Loading...
HomeMy WebLinkAbout20060798 Ver 2_Emails_20070220edited Additional Information Request for Bills Mountain (20060798) Subject: edited Additional Information Request for Bills Mountain (20060798) From: Kevin Barnett <Kevin.Barnett@ncmail.net> Date: Tue, 20 Feb 2007 21:59:24 -0500 (EST) To: ian.Mcmillan@ncmail.net CC: david.mchenry@ncwildlife.org Additional Information Request for Bills Mountain (20060798) The Asheville Regional Office has performed a site visit and a review of the submitted application package. Upon review of the application, the ARO has determined that the package is incomplete. Please include the following in an additional information request to the applicant: 1. A through cost benefit analysis must be included to support any claim that the impact is needed for the project to be economically or financially feasible. The must include, but not be limited to, the construction costs of the dam, the cost of permitting (through all agencies (including but not limited to the US Army Corps of Engineers, the Division of Water Quality, and the Division of Land Resources), the consulting costs (including environmental consulting costs and engineering costs), the cost of purchasing the land for development, the costs of the preservation (value of land after development) and the time-value of money vs. the anticipated financial gain in land values. 2. As the issued Water Quality General Certification 3402 (GC3402) requires that "Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds. These mechanisms shall be put in place within 30 days of the date of issuance of the 401 Certification letter or the issuance of the 404 Permit (whichever is later). A sample deed notification format can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. DWQ shall be sent copies of all deed restrictions applied to these lots." As protective mechanisms already exist on this property, and no submission of Deed notifications has been submitted to the Division of Water Quality, you must further explain how a failure to authorize these impacts will result in degradation of Waters of the State and in turn, violations of the states Water Quality Standards. Additionally, the issued Water Quality General Certification 3402 (GC3402) requires that "if this Certification is used to access building sites, all lots owned by the applicant must be buildable without additional fill beyond that explicitly allowed under other General Certifications. The applicant is required to provide evidence that the lots are buildable without requiring additional impacts to wetlands, waters or buffers if required to do so in writing by DWQ." An explanation as to why these impacts are needed, in violation of GC3402 Condition 15. must be provided. 3. As the NC Wildlife Resources Commission has formally opposed your project, you must resolve the outstanding issues that the WRC has brought forward before the Division of Water Quality can provide any form of concurrence. Additionally, you must provide copies of all correspondence with the WRC to the Division of Water Quality (5 copies) as to provide a tracking for resolution of the WRC's stated issues. 1 of 1 2/21/2007 1:27 PM