HomeMy WebLinkAbout310261_Response to Notice_20180820August 15, 2018
Nicholas D Edwards
Next Generation Family Ventures LLC
290 Willard Edwards Rd.
Beulaville, NC 28518
North Carolina Department of Environmental Quality
Division of Water Resources
127 Cardinal Drive Extension
Wilmington, NC28405� —'�
Subject: Notice of Deficiency
Permit No. AWS310261
Next Generation 1
Duplin County
Dear Ms. Sanchez -King:
�'UG 2 0 2018
Water Duality Regional
Operations Section
Wilmington Regional Office
This letter is in reference to the Notice of Deficiency that was given to Next -Generation 1-on July 23,
2018. This correspondence is to fulfill the written response required with in the 30 day period mandated
in the notification.
First let me say that our specific geographic area has experienced extremely large rainfall levels for the
period of time that the level became high. On the 11th of May the lagoon level was at 31 inches. We are
continuing even now to experience record high rain water levels. Additionally let me emphasize that the
notification to DWQ was made by Next Generation staff to the Office of Water Quality as soon as we
checked the lagoon level after a large rain on May 31, 2018. On the 11th of May the lagoon level was at
31 inches. Between May 16 and May 31, 2018 we had 10.4 inches of rain at this location. We followed
the proper protocol for this type incident. Immediately after phoning in the lagoon level we completed
and filed the proper POA. As We stated in our plan we took advantage of the clear days after the
ground saturation was improved to reduce the lagoon levels by irrigating on sunny dry days and were
back within proper levels within the thirty day requirement.
As for our plan for preventing the occurrence of this again, we will diligently continue to monitor the
lagoon levels and pump the irrigation reels on all available pumping days while staying within the
available PAN for each spray field. We will continue to monitor the drinking waterers in the hog houses
to insure they are not leaking. Sprinklers will continue to be monitored to insure they are working
properly and will only be utilized at necessary times. As usual the lagoon structures will be checked
after any significant rainfall of one or more to insure no leakage.
i
Additionally, a new technical specialist, Barwick Ag Services, has been contracted to assist with
recommendations and any additional procedures to put into place.
It is our intent as it has always been to be good stewards of the land and to maintain proper
management techniques. We work diligently to maintain our lagoons within the confines of the
regulations. Weather continues do not always permit this to occur, however we will continue to strive
to accomplish this task.
Yours truly,
Nicholas Edwards
.----- Operator in Charge
Next Generation Family Ventures LLC
Cc:
Michael.meilinger@ncdenr.gov
' 9
'
i
f
n
LIZ-
0
Z
CCD -J co
Q J .
00gm� y
Val
25
6 c -
�>
kE
O
® N
® co
®
® Er
co
1.,!
s
® O
® O
!
® o
o Cl
C3
R!}
Ln
mi
® �01
V