HomeMy WebLinkAboutNCGNE0975_Compliance Evaluation_201311271�
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral and Land Resources
Land Quality Section
Tracy E. Davis, PE, CPM
Director
November 27, 2013
Dixon Quick Coupliing
Attention: Mr. Scott Clark
2925 Chief Court
Dallas, North Carolina 28034
Pat McCrory, Governor
John E. Skvarla, III, Secretary
Subject: Compliance Evaluation Inspection
Facility Name
No Exposure Certification NCGNE0975
Cleveland County, North Carolina
Dear Mr. Clark:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection
conducted at the subject facility on Date by Personnel, of this Office.
The facility was close to meeting No Exposure requirements and wishes to continue working
towards that goal. A future inspection will be scheduled in December 2013.
The report should be self-explanatory; however should you have any questions concerning
this report, please do not hesitate to contact me at (704) 663-1699.
Enclosure
Cc: Stormwater Permitting
RK
Sincerely,
'Ryan Kormanik
Environmental Senior Specialist
J@@@fl�ft
DEC 0 3 2013
OSNR - WAII R QUALITY
k MD STORhV�i
R BRAIYOH
Mooresville Regional Office
610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115
Telephone 704-663-1699 / FAX: 704-663-6040 • Internet: http://portal.ncdenr,org/web/ir/land-quality
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
Compliance Inspection Report
Permit: NCGNE0975 Effective: Expiration: Owner: Dixon Quick Coupling
SOC: Effective: Expiration: Facility: Dixson Quick Coupling
County: Gaston 2925 Chief Ct
Region: Mooresville
Contact Person: Scott Clark
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Title:
Inspection Date: 11/26/2013 EntryTime: 10:00 AM
Primary Inspector: Ryan C Kormanik
Secondary Inspector(s):
Dallas NC 28034
Phone: 704-334-9175
Certification:
Exit Time: 11:00 AM
Phone:
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, No Exposure Certificate
Facility Status: ■ Compliant 0 Not Compliant
Question Areas:
0 Miscellaneous Questions Misc
(See attachment summary)
Page: 1
Permit: NCGNE0975 Owner - Facility: Dixon Quick Coupling
Inspection Date: 11/26/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Misc
Is the facility compliant?
Comment: The facility applied for no exposure. At the time of the inspecction the
facility did not meet the requirements of no exposure; however, the owner was working
towards meeting the requirements. A follow-up inspection will be performed in
December 2013.
voe KJ^ tie Kit:
n■nn
Page: 2