HomeMy WebLinkAbout20120773 Ver 1_Jacobs Landing Meeting Notes 2019_20190611Mitigation Site Meeting Notes
Date: April 15, 2019
Project Name: Jacob's Landing
Prepared By: Kim Browning, USACE
Type of Site: NCDMS Stream Site
Meeting Type: Year 5 Monitoring Review
Sponsor/Provider: KCI
USACE AID: SAW -2012-01006
County: Rowan *Denotes County w/ 30 -foot Buffer
NCDWR ID:
HUC and Basin: Yadkin - 03040105
Weather:
Coordinates: 35.5530 °N -80.6531 °W
Attendees:
USACE: Todd Tugwell, Kim Browning
NCDWR: Mac Haupt, Erin Davis
NCDMS: Melonie Allen,
Project Review Checklist - (provide additional detail in notes section on next page)
General Site Issues/Concerns:
0
Vegetation Composition or Density
❑
Inappropriate Credit Ratio Proposed
❑
Planted Stem Vigor (due to soil, browsing)
❑
JD Needed to Confirm Approach
0
Invasive/Exotic Species
❑
Continuity/Fragmentation
❑
Beaver/Feral Hogs (management plan)
❑
Easement Issues (existing farm, CE, NRCS funding)
❑
Soil (manipulation, compaction, fertility)
❑
Easement Encroachments (livestock, clearing)
❑
Livestock Present/Evidence of Livestock Access
❑
Easement Marking/Signage
❑
Crossings or Utility Lines
❑
Insufficient Project Size
❑
BMPs or Alternate Approaches
❑
Adjacent Property Owner
D
Fencing Issues or Fencing Needed
❑
T&E Species
❑
Ponds Within Project Area
❑
Section 106 (historic listing/tribal issues)
Stream Issues/Concerns:
❑
Incised/Entrenched
❑
Insufficient Stream Drainage Area
❑
Headcuts Present/Forming
❑
Insufficient Hydrology (if raising channel bed)
❑
Stream Structures Failing/Piping
❑
Vegetation in Channel (stream vs wetland)
0
Excess Sediment/Aggradation
❑
Flow Obstructions (undersized pipes, fords)
❑
Cross -Sections Missing/Indicate Problems
❑
Substrate Concerns (embeddedness, particle size)
❑
Bank Instability/Failure
❑
Live Stakes Absent/Failing
❑
Bench Rills/Erosion (constructed bench or P2 valley)
❑
Evidence of Water Quality Issues
❑
Excess Sinuosity (lack of flow)
❑
In -stream Habitat Weak/Missing
❑
Braided/Anabranch Channel
❑
Stream Buffer Width Inadequate
Wetland Issues/Concerns:
❑
Evidence of Excessive Hydrology
❑
Missing Gauge Data (preconstruction or monitoring)
❑
Evidence of Insufficient Hydrology
❑
Gauge Location/Placement
❑
Hydric Soil Indicators/Soil Series
❑
Gauge Maintenance
❑
Surface Roughness or Bedding
❑
Drainage Ditches/Swales Present
❑
Channel Relocation/Riparian Connectivity
❑
Field Tiles/Subsurface Drainage
❑
Hydroperiod Length or Start/Stop Date
❑
Continued Ag Use Adjacent to Wetland
Page 1 of 2
Date: April 15, 2019 Project Name: Jacob's Landing
Notes, Sketch, Action Items, etc.:
OFFICE REVIEW: **DMS requested a field visit**
Credits: As -Built = 4527.6 SMU
Mit Plan = 4368.6 SMU
Modification request= 4524 SMU
**Which is correct? Letter from the IRT in Sept 2014 was requesting explanation for credit differences.
Veg: Some supplemental planting occurred in 2018. 3/13 Plots Failed.
-Lots of volunteer sweetgum in several plots.
-Veg had very low vigor last year.
Invasives: dense privet on T2A (treated Dec 2018)
Tree fell on fence in T2, area was too wet to get in. Has this been removed and the fence repaired?
Streams: T-1 has aggradation for 81% of the reach (KCI says this is a natural function of this system...)
-XS-11 3 aggradation
Were dead trees removed from the buffer that the landowner dumped?
My Field Notes from May 2018:
J landing 550 ft of aggradation on T1. 3/13 veg plots not meeting. Dominance of sweetgum on the site. Also XS 8 has a
BHR of 1.4
Field: Replanted less than 10%. Lots of sweetgum. Lots of Willow by creek. XS8 looks fine. No downcutting. Dead
trees placed inside easement by landowner. VP3 covered in blackberries but they replanted around it. Trees are only
1-2 feet high. I would consider another year of monitoring veg. Streams look good, expressed concern about veg and
requested maps and numbers of replanting. Asked that the landowner not dump debris in the easement.
OK to release. KCI will send us info on how much was replanted
11 June 2019 Field Notes:
Streams look stable and no problems noted, though there is a good amount of sediment passing through the systems
Some rose noted along the stream.
No other issues - close out as proposed.
Credit Release/Site Closeout Information (for monitoring or closeout reviews only)
Stream Credits
Wetland Credits
Warm Cool Cold
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
679.14
Approved*
679.14
Result of Monitoring Report or Closeout Review I Close Out Approved
Project Manager Signature
��—
Date
June 11, 2019
*The updated credit ledger for the projet, which includes this release, must be approved by the Project Manager.