Loading...
HomeMy WebLinkAboutWQ0040927_Application (FTSE)_20190524State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION 60 `L4 (to be completed by DWR) Application Number: !A All items must be cow leted or the a �ylicliciiccation will be returned I. APPLICANT INFORMATION: I . Applicant's name: Town of Fuquay_Varina (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Jay T. Meyers. P.E. per 15A NCAC 02T .0106(b) NC Dept of Environmental Quality Title: Public Utilities Director 4. Applicant's mailing address: 401 Old Honevcutt Road MAY 2 4 2019 City: Fuquav-Varina State: NC Zip: 27526-� Regional Office Ra1e 5. Applicant's contact information: ><gh Phone number: 919 567-3911 Email Address: jmeyersQfuquay-varina.ors I1. PROJECT INFORMATION: 1. Project name: Fuquav-Varina Public Library 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00... 3. County where project is located: Wake County 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.585198' Longitude:-78.780398 5. Parcel ID (if applicable): 0666573847 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Steven J. Miller License Number: 022625 Firm: CLH Design, PA Mailing address: 400 Regency Forest Drive Suite 120 City: C_ as State: NC Zip: 27518- Phone number. (9-l9) 319-6716 Email Address: smilleraclhdesignpa.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: V,OaoQ 1. Facility Name: North Harnett Regional WWTP Permit Number: WWQ�006 Owner Name: Harnett County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0039452 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Numbers if applicable): WQCS00193 Owner Name(s): Town of Fuquay-Varina FORM: FTA 04-16 Page 1 of 5 V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ON. -'A 2. If the Applicant is a Developer of lots to be sold, has a Developer's 012crational Agreement FORM: DEV been attached? ❑ Yes ❑No ON -'A 3. If the Applicant is a Home. -Property Owners' Association has an Operational A greement FORM: HOA been attached? ❑ Yes []No ON. -A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation. -service ❑ Hotel and/or Motels ❑ School "preschool i day care ❑ Medical / dental! veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses., offices factories ❑ Nursing Home ® Other (Explain in Attachment) 5. Nature of wastewater: 0 % Domestic/Commercial 100 % Commercial 0 ° o Industrial See 15A NCAC 02T .0103 20 1Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(ff? ❑ Yes ;KNo D If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)} Community Center (Library) Office (Offices in Library) Daily Design Flow 0 5 gal/seat 25 gal/employee/shift gal/ gal/ gall gal/ No. of Units Flow 85 I2 425 GPD 300 GPD GPD GPD GPD 7'ota! GPD 725 GPD V/ a See 15A NCAC 02T .0114 b d e 1 and e 2 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. Wastewater generated by project: 725 GPD (per 15A NCAC 02T .0114) / ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: _ ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Paget of VI1. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers}; l . Summarize gravity sewer to be permitted: Size (inches) I Length (feet) I Material 1 8 I 311 I DIP D Section lI & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria D Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VI1 L PUMP STATION DESIGN CRITERIA (If Applicable) 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: __ . Longitude: -_._ 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational points) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(I ): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B), ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-I6 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (0213.0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC. 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305{t) contains minimum separations that shall be provided for sewer systems- ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer includirip, in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet To2 slope of embankment or cuts of 2 feet or more vertical height 10 feet -Drainage systems and interceptor drains 5 feet Any swimm ng pools Final earth grade vertical I0 feet 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications web a e ➢ If noncompliance with 02T.0305(o or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction D As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Perm ittin Branch 5. Does project comply with 15A NCAC 02T.0105 c 6 (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with ISA NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No IfNo, complete and submit the Variance. -'Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the re uest is re uired prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 1, _�-,-;!Jerj T P6 _ attest that this application for (Professional Engineer's name from Application Item I11.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seat signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes I43-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. �0,III it#, I North Carolina Professional Engineer's seal, signature, and date:.•�'ES'' •.�� ''. i = i iq � 5 Iolt Jom%rj 3. Applicant's Certification per 15A NCAC 02T .010`6(b1): Aol—attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes I43-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature Ww.17 May FORM: FTA 04-16 Page 5 of 5 Ad NCDEQ DWR — Fast -Track Sewer System Extension Application Attachment Additional Information Vt. 4. Other: Public Library Cover Letter Project: Fuquay-Varina Public Library Owner: Wake County Engineer: CLH design, p.a. Date: 05.E 15/2019 A new public library is proposed at 271 Bramblehill Drive, Fuquay-Varina, North Carolina. A gravity sewer extension will be required to serve the new facility. The public library building will be sized for 12 employees total (counting all shifts) and will have 85 seats for library users. The wastewater design flow rate was calculated as 5-gpd per employee per shift (office use) and 25-gpd per seat (comm nity center use). The a pected Avera Te Daily Flow for the facility is 725-gpd. The nearest public sewer, an 8-in gravity sewer main (WQ0039452), is owned and operated by the Town of Fuquay-Varina. This 8-in gravity sewer is currently under construction by the Adalyn Place Subdivision (Permit No. WQ0039452). This is the only sewer option for this site. The system eventually flows to Harnett County's North Harnett Regional WWTP (WQ00)4_). 00"? 1�3f An 8-in gravity sewer system is proposed to convey wastewater from the library to the existing public sewer. No wetlands are within 50-ft of the proposed sewer lines. No stream exists within 100-ft of the proposed sewer lines. • �OF WATFRp State of North Carolina `O G Department of Environment and Natural Resources r? Division of Water Quality p -c Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 06-13) Project Applicant Name: Town of Fu ua -Varina Project Name for which flow is being requested: Fu ua-Varina Library Afore than one FTS,E may be required for a single project if the owner of the 11'Y1"TP is not responsible far all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a o a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NCO021636 S All flows are in AIGD o N o c. WWTP facility's permitted flow 2.60 ., > v b d. Estimated obligated flow not yet tributary to the WWTP 0.539 w e. WWTP Facility's actual avg. flow 1.384 f. Total flow for this specific request 0.007 *, �.. g. Total actual and obligated flows to the facility 1.930 I� h. Percent of permitted flow used 74.2% Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)= (A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Finn! pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a pealing factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSF Oh- I I Certification Statement: I Jay T. Meyers, PE, Public Utilities certify to the best of my knowledge that the addition of Director the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Sig i `g Q ci atit Pate Page 2 of 6 1~TSE 06-13 State of North Carolina Department of Environmental Quality D:w Division of Water Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting AIlocation: Town of Fu ua -Varina Project Name for which flow is being requested: Town of Fu ua -Varina Library Mors than one FTSE mrry he i squired for a single project if the owner of th} IMITP is not responsible for all pump .stations along the route of the proposed wa.steivater• flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NCO021636 A11 flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 1.108 MGD FV Obligated Flow NYT 0.539 MGD Lillington Obligated Flow NYT 0.113 MGD HC Obligated Flow NYT 0.266 MGD Angier Obligated Flow NYT 0.190 MGD e. WWTP facility's actual avg. flow 5.471 MGD FV Actual Flow 1.470 MGD Lillington Actual Flow 0.923 MGD HC Actual Flow 2.387 MGD Angier Actual Flow 0.691 MGD f. Total flow for this specific request 0.007 MGD Lli� g. Total actual and obligated flows to the facility _ 6.586 MGD FV Actual Avg. + Obligated Flow 2.016 MGD Lillington Actual Avg. + Obligated Flow 1.036 MGD HC Actual Avg. + Obligated Flow 2.653 MGD Angier Actual + Obligated Flow 0.881 MGD h. Percent of permitted flow used NC Dept of Environmental Quality MAY 242019 Raleigh Regional Office 87.81 % Page 1 of FTCF (if,_ 1 11 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)-(A-D) Design Obligated. Pump Average Daily Approx. Not Yet Total Current Station Finn Flow" Current Avg, Tributary Flow Plus (Name or Capacity. * (Firm pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** SLS 120 14.4 5.76 2.869 0.944 3.813 1.947 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Pen -nit Number: NCO021636 111. Certification Statement, I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance ith local established policies and procedures using the best available data. This certification lies to those items listed above in Sections I and 11 plus all attached planning assessment ad dums for which I am the responsible party. Signature of this form indicates acceptance ofjhi vastewater flow. Signing t7ffi'cial Signature Date Page 2 of 4 F1SE 06-13 Fuquay-Varina Public Library Portion of USGS Quad Map Wake County North Fuquay-Varina, NC - 2016 Scale: 1' = 2,009 w 11 . Wa N• AIA AP AIL - 4 $k� ennet i Zr Proposed Gravity Sewer Proje Site J. Downstream ON Connection Point WQ0039452� Ok 41-4 iv. Pr 4Ail ` r' y t! _'_ ' • —,q}�sI 1 �'� ''s �! w •� : v. �• ..•sir JIL tA ir Ca rn Qk ''•yrl — f �� _ i '�y� dk \w �-r4�,f� � —~ l . �t� �' y1 : dw -;,�I'U •..� . i � err �� '�� "�:j• +'_,�,.� Sir ICU +� i d®r .'j!..y lee AAA ,1 �Y � 'r NC Dept of Environmental Quality CLH design, p.a. 400 Regency Forest Drive, Suite 120 Cary, North Carolina 27518 P: 919.319.6716 www.clhdesignpa.com Letter of Transmittal CLH Project Number: MAY 2 4 2019 Raleigh Regional Office May 22, 2019 To: Fast -Track Sewer Review Company: NCDEQ Division of Water Resources Address: 1628 Mail Service Center City/State/Zip: Raleigh, INC 27699-1628 Phone: 919-791-4200 Method: UPS Ground Subject: Fuquay-Varina Public Library Prints X Originals Specifications Applications X Reports X Copy of Letter Submittals Other: X (FeO Copies Date Description 2 05/17/19 Fast Track Application (FTA10-14) (1 Original & 1 Copy) 1 05/17/19 Flow Tracking/Acceptance Form (FTSE 06-13) -Town of Fuquay-Varina 1 05/21 /19 Flow Tracking/Acceptance Form (FTSE 04-16) - Harnett County 1 05/20/19 FTA Application Attachment / Cover Letter 1 05/17/19 USGS Quad Map 1 05/17/19 NRCS Soil Map 1 05/17/19 Aerial Map 1 05/20/19 1 Application Fee Additional Remarks: Please accept the attached documents for review and approval of the proposed sewer system to serve Fuquay-Varina Public Library in Fuquay-Varina, North Carolina. Please call or email Steve Miller (smiller clhdesignpa.com) with any questions or if you need additional information. Thanks. Signed: Cc: File CLH design, p.a. Robinson, Jason From: Allen, Trent Sent: Monday, June 10, 2019 1:10 PM To: Cashion, Ted Cc: Robinson, Jason Subject: RE: 725 gpd to N. Harnett WWTP No problems. Trent From: Cashion, Ted Sent: Thursday, June 6, 2019 2:04 PM To: Allen, Trent <trent.allen@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: 725 gpd to N. Harnett WWTP Hi Trent, We have a fast track sewer application from Fuquay to discharge 725 gpd from a library to North Harnett WWTP. Just making sure you're ok with us issuing the permit. Thx ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.gov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 ID Departmanl of EnvironmentAl Quality Subscribe to Collection System & Sewer Permitting Updates