Loading...
HomeMy WebLinkAbout20042046 Ver 1_Complete File_20041223 (2),r ENGINEERING Ii SURVEYING, PC 1906 Nash Street North Wilson, North Carolina 27893-1726 Tel(252)399-0704 Fax(252)399-0804 December 21, 2004 North Carolina Department of Environment and Natural Resources Division of Water Quality 401 /Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 042046 v? ?. 2 '•p REFERENCE: WILLOWBROOK AREA DRAINAGE IMPROVEMENTS-WILSON, NC To Whom It May Concern: Please find herewith, a PCN Application and supporting documentation for the above referenced project. This proposed construction is to remove an existing 48" pipe from a streambed/channel and restore the channel to its natural referenced stable condition. The proposed restoration will relieve flooding that occurs in the upstream roadway due to increased development in the area. This notification is solely a courtesy copy because written approval for the 401 certification is not required. The information has also been sent to the U.S. Army Corps of Engineers. If you have any questions or need additional information, please contact our office. Thank you. Sincerely, J0111 Jonathan Lee Meade Environmental Specialist Enclosure ~;€If ~ frry ~l;il ~ x`~ z a i C~,a a : r1~',~~€~~;;~~d~ b~K '",€x4 ~ r=?~r ~ f ~ ' ~ / ~ ~ , } r. L, , r ~ ~ ~ f~ 2~~ ~f S .f 6$' .V £!I ors K~~at~ R s r = b~~ yfja, k r,;, I EXCAVATION AND GRADING PLAN NOTESt f r xt _ ~ CONTRACTOR SHALL NOTIFY AND COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES a s` ` f` ft<r`."` ~ ~ ~ ~T ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR ••a € ~ ~ s ~ CONNECTING TO SAID FACILITIES, ` < fy a ik = f it s ,r; ; \k ~ri'~ a~'~ x" ~rr4~~: £Sfy ~ ~ ~ y~y~~~b x ~ , F;w Za ~ UNUSABLE EXCAVATED MATERWLS AND ALL WASTE RESULTING FROM DEMOLITION SHALL BE DISPOSED OF f r r, ?\I €'~~*€3~ ~ f~y~ ~ ~ OFF-SITE BY CONTRACTOR, AT AN APPROVED PERMITTED LOCATION OR AS DIRECTED BY CITY OF . = y ~ x~uY: L = E~ h~>~ WILSON UNLESS OTHERWISE INDICATED, f r~' k ~~F Y4~: 7$~'~~f; L~F9F ~ ~s~~~ rfs5 ~t~~~~p'7~` EXISTING CONDITIONS; ' P~~" THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AlL EXISTING JOB CONDITIONS. ANY ADVERSE Tf1P Mfr 11'x,5$' ,f<~ ~ : , ~ ~ x : y . f CONDITIONS AFFECTING WORK SHOWN ON THESE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF ~a~~y~~ a ~ff~g~€r~~~!, THE ENGINEER FOR POSSIBLE CLARIFICATION OR RECONCILIATION, ':I~Y IrM 1 1 ~`7'{a IY "r~~4 Sc~~`3 ,:=A ? 5 t ~y ~ CONSTRUCTION SAFETY, lNY ~ T 1 2,01 ' s,', ? ?s ~ \ m a r a~ Its _ ~~€I~g Y ~ ~ THESE DRAWINGS DO NOT CONTAIN THE REQUIREMENTS FOR JOB SAFETY. ALL PROVISIONS FOR SAFETY A pp }}~~``,,~y ' ~ ~r yb ~ SHALL BE SOLE RESPONSIBILIIY OF THE CONTRACTOR, . 4U,+ Lr iWS"' 31~ br£ I'F~zru~ $ _ "i y Y GENERAL NOTES: x t~ 1? y \ = k (g = ~ ' N~~ a ~ CALL ONE CALL CENTER AT 1-SOD-632-4949 FOR LOCATIONS OF EXISTING UTILITIES ~ , ~L K s~~r~g ~ 48 HOURS MINIMUM PRIOR TO EXCAVATION. ~ tt ~ f £ I i M1 ~ ! R' % ; ' € ^ ~ ~i , ~ TH CONTRACTOR SHALL BE RESPONSI LE FOR WORK ZONE TRAFFIC CONTROL, A f , ref T' y~ E B ALL x~ ~ d ~ ~~f a hr III s s~ 'r ALL METHODS SHALL CONFQRM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL ~ r ~ x)rssr ~ ~ ~ I ?a~~.as ~}2~ _ ~ DEVICES (MUTCD) AND NCDOT STANDARDS, B K~L': ~ x~ 9 i,- %R;f 3f~ f ~ <.if iix f',Y 5~ 3"~ g~3 ~i Y: ' ,r~~= ~ ' ~ CONTRACTOR R SPON IB E FOR I M NT C ITIONS OF ffi ~ N ~ E E S L COMPLYING WITH ALL REQU RE E S/ OND t `y° ' _ ` ` ? ` ~d, , ~ ALL ENCROACHMENTS do PERMITS INCLUDING PROVIDING BONDS INSURANCE IF i f) .r. ~ .t ~ / L~ ,,~;;v ~ RE4UIRED. r ~ b s r ~R ' f„'',~ Efy ~ _ s `r I CONTRACTOR IS RESPONSIBLE FOR COORDINATING REQUIRED INSPECTIONS BY CITY OF 'x EX C8 ~ a I ',t~?~f ' xss= 1~1€~ ~ WILSON, ;z C«X 8 4 ' s L y. TgP~11~i, 1 =~af~ ~y ~ L ~ff><~, E'F~€ kNV QUl' 1 3. T ~ 11 ~ 6 z~~~ y ~ ~ ~~'~h ~~~~`Y€ fb . k IN Q~T " T~,3 UTILITIES SHOWN ON PLANS ARE LOCATED APPROXIMATELY. CONTRACTOR SHALL BE -r ` r \'`wt e z r ~ RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UTILITIES ANO SERVICES ~ t=~ x. ~ a E fz9~ r . r' ~ ~ r , _ ~?3 a4„~\ WHETHER SHOWN ON PLANS OR NOT. ~ $ u z~ `tY='~~'~ 'e. CONTRACTOR TO BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF THESE ~i .r 8 4~ \ f s =YyE , i ~ ~ ? , i f'" t y ~`~F~ ~ ~ ~ FACILITIES IF DAMAGED, ,xxaa~~%%~~=;k 5 ~ 2 5y N~ "§I~ ~ G ~ '='",K R~ ~.?y 9n ~ G~~//yy~Y ~ 9j~.,, 4 Y, ~ Yf 4,,.fj'.: Y i~ ..:2 \ i ~ ~ \@} „',~,'g '~gY'f~'~rGTia ~ „ \a Sy 1 /..yr ~ ~ r1.~~ yuyar ~ = d ~x1 ~ :xs S ;€'„1Wk lad faz:xr xr\ f z`: ay~~ti'kjj\k l~~~ e 3r y~E, UU r ~,F E C• ~ii~.'. >h F ~~_~,'''~ph>{fi t~ s.':'' 4X ~fl ~ 3~' a~~E a, 1hR:. 11j ~ li)=K fiYb~# Y r~ ~ = y = ~3'S`\~,~ _ S~' ¢ { a~ 1L3Sb ~3$9d~'f ; A ~at.~x~. ~9S,~~vuF~~~~ x ~ y~ tv L s'' ~1\ ` T~R~1 ..7~ a is d\yE~'~~~~Y.~~i~~S;. f~ L Y \ t~\ ~ ~ S y y Sf, t 3 \ a3~=CD, yi INY IF'1: 1 ~.~G yt$, \ f gi ~ ir~. ~ t ~ INV III 13.26 : ;~~r~ Yf?, y~~ As FENCE ` ~ N x~ "1=s~~~~ ~ ' QQ y, p['~p/''1 I V IN 113.22 4 =Y € ~ TX.{if£VYE 4G i'tG.P3.JAL G. ~ INV 4. ""11f.i. ~ ~aYbysYu2~'~ ? f~ ?ac t a fx~,~t~~f ~.R ~ • r ° ,,iy t . L ~ w;~ "3 r y~., ;'f~ ~ , y y EROSION CONTROL NOTES 3`k• i ~ f ?i , f ~ a ~ f 1. SEEDING AND MULCHING TO 8 APPLI WITHI W KI ` _ E ED N 15 OR NG DAYS OF ALL LAND DISTURBING ACTMTIES NOT PREVIOUSLY STABILIZED. McIVA/R S'~ 2. EROSION CONTROL DEVICES TO BE INSTALLED AS SHOWN ON ~ rgsr=! r~ 60~''R w PLANS OR AS DEEMED NECESSARY BY VISUAL OBSERVATION. ~ r ;~4~,, 3. EXCELSIOR MATTING TO BE INSTALLED AS NEEDED IN ANY r , x ~ ~ AREAS OF DITCH DISTURBANCE v~R"~i'k < aYCr as r ~ x, rt k f =r Y ;`Yxy. ~9. rY.:... i, )9y~y' ~X ~B ~ zr£„~: Yu: P-117,44 TQ 18 M ~ 1.~ T; 1 4,11 EX r f Yt ~ f L ~a ( " ' ~I~~~K 33 kkLL ,y 1 f ~ s,4rYlb&.f ~ FE 1'l i5 ~:,"s i,~~€7 6 41# s x 4 z : YY F A< ~ y yf r kz f ; r~r?r § Y 's^ fig. ry,''~y5:~ ~ s Y €z £ ?'~~~,y ~a:se a ?r~ ~~la / 4GFk < E ~ ~ ~ : ) /s ~yyrrri R y~~' f a~3 k A ~;r£ .•k ~A cL 4~i k{~~ ? ` k 'rk r ' v a i , o, H YN YL v, ~ r z~`ke~~? ?r3 f~= a ~ 2~~kss~ lc~;tip Rr J F r _ 3 yiz s ,gf z a n•,; 2 f M11# 1 ~'z E ~ s y ~ Y', sF 3K P ELEV~117,6 E V T ffi114,1 yf ;f€, _ QU 3 y € sb ; r i \ r~ ~ ~ / r 3:. _ cif? b y ~ ~ ? p =Xk2 a } ~ zh' ~ sq >I Iu , y«: ,z" Z K x k ° 5($"•. Y N£ ~ y ~kV Y~ TI 4~9~ 1... S y i r ~ b(~ ifx Pi . ~,MR =4 5Y r>: • ~ :i f ~ a $ xL k s , s r: ?r t r 3 z gg w, ~ ~ a~ s ~ 3 > 3yab1 =:.r. Ike q z c,i f _ S~, ~ ~i ii~ ~aa~ ~s3 s~i : Viz; ~ ~r~xr s, ~ aL x 5 R Y i}=(~ ~,=ti L 0 Y 5 - = i . ~ 'f: a~, ~6 ~l D f = f _ kQ 3Y iC djf f:i. ? \ 5~~~. L\~ ~aL ~~jj LA/ i y r ~s ;w s ~ ~ a r v r~ ~i'~ ~s~ YM ~ a~ sy~ Fa s w br a : a a c, t / >k'.a E zEgz ~ 5 ~ Y =„i E ~Ya sd e { j tw,=' ~€~.~e x •s\ €rk:i{~ ? kl? r:;~~ e al %zH,r ~rl,Yx,, vp ;r,~ za= ~ ",I' ~p gp r 5\ ~ s~f3 e M fli£~~:~'•£_ ?~r4 r~i '<n5k?,~3x .',1 a'. 4 I L S Esb u~ t'_ ~~f r~£~,E.~'&s~ 3 ` =rr3r t Ye L 5 5 Fv ~ t3 ~ ~ a F 3~ ~ ra: s~` ~,f YI ° v ~~:e f E ,fG' aYZ\ h~ ° ~ k~~: ~ a P err= N,f`y ? p = ~ a~ s rs;f~' E zfi k ~ .~r~ ,f I ~t : xY i,' _ "fz S I£f ; ~Y „ ~i:~ t ,1' faM~r~~fk. ~ y ( ~~f1~ 1 GRAPHIC SCALE ao 0 ~s ,w so €2a (IN FEET 1 inch = 30 it. DATE; PROJECT; 04-203 _ _ _ n Ma CLIENT CODE: WC /~IT1/ n~ WII CnAI WII CnAI rnl IAIT1/ CADFILE: 04203CP1 vll I vl nlWVl~ n~L.,vn vvvnr FIELD BOOK: 03-05 SURVEYING, PC EXISTING CONDITIONS WILLOWBRO01 "p ENGINEERING SCALE: DRAWN BY: TSM,JM OOK AREA DRAINAGE r SURVEY BY: CP,TD NORTH CAROLINA ZONE: 2> V 1'=30' F 10u 1906 NASH STREET NORTH ME: (252) 399-0704 NAGEIMPROVEMENTS REVISIONS: PIN SHEET CP1 OF 2 , Fr,, r, WILSON, N.C. 27893-1726 FAX: (252) 399-0804 AND DEMOLITION PLAN DMINAGE EMAIL" infoObartletteng.com I i i I j t c g Office Use Only: . '04 20 d 5 Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 401 ISSUED 1. Check all of the approval(s) requested for this project: ,J ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification H. PP Name: Charles W. Pittman III gQUALITY Mailing Address: City of Wilson y,01 aAl&$TA P.O. Box 10 Wilson, NC 27894 Telephone Number: 252-399-2434 Fax Number: 252-399-2453 E-mail Address: jbattsa,wilsonnc.org 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jon Meade Company Affiliation: Bartlett Engineering and SlUXe3Ling, PC Mailing Address: 1906 Nash St. North Wilson, NC 27893 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 27 3; If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4 If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: 1_ rr," ..< Applicant Information ? I Owner/A licant Information DEC Telephone Number: 252-399-0704 Fax Number: 252-399-0804 E-mail Address: ion e,bartletteng.com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing : the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1 Name of project: Willowbrook Drainage Improvements T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 3711-25-8266,3711-25-8546 4. Location County: Wilson Nearest Town: Wilson Subdivision name (include phase/lot number): Willowbrook Subdivision Directions to site (include road numbers, landmarks, etc.): From Raleigh take 264 East to Wilson, turn right onto Forest Hills Rd, take a left onto Downing St, take 1 sr left onto Glendale Dr., take a left onto Willowbrook Lane. Site is located on property line of 2701 Willowbrook Ln. 5. Site coordinates, if available (UTM or Lat/Long): 35° 42' 42" N. 77° 56' 43" W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): Approximately 0.3 acres in easement area 7. Nearest body of water (stream/river/sound/ocean/lake): UT to Contentnea Crk 8. River Basin: Neuse River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: ?Anprox. 280 ft. of stream piped and covered to existing grade along _property line. House on west side with grassed yard and open field to partially wooded on east side. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: Project includes removal of -280 ft. of pined section (48" pipe) from streambed/channel and streambed/channel restored to within 15 ft. of its natural referenced stable condition. Typical construction equipment will be used including backhoes, dump trucks, track-hoes etc... 11. Explain the purpose of the proposed work: The purpose of the proposed work in the waters of the US is to restore - 280 ft. of streambed/channel to its natural referenced stable condition. This will alleviate some drainage and flooding issues in the area and provide some retention. Nr Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A i VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant. must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should, be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 _Burke with the City of Wilson met with Mr. Yates of the ACOE summer of 2004 to discuss the permitting requirements. 1. Provide a written description of the proposed impacts: Restore - 280 ft of streambed/channel to its natural referenced stable condition by converting a 280 ft piped section of the channel to an open channel. 2. Individually list wetland impacts below: Wetlandimpact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online' at hU://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on map) Type of Impact* Length of Impact linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leases ecify) Removal of piped section to restore -280 ft of 1 stream channel 280 UT to Contentnea Crk 4 ft perennial within 15 ft of its original location List'each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization. activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Strejam names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.lWozone.com, ww,w.m@Nuestcom, etc.). Cumulative impacts (linear distance in feet) to all streams on site: restore 280 ft. of stream Page 8 of 12 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact acres (if Name p Waterbody applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A List wh impact separately and identity temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5 Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction ;techniques to be followed during construction to reduce impacts. Standard soil and erosion control measures will be observed during the restoration process jVIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. i Page 9of12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at bgp://h2o. enr. state.nc.us/ncwetlands/atrmWde.html. 111. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at htW://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No IflI yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North 'Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes E] No ? X. Propbsed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No ® If you answered "yes", provide the following information: ;Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * Zone Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If puffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation ofProperty, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A F Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Restoring stream and floodway to protect surface waters upstream and downstream IMuervious area will not change XU. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) ?s this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). !N/A .pplicant/A*nt's Signature Date signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 CITY OF WILSON cJllonth CM061a INCORPORATED 1849 27894-0010 CITY ENGINEER i Authorization to Act as Agent for the City of Wilson f Project: Willowbrook Drive Area Storm Drainage Improvements Wilson County, NC At. December 17, 2004 I, Gary L. Mills, representing the City of Wilson authorize Bartlett Engineering and Surveying, PC to act as my authorized agent. I also give the US Army Corps of Engineers and Division of Water Quality permission to access the project site with either of my authorized agents. City of Wilson Cary L. Mills, PE Assistant Public Services Director / City Engineer P.O. BOX 10 ? WILSON, NORTH CAROLINA 27894-0010 ? TELEPHONE (252) 399-2465 OPERATIONS CENTER ? 1800 HERRING AVENUE ? FAX (252) 399-2453 EQUAL OPPORTUNITY 1 AFFIRMATIVE ACTION EMPLOYER i '1'opoZonet The Web's Topographic Map r Page 1 of 1 L I 7 J -4, r C 1 1 '- „ tM e ¦ r+ all 0 F ¦ ? r 9 Tiff Doi ¦ Air sit 1 ?w J 4 o y a +? 1 /iY . lo? ? yap ?yxy f .??? 1 ? .may e - ? .. ,r- ? ?: < Y I . ? ? r/ ? ?!? It ? ? ?r? ;, ? B } FRk i .} 11 •jj Wiggins At3dij *.. ? r 0 0.3 0.6 0.9 1.2 1.5 km 0 0.2 0.4 0.6 0.8 1 mi Map center is 350 42'42"N, 770 56'43"W (WGS84/NAD83) Wilson quadrangle M=-9.327 Projection is UTM Zone 18 NAD83 Datum G=-1.721 http://www.topozone.com/print.asp?z=18&n=3955961.99.902392&e=233534.999716699... 12/20/2004 y-'tau. ?' shpet 1) ?^ 1100 A Nu ( r I u a '' 1 1 / F N69 +! fJ .F3 t,3 cu No— b / , \.. f ???3 i . / \ l R 1-1 N-3 1 1'?/ ttE 111\\\ , 'G kk It P Cr Ra _ Pt R y. y r _ ?. NUB Nob I-o f ?ti`??. 1 rl AYA is ? 1? ?? ; ?. N? ? ?.,?,% j _ ?•? 1 qYB x Ra{ r VuB _. Rb NuB Ur G?0 r M ?` ...f 13 NuB r Ex GI GrA Re . i Rb 9b AYA -Ur Rb NuB Ur eb ?/ _T? `^Br!rs f NuB NuB ?L A A "r Ui ]IF ? Ra _ q ?? k; J. R b . 0 GIB?. Gi A ? ,?i y+ Ur -\ Gt61 / AYB Ra Rb . Nub Nu-1 V Ut42 v AYA f Ur f? T t NuB 4163 \ / ?J l \. i t / -? A,b t AaA Ra 5` ?l Rb .ca/, It AaA Rb AYB I Nub- Gu Gr U, N 111 E?3 " AR P;?as - ? ? ? ??? ? r R >A ,I NoF, Bb 4 ?\ ?`` r ?" ?) l GtB _ i AaA \` /J I U Y /f/ /? l?/ ? t?• W.h TerraServer Image Courtesy of the USGS Page 1 of 1 Send To Printer Back To TerraServer Change to 11x17 Print Size Show Grid Lines Change to Landscape Image courtesy of the U.S. Geological Survey Cc, 2004 Microsoft Corporation. Terms of Use Privacy Statement http://terraserver-usa.com/printimage.aspx?T=I&S=10&X=l 167&Y=19779&Z=18&P=... 12/17/2004 o' 'loom o' 1100yd a~0~ W/LLOWBROO )OK AREA STORM DRAINAGE lll for IMPROI/EMENTS CITY OF Wilson County, N ^,~b u ~ OF W/~eQ 'North Carolina 'soy ~o= c 9 i Qom s e GQ' NOq TH ~P / MAYOR C. BRUCE ROSE r ~ COUNCIL MEMBERS NOBLE G. 'BILL" BLACKMAN, N ~ zZ ~OMg~E S~ ~ GWEN C. BURTON ~ AVANT P. COLEMAN ~ DONALD I. EVANS M~Np,~R Sj ~ JAMES M. JOHNSON, III ~ ~ WILLIE J. 'BILL" PfTT w~~-~-°w~R~~ SITE ~a S~ jR ROBERT L. THAXTON 0 CITY MANAGER EDWARD A. WYATT S~ DEPUTY CITY MANAGERS CHARLES W. PffTMAN, III CITY CLERK REBECCA D. DAVIS CITY ENGINEER GARY L. MILLS, P.E. LOCATION MAP NO SCALE STORMWATER PROGRAM MANAGER DONNA HENDRIX ~PRT L eTT PREPARED BY: ~'a BARTLETT ENGINEERING & SURVEYING. PC ~ ~,s s+ m: 1906 NASH STREET NORTH ~ ~~;~'a~.••' ~nni cnni ninRru rAR(ll INA ~7Rg3-17~fi "F~' N ~ G ~R &S DECEMBER 10, 2004 w"J~~ ''.dW tvei