Loading...
HomeMy WebLinkAboutNC0057703_Inspection_20190404 (2) k. 1 ROY COOPED „ c:awc�rrar IHAEL S.R.EGANu Secretary `' LINDA CULPEPPER NORTH CARODNA C,'r{(tOr Environmental Quaff ty June 10, 2019 Joel A Mingus Aqua North Carolina Inc 251 Merchants Cir Building 24-1 Hampstead, NC 28443 SUBJECT: Compliance Inspection Report The Cape WWTP NPDES WW Permit No. NCO057703 New Hanover County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of The Cape WWTP on 4/04/2019. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0057703. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". The facility was found compliant. However, there are two issues listed in the CIR that require your attention: 1) Preparation and submittal to this office of a narrative/schedule with the plans for the installation and operation of the plant expansion (second phase for flow > 260,000 gpd) by 07/30/2019. 2) Plans for the implementation of repairs in areas of the plant that are showing an advanced stage of corrosion. If you should have any questions, please do not hesitate to contact Morella Sanchez-King with the Water Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at morella.sanchez-king@ncdenr.gov. Sincerely, DocuSignedby: E l.bV't�,�,a. E3ABA14AC7DC434— Morella Sanchez-King, Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Cc: Laserfiche North Caro:-ms Depart mervt of Environmental Qaaiity I Di%isiom of Water Resources Wlrnington RegcneI OfFca 1 127 ,ar6insl Drive Extension I Wilm,ngton, North Caro-ms 28405 �""W"t 1310-756-7215 DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA United States Environmental Protection Agency Form Approved. EPA Washington,D.C.20460 OMB No.2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A:National Data System Coding(i.e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NC0057703 I11 121 19/04/04 I17 18 [d 19 1 S I 201 ] 211111 1 1 1 1 1 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 1 1 1 1 1 166 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA --------------------Reserved------------------ 67 70 71 I J 72 LnJ I 73L J I74 751 1 1 1 1 80 Section B: Facility Data Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 01:30PM 19/04/04 17/07/01 The Cape WWTP 900 Cape Blvd Exit Time/Date Permit Expiration Date Wilmington NC 28412 02:45PM 19/04/04 21/12/31 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data 1H Eric Nathan James Youngs/ORC/910-443-3889/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Joel A Mingus,251 Merchants Cir Building 24-1 Hampstead NC 28443/Coastal Area Manager/910-270-1412/ No Section C:Areas Evaluated During Inspection(Check only those areas evaluated) Permit 0 Flow Measurement Operations&Maintenance Records/Reports Self-Monitoring Program Sludge Handling Disposal Facility Site Review Compliance Schedules Effluent/Receiving Waters Laboratory Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Morella Sanchez-King DocuSignedby: j WIROWQH910-796-7218/ 6/11/2019 E3ABA14AC7DC434... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date F DocuSigned by: James Gregsonr-1o&, '[1� �. o RG WG/// 6/11/2019 7F141E73B6F3456... EPA Form 3560-3(Rev 9-94)Previous editions are obsolete. Page# 1 DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA NPDES yr/mo/day Inspection Type (Cont.) 1 31 NCO057703 I11 121 19/04/04 117 18 I c I Section D:Summary of Finding/Comments(Attach additional ls Iheets of narrative and checklists as necessary) Morella Sanchez King inspected the facility on April 04, 2019. The writer appreciates the support offered by AQUA staff during the inspection and for providing information as soon as it is requested. • Operation and Maintenance: The facility appeared well operated and maintained. However, there are areas that require corrosion repairs due to the age of the plant. Electrical panels have been replaced due to hurricane Florence damages. • Solid Handling: Lewis Farms handles the solids in the facility. • Record Review: ORC log book, DMRs, and sampling/chain of custody records were organized and complete on inspection day. • Parameter Exceedances: The facility has a history of enterococci violations and related civil penalty assessments. DMR records show that the last NOV for enterococci violations was issued in April 2018 since then the facility has been in compliance with this parameter. The facility was issued NOV for TSS violations in December 2018. • Future wastewater treatment capacity (80-90 rule): The facility is reaching 85% of the as-built flow of 260,000 gpd. Please provide an engineering narrative and schedule for installation and operation of the plant's next phase. • Effluent Appearance: On inspection day, the effluent was clear and odorless. Remaining comments are located in the questions section of this report. Page# 2 DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA Permit: NCO057703 Owner-Facility: The Cape WWTP Inspection Date: 04/04/2019 Inspection Type: Compliance Evaluation Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? M ❑ ❑ ❑ Is the wet well free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? ❑ ❑ ❑ Are float controls operable? ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: Influent pump station #1. This is new pump station which started operation before hurricane Florence. Visual and audible alarms were tested. ORC received phone call after the alarm activated. Sedgley Abbey PS. Visual and audible alarms worked well when tested. Plant lift station#21- high water alarm was tested and worked at second attempt. Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? 0 ❑ ❑ ❑ Is the facility compliant with the permit and conditions for the review period? 0 ❑ ❑ ❑ Comment: There is a Compliance Schedule for the facility. Section AA) requires de submittal of an Alternative Analysis prior to expansion stapes. The facility is reaching 85%of the as-built flow of 260,000 Qpd. Therefore, an engineering narrative/schedule for the operation of the plant's next phase is required. Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ #Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The permit was issued July 1, 2017. Expiration date: December 31, 2021. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Page# 3 DocuSign Envelope ID: B345940A-5D80-424F-AC38-183054C20DAA Permit: NCO057703 Owner-Facility: The Cape WWTP Inspection Date: 04/04/2019 Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Comment: Operator uses far test and sludge fudge as process controls. There are areas of the plant showing advanced stapes of corrosion and need repairs. Flow meter calibration was performed by Horizon Engineering and Consulting (03/21/2019). Disinfection-Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑ Is bulk storage tank containment area adequate?(free of leaks/open drains) ❑ ❑ ❑ Is the level of chlorine residual acceptable? ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de-chlorination? ❑ ❑ ❑ Comment: The facility has a history of recurrent enteroccoci violations and civil penalty assessments. It seems that with the operation of the new equalization basin, and grit removal system, solid handling conditions have improved since the las NOV for enterococci violations was issued in April 2018. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? ❑ 0 ❑ ❑ Is sample collected below all treatment units? ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ #Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit(frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: Sampling is currently time-based but the equipment for flow-proportional sampling has been ordered. On inspection day, Temperature was 1.6°C in the sample storage unit. Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? ❑ ❑ ❑ Is SCADA telemetry available and operational? ❑ ❑ ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: Page# 4