Loading...
HomeMy WebLinkAbout20190466 Ver 1_470035_Permit Drawings_20190603_20190613II See Sheet 9-A For Index of Sheets See Sheet l-8 For Convetional Symbols See Sheets IC-1 & IC-2 For Survey Control Shee PUNGO RIVER GAME LA/ND 1151 _�• 114, Sl.&e m.&e ilk J� 1 I147 141 VICINITY MAP STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS HYDE CO UNTY LOCATION: BRIDGE NO.35 OVER SLADE CREEK ON SR 1143 (SLADES VILLE-CREDLE RD. ) TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT NAD 83/2011 STATE BTATE PROIBCT REPBR6NC6 NO. SNBOT TOTAL SHEBTB N.�. 1713PA.R.83 SSATB PROLNO. F. A.PROl.N0. D69CR�TION 176P.1.R.83 PE 17BP.1.R.83 ROW, UTIL. 17BP.1.R.83 CONST. _ _ PERMIT DRAWING SHEET 1 OF 6 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH �1 of Trans W/ ro 1223 JONE5 FINK ROB HYDRAULICS ENGINEER I ETHERILL surte16eL1N ® g°o?••'Essi ' %�'s 24�oe otil,q 50 25 0 50 100 ADT 2017 = 140 ENGINEERING Roiesn.N<.2-6 Lirenx No.F-03JJ Sue: 9198A SWI SEAL Roam ADT 2037 = 150 K = 10 % LENGTH ROADWAY TIP PROJECT 1713PA.R.83 = 0.067 MILES 9w es eloJ 18462 ®� PLANS 2018 STANDARD SPECIFICATIO = o /o D 60 TIP LENGTH STRUCTURE PROJECT 176P.1.R.83 = 0.016 MILES RIGHT OF WAY DATE: EDWARD G. WETHERILL, PE S1 SIGNATURE: quuu" 50 25 0 50 100 T = 6 % * V = 40 MPH TOTAL LENGTH TIP PROJECT 17BP.1.R.83 = 0.083 MILES PROJECT ENGINEER —AUGUST 16, 2017 A pnFFn ROADWAY DESIGN 'r �a..... ENGINEER F=p�FE55/Ro, !" PROFILE (HORIZONTAL) * TTST =2% DUAL 4% LETTING DATE: BOB A. MAY, PE 10 5 0 10 20 FUNC CLASS — LOCAL SUBREGIONAL TIERB^NE OCTOBER 16,2019 PROJECT DESIGN ENGINEER 21116 pJ J•`, '� oe a. MPr, PE,,'FFFF.F"� SIGNATURE: OR pR�fl6�� NCDOT CONTACT. JOHN S. ABEL, JR. DIVISION 7 BRIDGE PROGRAM MANAGER PROFILE (VERTICAL) NO\C (V � U C r� oC O G Lr OC UJI c�v) % LC UJ i IY d o, SURFOACE WATER ILL IN ETHERILL 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. Raleigh, N.C. 27606 Note: Hi -Viz Fencing to be WETLAND AND SURFACE WATER IMPACTS PERMIT ENGINEERING License No.F-0377 7BP.l.R.83 4 installed around NR-Eligible DENOTES FILL IN BUS: 9198518077 RM1V SHEET NO. ___ Properties before construction WETLAND Fax: 9198518307 ROADWAY DESIGN HYDRAULICS DENOTES EXCAVATION TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER IN WETLAND QVIUSITE DESIGN - GIS/GPS- CONSTRUCHON OBSERVATION SHnCA2p ��`�mAR�li ExistingPowedrele hone Line � ,,,," DENOTES HAND p CLEARING �=04oFE55/p��9�•�� �.`��. �EE55/p� 9�•.� Proposed Power/relephone Line ' 100' 0' 100' GLI SEAL - SEAL 21116 18462 GRAPHIC SCALE ,,,, �O �uinM`��,,,,,,• ,,,,,�� �urinu��JO`,,: io R ELI IBLE PR PER PERMIT DRAWING SHEET 2 OF 6 DOCUMENT NOT CONSIDERED FINAL ST JOHNS EPISCOPAL UNLESS ALL SIGNATURES COMPLETED RICHARD H. CREOLE CHURCH = MADGE J.WILLIAMS z -L- STA. 1MSLLB JEFF M. CREDLE & _ �S n RICHARD H. CREDLE _ _ + TYPE B-77 n SHOP CURVED .� —D 0 —I1 PS : E; o N p o • N TYPE -III I TYPE B-77 LC\'3 $HOP CURVED ROP. SHEET PILING E D APP. 24. 06 BEGIN DIRECTIONAL BORE SKETCH SHOWING PAVEMENT/STRUCTURE RELATIONSHIP CHARD . ELF o M, RI CREOLE PROPOSED EXCAVATION 4Y EST. 58 CY } NO DECK DRAINS REQUIRED ON THE BRIDGE PROPOSED SHEET PILING TOOLEY PROPERTIES LLC -L-LT. STA. 13+67.93 TO 15+32.28 Mnl T cE TING WATER_ MARSH AREA -L-RT. STA. 15+05.49 TO 15+32.28 = w PROPOS WATER LINE 20 (DIRE NA BORE) EM1AINTFNANCE --� --� � �.de M1 •,C� Mai TpNa CF �' 0ti 4tiw ,� TO SIL_-CRU R 1145DE%15T.ft\W ey MaMTENANC _ _ d A ISFBUS - W BY o SLADES CE EMP�NTENANw n \ \ CREEK \ ti WOODS m� 9 ell DCKFT h a �-' MACK B END DIRECTIONAL PIER 'L^ KEECH MARSH AREA MAD JAIL JAMS � 3 ,OS•60'S RUINS, G, / BORE 1 ASCMIT S SCRRE DE VOLUNTEER `�9 SEPTI SCMITT ARMSTRONG FIRE DEPARTMENT 9 ��/TAN 3 z TEXES L cR EK y ti Oy q SEARS r1 m JOESPH M. / \ ✓ \vc 2 �a m DMITC HY S HOLLOWELL MITCHELL ALBIN B. SEARS j5 • Y \ a HAND CLEARING m P0C GLADE S. HARRIS / FILL IN WETLANDS Po kFr 4 SCATTERED g` - NR ELIGIBLE PROPERTY CLASS B RI RAP SURFACE WATER IMPACTS Pq cF TREES = w EXISTNIG WATER MAIN 3 TONS RI RAP EXCAVATION IN WETLANDS �' 9 SQ. YDS GE cb� -� 4gxy li MARSH AREA SCTTT S D roI -- II •o �I \t \ \ _ - - _ TO SCRAATON l MACK \ KEECH�-- s\ \ - ✓ ^ A •r\L Z \ N In SITE 1 ENLARGEMENT / z 2X ENLARGEMENT E MELODY C. WILLIAMS x TB _ _ _ED Tg N � „ZS,05�60 S o z Q J w CHRISTOPHER CHADWICK 3 On N 0 CC C NC-1 y ALL WETLANDS ARE DETERMINED BY CLAY WILLIS O DIVISION ENVIRONMENTAL OFFICER AAS WETLANDS A,B,C,D HAND CLEARING sw FILL IN WETLANDS . SURFACE WATER IMPACTS Dw. EXCAVATION IN WETLANDS SEE SHEET 5 FOR PROFILE SEE SHEETS S-1 THRU S-22 FOR STRUCTURE PLANS O C U C OC CLr OC �C LJJ v) Li UJ i . d g V \� WETLAND AND SURFACE WATER IMPACTS PER DURFd. OACE WAERTES TS IN ETHERILL 1ZZ Raleigh,Jones NC.Franklin7 6 PROJECT REFERENCE NO. SHEET NO. Note: Hi -Viz Fencin to be �.t' L ENGINEERING License No. F-0377 78P.1.R.83 4 installed around NR-Eli ible / �- '\ — DENores FaL IN Bus: 9198518077 g \ WETLAND Fax: 9198518307 R>W SHEET NO. ___ Properties before construction / �^ / \ -\ \ r -- 1 \ ROADWAY DESIGN HYDRAULICS ` ` / _ \_\\ �\\��l Z.� DENOTEWETLANDTION TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEER ENGINEER \ / \\ CINUSITE DESIGN - GIS/GPS- CONSTRUCTION OBSERVATION ,T'1„"„" ♦,,,����,,,,, Existing Powerelephone LWine r \` �' /' '\'\I `\�1 \�� \I���t �`)! \'�.i ,\ �2^�\'_UiU_\�_�\ hI� IIII I \��\!��\`�, t✓4'�> � S GLI ''♦•4. `s� .CA �Q�:;% �♦ C••'•4 [r..SEAL .CDENOTEHAND CLEARING 5.5.A./. o' O LProposed Power/Telephone Line loo, lo1862 z1116 R F 0@ `H'•. A'GINE`' '. q'••:PGINE .: `>♦'� GRAPHIC SCALE •oauuno• muuT♦♦♦♦ I / \ >� PERMIT DRAWING r f ` \ ,-- 1 S DOCUMENT NOT CONSIDERED FINAL o\ \) I l\ \ I HEET 3 OF 6 T JOHNS EPISCOPAL,- i / /) `I x\ i (\ram , L \\ l _ \' --% 1 UNLESS ALL SIGNATURES COMPLETED / \\I \\ \ 1\ •�_ RICHAf`CREDLE N CHURCH / - I \\ 1J.- `\ �, I I \ MADGE 1�.IL IAM� I"/ ` < ` / \ z 2^ / \ \ `---______,J I , -LE STA. GIN PP. SLAB \ \J• l S' 1 �`_________ D t TYPE B-77 �.../RRRaEFF fr CREDL & l \ ` = - \ ` \ ` 1 /'� ✓ \ ✓3/ If \ /O�R.PS.E�IT SHOP CURVED l V D\H. ,E-� ` 1 \ r;' = N l6• %�4 w ] ✓ I I \\ \ \\ \\ \\ i �a-3-1\' i + C— Y �,\ \ �`\�. / i 1 �\ �_ \�__- /// \w __, i �J�0 25.1 PS 1 01 N i �. 1 I I - ti \ ' �. 1---P--= 7/ _-- /ram. _ . j� /,�, D o PS \ I \ w TYPE 8-77E-III SHOP CURVED E DAPP. LAB L7 \ I \✓ �,1 i \�\���J I 1 �\,%� 1 li�-$m\ / ,\�_� \\`/ �J� �� >\�� ) / -/ I\ t \ -- + -- + . 1 \ re} \`, \ ` /\ ✓ I BEG)N' DI CTIONAL I \ / _ \` ' C1 I `•� \ �� I\, �� BORE_7— j , \\ / )\ / (_/ / \ \\ \\ ,\ ��; ' \ ,SKETCH SHOWING PAVEMENT/STRUCTURE RELATIONSHIP i \ `'' GI�-- I i / , o II I/ i \ \ \�' fiIQHARD r l \ I �'' �I '� , N \ , PROPOSED EXCAVATION EIG \'I\, I mJ W 1 i I \ r \ 11 1 I )\ \ / I ` \ % 1 V'--�I •\ �' ` - \ ___ BEGIN S30 EST. 58 CY \I I V \ 1 \ J".�1 �-1� \ 1 m \ `/ 1 I\\ ' / �-`� / I, �. \ _/.'I STA. 14+30 RT. 1) 1 NYT REQUIRE \\\ / --� fix'\ 1 \ 1/� \ U�, J \ j 1 I I `��-\ \ \ i RI©�E' '1 \ PROPOSED SHEET PILING �1Nw.r TXhY OP R I I , , \ / \ t PRJ ' 11 S I \ / // -L-LT. STA. 13+67.93 TO 15+32.28 / i 11 0'i /' \ L RT. STA. 15+05.49 TO 15+32.28 LLC I \g\\ / n \ r yyyyyy`, r r > NAI - ISIT:'iW E ', / AREk/� ` \-- I\ / �_A'ER LINE / I ✓ -1\", \ \ n -- 1 DIRE NAL `SORE) V I l�l 1 I N 1 / ex/'tea / / r�l\� L_/' I/' /� / Il, j _ �I � 1 V 1� ISFBus _ • g //� I \ \ ' /�1J / cKFT r, BEGIN-SEG \r�/ / /STA. 13+8 RT. _ - - \ \) / K 0 1 / ' -/l - \ lV 3.2k 58.�� ll _ , _ PI �, 'L° D DIRE IONALI \ / � /' -- � r ^tl/' �`.--- ✓\, `� �N \ \ �KAREA _1_c1AID y�.^N� IAMS - j\ \ x 40/,�S`. _ \- �OR,Fi r I `� % _ I � \ \ 5C TON VOLUNTEER J ` I ( \ 9 I A \ \ / 1 I / i 15.q E ARR �/FIR DEPART�I�T / \ / l I`• L � �R, Y SI 1\II_ _/"\ \ I� V /j I-, \ _\2 J 2 ---�1 /�/ ' ��'F1pLLOW6 L 11 ___ , �\ , v� �'/, N e z I (' ,"%''i -0 �' �, MtTEELL i / ��'-I ,' / l i n' �`-- - 1 1 \ ` `/' i I � / \ FILL N WET , /ry `114 .0 � � \ y � '�` / ,-GL DF S. HARRIS -I LEAfptl \ FT SCATYERE6� �2 1 1\ I\I^ i INS RI R XCAVATION I ` � \ N F••, _� � 2� I £ � \I ��\ / / ,I I I > �1/ \\ // \J%i \----- `e r\; \ \ / \ _ �� \� - \�\�\\ W ----- , TO SCR�O� , I _ /`-- SMACK KEECH o z V vq SITE 1 ENLARGEMENT `-I < % -A 2X ENLARGEMENT I I m fie✓ __ ,� , �' Grs A_ �IL-� \ry ✓ \\ / y I h`, //' 0' r i 2 it 1 Y � 1 vv � ;v ; � - vI Vi � �i- N 18' CH�STOPF R CHADWICK / Nca _ I__ _ \ \ ALL WETLA DS AgE�rpETE IN BY CLNY WILLIS < \I \ -� I�� ` �- \ r�N EY+VfR ENTA�UF AAS WETLkNDS A.B.C�D - ``..' W \ �� JJ \ ✓� \`\I 1 I / , DIVI51 \ HAND CLEARING �_,�-?% - < j �% ✓ \ FILL IN WETLANDS SURFACE WATER IMPACTSI'1v,v N Z All 1 % EXCAVATION IN WETLANDS \ I ,�` :`��� AI SEE SHEET 5 FOR PROFILE SEE SHEETS S-1 THRU S-22 FOR STRUCTURE PLANS Mail lolloommoommmmommol ommoommmmoommm����r����������������1����� iiiiiiiiiii riwinr�ii- r o■I000■MEN ■Lcaumo. ■ ■runmmcuooloo■ MENEE■IEEE ., E■ EEEE■■■■■■ ■.A., —a III ...aoo. i iii iiiiii�= 5::a■■r■■ rr■■r■■r■■ ■u •eti �' ICorJ\�. \\\\\■■.. \\\\\■■■.. .I 17a mrG7 NEI 1■ �..�..�:�:� ■■■1 \\■ \\ \\\EI I\\\ �\ M 14i IN IEEE\ ■I 1■ •.�•WVA ■■■1 ■Ei =3 i■■■1 I■■■J■ ■I I %; IN IEEE■ SHEET NO. SHEET NO. n000n n000n n000n n000n n000n n000n n000n n000n n000n n000n n000n n000n n000n n000n �iWMMIMMr��mom� nuuun nuuun nuuun nuuun nuuun nuuun nuuunMENNEN iiiiiiiiii i iiiiiiiiiiiiiiEiiiiiiiiHUH m0000n r0000' ����oa�onom e000�r�±0000. ��oa._0000a WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Coastal Wetlands (ac) Temp. Fill In Coastal Wetlands (ac) Excavation in Coastal Wetlands (ac) Temp. Excavation in Coastal Wetlands (ac) Hand Clearing in Coastal Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 14+82 to 15+52 1 @30', 1 @50' 21 " Cored Slab < 0.01 < 0.01 < 0.01 ** 17 TOTALS*: < 0.01 < 0.01 < 0.01 0.01 140 *Rounded totals are sum of actual impacts NOTES: SITE 1: Permanent Surface Water Impacts = 67.7 Sq. Ft. (0.002 Ac) Permanent Fill in Coastal Wetlands = 135.9 Sq. Ft. (0.003 Ac) Excavation in Coastal Wetlands = 69.6 Sq. Ft. (0.002 Ac) Hand Clearing in Coastal Wetlands = 78.2 Sq. Ft. (0.002 Ac) 2013 1024