Loading...
HomeMy WebLinkAboutNC0089818_Other_20190611 ROY COOPER sum. it" Governor MICHAEL S. REGAN Secretary . LINDA CULPEPPER .tea w Director NORTH CAROLINA Environmental Quality June 11, 2019 Kevin Davidson,P E,VP of Engineering Agri-Waste Technologies Inc. 501 N. Salem Street, Suite203 Apex,North Carolina 27502 Subject: Request for Additional Information Application for Discharge to Surface Waters Under NPDES Permit NC0089818 NC Land Lease LLC (dba)Bailey's Mobil Home Park(MHP) Wastewater Treatment Plant(WWTP) 4131 US 70 E,Durham 27705 Durham County Dear Mr.Davidson: The Division of Water Resources (DWR of the Division)has reviewed your application for discharge to surface waters, and hereby requests additional information. We note that this proposed wastewater treatment system is subject to Neuse River Basin permitting Rules. Existing Facilities. We understand that Bailey's MPH currently consists of a subsurface sanitary sewer system supporting approximately 28 mobile homes. This system utilizes three(3) septic tanks and leach fields with a design flow capacity of 3,000 gpd. We note that treatment is currently"failing"(day-lighting to ground surface) and has been condemned by the Durham County Health Department. We note that no municipal sewer service is available to connect within one(1)mile of the site. Records show a history of notices of violation, and health and odor complaints ranging in age from 2002 to the present. Existing Regulations. While the surface-water flow and stream classification may allow a discharge to the UT to Stony Creek [15A NCAC 02B .0206 (d) (1)], your,proposed discharge is further subject to permitting Rule 15A NCAC 02B .0279 governing nutrient discharges in the Falls Lake watershed. These Rules currently require any proposed new treatment system to meet limits for Total Nitrogen(TN) of 3.0 mg/L and Total Phosphorus (TP) of 0.1 mg/L) t9 protect water-quality. Moreover, the rule requires the applicant to purchase TN allocation from an existing NPDES discharger or nutrient offset credits from an approved mitigation banker prior to permit issuance. I‘MY4 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617-919.707.9000 Kevin Davidson,P E Agri-Waste Technologies Inc. AD-INFO request Page 2 of 2 It follows that your client must be able and willing to procure Total Nitrogen(TN) allocation or credits. Without one or the other, this discharge cannot be permitted. Please advise within 60 days of this notice as to how we should proceed with this project: In the absence of additional information, the Division must return your application for surface discharge as incomplete. Sincere y, Joe R. Co oron, P G DEQ/D /NPDES'Permitting Unit • ec: DWR/RRO,Karen Higgins;Van ssa Manual NPDES Program Files Jimmy Radford[jaradford@yahoo.com] • •