HomeMy WebLinkAboutNCC190603_NOI Application_20190612Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 6/12/2019 9:18:40 AM (NCG01 NOI Submission)
Approve by Lucas, Annette 6/13/2019 10:21:53 AM (Review- Construction NOI 12083)
• The task was assigned to Lucas, Annette by round robin distribution 6/12/2019 9:18 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 14, 2019 5:00 PM
6/12/2019 9:18 AM
Submit by Lucas, Annette 6/13/2019 10:28:08 AM (Payment Verification - NCG01-2019-0603)
• The task was assigned to Lucas, Annette. The due date is: June 14, 2019 5:00 PM
6/13/2019 10:22 AM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * 1-85 Business Park Phase 2 Sewer
2. County* Davidson
3. Highway or Street Belmont Road
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township* Linwood
5. State * NC
1r-G)a�T7i)MfiIif_T1IIa10141
6. Zip Code* 27299
7. Latitude * Enter the latitude in decirral degrees
35.7470
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-80.3337
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
08/30/2019
Estimated Construction Project Start Date
10. Date to End*
03/31 /2020
Estimated Construction Project End Date
11. SIC (Primary)*
Other (0000)
Standard Industrial aassification for Development
12. Acres to be
5.48
disturbed*
(including off -site borrow and waste areas)
13. Total site area
100.00
(acres)*
14. Post-
0.15
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-DAVID-2019-1-85 Business Park Phase 2 Sewer
Tracking ID
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving North Potts Creek
Wate rbody* Nacre of waterbody into which stormuater runoff will discharge
15b. Waterbody 12-112
Index No. * NCWaterbody Index Narrber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Davidson County
Name *
2. First Name* Zeb
ff Corporation, enter Registered Agent First l\b e
3. Last Name * Hanner
ff Corporation, enter Registered Agent Last Barre
3b. Title County Manager
4. Permitee E-mail zeb.hanner@davidsoncountync.gov
Address*
5. Permittee 336-242-2200
Telephone No.*
6. Permittee Mailing Street Address
Address* PO Box 1067
Address Line 2
City
Lexington
Postal / Zip Code
27293
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
r Yes
Street Address
913 Greensboro Street
Address Line 2
City
Lexington
Postal / Zip Code
27292-2699
State / Province / Region
NC
Country
United States
State / Province / Region
NC
Country
US
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Government - County
Ownership*
2. Primary Site Dwayne
Contact - First
Name *
3. Primary Site Childress
Contact - Last
Name *
4. Title
5. Site Contact E- dwayne.childress@davidsoncountync.gov
mail Address*
6. Site Contact 336-242-2030
Telephone No.*
7. Organization Davidson County
Name
8. Site Contact Street Address
Mailing Address* PO Box 1067
Address Line 2
city
Lexington
Rxstal / Zip Code
27293
State / Province / Region
NC
Country
United States
D. E&SC Plan
Part D.
Erosion & Sediment Control (MSC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 05/29/2019
Approved *
2. E&SC Plan Project David-2019-026
Number/ID* Assigned by agency or local program
3. E&SC Plan f• State DEQ Office
Approved by r Local Program
4. State DEQ Office * Winston-Salem (WSRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan David-2019-026.pdf
Approval Mast be FDFfornat
letter/documentation
6. NOI Certification david-2019-026 NOI.pdf
Form Mist be RDFformat
This is an Express f• No
Review Project* r Yes
3.78MB
237.93KB
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
�'W .K e
Type Name *
Zeb Hanner
Title
County Manager
Organization
Davidson County
Date *
06/12/2019
F. Tracking and COC Info
NOI Tracking No. 12083
NC Reference No. NCG01-2019-0603
Uses 'count number variable (incremrented by SP)
Certificate of NCC190603
Coverage (COC) Uses 'count _nunber'variable (increrrented bySP)
No. *
Count Number 603
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)