ver 1_SR 1779_Wetland Impact Summary Sheet_20190613WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Bank Stabilization (ft) SITE #1 N/A Dewatering 10 SITE #2 N/A Ditch (Stream) Excavation 180 TOTALS*: 180 10 *Rounded totals are sum of actual impacts NOTES: 20131024