Loading...
HomeMy WebLinkAbout20171039 Ver 1_PCN Plan_20190612��-PRQI�T LOCATION - S VICINITY MAP h" DMS PROJECT #: 100022 CONTRACT #: 718G USACE ACTION ID #: SAW-2017-015OG RFP #: I G-OOG993 CATBIRD SITE DAVIE COUNTY, NORTH CAROLINA YADKIN 01 RIVER BASIN: HUC 03040101 DECEMBER 2018 RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 302 JEFFERSON ST, SUITE 110 RALEIGH, NC 27605 REACH D52 SITE MAP NTS Sheet List Table Sheet Number Sheet Title - COVER A I OVERALL PROJECT E I NOTES E2 EXISTING CONDITIONS 51 REACH D51 52 REACH D51 53 REACH D52 54 REACH D52 55 REACH D52 PI PLANTING PLAN MI MONITORING PLAN DI DETAILS D2 DETAILS D3 DETAILS D4 DETAI L5 D5 DETAILS DG DETAILS D7 DETAI L5 res 302 Jefferson Street Suite 110 Raleigh, NC 27605 Main: 919.929.9909 Fax: 919.829.9913 www.M.us PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN; BRC CHECKED: AFM SHEET NUMBER REACH DS 1 RESTORATION 5' ,w r. J REACH DS2 ENHANCEMENT II -REACH DS2 RESTORATION REACH D52 ENHANCEn.IMT 11 #* wo REACH DS2 RESTORATION pro err e. 1 r • i �� '!�fC of # •9'4� r. ores 902 Jeftrson Street, SuRe 110 Relelgh, NC 27605 Main: 919.829.9909 Fax: 919.629.9919 www.res.us SEAL FULL SCALE: 1'=100 9 t W 240 r - FULL SCALE HALF SCA"EE w o � IL Z 0 U K z O U 0 LL Z o Y LL a Z zo y yo ¢ 3 LU Lu ¢ a z J O a ~ w w 0 a � }Z am ~ Z U° o w Lu Q W z o PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: Al CONSTRUCTION NOTES: I . INSTALL EROSION CONTROL MEASURES AS DESCRIBED IN THE EF051ON CONTROL PLAN AND NOTES. EROSION CONTROL MEASURES MAY BE PHASED -IN TO THOSE AREAS OF THE PROJECT CURRENTLY BEING WORKED ON. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS 50 LONG AS PROPER CONSTRUCTION 15 MAINTAINED TO ENSURE THE INTEGRITY AND USEFULNESS OF THE PROPOSED MEASURES. ALL DISTURBED AREAS ALONG CHANNEL BANKS SHALL BE STABILIZED WITH TEMPORARY SEED AND MULCH AT THE END OF EACH DAY. 2. IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAM DIRECTION. 3. EXISTING WETLANDS CANNOT BE ENCROACHED UPON UNDER ANY CIRCUMSTANCES IF NOT APPROVED AS DESIGNATED IMPACT AREAS. HIGH VISIBILITY FENCING MUST BE PLACED AROUND ALL EXISTING WETLANDS THAT ARE LOCATED ADJACENT TO CONSTRUCTION ACTIVITIES AND/OR ARE LOCATED WITHIN THE PROPOSED CONSERVATION EASEMENT. 4. DURING STREAM CONSTRUCTION ACTIVITIES, THE WORK AREA SHALL BE STABILIZED AT THE END OF EACH WORKING DAY. 5. UNLE55 NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION AND STABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT AN ELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL. G. STOCKPILE AREAS MAY BE RELOCATED UPON THE APPROVAL OF THE ENGINEER. SILT FENCING MUST Be INSTALLED AROUND ALL STOCKPILE AREAS. 7. CONTRACTOR SHALL NOT COMPACT 5O1L AROUND ROOTS OR TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED, PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. ANY COMPROMISED TREES NOT USED IN CONSTRUCTION ARE TO BE REMOVED AND DISPOSED OF OFF SITE. 8. CONTRACTOR SHALL CONSTRUCT PR0PO5ED RIFFLES PER SHEET D7. 9. IN-5TRFAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES, LOG VANES, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PER APPROVAL FROM DESIGNER. 10. THE WORK TO RESHAPE THE CHANNEL BANKS WILL BE PERFORMED USING EQUIPMENT WORKJNG FROM THE TOP OF THE EXISTING STREAM BANK. WHERE POSSIBLE. 11. CONSTRUCTION EQUIPMENT WILL NOT Be PLACED WITHIN THE ACTIVE CHANNEL TO PERFORM WORK IF POSSIBLE. PLATFORMS SHOULD BE USED TO CK055 CHANNEL WHERE ACCESS 15 NOT POSSIBLE. 12. NO MORE CHANNEL SHALL BE DISTURBED THAN CAN BE STABILIZED BY THE END OF THE WORK DAY OR PRIOR TO RESTORING FLOW TO NEWLY CONSTRUCTED CHANNEL SEGMENTS. 13. CONTRACTOR SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION 15 COMPLETE AND THE SITE 15 STABILIZED. A MAXIMUM OP 200 UNEAR FEET Of, STREAM MAY BE DISTURBED AT ANY ONE TIME. 14. ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS. 15. AT LOCATIONS IN WHICH THE EXISTING CHANNEL 15 BEING MAINTAINED, TEMPORARY PUMP AROUND DAMS AND BYPASS PUMPING WILL Be USED TO DE -WATER THE WORK AREA AS DESCRIBED IN THE DETAILS. I G. WHEN THE PR0PO5ED CHANNEL HA5 BEEN SUFFICIENTLY STABIUZED TO PREVENT EROSION, ALL TEMPORARY PUMP AROUND DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL AND NORMAL FLAW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DE51GNATED SPOILS AREAS PRIOR TO REMOVAL OF TEMPORARY PUMP AROUND DAM. 17. AT LOCATIONS IN WHICH ROCK STRUCTURES, BOULDER TOE STABILIZATION, AND LOG TOE STABILIZATION ARE CALLED FOR ON THE PIANS, TEMPORARY COFFER DAMS AND BYPASS PUMPING WILL BE USED TO DE -WATER THE WORK AREA, EXCEPT AT LOCATIONS IN WHICH THE NORMAL FLOW CAN BE DIVERTED AROUND THE WORK AREA WITH THE USE OF AN EXISTING CHANNEL. WHEN THE TOE HAS BEEN SUFFICIENTLY STABILIZED TO RESTRAIN EROSION ALL TEMPORARY COFFER DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL AND NORMAL FLOW RESTORED. ACCUMULATED SEDIMENT 5HALL BE DISFO5ED OF IN DESIGNATED 5P0IL5 AREA PRIOR TO REMOVAL OF TEMPORARY COFFER DAM. 18. MATERIAL THAT 15 REMOVED FROM THE STREAM WILL BE RE -DEPOSITED OUTSIDE OF THE ACTIVE CHANNEL AND ITS FLOODPLAIN. 19. TEMPORARY AND PERMANENT STABIUZATION OF ALL DISTURBED GRASSED AREAS AT THE TOP OF THE CHANNEL BANKS WILL Be IN ACCORDANCE WITH THE SEEDING AND MULCHING SPECIFICATION A5 SHOWN ON PLANS. 20. RE -FERTILIZE AND RE -SEED DISTURBED AREAS IF NECESSARY. 21. TEMPORARY AND/OR PERMANENT IMPACTS TO EX15TING WETLANDS SHALL BE AVOIDED TO THE EXTENT POSSIBLE. HIGH V15151LITY FENCING SHALL BE INSTALLED AROUND ALL EXISTING WETLANDS LOCATED WITHIN THE PROJECT AREA AND/OR ADJACENT TO ANY CONSTRUCTION ACTIVITIES. STREAM CONSTRUCTION SEQUENCE: I . CONDUCT ME-CONSTKUCTION MEETING INCLUDING OWNER, ENGINEER, A550CIATEO CONTRACTORS, NCDEQ EROSION CONTROL PERSONNEL, AND OTHER AFFECTED PARTIES. CONTACT NCDEQ ERO51ON CONTROL PER5ONNEL AT 919-791-4200. 2. OBTAIN EROSION CONTROL PERMIT FROM NCDENK - LAND QUALITY SECTION AND ALL OTHER APPROVALS NECESSARY TO BEGIN AND COMPLETE THE PROJECT. 3. CONTRACTOR 15 FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE -CALL (PREVIOUSLY ULOCO) AT I -800-G32-4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. PRIOR TO CONSTRUCTION, STABILIZED GRAVEL ENTRANCFAEXIT AND ROUTES OF INGRE55 AND EGRESS SHALL BE ESTABLISHED AS SHOWN ON THE PLANS AND DETAILS. MAINTAIN EXISTING DRIVEWAY OVERTOPPING ELEVATION / PROFILE. 5. PREPARE STAGING AND STOCKPILING AREAS IN LOCATIONS AS SHOWN ON THE CONSTRUCTION PLANS OR AS APPROVED BY THE ENGINEER. ANY EXCESS SPOIL FROM STREAM CONSTRUCTION SHALL BE USED TO CONSTRUCT CHANNEL FLUGS AS SHOWN ON PIANS. G. INSTALL PUMP AROUND APPARATUS AND IMPERVIOUS DIKES AT UPSTREAM END OF PROJECT. A5 CONSTRUCTION PPOGKE55E5, MOVE PUMP AROUND OPERATION DOWNSTREAM. (SEE DETAILS ON SHEET D 1) 7. INSTALL SILT FENCE, TEMPORARY CRO551NG5 AND ALL OTHER EK051ON CONTROL MEASURES AS SHOWN ON PLANS. 8. CONSTRUCT UPSTREAM PORTION OF THE CHANNEL FIRST, WORKING IN AN UPSTREAM TO DOWNSTREAM DIRECTION. 9. ROUGH GRADING OF CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF STRUCTURES. 10. INSTALL STRUCTURES AS SHOWN ON PLANS AND DETAl15. PRIOR TO FINE GRADING, OBTAIN APPROVAL OF THE ENGINEER ON INSTALLATION OF STRUCTURES. 1 1 . UPON COMPLETION OF FINE GRADING, INSTALL EROSION CONTROL MATTING OR 5OD MATS ALONG CHANNEL BANKS. 12. FILL AND BTA54UZE ABANDONED SEGMENTS OF THE EXISTING CHANNEL PER DIRECTION OF THE ENGINEER. 13. ALL IMPERVIOUS DIKES AND PUMPING APPARATUS SHALL BE REMOVED FROM THE STREAM AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 14. DURING STREAM CONSTRUCTION ACTIVITIES, THE WORK AREA SHALL BE STABIUZED AT THE END OF EACH WORKING DAY. 15. INSTALL LIVE STAKE, BARE ROOT, AND CONTAINERIZED PLANTINGS A5 SPECIFIED ON PLANTING PLANS. LEGEND EX15TING CONTOUR MAJOR EXISTING CONTOUR MINOR PR0POSED CONTOUR MAJOR - PROPOSED CONTOUR MINOR iL} EXISTING WETLAND EX15TING STREAM EXISTING TOP OF BANK EXISTING BOTTOM OF BANK EXISTING OVERHEAD ELECTRIC UTILITY LINE PROPERTY UNE EXISTING FENCEUNE EXISTING TREELINE PROPOSED TOP OF BANK - - - - - - - - - PROPOSED CENTERUNE OF CHANNEL - LIMITS OF PROPOSED CONSERVATION EASEMENT LCE - PROPOSED CHANNEL PLUG (SEE DETAIL DWG D2) PR0PC5ED PILL AREA EXISTING TREE 0 BRUSH TOE PROTECTION (SEE DETAIL D2) LOG TOE (SEE DETAIL D2) DOUBLE LOG DROP (SEE DETAIL D4) ROCK SILL (5EE DETAIL D3) 0001=1 ROCK STEP POOL (SEE DETAIL DG) ROCKVANE (SEE DETAIL DG) EE DET LOG VANE (SEE DETAIL D3) CONSTRUCTED RIPPLE (SEE DETAIL D6) SEDIMENT TRAP (SEE DETAIL D3) LOG SILL O (PROFILE) o DOUBLE LOG DROP (PROFILE) ROCK 51LU CRO55-VANE / n STEP POOL }U{ (PROFILE) ores 302 Jefferson Street, Suite 110 Raleigh, NC 27805 Maln: 919.829.9909 Fax: 919.829.9915 www.resus SEAL SCALE: AS SHOWN Sf Q :2 O IL Z O U C z O U O jrLL O Z } LL rA fu G Z O 21 W ii a ¢ a O Q W U 0 w Z Q CID Z Q U Z O U W O z Lu a o PROJECT NUM9ER: 0399 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: E1 REACH D5 1 1 i ._r / R q/ REACH D52 I � v I I pres 1 302 Jefferson Sleet, SuBe 110 Raleigh, NC 2719 Main: 919.829.9909 Fax: 919.829.9913 W W W.res.us SEAL FULL SCALE: V=80 0 BD tE0 T — FULL SCALE HALF SCALE --f' s" z O U K z O U K O S? O K LL W ? Z gx N W a z J Q' z Q O W = H' W z z O U m Q z Z U U W Jii W Q zLu c IE a. PROJECT NUMBER: D389 PROJECT MANAGER: 8F8 DESIGNED:AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: E2 REACH D5 I STA 01 +04 TO STA 07+00 4.5' BAN• `ULL STAGE 20? of 36' RCP @ 1.00% F 0 S. TYPICAL 511ALLOW CRO55 SECTION LCE \ \ J a+PCI BAWXULL STAGE 55 '� � __ nsT., rB T.. � �- CF o +5o . �� 541 — 57 �aD v 5G g` + 538 — — Te / - x�� .--• sx � � 'a /+5s+ \ " /4 ' o J�2 TYPICAL RIGHT MEANDER CRO55 SECTION m Gn 7 - 1-c I, ss; o0 REACH D51 RESTORATION REACH D51 TYPICAL LEFT MEANDER CRO55 SECTION STA. 0 I + 19 TO 04+07 RESTORATION REMOVE EXISTING STA. 04+37 TO 10+95 24" MP E DISPOSE OFFSITE JJ EXISTING TOP OF &4NK 765 I I I I l I I I I I I 1 I I 7G5 EXISTING GRADE ALONG PROPOSED CHANNEL STREAM CENTERLINE BED SLOPE I I ,rj I c n PROPOSEDOP BANK 7GO i f JG S3 i I 7Go 55 f S .70% i 544 S7 �iI ; I 7551 tt� } 1 I. 755 w ��I �"\•L70% I+ cis6 s�' I 750 NI 750 I �71D%l oI Z < I+ 745 I I I -745 I I I I I I I 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 G+00 SCALE: HOR 1"=30'; VERT 1"=3' res 902 Jefferson Str K Suite 110 Raleigh, NC 27605 Main: 919.829.9909 Fax: 91 9.629.9919 www.m.us FULL SCALE: 1 °=30 0 30 60 2' — FULL SCALE 1' = HALF SCALE' z J U 2 O z z m O U _W J :! a� o� o .- ii D U PROJECTNUMBER: 0388 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: S1 REACH D51 RESTORATION LCE 5TA. 04+37 TO 10+98 vGt- LGt l 0 G� ' j / S42 512 �ti 0'1\� �� 543—`t 513 58 6+50 i 59 514 5+50 gI1 � 1 REACH D52 �- 1 r 1 RESTORATION + + 5TA. 08+55 TO 13+GG +y� S44 755 750 745 740 735 EXISTING CHANNEL TO BE ABANDONED AND BACKFILLED SEE DETAIL SHEET D3 515 -,o� .1 37 1 I / G+'W G+50 I 7+00 7+50 T 8+00 8+50 9+00 9+50 10+00 10+50 II+( SCALE: HOP 1'=30'; VERT I'=3' EXISTING CHANNEL TO BE ABANDONED AND BACKFILLED SEE DETAIL 5H EFT D3 1 755 750 REACH DS I STA O 1 +04 TO 5TA 07+00 4.5' 3' 0.95' rrnlvu tT F O TYPICAL SHALLOW CP055 SECTION 4.9' BANUUU STAGE 4 TYPICAL RIGHT MEANDER CROSS SECTION 4.9' ti 0 TYPICAL LEFT MEANDER CROSS SECTION REACH D51 STA 07+90 TO STA 10+98 d 4 TYPICAL SHALLOW CP055 SECTION 5.7' 3.4' 1.5' BANUULL ST 745 77 tV TYPICAL RIGHT MEANDER CROSS SECTION 740 5.7' STAGE 735 Z... L\ ti TYPICAL LEFT MEANDER CP055 5FCTION ores 302 Jeftmon Street, Suite 110 Raleigh, NC 27605 Mein: 919.829.9909 Fax: 919.829.9913 mwr.res.us SEAL FULL SCALE: 1'=30 0 30 60 Y — FULL SCALE HALF SCALE—��' Cd a m_ d r O U W W O U d' O LL y� O 2 r oLL % .. w o z m Lu Lu cr X Z J O Q LU = U 0~C O Z co Q Z U LL � O U w W Q z U z a a a PRQIECT NUMBER: 0388 PRQIECT MANAGER: BPB DESIGNED: AFM D.. BRC CHECKED: AFM SHEET NUMBER: S2 8C 78 7E 77 7G LCE L AGE CE LCE REACH D52 ENHANCEMENTII 5TA. 00+92 TO O 1 +70 _ 2X Wd HID- 0,0. ID -xh0. X47 �f I+00 o X W J / I 519 - 5,3 I 7R5F�AC�H� RESTORATION 5TA. O 1 +70 TO OG+9G J) 521 pix P~� 1911 i ,t 532 SCALE: HOP, 1'=30; VERT I.=G' :ks 790 r80 '70 'GO REACH D52 5TA 02+91 TO STA OG+90 4 5' BMF u, STAGC F 6 IL TYPICAL SHALLOW CP055 SECTION 4.9' dMUM 5TAG b ti TYPICAL RIGHT MEANDER CRO55 SECTION 4.9' 1.3' 2.9' r.• • WL STAGE a TYPICAL LEFT MEANDER CP055 SECTION res 302.191% n Street, Suits 110 Raleigh, NC 27605 Main: 919.629.9909 Fax: 919.829.9913 w .res.us SEAL FULL SCALE: 1-30 0 30 so 7 — FULLSCALE HALF SCALE' a`0 p C O IL iq O U z 0 V crO LL0 � ¢ Y LL N p Z rn 7 Y W ai a Q Z J w 04 O U coO Z = In ¢ Z U =) O U w W z Q �i z a C1 PR0.1ECf NUMBER: 0 B388 PROJECT MANAGER: PB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: S3 REACH D52 ENHANCEMENTII STA. 06+96 TO 08+55 vclt 1 1 528 1 1�" I 532 t, —i J 521 x°l 522 v /G,j y 52b PROPOSED TOP OF BANK 780 ff I PIj0P05ED CNANNEL jjj BED 5L0PE 770 U LCE SSI J LCE LCE REACH D52 LCE RESTORATION LCE g+SD 5TA. 08+55 TO 13+66 i F5-45-1� `U� ��� 533 29 ^\ , /i`�" +50\ � 536 REACH D52 RESTORATION STA. 01 +70 TO 06+96 TIE REACH D52 INTO EMSTING/PROPOSED BED OF REACH D52 IXISTING GRADE ALONG STREAM CENTERLINE i � I i IX15TING TOP _2 0096 I OF BANK 760 11 Y 750 740 TIE REACH D52 INTO EXISTINGh'R0P0SED BED OF REACH D52 8+00 534 r EXISTING CHANNEL TO BE ABANDONED AND BACKFILLED 5EE DETAIL SHEET 03 SCALE: HOR 1'=30'; VERT 1°=6' 50 70 REACH D52 STA 02+91 TO STA 06+90 4 5' Bind 9 F O ti TYPICAL SHALLOW CR0SS SECTION 2.9' 1.3' BANKFUU STAGE b rL TYPICAL RIGHT MEANDER CR055 5FCTI0N 4.9' 0 TYPICAL LEFT MEANDER CR0SS SECTION REACH D52 5TA 08+70 TO 5TA 13+G0 _ 5 2' 1.5' 1.1' 0 f E TYPICAL SHALLOW CK055 SECTION S.T 3.4' 1.5' GO BANKIPULL STAGE (V 50 TYPICAL RIGHT MEANDER CRO -95 SECTION 5.7 I .5' 3.4' JIMMOULL sTArE 40 N E TYPICAL LEFT MEANDER CP055 SECTION ores 302 Je0er Street, Suite 110 R"gh, NC 27605 Main: 919.629.9909 Fax: 919.829.9913 WWW.MAA SEAL FULL SCALE: 1'=30 0 30 60 2'= FULL SCALE 7' = HALF SCALE-' w a aD o a O H Ir IrU Z O U if ZZ O LL O z Y LL z N 0 a Q Z J 0 v Uld C14 O U � in 0 = 0'. Z im a Z U =) O U Iii W Q O z LuI PROJECT NUMBER:0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: S4 REACH D52 RESTORATION STA. 08+55 TO 13+66 LGE LGE A 5 0 �`_ N / w 534 , Tr ` 1 ��1 770 760 750 740 730 9 Ic LGE 1 514 rREACH D51 n RESTORATION 5TA. 04+37 TO 10+98 ,N 515 EXISTING CHANNEL TO BE ps ABANDONED AND BACKFILLED SEE DETAIL SHEET D3 \ y r- � n 0 539 1 50 y 8 536 12+ --1, `1 —' / �w.:•�`g11 �� .� .' �'�� 52,70 \ r�n 1 1� EXISTING CHANNEL TO BE ABANDONED AND BACKFILLED SEE DETAIL SHEET D3 5CALE; HOP, V=30; VERT 1•=6' I 770 m EX15TING TOP OF BANK rir REACH D52 INTO 9fISTINGIPROP05ED BED OF 2FACH 052 760 750 740 730 REACH D52 5TA 08+70 TO 5TA 13+60 5.2' I.s' I.J' eM1KPULL STAGE 4 TYPICAL SHALLOW CRO55 SECTION 5.7' 3.4' 1 S. IWw-�u �ssa:c rf i TYPICAL RIGHT MEANDER CROSS SECTION 5.7 1.5' 3.4' F3ANKr_-- STAGE tV Q TYPICAL LEFT MEANDER CRO55 SECTION res 302 Jefferson Street SuBe 110 Raleigh, NC 27605 Main: 919.829.9909 Fax: 919.628.9913 www.res.us SEAL C) FULL SCALE: 1'=30 C 30 60 2 — FULL= 1' = HALF sCALE' f o � O = a `r' z 0 U z O U o: O LL O c� ? Ift � O LL Srri z W Z V) Y 0 co Q W Q Z J O Q U O 2 IX z Z Q 0: O U w W 2 Q tj O oz = LU a a ❑ PROJECT NUMBER:0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: SRC CHECKED: AFM SHEET NUMBER: S5 PLANTING LEGEND L1MIT5 OF CON5EKVATION _ EASEMENT IXI5TING TREEUNE PROPERTY UNE RIPARIAN PLANTING (TOTAL AREA: 5.4 AC) 21 IE PLANTING TABLE Permo A pp— 5eed Mar 802 Jeflenon Street, Suite 110 Cwmlon Name Saenphe. Name Percmt comp—aon Vvgmu Wldye Elymra wgrmcw 25% IM Graea naWn 25% Lktk N - Stem 5rh- :ampa.um 10% SeR Ru Ju,wio ellvwa I O% Blactryed wsan Ru�rnu hrta 109E Deertalgae Or-+srlha4� adfAn'm IO% (:anmon MiAWeed AacteH eYnaU 5% Showy Goldenrod D�mpyrm wngmry B% Live Stating and I.— Cuttmlge D.O. Tree 5pc— Cwrarwn tame Sa s. Wme Pdrad Co n".0 m Sky d ]'fid Caws Nmamam 40% W'sck wlloW Sa6+mgn. GO% Dare R—t PMnGng Tree Sp— pecleAW—Ort 802 Jeflenon Street, Suite 110 Raleigh, NC 27605 Main: 919.829.9909 Fax: 919.829.9913 www.rea.Lls W— 0. Oaenau nyn 15% WA— Oat OVenao F*,A s 15% Rha 5ach BetW -9" 15% Ammon Sycamore PrMnea— 15% Meru— Red Oak 0— rc 10% Green ACh h—P ytwmaa IO% Yeibw Poplx z Rr IO Pmenmon D�mpyrm wngmry B% Blame Gan — — 5% PLANTING NOTES ALL PLANTING ARE.A5 1. EROSION CONTROL MEASURES SMALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATION 15 ESTABLISHED AND FINAL APPROVAL HAS BEEN ISSUED, THE CONTRACTOR SMALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. 2. DISTURBED AREAS NOT AT FINAL GRADE SMALL BE TEMPORARILY VEGETATED WITHIN 10 WDRMNG DAYS. UPON COMPLETION Of FINAL GRADING, PERMANENT VEGETATION SMALL BE ESTABLISHED FOR ALL DISTURBED AREAS WITHIN 10 WORKING DAY5, SEEDING SMALL BE IN ACCORDANCE WITH EROSION CONTROL PLAN. 3. ALL DISTURBED AREAS SHALL BE PREPARED PRIOR TO PLAITING BY D15C OR SPWNG-TOOTH CHISEL PLOW TO MINIMUM DEPTH OF 12 INCHES. MULTIPLE PASSES SMALL BE MADE ACROSS PLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PA55 SMALL FOLLOW TOPOGRAPHIC CONTOURS. 4. BARE ROOT PLANTINGS SMALL BE PANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. LIVE STAKES SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON STIEET D2, 5. TREATMENTIREMOVAL Of INVASIVE SPECIES, PINES AND SWEET GUM5 LESS THAN P DBM SHALL BE PERFORMED TMROUGHOUT THE PLANTED AREA G. SPECIES SHALL BE O6TRIDUTED SUCM THAT 3 TO G PLANTS Of THE SAME SPECIES ARE GROUPED TOGETHER. 7, BARE ROOT PLANTING DENSITY IS APPP=IMATELY BOO STEMS PER ACRD, B. UVC STAKES ARE PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS AND ALONG BOTH BANKS OF STRAIGHT REACHES ADJACENT TO POOLS. 9. TEMPORARY SEED MIX SIVLLL BE APPLIED AT A RATE Of 150 LD51ACFZ TO ALL DISTURBED AREAS WITH SLOPES EQUAL TO OR STEFPER THAN 3:1. 10. PERMANENT RIPARJAN SEED MIX SMALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT AT A RATE OF 15 LWACRE. 11. PERMANENT HERB SEED MIX 6HALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THE CONSERVATION EASEMENT BREAKS AT A RATE OF 15 LMACRE. res 802 Jeflenon Street, Suite 110 Raleigh, NC 27605 Main: 919.829.9909 Fax: 919.829.9913 www.rea.Lls SEAL FULL SCALE: 1'=100 0 100 2 7 — FULL SCALE 1' = HALF SCALE m am o � 0 $ r z 0 o: z z 0 O LL g 0 L� z W LL O Z yto < m P. a Q Z J 0 U Z W= g ~ a rn � z z z z U � o a U Cd W ti i LULU o. o PROJECT NUMBER: 0388 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: P1 0 rtts 902,1eNemon Street, Sults 110 Raleigh, NC 27605 Main: 919.1129.9909 Fax 919.829.9915 WWw.teSus FULL SCALE: 1=100 0 100 200 7 — FULLSCALE t' = HALF SCALE—�' a z J 0 a W U 00 Ly z m Uz D O 0 O IL Z O U K N O U O LL rLO Z 2 } O $ z w 3 cc ¢ 0. z g a a z R O z O m w � W W a REACH D51 a a � o e 0396 PROJECT MANAGER: BPB V AFM DRAWN: BRC CHECKED: AFM VP VP gym/ REACH D52 LEGEND RIPARIAN PLANTING LIMITS Of CON5ERVATION EASEMENT _ 'R PROPOSED VEGETATION PLOT (AREA: 0.02 AC) VP PROPOSED CROSS SECTION LOCATIONS PROPOSED CREST GAUGE PROPOSED FLOW GAUGE O 0 rtts 902,1eNemon Street, Sults 110 Raleigh, NC 27605 Main: 919.1129.9909 Fax 919.829.9915 WWw.teSus FULL SCALE: 1=100 0 100 200 7 — FULLSCALE t' = HALF SCALE—�' a z J 0 a W U 00 Ly z m Uz D O 0 O IL Z O U K N O U O LL rLO Z 2 } O $ z w 3 cc ¢ 0. z g a a z R O z O m w � W W a z a a � o PROJECT NUMBER: 0396 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: M1 WHEN AND WHERE TO USE IT 302 JBllmson Street, Suite 110 Raleigh, NC 27605 Main: 919.829.9909 IL N IL f IN AREAS: 1.25 LBhINCAR FT. STEEL POSTS SEAL FLOW WHERE THE MA%IMUM SHEET OR OVERLAND FLOW PATH LENGTry. TO THE FENCE S LOO -FEET. THE MAXIMUM SLOP[ STEEPNESS (NORM LL UERPENDICUTAM TO FENCE LINE) IS 2H: I V. EXTRA STRENGTH Til aa0 � B MIDDLELAYERTOPLAYERN4ICRE BOTTOM LAYER THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN C.5 CPS. FILTER FABRIC 6• SURFACE I DO NOT PLACE SILT FENCE ACROSS CHANNELB OR USE IT AS A VELOCITY CONTROL BMP. lyTh Z O ST4O�D A A CONSTRUCTION SPECFICATIONEI Q' <Eo.. I . USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH 0 O CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE RECUIREMENTS IN ASTM V 6461. HEAVY DUTY PLASTIC TIC B 25' I1ECP SYNTMETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INMISTORS AND STABILIZERS TO PROVIDE A FOR STEEL POSTS PLAN VIEW ENDS d' BAGS IN ONLY W HEN PLACED ON MINIMLIIA Of 6 MONTHS O° EXPECTED USABLE CONSTRUCTION LIR AT A TEMPERATURE RANGE OF 0' TO 120° BACKFILL TRCNCry WITH ADJACENT ROW" BUTTED EARTH SURFACE F• COMPACTED EARTH SUGMTLYTOGETHER 2. ENSURE THAT POSTS FOR SEDIMENT FENCES AR[ 1.33 LBAINCAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC.E O Z Vl f SEE NOTE POINT GROUND LEVEL SECTION B -B CONSTRUCTION= � F-- _ Q \ Z I. CONSTKU THE SEDIMENT BARRIER OF EXTRA STRENGTH 5YNTMFTIC FILTER FABRICS, 2. ENSURE THAT TIME HEIGHT OF THE SEDIMENT FENCE DOCS NOT EXCEED 24 INCHES ABOVE THE GROUND BURY FABRIC 0 SURFACE. (MIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFEIGIENT TO CAUSE FAILURE OF THE USE EITHER FLAT -BOTTOM Q STRUCTURE.) OR V -BOTTOM TRENCH - EARTH S:1RFACE S. CONSTRUCT THE FILTER FABRIC FROM A CCMITINUOUS ROLL GUT TO THE LENGTH OF THE BARRIER TO AVOID SHOWN BELOW JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN TME FILTER CLOTH ONLYAT A SUPPORT POST WITH 4 SECTION A -A ❑ O FEET MINIMUM ERLAP TO THE NEXT POST. 4. OV RIEXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REOUIRE WIRE MESH SUPPORT FENCE. SILT FENCE INSTALLATION NOTE: END OF DIKE AT GROUND LEVEL TO BE ca � SECURELY FASTEN THE FILTER FABRIC DIR[CTLYTO PO5T5. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM Q Z MIGHER THAN THE LOWEST POINT OF FLOW CHECK. SANDBAG BARRIERS SMALL BE CONSTRUCTED OF THREE LAYERS OF SANDBAGS, 50 POUND TENSILE STRENGTM. OLU 6UFFICIE W SANDBAGS ARE TO BE PLACED TO THE BOTTOM I SHALL MI 515T OF 3 ROWS OF BAGS, THE MIDDLE LAYER 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND H INCHES DEEP ALONG THE PROPOSED LINE OF 1�L PREVENT SCOURING. SHALL CONSIST Of 2 ROWS OF BAGS AND THE TOP LAYER SMALL CONSIST Of I POSTS ANLEMOPE FROM THE SARUM FILTER FABRIC D FILTER fABRIC ROW OF BAGS. THE RECOMMENDED DIMENSION OF A FILLED SANDBAG SMALL BE C.PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION COMPACTEDp COMPACTED APPROXIMATELY 0.5 RX 0.5 FTX 1.5 FT. PROJECT MANAGER: OF THE BACVILL 19 CRITICAL TO SILT FENCE PERFORMANCE. EARTH OF B. DO NOT ATTA01 FILTER FABRIC TO EXISTING TREES. EARTH Or AFM DRAWN: RUNOFF 4 RUNOFF m SANDBAG IMPERVIOUS DIKE MANIENANM o m NT5 INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAV ANY REOMRED REPAIRS IMMEDIATELY. v t SHOULD TME FABRIC OF A SEDIMENT FENCE COLLAPSE. TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE T PRO./PRY. FILTER REMOVE SEDIMENT DEPOSITS AS NECESSAFUTO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NPM RAN AND 70 FABRIC 4• FILTER FABRIC REDUCE PRESSURE ON THE FENCE. TAKE CARO TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. NOTES: REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND 5TABIL12E FIAT -BOTTOM TRENCH DETAIL V -SHAPED TRENCH DETAIL I. EXCAVATION SHALL BE PERFORMED ONLY IN DRY ANDNR ISOIATEC SECTIONS OF IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CHANNEL. .. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SMALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY A MAXIMUM O' 200 FEET MAYBE DISTURBED AT ANY ONE TIME. TEMPORARY SILT PENCE10 COARSE AGGREGATE- STONE 912C - 2•-3•SUFFICIENT 4. TMEC)NTRACTORSMALLBE RESPONSIBLE FOR DETERMINING PUMP 512E TO PUMP BASE FLOW. J�ZA V 5. DIKE MUST BE CONSTRUCTED OF 1,1011 -ERODIBLE MATERIALS SUCH A5 SANDBAGS, S OUEI C OF CON 9TRLCION1 I . INST "' STILLING IN ANO STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DO'AMSTREAM END OF THE DESIGNATED PROJECT WORKING AREA THE CONTRACTOR SMALL INSTALL 7111! NMP AROUND PUMP AND THE TEMPORARY ^ PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA 2•. 1OR 2-a 2'MINIMUM S' ERC91d1 TO THE STABILIZED OUTFALL. WOODENSTAKE CONTROL STRAW WATTLE NOTE• S.INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR EXISTING DR SIR WATTLfhDG EROSION GRADE SILT FENCE. CONTROL WATTLES O2 LOIS, IOGBWATTIlS MAY BE USED IN PLACE OF STREAMDIVERSION. 4. INSTALL DOWNSTREAM IOLS DIV AND DEWATERING NGA PMP TO EWATE ENTRAPPED O ARCA, THE NMP AND HOSE APPARATUS E APPARATUS IF NEEDED TO �\��//���j•\�j OF SLEFIIE FORT IS ATTR POSE SMALLBE BOOP DD O CIFKTAN O ITALL S DEWATERTME WITH ORK CLASS A M. BE WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP T�� �• - `��T� ���/\\%i\�\f\\ • 1'\�� EROSION CONTROL WATTLE l ` J h AXP S. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE ALLDIKDI,RPTMLIMP T R 9�� AREA. TBE F THEPED THROUGIMPERVIOUS DILE BAG. REMOVE IMI -�\ W5 AND TEMPORARY FLEXIBLE MCSBPIPNG STARTING WITH THE DOWNSTREAM DIKE INSTALL WATTLE IN 3- TO FIRST. 5- TRENCH G. ONCE THE WORKING AREA 16 COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS PURPOSE; AND STABILIZE DISTURBED AREAS VAT" SEED AND MULCH. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WELL BC LEAVING A 7. 7. ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A NBUC ROAD. INSTALLATION NOTES: KEY4N MATTING PF CONSTRUCTION 9PFCIFICATIONS: ^.a FIG. I OR FIG. 2 FLOW SITE PREPARATION M I . FROMTH[ ENTRANT[ AND EXT AREA OF ALL VEGETATION• ROOTS. AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. I . GRADE AND COMPACT AREA. 2. PLACE THE GRAVEL TO THE 5PfCFIG GRADE AND DIMENSIONS SHOWN ON THE DETAIL. AND SMOOTH T. I WAKE MOST _ 2. REMOVE ALL ROCKS. CLODS. VEGETATION. AND OBSTRUCTIONS 90 THAT MATTING WILL " 1 _ I - S.PROVIDE DRAINAGE TO CARRY WATER. TO A SEDIMEMT TRAP OR OTHER SUITABLE OUTLET. CLASS A HAVE DIRECT CONTACT WITH THE SOIL. - S. PREPARE BE[DBCD BY LOOSENING 3 TO 4 INCHES OF TOPSOL ABOVE FINAL GRADE. TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE - 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. STONE PUMP AROUND 4. ENGINEER. APPLY ANY TREATMENT EI AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. �L`" KCY-IN ANOpR PUMP STAKE MATTING MAINTENANCE: SEEDING JUST ABOVE WORK CHANNEL TOE MAINTAIN THE' GRAVEL PAD IN A CONDITION TO PRtbFNT MJD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. DEWATERING AREA I, SFC FLAWING SHEETS FOR SEEDING REQUIREMENTS. 2. APPLY SEED TO SOL BEFORE PLACING MATTING. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 24NCH STONE. MCR EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL ODJEC71ONABLE MATERIALS PUMP --------------------- SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS, OR AIRFIELD PAVEMENTS. INSTALLATION-57REAM BANK IMPERVIOUS 1. SEE GRADING NOTES ON PLAN AND PROFILE SHEETS AND DOTAL SHEETS FOR DIKE INFORMATION REGARDING "AT AREAS ARE TO RECEIVE COIR MATTING. 2. OVERLAP ADJACENTMAT59•(INDIRECTIONPARALLELTOFLOMANDANCHOR.EVERY 12` TRENCLAPPROx. ACROSS THE OVERLAP. THE UPSTREAM MAT SHOULD BE PLACED OVER THE DOM45TRZAM &WIDE X 0• VEEP MAT. 5OR PILE 9. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW Of WATER, FROM TRENCH TRENCHAPPROX. 5OLLPILE v WIDE x & DEEP FROM TRENCH FLOW TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS IMPERVIOUS _ 4. LAY MAT LOOSE TO ALLOW CONTACT WTTM SOI.. 00 NOT STRETCH TIGHT, 5. ANCHOR MAT USING DICOEGRADABLE STAYS C IN . F G.CUT 9' • & TRENCH ALONG TOP OF BANK FOR MAT TERMINATION AS SHOWN IN FIGURES 1 r� to, � 1 �� F LOW DISCHARGE NOSE CLASS A l 2. EXTEND MAT 2 TO 3 FEET PAST TOP OF BANK. a� 7. PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 4. OVERLAP. -� �- ��� � GENERAL NOTES: B N 5 WASHED STONE STONE SECURE WITH BIOOEGRPDABLF STARES OR PN[3. BACVILL ANCHOR 7RENC1, AND 1.2 CONSTRUCT DAM ACCORDING TO NCDENR EROSION CONTROL NOTE: MOST SHOULD lY COMPACT SOIL. �--- -"- e. STAPLE AT 12• INRRVAL5 ALONG O2RlAP. BANK TO A OF 2.O MANUAL. 2. ROCK DAM RIPRAP SHALL BE DQ5O MIX OF CLASS I AND Ll. 3. PLACE R= DAM AS SHOWN ON PLANS. EXTEND CLASS B RIP � � KEPT OUTSIDE Of WORK SILT BAG gppA S. STREAM BANK MATTING TO BE INSTALLED PROM TOP Of MINIMUM PAST TOP OF BANK. SfE FIGURE 3 FOR TERMINATION AT TOP Of BANK, I ROW O 9T. OF n OR STAKES, MIN. OF 24° RAF ROCK APRON 5 FEET DOWNSTREAM FROM, TOE OF ROCK LOCATION EO.IF MORE THAN ROLL IS REOUIRED TO COVER THE CHANNEL FROM THE TOP OF BANK DOWN I ROW O STAPLES OR TO THE TOE. THEN OVERLAP MATTING 8Y A MINIMUM OP I', STAKES, MIN. OF P4• O C DAM. A A OIC STEP I STABILIZED OUTFALL OLASS A STONE FILTER FABRIC STOP I 1.3'TMICK CLP55 B ROCK APRON 5 I ROW OF STAPES OR FLOW STAKES. MIN. Of I B' O.0 I ROW OF STAPLES - STAKES, MIN. Of I?' S MIN. PIAN CREST I I DISCHARGE FGROUINGMOBE _`---- ------SPILLWAY OW Ff� I (SPILLWAY) - - 40.0 -- ..---�-"` �I\W WASHED -TONE LLA591 AND II RLP I MHN OF c 5 M'N. i§ STREAM WIO•K21'. STABILIZED OIRFALL CLASS A 15' T� •� RAP STONE _-- WSOIL F LLCD I.5' THICK CLA59 � FLOW KMUST FROM SOL PILE,SOIL FILLEDD ROCK APRON MEET OR EXCEED THE COMPACT WITH FOOT FROM SOIL PILE, FOLLOWING REOUIREMCNTS: STEP ^ COMPACT WITH FOOT • 100 % COCONUT FIBER (MR) TWINE WOVEN INTO A STEP 2 CLASS I AND II CUTOFF TRENCH FILTER FABRIC & ar CLASS A HIGH STRENGTH 0. 3 IN. MINIMUM. S- 5 �Sn AR FILTER RIP R� FILTER, FABRIC 'ABRC SECTION A -A STONE TTU U B'a'FTT FIGURE I FIGURE 2 SECTION &B EXISTING • FLOW VELOCITY -OBSERVED 16 FTWC • WEIGHT -29 O2JSY CHANNEL SILT BAG PROFILE OPEN AREA - 3B1& • SLOPES - UP TO A MAXIMUM OF 1. I COIR MATTING TEMPORARY ROCK CHECK DAM PUMP AROUND III DEWATERING DETAIL NT5 41 NTS NT5 ores 302 JBllmson Street, Suite 110 Raleigh, NC 27605 Main: 919.829.9909 Fax: 919.829.9913 WWW.TeS.OS SEAL SCALE: AS SHOWN Til aa0 � Fo O = EL Z O U Q' y O U crO LL g� O 2 Y o ay tl O O Z Vl f BE Q Z J 0 Q U W55 ❑ O J w Z ca � w ❑ Q Z U OLU R Lu 1�L W QED O PROJECT NUMBER: 0388 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D1 T m so NOTE5: coin IBBER 1. HLOGS ARDWOOD. BE AT LEAST 10 INCHES IN DIAMETER 5-0 FEET LONG, RELATIVELY 6TRAIGHT, AND 0.75• TO 2' MATTIRL[ _ 2. I I CAANCHORS SHOULD BE PLACED 1' TO S' FROM EACH END OF LOG. REBATE (5/S` MINIMUM DIAMETER FLAT TOP END V MIN. LENGTH TYPICAL) MAY BE USED AS A SUBSTITUTION FOR GABLE ANCHORS PER DIRECTION Of ENGINEER A S. IF RfBM IB USED. PRE -DRILL HOLES WITH 519' DRILL BIT. F LATERAL BUD DETAIL L UMAKES BHCULD BE LONG ENOUGH TO REICH BROW THE GROUNDWATER BANKFULL ELEVATION TABLE. (GENERALLY. A LENGTH OF 2 TO 3 FEET IS SUFFICIENT.) ADDmONALLY. THE STAKES SHOULD HAVE A DIAMETER IN SIDE BRj.AMTABLf THE RANGE OF 0.75 TO 2INCHES. REMOVE SLIGHT A� 2 b i DIAMETER PRIOR TO CAN BE MIM GRADING D — � PROPOSED BCD `MINIMUM OF US OC LOG DIAMETER BEDDED BELOW EXISTING CHANNEL INVERT 10• MINIMUM LOG DIAMETER (TYPJ INSTALL CABLE ANCHOR AS SHOWN. DRILL (OR SAW CUD PLOT HOLE THROUGH LOG IFS TO IH OF THE WAY DOWN SO THAT ANCHOR CABLE IS NOT EXPO" ED. LOG TOE PROTECTION HIS BANKFULL ELEVATION IF♦ TO IAS LOG DIAMETER CAN BE EXPOSED PR10RT0 FINAL GRADING 9 `MINIMUM OF 112 TO 113 OP LOG WOOD 5-P�\\` DIAMETER BEDDED BELOW STAKES CHANNEL INVERT 12- LOG DIAMETER ITTP.) MES• I . INSTALL STAKES ON S' CENTERS ON EACH SIDE OF ROLL. TOP Of STAKE SHOULD NOT (MEND ABOVE ROLL. .'. EXCAVATE A SMALL TRENCH (DEPTH APPROX 14 TO 219 Of LOG DIAM) FOR PLACEMENT OF ROLL. 9. COIR LOGS SHALL BE 10 IT LONG AND HAVE A DIAMETER Of 12 IN. COIR LOG (TOE PROTECTION) M5 NEW CHANNEL TO BE cowsrRucTCo OLD CHANNEL TO BE DIVERTED OR CHANNEL PLUS ABANDONED PLAN VIEW UNCOMPACTED 13ACKFILL 1.5'MINIMUM /J r BANRFULL ELEVATION 90 'NEW CHANNEL BANK 6HALL PUNISHED GRADE ////////////•--''-••'BE TREATED AS SPECIFIED COMPACTED BACKFILL I – - �IN PIANS (12'LIIT9)�� 17 HILI 1 �1 _ PROPOSED %Ot _ NNN[LINVERT IMPERVIOUS SELECT MATERIAL -� (PER DIRECTION OF ENGINEER) TYPICAL SECTION LOG TOE OR COR LOG CHANNEL PLUG NTS BACKFILL AREA BETWEEN BANK AND COR Fit fAPPLY PERMANENT SEED MUT A COR MATING OF ROLL APPROX:-M NOTES: IT INTO BANK SECTION VIEW 1. DESIGNER TO MARK LOCATONB AND DIMENSIONS OF SILLS IN THE FIELD PRIORTO CON5TRUGTION. 2. INSTALL STAKES ON S CENTERS ON EACH SIDE OF ROLL TOP Of STAKE SHOULD NOT EXTEND ABOVE ROLL. S. EXCAVATE A SMALL TRENCH (APPROX 2• DEEP) FOR PLACEMENT Of ROIL. VEGETATED SILL DEFLECTOR NT5 MIN. aY EXISTING BANK P.JWIFD COIR MMK BOTTOM OF ROLL H FILL T OF NORMAL WATER - BANK W BANK PLANE LEVEL fO BACKFILL !I2 PTO �(1Y T _ • `� 0.5, TO 1.25' DENSE COR MATTING IROLANKA BUD-MaAW OR NOTES: [OUNALEND / 2. CHANNEL MUST BE FILLED IN IT TO I& LIFTS. WOOD STAKE 9. IF CHANNEL CANNOT BE COMPLETELY FILLED TO TOP OP BANK, FILL TO TOP OF pQ OF ROLL APPROX:-M NOTES: IT INTO BANK SECTION VIEW 1. DESIGNER TO MARK LOCATONB AND DIMENSIONS OF SILLS IN THE FIELD PRIORTO CON5TRUGTION. 2. INSTALL STAKES ON S CENTERS ON EACH SIDE OF ROLL TOP Of STAKE SHOULD NOT EXTEND ABOVE ROLL. S. EXCAVATE A SMALL TRENCH (APPROX 2• DEEP) FOR PLACEMENT Of ROIL. VEGETATED SILL DEFLECTOR NT5 CHANNEL BACKFILL NT5 45 DEGREE TAPERED BUTT END NOTE: I. ACCEPTABLE SPECIES INCLUDE BUCK WALLOW (SAUX NIGRA), SILKYWLLLOW (Skn SERICPA) AND SILKY DOGWOOD (CORNUS AMMONIUM). 2. LM STAKES SMALL BE PLANTED IN AN AREA EMENDING 7 FEET OUT FROM TOP OF BANK TO JUST BELOW BANKFULL. S. LM STAKES SHALL BE SPACED S PEET APART, ALTERNATE SPACING. LIVE STAKE HIS DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR L FIBER TING I. INSERT " REMOVE & INSERT PLANTING BML AS PLANTING BAR FUMING BAR 2 SHOWN AND PULL AND PLACE INCHES TOWARD HANDLE TOWARD SEEDING ATPLANTER FROM PUNTER. CORRICT D[FTM. SEEMING. 4. PULL HANDLE OF 5. PUSH G. LEAVE BAR TOWARD HANDLE COMPACTION PUNTER FIRMING FORWARD HOLE OPEN. SOIL AT BOTTOM. FIRMING SOL WATER ATTOP. THOROUGHLY. PLANTING NOTES: NOTES+ BAR[ ROOM SMALL BE PED 6 PLAITING P IT. TO 10 PT. ON CENTM. UNT DARING PLANTING, 5E[DLINGS SMALL RANDOM 9PAGMG. AVERAGING 8 SIMIILLARR ICOMAINLR TO PR[VfMGTMRE FT. ON CENTER APPROXIMATELY ROOT SYSTEMS FROM DRYING. 680 PUNTS PER ACRE. KBC PLATING BAR PUNTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS SECTION, AND SHALL BE 12 INCHES LONG, 4 INCHESWIDE AND 1 INCH THICK AT ROOT PRUNING ALL SEEDLINGS SMALL BE ROOT PRUNED, IF NECESSARY, 90 THAT NO ROOTS EXTEND MORE THAI 10 INCHES BELOW THE ROOT OCULAR. BARE ROOT PLANTING res 302 Jeffelsnn Shwt, Suke 110 Raleigh, NC 27805 Main: 919.829.9909 Fax: 919.829.9913 WWW.res.us SPIV. SCALE: AS SHOWN LIl Qm LD O a H U K z 0 Z U ca 4 O Z g�W fA LL F � Z 035 Lu Q it a z J O Q W U F_ J z U z OLu UUII W an 0 S Q O PR-:; NUMBER: 0388 PFI. MANAGER: BPB DESIGNED:AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D2 MIN. aY MAX. 75' EXISTING CHANNEL TOP OF BANK / BOTTOM OF EXISTING CMANNFL U H FILL T OF BANK W BANK i fO BACKFILL !I2 PTO I tlrro Ir LIFTS) FILL AT LEAST IN` 70A OF CHMNC f NOTES: 1. FILL EXISTING CHANNEL TO TOP OF BANK ELEVATION WHEN POSSIBLE, / 2. CHANNEL MUST BE FILLED IN IT TO I& LIFTS. 9. IF CHANNEL CANNOT BE COMPLETELY FILLED TO TOP OP BANK, FILL TO TOP OF pQ BANK FOR 25' OUT OF EVERY 100 SEGMENT. CHANNEL BACKFILL NT5 45 DEGREE TAPERED BUTT END NOTE: I. ACCEPTABLE SPECIES INCLUDE BUCK WALLOW (SAUX NIGRA), SILKYWLLLOW (Skn SERICPA) AND SILKY DOGWOOD (CORNUS AMMONIUM). 2. LM STAKES SMALL BE PLANTED IN AN AREA EMENDING 7 FEET OUT FROM TOP OF BANK TO JUST BELOW BANKFULL. S. LM STAKES SHALL BE SPACED S PEET APART, ALTERNATE SPACING. LIVE STAKE HIS DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR L FIBER TING I. INSERT " REMOVE & INSERT PLANTING BML AS PLANTING BAR FUMING BAR 2 SHOWN AND PULL AND PLACE INCHES TOWARD HANDLE TOWARD SEEDING ATPLANTER FROM PUNTER. CORRICT D[FTM. SEEMING. 4. PULL HANDLE OF 5. PUSH G. LEAVE BAR TOWARD HANDLE COMPACTION PUNTER FIRMING FORWARD HOLE OPEN. SOIL AT BOTTOM. FIRMING SOL WATER ATTOP. THOROUGHLY. PLANTING NOTES: NOTES+ BAR[ ROOM SMALL BE PED 6 PLAITING P IT. TO 10 PT. ON CENTM. UNT DARING PLANTING, 5E[DLINGS SMALL RANDOM 9PAGMG. AVERAGING 8 SIMIILLARR ICOMAINLR TO PR[VfMGTMRE FT. ON CENTER APPROXIMATELY ROOT SYSTEMS FROM DRYING. 680 PUNTS PER ACRE. KBC PLATING BAR PUNTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CROSS SECTION, AND SHALL BE 12 INCHES LONG, 4 INCHESWIDE AND 1 INCH THICK AT ROOT PRUNING ALL SEEDLINGS SMALL BE ROOT PRUNED, IF NECESSARY, 90 THAT NO ROOTS EXTEND MORE THAI 10 INCHES BELOW THE ROOT OCULAR. BARE ROOT PLANTING res 302 Jeffelsnn Shwt, Suke 110 Raleigh, NC 27805 Main: 919.829.9909 Fax: 919.829.9913 WWW.res.us SPIV. SCALE: AS SHOWN LIl Qm LD O a H U K z 0 Z U ca 4 O Z g�W fA LL F � Z 035 Lu Q it a z J O Q W U F_ J z U z OLu UUII W an 0 S Q O PR-:; NUMBER: 0388 PFI. MANAGER: BPB DESIGNED:AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D2 CHANNEL BOTTOM OF BANK COARSE BACKFILL CHANNEL TOP OF BANK y , 1 191GAL PL u NEW PROPOSED STREAM BED - SILL CONTROL POINT ELEVA11ON FLOW_-` _.N..-. HEADER BOULDER - FOOTER BOULDER COARSE AGGREGATE - _ _ •. BACKFIL (1' TO 4') FIL10 FABRIC (804.2.11 CLASS 2) ROCK 51LL NTS TOE OF BANK N07Fc• B4BO€ 1. BOULDERS DIMENSIONS SHALL BE AT LEAST: I . LOG VANES BNALL BE CONSTR ED OF ONE OR MORE LOGS HELD IN PLACE BY FITHER BALLAST BOULDERS. DUCKBILL Fax: 919.829.9913 WWW.RESMS ANCHORS. OR REBAR, LOGS SHALL 51 OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE RELATIVELY STRAIGHT TOE of BANK AA NON -WOVEN GEOTFATILE STREAM BANK PABRIC (NCDOT TYPE II) cn' BALK (ON ONE END) AND 57R[AM BED (ON THE OTHER END) A MINIMUM DISTANCE OF 4.0. FLATSIDED BALLAST BOULDERS SHALL BE OF 512E 2' X 2' X I .Y OR AS SPECIFIED BY THE DESIGNER REACH TC1-A: 3.0' K 2.0' X 20' 2 THE VANE SMALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN 1. 5ANKFULL STAGE AND BANKFULL STAGE. AN ELEVATION CONTROL POINT MAY BE ESTABLISHED AT THE LEFT OR RIGHT STREAM BANKWANE INTERCEPT POINT. THE VANE ` INTERCEPT LOCATION MAY BE OTHERVASE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BYTHE LENGTH AND SLOPE FABRIC INGDDT TYPE III Of THE VANE ARM. BANKFULL 15 NOT NECESSARILYTHE TOP OF THE STREAM BANK SLOPE. 201 TO SP BALLAST BOULDER 3. FILTER FA5MC 5HAL BE USED TO SEAL THE GAPS BETWEEN THE LOGS AND UNDER THE COARSE BACKFLLL MATERIAL OF THE OR DUCK BILL ANCHORS VANE. THERE SHALL BE NO FIITTR FABRIC VISIBLE IN THE FINISHED WOM- EDGES SHALL BE FOLDED TUCKED. OR. TRIMMED AS / REACH TC2. TC3, h TCB: 2.0' X 2.0' X 1.5' 4 ) 4. LOG VANES SHALL BE BUILT TYPICALLY AS FOLLOWS, A. OVER -EXCAVATE STREAM BEO TO A DEPOT EQUAL TO THE TOTAL THICKNESS OF THE HEADER (AND FOOTER IF SPECIFIED) • ' BACKFILL (I • TO B% WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE. BANKFULL C. INSTAL HEADER LOG OF THE VANE ARM ON TOP OF AND SLIGHTLY FORWARD OR BACK FROM THE FOOTER LOG, 4 D. NAL FILTER FABRIC TO THE HEADER LOG USING A GALVANIZED NPR WITH A PLASTIC CAF. THE SUE AND GAGE OF NAL 2. COARSE AGGREGATE BACKFILL SHALL CONSIST OF A AND NAIL SPACING SHALL BE SPECIFIED BYTHF DESIGNER Y �,,,- E� LOG VANE G. BACKFILL REMAINDER OF VANE WITH PREVIOUSLY EXCAVATED MATERIA. O _ B. IF ANY EROSION CONTROL MATTING I5 SPECIFIED FOR USE IN THE VICINITY OF THE STREAM BANK(VANC INTERCEPT POINT THE MATTING EDGES SHALL BE NEATLY SECURED AROUND THE LOGS. O MIK OF GRAVEL, BALLAST STONE. AND CLASS A O f 1 y 0 Z O :3 PROPOSED STREAM SILL CONTROL POINT PRAP. 3. PoTHE BOULDER SW. IS GENERALLY CONSTRUCTED AS- Q z J I SAN ELEVATION FOLLOWS: - F J TOP OF BANK A. PLACE FOOTER BOULDERS. A LAYER OF BEDDING MATERIAL UNDER THE FOOTER BOULDERS MAY BE Lu U Z O U W J r HEADER BOULDER, TYPICAL SPECIFIED BY THE DESIGNER. THERE SHALL BE NO Q z W y o PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC GAPS BETWEEN BOULDERS. AFM SHM NUMBER: D3 l B. INSTALL FL70 FABRIC. I C. PLACE COURSE BACKFILL BEHIND THE F001M it V BOULDERS. D. INSTALL HEADER BOULDERS ON TOP OF AND SET 9 _ - _ SLIGHTLY BACK FROM THE FOOTER BOULDERS 3 { (SUCH THAT PART OF THE HEADER BOULDER IS ( ( RCOARSE BACKFILL)HEADER RESTING ON THE IZDw Na N SECTION B -B 't BANKFULL BOULDERS SHALL SPAN THE SEAMOP THE FOOTER BOULDERS THERE SHALL NOT 8E A SEAM CHANNEL BOTTOM OF o IN THE CENTER OF THE STREAMBED (I THE BANK LIVE STAKES SMALL BRANCHES STREAM BED THALWEG). THERE SHALL BE NO GAPS BETWEEN 1.5 1,5 AND BRUSH 1 IE POUTER BOULDER, TYPICAL E. PLACE COARSE BACKFILL BEHIND HEADER LIVE�OPO�` SMALL LOGS AND/OR BOULDERS ENSURING THAT ANY VOIDS BETWEEN LARGE BRANCHES SECTION R -R THE BOULDERS ARE FILLED. 4. BACKFILL SHALL BE COMPACTED IN 12' LIFTS. • A _ EM A MM DIAMETER OF 4-. PROPOSED STREAM BED - SILL CONTROL POINT ELEVA11ON FLOW_-` _.N..-. HEADER BOULDER - FOOTER BOULDER COARSE AGGREGATE - _ _ •. BACKFIL (1' TO 4') FIL10 FABRIC (804.2.11 CLASS 2) ROCK 51LL NTS TOE OF BANK N07Fc• Raleigh, NEC 27605 I . LOG VANES BNALL BE CONSTR ED OF ONE OR MORE LOGS HELD IN PLACE BY FITHER BALLAST BOULDERS. DUCKBILL Fax: 919.829.9913 WWW.RESMS ANCHORS. OR REBAR, LOGS SHALL 51 OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE RELATIVELY STRAIGHT TOE of BANK HARDWOOD., RECENTLY HARVESTED. THE LENGTH SHALL BE SUCH THAT THE LOG IS BURIED INTO THE SOIL OF THE STREAM NON -WOVEN GEOTFATILE STREAM BANK PABRIC (NCDOT TYPE II) cn' BALK (ON ONE END) AND 57R[AM BED (ON THE OTHER END) A MINIMUM DISTANCE OF 4.0. FLATSIDED BALLAST BOULDERS SHALL BE OF 512E 2' X 2' X I .Y OR AS SPECIFIED BY THE DESIGNER N� 2 THE VANE SMALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN 1. 5ANKFULL STAGE AND BANKFULL STAGE. AN ELEVATION CONTROL POINT MAY BE ESTABLISHED AT THE LEFT OR RIGHT STREAM BANKWANE INTERCEPT POINT. THE VANE ` INTERCEPT LOCATION MAY BE OTHERVASE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BYTHE LENGTH AND SLOPE FABRIC INGDDT TYPE III Of THE VANE ARM. BANKFULL 15 NOT NECESSARILYTHE TOP OF THE STREAM BANK SLOPE. 201 TO SP BALLAST BOULDER 3. FILTER FA5MC 5HAL BE USED TO SEAL THE GAPS BETWEEN THE LOGS AND UNDER THE COARSE BACKFLLL MATERIAL OF THE OR DUCK BILL ANCHORS VANE. THERE SHALL BE NO FIITTR FABRIC VISIBLE IN THE FINISHED WOM- EDGES SHALL BE FOLDED TUCKED. OR. TRIMMED AS / NEEDED. 4 ) 4. LOG VANES SHALL BE BUILT TYPICALLY AS FOLLOWS, A. OVER -EXCAVATE STREAM BEO TO A DEPOT EQUAL TO THE TOTAL THICKNESS OF THE HEADER (AND FOOTER IF SPECIFIED) COARSE AGGREGATE I I LOGS. B. PEACE POOTER LOG OF THE VANE ARM IF SPECIFIED. THE SLOPE OF THE VANE ARM 6 MEASURED ALONG THE VANE ARM BACKFILL (I • TO B% WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE. BANKFULL C. INSTAL HEADER LOG OF THE VANE ARM ON TOP OF AND SLIGHTLY FORWARD OR BACK FROM THE FOOTER LOG, 4 D. NAL FILTER FABRIC TO THE HEADER LOG USING A GALVANIZED NPR WITH A PLASTIC CAF. THE SUE AND GAGE OF NAL AND NAIL SPACING SHALL BE SPECIFIED BYTHF DESIGNER E. PLACE BALLAST BOULDERS OR DUCKBILL ANC41OR ON THE VANE. OfO LL F. PLACE COARSE BACKFILL BEHIND LOGS ENSURING THAT ANY VOIDS BETWEEN THE LOGS APE FILLED, LOG VANE G. BACKFILL REMAINDER OF VANE WITH PREVIOUSLY EXCAVATED MATERIA. O _ B. IF ANY EROSION CONTROL MATTING I5 SPECIFIED FOR USE IN THE VICINITY OF THE STREAM BANK(VANC INTERCEPT POINT THE MATTING EDGES SHALL BE NEATLY SECURED AROUND THE LOGS. LEFT OR RIGHT VANE POOL ) ARM BANK INTERCEPT ( � CONTROL POINT (1 1 A-O`K PLAN VIEW BANKFULL� STREAM BANK COARSE AGGREGATE BACKPIII (I - TO 37 Raleigh, NEC 27605 -� HEADER LOG Fax: 919.829.9913 WWW.RESMS SEAL TOE of BANK FOOTER LOG 7 S STREAM BEG / POOL \�C{ NONWOVEN GEOT[XEILE FABRIC INGDDT TYPE III B. VARIES O o roK vnvrH 5ECTION A -A BANKFULL BALLAST BOULDER OR DUCKBILL ANCHOPA F LER OR RIGHT VANE ARM BANK INTERCEPT j CONTROL POINT C; I____ � FLOW CFL ---- a P POOL / \ FOOTER LOGJ f HEADER LOG PROFILE VIEW LOG VANE NTS -t L NOTES A 1. DRIVE 2 ROWS OF 4' CEDAR POSTS ON MINIMUN 3' CENTERS PAST MINIMUM DEPTH AS SHOWN. 2. FELL THE VOID BETWEEN POST ROWS W/ AN EVEN MIA OF HARDWOOD LAGS. LIMBS. AND BRUSH AS SHOWN. 3. REDUCE POST SPACING AS NEEDED TO IMPROVE STRUCTURE STABILITY. SEDIMENT TRAP NT5 INSTALL COIR MATTING PER DETAIL SEE DWG D I MI COMPACTED SOIL - LIVE STAKES � TOP OP BANK - LIVE CUTTINGS 1 5l BRANCHES BGff L. - - _ BRUSH . OVER EXCAVATE THE OUTSIDE BEND OF THE CHANNEL. PLACE 114 MAX POOL DEPTH j:ArD LARGER BRANCHES AND= APPROPRIATELY SIZED LOGS IN A CR155-CROS9 PATTEIRN. LOCK IN PLACE WITH FILL COVERNNG 6 I A MAX POOL DEPTH IN TO ID IN OF THE LARGER BRANCHES/SMALL LOGS. - 2. PLACE SMALLER BRAKCHES AND BRUSH OVER THE LARGER 6' DRANCHF515MAL LOGS (HARDWOOD SPECIES ONLY) AND COMPACT LIGHTLY TOGETHER BACKFILL AND COMPACT TO LOCK IN RACE. S. ACCEPTABLE LIVE CUTTINGS SPECIES A INCLUDE BLACK WILLOW SMALL LOGS AND/OR (BAUR NRA IGAND SILKY WILLOW MAUX SERICEA). WILLOW LARGO BRANCH[5 WITH p CUTTINGS SHOULD BE RINSED AT CURING POINT TO ALLOW MIN DIAMETER IT A BETTER ROOTING. 4. INSTALL EROSION CONTROL (COIR) MATTING OVER COMPACTED SOIL PER DIRECTION OF ENGINEER SECTION A -A B. INSTALL 1 TO 3 ROWS Of LIVE STAKES ABOVE THE LIVE CUTTINGS LAYER PER DIRECTION OF ENGINEER.. A r COIR MATTING CHANNEL OF E `Y I N ` A A TYPICAL PLAN VI1:W BRU5H TOE NT5 ores 302 Juhrion Street, Sutle 110 Raleigh, NEC 27605 Main: 919.829.9909 Fax: 919.829.9913 WWW.RESMS SEAL SCALE: AS SHOWN 111 Q m O B. O U z U OfO LL O O 0 } LL y 0 Z O :3 Q z J Q WU 2 F J FN/ w Z Lu U Z O U W J Q z W y o PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHM NUMBER: D3 NOTES: ? �(1 JT MINIMUM DIAMETER S' MIN. LENGTH EXISTING DITCH `�' LOEr SILL GTSTNG GRADE TYPICAL) SHOULD BE PLACED I' TO S' FROM CND OF BANK D ISTNG DITCH (SES DETNLJ A IOC. ADDITIONAL REBAR TO BE PLACED AT 6' \�I! LOG STRUCTURE TOP OF BANK //%% MINIMUM OFFSETS. LAST REM SHOULD BE PLACED 1' TO S' MM05M CONSERVATION (SEP MAIL) / PROPOSED GRADE DIAMETER 12' G. FROM CND OF IDG. DUCK BILL ANCHORS MAY BE EASEMENT LIMITS �[f/ USED ASA SUBSTITUTION FOR REL'.AR, 2 PER LOG. 0.590 ALTERNATIVELY, APPROPRIATELY SIZED BOULiXRS neJN To TT - MAY BE USED TO ANCHOR SILL LOGS PER DIRECTION ,I �� EXISTING m� OF THE ENGINEER FILL DITCH. SUCH THAT pticT1 J ` f FLOODPWN LOGS PRCIP05[D I I ELEVATION THE TIES INTO DITCH INVERT FLS —_FILL DITCH AND UA OF GRADING EXISTING GRADE OF THE CONSTRUCT PROPOSED FLOODPLAIN O B I B FLOODPLAIN POOLSURINSTALL COR SECTION A -A ^+(`TTI A DONM � LENGTH VARIES ~ICY GRADE AREA SIKH THAT D05TING STRUCTURE_ BELOW LOG 151% GROUND d/T NOTES: s•/� ; __ -� -- --- 1. FLOODPLAINPROPOSED GRADING LSP OFELOVATHiN IDR OF 2. THE PROPOSED E AT LEL TOP -2 BANK. t P INCH S ILD B[ AT AND I RDW LONG AND AT LEAST H INCHES IN OPMETCR, AND HARDWOOD. BAlKFULL LIMITS OF y 9.1MAY SLOPE SLOPE PROPOSED CHANNEL 5' �\ / 5b' RFBJR VARIES (TYPICALLY 20 To, 401 INSTALL COIR MATTING PER PIAN VIEW SECTIONAL VIEW A - A' MANUFACTURER'S ` - - - _ J 'ILL DITCH INSTRUCTIONS SECTION B-15 PLAN VIEW FLOODPLAIN SILL NTb DIFFUSE FLOW STRUCTURE NTS "A BANKFULL J i BACKFILL (1• TO 6') A EFERENCED IN RSE AGGREGAT NLL (3`706') LOG MIN.Z.S'C COWER CHANNEL BOTTOM OF BANK COARSE BALKFlLL NON -MOVEN GEOTOOILE FABRIC (NGDOT TYPE III S ROOTWAD OR S"IlToE I' - A' DOWNSTREAM LOG PROFILE B -B' LOGBURRD INC BANKMIN 5R CHANNEL TOP OF BANK POINT REFERENCED IN PROFILE POINT REFERENCED IN -- PLAN VIEW PeovuE MIN 9R MIN SR CHANNEL BOTTOM OF BMR OVERLAP OF UPSTREAM LOG COARSE BACKFILL 0%TD aG • .TCR FABRIC GN 4' 70 & LflA PONE REFERENCED PC NT REFERENCED B /INPRORL, /Ill PROFILE Mel, 3.0 COARSE AGGREGATE BACKFILL Il' TO S')_. /- COARSE AGGREGATE RCOTWAD OR / BACKRLL(I'TOS-) BRUBYTOE� COARSEAGGREGATE BACKFILL (Y TO 6') .2 ., -WAN TACK FASRX TO GEOTEX ONLWILE VENRIC LOG NOWWOVEN— (NCDOTTYPEIO BE OR DUCKBILL GEOTEXTILE FABRIC ANCHOR (NCDOTTYPEIB TACK FABRICTO- LOG REM E Ml OR DUCKBILL - PROPILE A -A' ANCHOR DOU61-E LOG DROP NTS PROFILE GC' NOTES: I, LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. .. LOG DIMENSIONS: MIN DIAM. - 1 Y, MIN LENGTH m 15. S. NAIL FILTER FABRIC USING S' I DO GALVANIZED COMMON IAL EVERY 1.5' ALONG THE LOG 4. DUCKBILL ANCHORS MAY BE USEO IN PLACE OF RESAR. CHANNEL TOP OF BANK FLOW I r 5.0 MIN A POOL TYPICAL PLAN VIEW !OPT I 1 FLOW I t BAY MIN POOL TYPICAL PIAN VIEW (OPT 2) STREAM BED FLOW`— =IN. S BACKFILL VAT" COARSE AGGREGATE WTO TO 5' DIAJ B NoN-WCNEN � GEOTIXTILE FABRIC TACK FABRIC OIGDOT TYPE IU TO LOG MAR OR DUCMUL ANCHOR �-BACKFILL WITH COARSE AGGREGATE (I' TO 5- DIA.) J/ r POOLAPPROx / .!. / 0.75' TO 1.5' DEEP SECTION A -A COIR MATTING HEADER LOG 1% TO 3% _ FOOTER LOG REM (WIV MIN. DIAMETER 4' MIN. LENGTH) OR DUCKBILL ANCHORS INSTALLED PER MANUFACTURERS INSTRUCTIONS MPJ SECTION B -B (OPT I PROPOSED STREAM BANK HEADER LOG B FOOTER LOG N t REBAR (W& MIN. DIAMETER 4• MIN. LENGTH) OR DUCKBILL ANG"ORB INSTALLED PER OVERLAP OF MANUFACTURERS INSTRUCrION5 (IYPJ DOWNSTREAM LOG SECTION E -B (OPT 2S NOTES: I—LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. �• LOG DIMENSIONS: MIN DIAN. - 12% MIN LENGTH - I& NAIL FILTER FABRIC MING S' IDO GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG LOG SI LL S. DLICNBLLANCHORS MAYBE USED IN PLACE OF PEBAR. NTS res 902 JeBersm Street, Suite 110 Raleigh, INC 27805 Main: 919.829.8909 Fax: 919.829.9813 W1MW.TBB.Us SCALE: AS SHOWN m O O = IL Z O U M N O U C 0 O v Z Irgl R >- 0 O W y LL g Zo LU 8 a � a I Z J O Q U w V) J 0 Z H Q � 0 Z U O U W L2 W 0 Q z O PROJECT NUMBER: D986 PROJECT MANAGER: BPB DL-SIGNED:AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D4 HITT: A. COMPOST FILTER SOCK SHALL BE PLACED PERPENDICULAR TO FILTER MEDIA: A. RANGE OF PH IS 5.0-8.0 IN ACCORDANCE WITH TMECC 04.11-A, STORMWATER FLOW, ACROSS THE SLOPE, SWALE, DITCH, OR CHANNEL ELECTROMETRIC PH DETERMINATIONS FOR COMPOST G- FAST B. LOSE COMPOST MAY BE USED TO BACKFILL THE COMPOST FILTER SOCK B. PARTICLE SIZE99% PASSING A 2 IN (SOMA) SIEVE 1M7H A RANGE OF TO CONNECT THE GROUND AND COMPOST FLM SOCK INTERFACE 3DIF50% PASSING A 3/8 IN (S.SMM) SIEVE N ACCORDANCE WITH C. EDGES OF THE COMPOST FILTER SOCKS SHALL BE TURNED UPSLOPE TO TNECC 02.02-B. SAMPLE SIEVINGFOR AGGREGA7ESIZE CLASSIF1CAl10N'. PREVENT HE FLOW AROUND TENDS OF THE COMPOST FILTER SOCK. (NOTE- IN 11E FIELD, PRODUCT COMMONLY 5 BETWEEN 1i IN [12.5MM] D. COMPOST FILTER SOCKS MY BE INSTALLED ON TOP OF ANY EROSION AND 2 IN [SOMM] PARTICLE SIZE) CONTROL BLANKET. C. MOISTURE CONTENT OF LESS THAN IW% N ACCORDANCE WITH TOP OF BANK INSTALLED PARALLEL STANDARDIZED TEST METHODS FOR MOISTURE DETERMINATION. ITER M MATERIAL SHALL BE RELATIVELY FREE (G1% BY DRY WEIGHT) OF INERT A SOCKS SHOULD LE INSPECTED AFlTR RUNOFF EVENTS OR FOREIGN MAN MADE MATERIALS TO ENSURE PROPER FUNCTION AND PERFORMANCE. B. F FLOW-7FBROU(aH BECOMES RESTRICTED. AN ADOIIIONAL COMPOST E MATERIAL FEEDSTOCKS SHALL NOT CONTAIN WOOD MATERIALS THAT HAVE BEEN TREATEDOR PAINTED, ENGINE PRESiOOD7IVEO OR FLTER SOCK CAN BE PLACED ON TOP OF THE ORICNAL TO PREVENT AOHESVES, OR ARE COMPOSED OF ETRE EERED WOOD PRODUCTS. OVERTOPPING. C. SEDIMENT SHOULD BE REMOVED ONCE R REACHES HALF THE HEIGHT OF F. A SAMPLE SHALL BE SUBMITTED TO THEE ALL LOG FOR APPROVAL PRIOR TO BONG USED AND MUST COMPLY WITH ALL LOCAL STATE AND THE COMPOST FILTER SOCK FEDERAL R NS D. AN ADDITIONAL COMPOST FILTER SOCK MY BE INSTALLED ON TOP OF SHOULD G. MATERIAL SHOULD BE ODOR FREE HAVE NO RECOGNIZABLE THE ORIGINAL TO INCREASE STORAGE CAPACITY OR TO PREVENT FR PART FEEDSTOCK MATERIALS AND SHOULD ADHERE TO TITLE 40 CFA PART SEDIMENT DISTURBANCE E F A COMPOST FILTER SOCK BECOMES DISLODGED OR DAMAGED, IT 503. SHOULD 13E REPAIRED OR BARBED OR Wit POST F. F THE COMPOST FILTER SOCK IS USED FORATEMPORARY APPLICATION. ELECTRIC WIRE THE COMPOST MATERIAL CAN BE SPREAD OVER THE LANDSCAPE OR INCORPORATED INTO THE SOIL AT THE END OF THE PROJECT. 4' TO G' 3' MIN, WOVEN WIRE: 2'X2' HARDWOOD ASTM GIl55 3 GALVANI3D. STAR5 CENTERS DIR :N7ER5 COMPOST FILTER SOCK TOP AND BOTTOM WIRES MIN. 2 GAUGE, BE MESE OPENING WOVEN WIRE INTERMEDIATE AND STAY WIRES MIN. ErUSONG BE7YIEEN 1/6' AND 318 - GROUND LINE 12 112 GAUGE. TIRADE WOVEN WIRE WITH ONE BARB DETAIL NOTES) TINE POSTS (WOODEN): MIN. 41N. DIAM. OR 41N, SOVARE. 2. LINE POSTS (5TEELI: STUDDED OR PUNCHED T. U. OR Y SHAPED, WITH ANCHOR PLATES. S. MIN. WEIGHT 1.9 1.580T. (EXCLUDING ANCHOR PLATE). P05T5 SHALL BE DRIVEN A MINIMUM OF 1 e' DEEP AND MUST BE AT LEAST 5.5 FT IN LENGTH 4. SPECIES AND TP.EATMENT FOR ALL WOOD: LOSE UNTREATED DURABLE POSTS DF SFECIES SUCH AS RED CEDAR, BLACK LOCUST OR OSAGE-ORANGE WITH BARK REMOVED, OR NON -DURABLE WOOD THAT IS PRESfRVATIVE PRESSURE TREATED (0.40 L55JGUB!C FOOT GGA, OR-FWIVALENT NON -CCA TREATMENT). DO NOT USE RED PINE. TIMBER F WOVEN WIRE FENCE (NKC5 DETAIL 382A) NT5 .T INSTALLED L BOLT MAT, 8" FILTER FART SLOPE R NOTES: PIAN VIEW I. TIMBER MATS SHALL BE USED FOR TEMPORARY 375 CONSTRUCTION ACCE55 TO TRAVERSE WET AND/OR MUDDY SEDIMENT RAIL ARES ADJACENT TO THE STREAM AND TO CROSS THE MIN HEIGHT • 4" STREAM AND OTHER CONCENTRATED FLOW AREAS. CARRIAGE BOLT, TIMBER MAT INSTALLED 2, THE STREAM CROSSING SHALL BE INSTALLED IN A DRY TYPICAL PERPENDICULAR CONDITION WHEN FLOW IS ION. THERE SHALL BE MINIMAL CLASS B RIP RAP TIMBER MAT BANNS TO NO DISTURBANCE Of THE CHANNEL BED AND BANKS A5 A NO D AND TOP OF BANK INSTALLED PARALLEL Rf OF INSTALLING THE APPROACHES ID O '0 O O S. THE IENGTH OF TIMBER MAT REQUIRED TO CROSS THE 100 STREAM OR CONCENTRATED FLOW AREAS SHALL BE SUCH 20 THAT THE TIMBER MAT EXTENDS PAST THE TOP OF BANK ON 65 EACH SIDE OF THE CRO55ING A SUFFICIENT DISTANCE TO 130 SUPPORT THE MAXIMUM EQUIPMENT 8I2E USING THE 40 CROSSING. 55 4. STREAM CRO55INCS SHALL BE INSTALLED WITH THE TIMBER FILTER FABRIC MAT LENGTHS ORIENTED PERPENDICULAR TO THE TOPS OF ME OF BANK,—/THE TYPICAL '— APPROXIMATE BASE FLOW STREAM BANKS. TIMBER MAT STREAM APPROACHES SHALL BE INSTALLED WITH THE TIMBER MAT LENGTHS WATER SURFACE ORIENTED PARALLEL TO THE TOPS OF THE STREAM BANKS. 30 5, A 4' MINIMUM HEIGHT SEDIMENT RAIL SHALL BE PROVIDED AT 45 STREAM CROS61N65 TO PREVEPT TRACKED SEDIMENT FROM 5ECTION VIEW fALUNG IMO THE STREAM BED, 40 G. STREAM CROSSING APPROACHES FROM CRY ARRAS SHALL 50 BE CONSTRUCTED USING CLASS B RIP RAP PLACED OVER 20 FILTER FABRIC. 30 7. ALL TIMBER MATS. FILTER FABRIC. AND RIP RAP SHALL BE 50 COMPLETELY REMOVED FROM THE SITE WHEN THE CROSSING 25 IB REMOVED. TIMBER MAT TEMPORARY CROSSING NTS 8" FILTER FART SLOPE R MAXIMUM SLOPE LENGTH ABOVE COMPOST FILTER SOCK (FT) DIAMETER OF COMPOST FILTER SOCK REQUIRED 8 -INCH 12 -INCH 18 -INCH 24 -INCH 2 (OR LESS) 300 375 500 650 5 200 250 275 325 10 100 125 150 200 15 70 85 100 160 20 50 65 70 130 25 40 50 55 100 30 30 40 45 65 35 30 40 45 55 40 30 40 45 50 45 20 25 30 40 50 20 25 30 35 COMPOST FILTER SOCK DETAIL NT5 INVERT R PIPE SZE PEN PLAN BURY CULVERT 1.0' UNLESS NOTED OTHERWISE BY ENGINEER 5ECTION VIEW PROPOSED CULVERT CROSSING Nis EARTH W1 COVERED BY LARGE ANGULAR ROCK COSTING COMPOST FILTER SOCK GRADE 1V OR TEMPORARY SILT FENCE S�LOPEy GRADEEXISTIND NOTE, T. MAINTAIN HAUL ROAD OURNG COHBDLUCIIMIL 2. RETURN 70 W04AL GRADE AT THE COMPLETION OF WOK 3. YEMATE ALL DMTLM fO ARRAS 4. RENINE COMPOST FILTER SOCK UPON ESTABLISHMENT MENT OF VEGETATION. TYPICAL HAUL ROAD SECTION DETAIL NTS 1. CONSTRUCT STREAM CROSSING IN A DRY/ DEWA7ERED CONDITION. Z. INSTALL STREAM CROSSING PERPENDICULAR TO FLOW. 3. CONTRACTOR TO COOROINATE APPROPRIATE BEDDING MATERIAL WITH MANUFACTURER. 4. FILTER FABRIC USED SHALL BE NCDOT TYPE 2 ENGINEERING FABRIC OR EQUIVALENT. 5.WIDTH OF TYPICAL FARM CROSSINGS SHALL BE PER PLAN OR A MINIMUM OF 12'. 6. WHEN REQUIRED. CONTRACTOR TO ENSURE PIPE MATERIAL AND COVER MEET H-20 LOADING REQUIREMENTS INSTALL CLAY PLUG 2 FEET BELOW CULVERT INVERT TO' OF SAM( PLAN VIEW LOG SILL SET TOP OF LOG 1.0 FOOT ABOVE CULVERT INVERT MSI O O O� 0o0c Oc OC OC 00 00 00 00 O0 OC Opo 0O 0�0"ooc 0 0 0„0, olor LOG SILL SET TOP OF LOG 1.0 FOOT ABOVE CULVERT NVEFT ores 302 JeMemon Street, SWIG 110 Raleigh, NC 27605 Main: 919.929.9909 Fax: 919.929.9913 WM NJOS.Ui SEAL SCALE: AS SHOWN 111 Q W_ a o_ N O U 0 O LL g O K2 XSi Z Q } O 7d rn O Z 11'11 a Q Z J O I.L Q U `W` Z F- � � J w Z Fo z 0 Q Z U 0 � W D PROJECT NUMBEff: PROJECT MANAGER: BPB DESIGNED: 10386 AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D5 TOE OF BANK FLOW STREAM BANK BANKFULL I 1l STREAM BANK YA ANNEL Y CFIANNEL Ya [n EL BANKFULL O'^ WIDTH W) COARSE AGGREGATE E AGGREGATE BACKFILL(I• TO S) CIONIPILL (I' TO 57 I CROSS VAN[ INVCRT \ � FONT EHEADER BOULDER I I f RIGHT VANE ARM -- I { HEADER AND fIX BANK INTERCEPT CONTROL POINT 4 FILTER FABRIC 4 / I MIN 5.a LEFT VANE ARM BANK INTERCEPT CONTROL POINT PIAN VIEW BANKFULL COARSE AGGREGATE BACKFILL (I' TO 57 EPR OR RIGHT VANE ARM BA14K INTERCEPT CONTROL POINT FLOW VARIES I TO 0.N POOL— FOOTER ROCK HEADER ROCK PROFILE VIEW TOE Of BANK —. FILTER FABRIC SECTION A -A' \ STREAM BED / IN POOL US CHANNEL YA CMANN[L )S CHMMMI VANE ARM BANK INTERCEPT CONTROL POINT VANE ARM BANK INTERCEPT CONTROL POINT FILTER -+ J FABRIC HEADER BOULDER FOOTER BOULDER SECTION B -B' ROCK CK055 VANE M5 Z FLOW BANKPI)LL STREAM INVERT CONTROL POINT WOODY DEBRIS HEADER ROCK / r FOOTER ROCK 1 SECTION A -A' BACKFILL EMSTING CHANNEL WITH NATIVE MATERIAL AS NEEDED STREAM BED �NKFULL HEADER ROCK r FLOW I .5x RIFFLE DEPTH (EYP.) v 1 -+ ^.75' MAY LTYP.) r r � r FooTeRROCK -� WELL GRADED MIX OF 057 STONE. CLASS A AND B RIPRAP FILTER FABRIC PROFILE VIEW STEP POOL ROCKS MUST HAVE AN INTERMEDIATE DIAMETER OF 12' TO 14' FOR HEADERS AND 14' TO 1 B' FOR FOOTER5. 2. BACKFILL MATERIAL. IF NEEDED TO ESTABLISH A STEPAWL SUBPAVEMENT AND/0? TO RA15F THE CHANNEL BED DUE TO 5COURANG510N. SHALL BE OF A TYPE, 51ZE, AND GRADATION A5 SPECIFIED BY THE DE51GNM BACKFILL SHALL BE PLACED SUCH THAT THE ADDITION OF THE 5PECIFIFD THICKNE55 Of 5TEP-POOL MATERIAL SHALL ACHIEVE THE DESIGNATED GRADES. 3. 5TEP-POOL DED MATERIAL SHALL BE OF A TYPE, 5RE'AND GRADATION AS SPECIFIED BY THE DESIGNER TO BE MOBILE OR NON-MOBILE A5 THE CONDITIONS IN THE CHANNEL WARRANT (I.E. -CLEAN-WATER D15CHARGE ENVIRONMENT. HIGH BEDLOAD SYSTEM, ETC.) BED MATERIAL SHALL BE EXCAVATED, STOCKPILED. AND RE -USED FROM ABANDONED CHANNEL SECTIONS WHEREVER PRACTICAL. OTHERWISE BED MATERIAL SHALL BE 5LIGHTLY ROUNDED, 'RIVERJYPE' ROCK. UNLE55 OTHER ROCK CHARACTER15TIC5 ARE APPROPRIATE FOR THE CHANNEL. LOGS AND OTHER WOODY DEBRIS MAY BE INCORPORATED INTO THE 5TEP-POOL BED MATERIALS. 4. 5TEP-POOL INVERTS SHALL CON515T OF BOULDERS OF AN INTERMEDIATE DIAMETER OF 12' TO 14' AND FOOTERS SHALL HAVE AN INTERMEDIATE DIAMETER OF 14' TO 18'. INVERTS SHALL BE SET AT A DROPM5E FROM THE ADJACENT UP57REAMIDOWNISTREAM INVERT TO ACCOMMODATE THE PA55AGE OF FISH. THE INVERTS SHALL FORM THE THALWEG OF THE STEP POOL STRUCTURE. POOLS SHALL BE FORMED BETWEEN THE INVERTS TO THE DIMENSIONS SPECIFIED BY THE DESIGNER - 5. THE BENCH OF THE 5TEP-POOL STRUCTURE SHALL BE FORMED BE51DE THE POOL AT THE DIMENSIONS SPECIFIED BY THE DESIGNER. THE BENCH SHALL BE FORMED OF 5TEP-FOOL MATERIALS PLACED TO A DEPTH SUCH THAT THEIR SURFACE MATCHES THE 5TEP-POOL INVERT IMMEDIATELY UPSTREAM. 6. USE CLASS A AND B RIPRAP TO FILL GAPS ON UPSTREAM 51DE OF STEP POOL ROCKS. 7. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM BIDE OF THE STRICTURE WITH CLA55 A AND B KPRAP TO THE ELEVATION OF THE TOP OF THE HEADER ROCK e. FILTER FABRIC SHALL MEET SPECIFICATIONS FOR NCDOT WOVEN FILTER FABRIC. STEP POOL NTS NOTES: 1. LOGS BHALL BE OF A MINIMUM OF 12' IN LENGTH AND 10' IN DIAMETER AND RELATIVELY STRAIGHT HARDWOOD. RECENTLY HARVESTED. 2. A SINGLE LOGMAY BE USED IN LIEU OF A MEADER/FOOTER LOG COMBINATION. PER DIRECTION OF DESIGNER 9. FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOO(5) AND THE STREAM BED, UNDER THE COARSE BACKFILL MATERIAL. THERE SNAIL BE NO NLTER FABRIC VISIBLE IN THE FINISHED WORK: EDGES SMALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED. R. COARSE BWAVILL SMALL BE PLACED TO A THICKNESS EOUAL TO THE DEPTH OF THE HEADER (AND ANY FOaTER) LOGS AND SMALL EMEND OUT PROM THE VANE ARMS TO THE STREAM BAN' AND UPSTREAM. 5. AS AN OPTION, PIAT -SIDED BOULDERS MAYBE PLACED AS BALLAST ON TOP OF THE STREAM BANK BIDE OF THE EMBEDDED VANE ARMS. DUCK BILL ANCHORS MAY BE. USED IN LIEU OF BALLAST BOULDERS. 6, DUCKBILL ANC IM WITH GALVANIZED CABLE ATTACHED MAY BE USED TO SECURE LOGS INTO THE STREAM BED AND/OR BANKS. FIAT SIDED BOULDERS CAN BE USED IN LIEU Of THE LOG INVERTANCKBILL ANCHOR SYSTEM. ores FLOW Raleigh, NC 27605 BANKFULL STREAM BANK Fax: 919.829.9915 www.mS.Us TOE Of BANK TYPICAL SCALE: AS SHOWN BANKS. TYPICAL - COARSE AGGREGATE ) BACKFILL 12• TO 67 , r HEADER LOG Z O CR055 VANE INVERT FOOTERIF J5W ➢W yW G: SP[GFIEDfD y BANKFULL C O COARSE AGGREGATE g O Z til /-STREAM BCD IN POOL / BACXfILL (2• TO 67 O Y S LJL LU LLT FILTER FABRIC Y. w 1 a Q — INVERT LOG IBFE NOTE 6 1 1 1] Z J A O SECTION A -A' Q U FILTER FABRIC LLI 1 A' \ IL Z MIN INVERT LOG LU FOOL I r VANE ARM LOG, TYPICAL COARSE AGGREGATE BACKFILL(: TO 67 BANKFULL U j/ OPTIONAL BALLAST BOULDER FLOW 3% TO 8% HEADER Loc MEADER LOG a 2 o PROJECT NUMBER: 0386 STREAM BED BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: Foot `- FILTER FABRIC FOOTER LOG FOOTER LOG DUCKBILL AICHOR PLAN VIEW PROFILE VIEW LOG CROSS VANE NOTES: 1. LOGS BHALL BE OF A MINIMUM OF 12' IN LENGTH AND 10' IN DIAMETER AND RELATIVELY STRAIGHT HARDWOOD. RECENTLY HARVESTED. 2. A SINGLE LOGMAY BE USED IN LIEU OF A MEADER/FOOTER LOG COMBINATION. PER DIRECTION OF DESIGNER 9. FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOO(5) AND THE STREAM BED, UNDER THE COARSE BACKFILL MATERIAL. THERE SNAIL BE NO NLTER FABRIC VISIBLE IN THE FINISHED WORK: EDGES SMALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED. R. COARSE BWAVILL SMALL BE PLACED TO A THICKNESS EOUAL TO THE DEPTH OF THE HEADER (AND ANY FOaTER) LOGS AND SMALL EMEND OUT PROM THE VANE ARMS TO THE STREAM BAN' AND UPSTREAM. 5. AS AN OPTION, PIAT -SIDED BOULDERS MAYBE PLACED AS BALLAST ON TOP OF THE STREAM BANK BIDE OF THE EMBEDDED VANE ARMS. DUCK BILL ANCHORS MAY BE. USED IN LIEU OF BALLAST BOULDERS. 6, DUCKBILL ANC IM WITH GALVANIZED CABLE ATTACHED MAY BE USED TO SECURE LOGS INTO THE STREAM BED AND/OR BANKS. FIAT SIDED BOULDERS CAN BE USED IN LIEU Of THE LOG INVERTANCKBILL ANCHOR SYSTEM. ores 302 Jeft mn Street, Suite 110 Raleigh, NC 27605 Main: 919.629.9909 Fax: 919.829.9915 www.mS.Us SEAL SCALE: AS SHOWN LI! Q � O O = IL Z O U G: y O U C O g O Z til O rR' LL 2 ? O Y S LJL LU LLT Q a Q Z J O Q U LLI IL Z LU Z U D O U LL LZ W Q QZ a 2 o PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN: BRC CHECKED: AFM SHEET NUMBER: D6 s ANCHOR BOULDER 4.0 CHANNEL 0.5' MIN/// 1.0 MIN � •• - ,---~ G. LOGE 4'-6'LOGS r -W>55 SECTION A -A' BEGIN R CONTROL P POOL PROFILE CONSTRUCTED RIFFLE MB LARGE COBBIf/SMALL BOULDERS. TYP 4.0 TOP OF BANK TVP _____________-___-____ I' PROPO-ED TOC OF BANK RIFFLE MATERIAL, SEE TABLE I 4.0 A 0.5'MIN •,\ 1.0 MIN 4'.6' LOGS j 4° - G. LOG.,5 fj BEGIN RIFPLE CONTROL POINT POOL LAPGE COBMfffi LL _.. rBOULDER9. TW CHANNEL if 4.0 l TOP OF BANK INT PROPOSED TOE OF BANK `RIFFLE MATERIAL: SEE TABLE I CK055 SECTION A -A' GRADE CONTROL ROCK 50/50 MIX OF CLASS A AND B RIPPAP RIFFLE MATERIAL; SEE TABLE 1 VARIES PER PROFILE PROPOSED TOP OF BANK FLOW -1! END RIFFLE CONTROL POINT GtIpE� PLO// 4- \�r RUN POOL 4` - 6' LOGS J `GRADE CONTROL RO(T'. 50)50 MIX Of CLA55 A AND PROFILE B R�PRAP RIFFLE GRADE CONTROL NTS NOTES: I . CONSTRUCTED RIFFLES SHALL BE INSTALLED IN NEWLY GRADED CHANNEL SECTIONS, AS 5FECIFIED BY THE DESIGNER 2. ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE BEGINNING AND END OF RIFFLE POINTS TO ESTABLISH PART OF THE PROFILE OF THE CHANNEL. SURVEY OF CONTROL POINTS SHALL BE REQUIRED TO ESTABLISH ACCURATE RIFFLE INSTALLATION WITHIN A TOLERANCE OF m0.2'. 3. RIFFLE MATERIAL SHALL BE COMPRISED OF ROCKS AND LOGS. THE ROCK MATERIAL COMPOSITION SHALL MATCH TABLE I'RIFFLE MATERIAL SHALL BE EXCAVATED. STOCKPILED. AND RE -USED FROM A13ANDONTD CHANNEL SECTIONS. ROCK RIFFLE MATERIAL OBTAINED OFF51TE SHALL BE SLIGHTLY ROUNDED, 'RIVER -TYPE' ROCK, UNLF55 OTHER ROCK CHARACTERISTICS ARE APPROPRIATE FOR THE CHANNEL. 4, SPACING AND NUMBER OF LOGS SHOULD BE BASED ON RIFFLE LENGTH AND MAY VARY BASED ON LOG AVAILABILITY. LOGS SHOULD BE SPACED EQUALLY AND ANCHORED TO THE CHANNEL BED WITH BOULDERS. 5. THE PLACEMENT OF RIFFLE MATERIAL SHALL BE DONE IN A MANNER TO CREATE A SMOOTH PROFILE, WITH NO ABRUPT:JUMP- (TRANSITION) BETWEEN THE UPSTREAM POOL -GLIDE AND THE RIFFLE, AND LIKEWISE NO ABRUPT 'DROP' (TRANSITION) BETWEEN THE RIFFLE AND THE DOWNSTREAM RUN -POOL. THE FINISHED CIRO65 SECTION OF THE RIFFLE MATERIAL SHALL GENERALLY MATCH THE SHAPE AND DIMEN51045 SHOWN ON THE RIFFLE TYPICAL SECTION WITH 50ME VARIABILITY OF THE THALWEG LOCATION AS A RESULT OF THE SMALL POOLS AND LOG5. G. THE END OF RIFFLE CONTROL POINT MAY TIE IN TO ANOTHER IN-5TREAM STRUCTURE (LOG BILL , J -HOOK. ETC.. NO LOGS SHOULD BE INCLUDED WITHIN THE FOOTPRINT OF THE PROP05ED STRUCTURE. 7. THE CONSTRUCTED RIFFLE SHALL BE KEYED IN TO THE STREAM BANKS AND/OR BED AS M51GNATED BY THE DE5IGMM THE'KEY SHALL EXTEND BEYOND THE TOP OF BANK AT THE BEGINNING (CREST) OF THE RIFFLE. WHERE PRESERVATION OF EXISTING STREAM BANK VEGETATION 15 A PRIORITY A °KEY° MAY NOT BE USED (OR THE DIMENSIONS MAY BE ADJUSTED) TO LIMIT D15TURBANCE. TABLE I - RIFFLE COMPOSITION REACH STONE 51ZE % NATIVE 25 051 F DB2 K5 50 BU -4c 25 NOTES: I . CONSTRUCTED RIFFLE5 SHALL BE INSTALLED IN NEWLY GRADED CHANNEL SECTIONS. AS SPECIFIED BY THE DESIGNER. 2. ELEVATIONCONTROL POINTS SHALL BE DE51GNATED AT THS BEGINNING AND END OF RIFFLE POINTS TO E5TASU5H PART OF THE PROFILE OF THE CHANNEL. SURVEY OF CONTROL POINTS SHALL BE REOUIRED TO ESTABLISH ACCURATE RIFFLE INSTALLATION WITHIN A TOLERANCE OF ±0.2`. 3. GRADE CONTROL ROCK SHALL BE COMPRI5FD OF A 5050 MIX OF CLASS A AND B RIPRAP. GRADE CONTROL ROCK SHALL BE PLACED SUCH THAT THE ADDITION OF THE SPECIFIED THICKNESS OF RIFFLE MATERIAL SHALL ACHIEVE THE DESIGNATED GRADES. 4. RIFFLE MATERIAL SHALL BE COMPRISED OF ROCKS AND L•OG+:. THF ROCK MATERIAL COMP051TION SHALL MATCH TABLE I. RIFFLE MATERIAL 5HALL BE EXCAVATED, STOCKPILED. AND RE -USED FROM ABANDONED CHANNEL SECTIONS. ROCK RIFFLE MATERIAL OBTAINED OFF5ITE SHALL BE SLIGHTLY ROUNDED, 'RIVFR--TYPE' ROCK, UNLE55 OTHER ROCK CHARACTERISTICS ARE APPROPRIATE FOR THE CHANNEL. 5. SPACING AND NUMBER Of LOGS SHOULD BE BASED ON RIFFLE LENGTH AND MAY VARY BASED ON LOG AVAILABILITY, LOGS SHOULD BE 5PACED EOUALLY AND ANCHORED TO THE CHANNEL BED WITH BOULDERS. G. THE PLACEMENT OF GRADE CONTROL ROCK AND/OR RIFFLE MATERIAL SHALL BE DONE IN A MANNER TO CREATE ASMOOTH PROFILE, WITH NO ABRUPT'JUMF- (TRANSITION) BETWEEN THE UPSTREAM POOL -GLIDE AND THE RIFFLE, AND LIKEWISE NO ABRUPT *DROP* (TRANSITION) BETWEEN THE RIFFLE AND THE DOWNSTREAM RUN -FOOL. THE FINISHED CRO55 SECTION OF THE RIFFLE MATERIAL SHALL GENERALLY MATCH THE SHAPE AND DIMENSIONS SHOWN ON THE RIFFLE TYPICAL SECTION WITH 50ME VARIABILITY OF THE THALWEG LOCATION AS A RESULT OF THE SMALL POOLS AND LOGS. 7. THEEND OF RIFFLE CONTROL POINT MAY TIE IN TO ANOTHER IN -STREAM STRUCTURE (LOG SILL , J -HOOK, ETC.). NO LOGS SHOULD BEINCLUDED WITHIN THE FOOTPRINT OF THE PROPOSED STRUCTURE, e. THE CONSTRUCTED RIFFLE SHALL BE KEYED IN TO THE STREAM BANKS AND/OR BED AS DESIGNATED BY THE DESIGNER. THE'KEN SHALL EMEND BEYOND THE TOP OF BANK AT THE BEGINNING (CREST) OF THE RIFFLE. WHERE PRESERVATION OF EXISTING STREAM BANK VEGETATION 15 A PRIORITY A'KFf MAY NOT BE USED (OR THE DIMENSIONS MAY BE ADJUSTED) TO LIMIT DISTURBANCE. TABLE I - RIFFLE COMPOSITION REACH STONE 51ZE % •ATIVE 25 D51 t D52 e5 50 FAA GE 25 ores 302 JeRelson Street Suis 110 FWaigh, NC 27605 MLL)n: 919.929.9909 Fax: 919229.9913 Www.reLt.us SEAL SCALE: AS SHOWN am 0 N J o_ Z 0 Z 0 O LL a 0 �2 I$Tf Z ¢ } � a O Y tWil � a IL LLI cc a a Z J O a U W I'^ cn J Z ~ � a Z U D O W a z LU oCL a PROJECT NUMBER: 0386 PROJECT MANAGER: BPB DESIGNED: AFM DRAWN:BRC CHECKED: AFM SHEET NUMBER: D7