Loading...
HomeMy WebLinkAboutWQ0035579_More Information (Requested)_20190523 ROY COOPER 4W.,,,� > z�a Governor e. MICHAEL S.REGAN ,`, I- , `, .>a Secretary '° " LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality May 23,2019 Lynn Davis Town of Belhaven PO Box 220 Belhaven, NC 27810 Subject: Engineering Certification Requested Town of Belhaven Dear Permittee: Based on a review of our records, it appears that the Division of Water Resources (Division) has not yet received a final engineering certification in accordance with 15A NCAC 02T.0116,as well as the standard conditions,for the following Wastewater Collection System Extension Permit(s): Permit No. Issue Date Facility County e;,_ (WQ0035579 02/08/12 Gary Gibbs Tara Gibbs LPSS (Lot B) Beaufort WQ0035683 02/08/12 Gary Gibbs Tara Gibbs LPSS(Lot B) Beaufort lk WQ0035799 03/01/12 Wynn's Gut Dock�aoge Sewer y t Beaufort ,, , y ) 1 `o If the permitted facilities have been constructed and are in operation,a complete and final engineering certification must be submitted as soon as possible in accordance with 15A NCAC 02T.0116. Please note that if any portion of the facility has been constructed and is in operation, a certification must be provided.A complete certification is one that includes a copy of the construction record drawings (plan and profile views of all sewer lines), pump station design calculations(if applicable), and the certification form as provided with the original permit. Please note that the Division may not acknowledge the receipt of certifications, however,the status can be viewed at any time using our online Sewer Extension Permit Tracker located on the PERCS Unit website. if the permitted facilities have not yet been constructed but shall be in the future or are currently under construction but are not yet in operation,or if the permittee desires to rescind the permit(s), please complete and return the attached form. Should a permit rescission be requested, a letter from the Division confirming the rescission shall be sent to the applicant. Please provide your response within 30 days from the date of this letter. Please be advised that failure to certify a non-discharge sewer extension permit appropriately in accordance with the provisions of 15A NCAC 02T.0116 may result in enforcement action. Operating a non-discharge system without a valid Wastewater Collection Permit may subject the responsible party to a civil penalty of up to$10,000 per day. D E''' �s North Carolina Department of Environmental Quality I Division of Water Resources NORN COAR INA 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 Daw naott t at Emaaa.Taat4 Quittr 919.707.9000 Sewer Extension Permit Status Update • Permit No.: tiOC%� s3'7 ' Permittee: ,f/ or d,Yf Project Name: '' ) 1 v'bk5 T nig, LPsS (L 13) Bo tp-e 1-- B For multiple permits with the same status,please attach a supplementary page indicating all permit numbers and project names of the permits being addressed by this form. Please complete the applicable remaining portion of this form and return to the Division at: NCDEQ/DWR WQPS—PERCS UNIT By U.S. Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem qqps/ Raleigh, NC 27699-1617 Raleigh,NC 27604 Nyle.Hothem@ncdenr.6crr **************************************************************************************************fie Permit Shall Remain Open We certify that the subject perrit(s)has not yet been constructed but shall be constructed in the future in conformity with the approved project plans,specifications,and supporting documents OR that this project is currently under construction but is not yet in operation. We understand that the appropriate certification documents must be forwarded to the Division prior to operation. Please maintain the subject permit(s)in active status. Name&Title(print): Signature: Date: Comments: *************************************************************************************************** Permit Rescission Request We request that the subject permit(s) be rescinded and certify that the permitted sewer(s) have not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): L\i{lrrl Davis TO uu rl M c na Gam" 8 Signature: i _J Date: 5 ` — ( 9 Comments: Contact Information Updates: To update your contact information, including mailing address,please list that information below: Updated Contact Person: Updated Mailing Address: Updated Email: