HomeMy WebLinkAboutNC0057703_Inspection_20190404 (2) k. 1
ROY COOPED „
c:awc�rrar
IHAEL S.R.EGANu
Secretary `'
LINDA CULPEPPER NORTH CARODNA
C,'r{(tOr Environmental Quaff ty
June 10, 2019
Joel A Mingus
Aqua North Carolina Inc
251 Merchants Cir Building 24-1
Hampstead, NC 28443
SUBJECT: Compliance Inspection Report
The Cape WWTP
NPDES WW Permit No. NCO057703
New Hanover County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of The Cape WWTP on 4/04/2019.
This inspection was conducted to verify that the facility is operating in compliance with the conditions and
limitations specified in NPDES WW Permit No. NC0057703. The findings and comments noted during this
inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report".
The facility was found compliant. However, there are two issues listed in the CIR that require your attention:
1) Preparation and submittal to this office of a narrative/schedule with the plans for the installation and
operation of the plant expansion (second phase for flow > 260,000 gpd) by 07/30/2019.
2) Plans for the implementation of repairs in areas of the plant that are showing an advanced stage of
corrosion.
If you should have any questions, please do not hesitate to contact Morella Sanchez-King with the Water
Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
morella.sanchez-king@ncdenr.gov.
Sincerely, DocuSignedby:
E
l.bV't�,�,a.
E3ABA14AC7DC434—
Morella Sanchez-King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: Laserfiche
North Caro:-ms Depart mervt of Environmental Qaaiity I Di%isiom of Water Resources
Wlrnington RegcneI OfFca 1 127 ,ar6insl Drive Extension I Wilm,ngton, North Caro-ms 28405
�""W"t 1310-756-7215
DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA
United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 15 I 3 I NC0057703 I11 121 19/04/04 I17 18 [d 19 1 S I 201 ]
211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA --------------------Reserved------------------
67 70 71 I J 72 LnJ I 73L J I74 751 1 1 1 1 80
Section B: Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01:30PM 19/04/04 17/07/01
The Cape WWTP
900 Cape Blvd Exit Time/Date Permit Expiration Date
Wilmington NC 28412 02:45PM 19/04/04 21/12/31
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
1H
Eric Nathan James Youngs/ORC/910-443-3889/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Joel A Mingus,251 Merchants Cir Building 24-1 Hampstead NC 28443/Coastal Area
Manager/910-270-1412/ No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
Permit 0 Flow Measurement Operations&Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Compliance Schedules
Effluent/Receiving Waters Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Morella Sanchez-King DocuSignedby: j WIROWQH910-796-7218/ 6/11/2019
E3ABA14AC7DC434...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
F DocuSigned by:
James Gregsonr-1o&, '[1� �. o RG WG/// 6/11/2019
7F141E73B6F3456...
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NCO057703 I11 121 19/04/04 117 18 I c I
Section D:Summary of Finding/Comments(Attach additional ls Iheets of narrative and checklists as necessary)
Morella Sanchez King inspected the facility on April 04, 2019. The writer appreciates the support
offered by AQUA staff during the inspection and for providing information as soon as it is requested.
• Operation and Maintenance: The facility appeared well operated and maintained. However, there
are areas that require corrosion repairs due to the age of the plant. Electrical panels have been
replaced due to hurricane Florence damages.
• Solid Handling: Lewis Farms handles the solids in the facility.
• Record Review: ORC log book, DMRs, and sampling/chain of custody records were organized
and complete on inspection day.
• Parameter Exceedances: The facility has a history of enterococci violations and related civil penalty
assessments. DMR records show that the last NOV for enterococci violations was issued in April
2018 since then the facility has been in compliance with this parameter. The facility was issued NOV
for TSS violations in December 2018.
• Future wastewater treatment capacity (80-90 rule): The facility is reaching 85% of the as-built flow
of 260,000 gpd. Please provide an engineering narrative and schedule for installation and operation of
the plant's next phase.
• Effluent Appearance: On inspection day, the effluent was clear and odorless.
Remaining comments are located in the questions section of this report.
Page# 2
DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA
Permit: NCO057703 Owner-Facility: The Cape WWTP
Inspection Date: 04/04/2019 Inspection Type: Compliance Evaluation
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures? M ❑ ❑ ❑
Is the wet well free of excessive grease? 0 ❑ ❑ ❑
Are all pumps present? 0 ❑ ❑ ❑
Are all pumps operable? ❑ ❑ ❑
Are float controls operable? ❑ ❑ ❑
Is SCADA telemetry available and operational? ❑ ❑ ❑
Is audible and visual alarm available and operational? 0 ❑ ❑ ❑
Comment: Influent pump station #1. This is new pump station which started operation before hurricane
Florence. Visual and audible alarms were tested. ORC received phone call after the alarm
activated.
Sedgley Abbey PS. Visual and audible alarms worked well when tested.
Plant lift station#21- high water alarm was tested and worked at second attempt.
Compliance Schedules Yes No NA NE
Is there a compliance schedule for this facility? 0 ❑ ❑ ❑
Is the facility compliant with the permit and conditions for the review period? 0 ❑ ❑ ❑
Comment: There is a Compliance Schedule for the facility. Section AA) requires de submittal of an
Alternative Analysis prior to expansion stapes. The facility is reaching 85%of the as-built
flow of 260,000 Qpd. Therefore, an engineering narrative/schedule for the operation of the
plant's next phase is required.
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑
application?
Is the facility as described in the permit? 0 ❑ ❑ ❑
#Are there any special conditions for the permit? 0 ❑ ❑ ❑
Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑
Comment: The permit was issued July 1, 2017. Expiration date: December 31, 2021.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 3
DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA
Permit: NCO057703 Owner-Facility: The Cape WWTP
Inspection Date: 04/04/2019 Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Comment: Operator uses far test and sludge fudge as process controls. There are areas of the plant
showing advanced stapes of corrosion and need repairs. Flow meter calibration was
performed by Horizon Engineering and Consulting (03/21/2019).
Disinfection-Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant? ❑ ❑ ❑
(Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑
Is bulk storage tank containment area adequate?(free of leaks/open drains) ❑ ❑ ❑
Is the level of chlorine residual acceptable? ❑ ❑ ❑
Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑
Is there chlorine residual prior to de-chlorination? ❑ ❑ ❑
Comment: The facility has a history of recurrent enteroccoci violations and civil penalty assessments.
It seems that with the operation of the new equalization basin, and grit removal system, solid
handling conditions have improved since the las NOV for enterococci violations was issued
in April 2018.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ 0 ❑ ❑
Is sample collected below all treatment units? ❑ ❑ ❑
Is proper volume collected? 0 ❑ ❑ ❑
Is the tubing clean? 0 ❑ ❑ ❑
#Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑
Celsius)?
Is the facility sampling performed as required by the permit(frequency, sampling type 0 ❑ ❑ ❑
representative)?
Comment: Sampling is currently time-based but the equipment for flow-proportional sampling has been
ordered. On inspection day, Temperature was 1.6°C in the sample storage unit.
Pump Station - Effluent Yes No NA NE
Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑
Are all pumps present? 0 ❑ ❑ ❑
Are all pumps operable? 0 ❑ ❑ ❑
Are float controls operable? ❑ ❑ ❑
Is SCADA telemetry available and operational? ❑ ❑ ❑
Is audible and visual alarm available and operational? 0 ❑ ❑ ❑
Comment:
Page# 4