Loading...
HomeMy WebLinkAbout20041995 Ver 1_Complete File_2004121511 DEPARTMENT OF THE AIR FORCE HEADQUARTERS 43D AIRLIFT WING (AMC) POPE AIR FORCE BASE NORTH CAROLINA MEMORANDUM FOR NCDENR DIVISION OF WATER QUALITY ATTN: 401/WETLANDS UNIT l 0 AUG 2CO5 L [,l AUG 1 6 ?005 QUALITY FROM: 43 CES/CC I'' SAN STORMW RANCH 560 Interceptor Road Pope AFB, NC 28308-2314 SUBJECT: Submittal of Revised Package, Application for a 401 Water Quality Certification; . Repair Manchester Road (BT-8) Spill Gates, Pope AFB, NC; Project No. 04-1995 1. Request that the attached copies of the revised 401 Water Quality Certification package be provided to the appropriate personnel in your organization for their files. This replaces the original package submitted on 18 Apr 05. The 401 Water Quality Certification was issued on 28 Apr 05, based on the impacts identified in our original package. The specific changes in this revised package are as follows: a. Section 11. 1, Page 5 of 14, and Section XIV, Page 14 of 14, changes the applicant and signer to Lt Col Frank Freeman III. I recently replaced Lt Col Michael R. Hass as Base Civil Engineer for Pope AFB. b. Section III. 10, Page 7 of 14, second paragraph, only 300 linear feet of Tank Creek are to be diverted, instead of the 1,050 linear feet originally indicated. c. Section VI. 2, Page 9 of 14, the total acreage (estimated) of all existing wetlands is 0.3719 acres in the vicinity of the project (this item had been erroneously answered as "N/A" on the original application). Also, the total area of wetland permanently impacted is now 0.092 acres, in comparison to the 0.096 acres originally indicated. d. Section VI. 3, Page 9 of 14, the length of impact is 89.6 linear feet as compared to the 105 linear feet indicated in the original package. The corrected average width of stream before impact is 34 feet, as compared to the 10 feet originally indicated. And finally, the cumulative impact (linear distance) to all streams on site is 89.6 feet, as compared to the 105 feet in the original application. e. Attachment 3 to the application package includes revised drawings 4 and 14 of the original design package and an improved version of the diversion channel plan. 2. Based on a telephone conversation with Mr. Ken Averitte from your Fayetteville Regional Office on 3 May 05, the data provided in this revised package represents a lesser level of environmental impact than authorized in the 401 Water Quality Certification issued on 28 Apr 05. Therefore, the already issued 401 Water Quality Certification is still valid for this project. AAiC-Global React for America 3. Under separate correspondence, we have also provided the corrected information to the US Army Corps of Engineers, Wilmington District Office, so they may issue the required Nationwide Permit No. 18 (for work in wetlands) and Nationwide Permit No. 33 (for the use of a diversion channel). 4. If you have any questions, please contact Mr. Alberto R. Marquez, Water Quality Program Manager, at (910) 394-1637. Y FRANK FREEMAN III, Lt Col, USAF Commander Attachment: 7 Sets, Revised 401 Water Quality Certification and Nationwide Permits No. 18 and 33 Application Package LE. El L°J Office Use Only: Fonn Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not AppncaDle° or °NtA .) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 18 and Nationwide 33 Permits 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page Area of 4), and the project is within a North Carolina Division of Co e t ?Wf? Environmental Concern (see the top of page 2 for further details), Vchuig'M n A UG j 6 M5 ?U II. Applicant Information DENR - WATErt QUALITY lYETLAtJDS AtJD STORMWATER BRANCH 1. Owner/Applicant Information Name: Pope Air Force Base Attn: Lt Col Frank Freeman III Mailing Address: 43d Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB NC 28208 Telephone Number: 910-394-2561 Fax Number: 910-394-1643 E-mail Address: frank.freeman@pope.af mil 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: E Page 5 of 14 Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than I I by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Repair Manchester Road (BT-8) Spill Gates, Pope AFB 2. T.T.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cumberland Nearest Town: Spring Lake Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From the intersection of SR 87 and Manchester Road in Spring Lake, take West Manchester Road to Pope AFB; the site is after the Seaboard Coast Rail Line on the left, traveling west. 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 2,130 acres (includes the entire Pope AFB) 7. Nearest body of water (stream/river/sound/ocean/lake): Tank Creek 8. River Basin: Cape Fear Page 6 of 14 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site already contains a spill gates structure, surrounded by wooded areas on three sides, parallel to Manchester Road, located within a wetland which is part of a Military Installation. The Fort Brag, Wastewater Treatment Plant is located diagonally across the road from the existing structure. This site is located at the northern boundary of the Base, where Tank Creek flows under Manchester Road. 10. Describe the overall project in detail, including the type of equipment to be used: Overall project plans include repair by replacement of the existing gates structure by building a larger, independent structure approximately 50-feet upstream of the existing one, outside of the NCDOT's right-of-way, then demolishing the existing structure. The channel portion immediately downstream of the new gates structure will be re-graded and riprap placed. Correspondingly, the upstream area adjacent to the new structure will also be re-graded to facilitate flow into the structure. Five, six-foot high by seven-foot wide slide gates, with motor operators that will be controlled both locally and remotely, will regulate flow. The base perimeter fence will be extended upstream to the structure and across it. A 12-foot wide gavel service road will be constructed from Manchester Road to the new structure. Equipment used on the project will include, but not limited to: a small backhoe, dump truck, earth compactor, dewatering pumps, air compressors, excavators for sheet piling and cranes. Additionally, the project will include the diversion of Tank Creek during construction. It is anticipated that approximately 0.0037 acres of wetlands will be temporarily impacted by the diversion of approximately 300 linear feet of Tank Creek around the construction site. TolTest will divert Tank Creek by placing Porta-Dams across it (see attached drawing for locations and details) and routing it through a PVC lined channel. The diversion channel will be approximately 180' long, with a trapezoidal cross-section 20' wide on its top dimension. All bank walls will be slopped back at 1 to 1 or 1 '/2 to 1 depending on soil types. This diversion channel will require the temporary excavation of approximately 1,200 cu/ dY s of soil, which will be stored on-site, out of potential flood areas, and covered at all times. Additionally, the perimeter of the stockpile will be closed-in with silt fencing (see attached drawing for soils stockpiling, and silt fence locations). The anticipated timeline or sequence of events associated with the diversion of Tank Creek is as follows (note all days listed are working days): Excavate diversion channel 10 days Install PVC liner 4 days ¦ Tank Creek diversion 30 days ¦ Backfill/restore diversion channel 7 days At the conclusion of the diversion. TolTest will restore the areas temporarily affected by the diversion channel back to like conditions. Once the new gates are operating, the old gates will be demolished. The areas of the bank presently protected by the existing wing walls will be stabilized with gabions. The procedure to restore the entry and exit ways of the diversion channel will be: Porta-Dams will be relocated to seal the entry and exit ways of the diversion Page 7 of 14 channel so that Tank Creek may return to its orieinal course. At that noint. TolTest will begin to restore the breakthrough walls at each end of the diversion channel; followed by backfilling and compacting the diversion channel. removing the relocated Porta Dams; and stabilizing the restored banks with coco matting or root wad, with an underlying wetland seed mix. 11. Explain the purpose of the proposed work: To provide a suitable spill antes structure to pass the normal flow of Tank Creek and be able to contain multiple hazardous material releases within the boundaries of the base. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Pope AFB provided limits of the Wetland Delineation. ?1-1 V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream C7 Page 8 of 14 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed project will impact a total of 0.0920 acres of wetlands adjacent to Tank Creek and 89.6 linear feet of Tank Creek. The diversion channel will teml2orarily impact approximately 0.0037 acres. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** (es/no) Distance to Nearest Stream linear feet) Type of Wetland*** Structure/ rip rap 0.0920 No 0 Riparian * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://kvww.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0.3719 Total area of wetland impact proposed: 0.0920-acre lermanent impact 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Tank Creek Structure/rip rap 39.6 Tank Creek 34' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated riprap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and alter, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uses.!Zov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.maoguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 89.6 ft C Page 9 of 14 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation: N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Between the nreliminarv and final desiuns, the amount of rinran to be Placed within the stream and the amount of grading of the upstream and downstream channel were minimized to avoid greater permanent impacts to the stream and adjacent wetlands. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H.0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 10 of 14 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.ne.us/ncwetlands/strmgide.htm1. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Page 11 of 14 Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone' Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total E Page 12 of 14 Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an 41 additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No net change to the impervious area will occur as a result of this project. Storm water controls will include silt fences ripmp and permanent grassing on all exposed soil. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No -- Page 13 of 14 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A vz?,Z /0 A),-7 0S Applicant's Signature Date FRANK FREEMAN III, Lt Col, USAF Commander, 43d Civil Engineering Squadron (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 14 of 14 ul u L-11 \ ? ? \\ ; ? I+Jj_G1t \? t \•` \,, ._' y 7 ) I53' 1 ?' `? I ' ?•; "',?` ?• .? . ,- -- I. ,rj C Ji 1 ? 10 ps: .27 •-.r SITE LOCATION 1500 Radius = ( i Iv- i'ot AIB,-V6lzc b, a.9??? k. , ?? 1 1?1?? ll I ?4r l \ f 1 b \ if `?I`` ?Y ( 'p tit)I?J -t* N FIGURE 1. LOCATION MAP VC • • POPE AIR FORCE BASE BT-8 SPILL GATE STRUCTURE SCALE IN FEET QCADRAN611. LOCATION FAYETTEVILLE, NORTH CAROLINA 0 2000 Prepored for. SOURCE: USGS 7.5' TOPOGRAPHIC QUADRANGLE 1', dM I- OVERHILLS, NC - DATED 1957, REVISED 1971 DRAWN BY: EHi PM „or.,, unnn rrya USGS 7.5' TOPOGRAPHIC QUADRANGLE DATE: 06/08/04 F q. MANCHESTER, NC - DATED 1957, REVISED 1987 PROJECT NO. 1 A-rcoz s • • Y? g? Ala / \ 1 ` \ 1 /' \ 1 _ / I)4 MiuTN Vnn[ SE hGTC . 1)4 I,y 1`1 1 1 / 1]I ___ -T 2 172 ExISTING PIPE ?\ 1 ` 1 / .' I _ ARCH CULYER7 \ 1 1 / 1 ^ 168 - 168 4 I \ 1 69'Ofi O)•E 1 \ ? /? SEE DETAIL 2 166 164 '• .??. 16fi '< I61 Zi i 688]'(CGNTROL TINE) 1 162 162w \ \ 1 1 EDGE OF EXISTING ASPHALT \1 PIPE w' T AT 171.0 VV`hv I. ?PRAP A SECTION S o 10 20 °• JO I .• ? 5.}? ? Ex15TwG GROUND SCxE w FEET / / /-• • ` 1 N'IOTH VARIES (SEE NOTES 6 AND 7) I)6 p /• t 171 I7a C' _ 10 "177 _ ' '? I 1 ?? S+T 4H IV 4168 ?.' 7 OZ 168 POPE AFB 166 166 %ha PROPERLY E ba i l6a N. 523 28700 PIPE I RT TOP OF RIPRAP EXISTING ELECTRICAL AT EL. 167.0 6 RT E. 1.998. OJ PULL Box L. 169.0 El. 1]? /-' NEN ICIE Wi ? EL Ili TJ 173 D 2 \ 8'r GALVAN12ED 'CMP CULVERT ; 62 16] u CTI N B 64 o =07,0 JO SCALE IN FEET CU O' - TOP EL 'OF PIPR /'?? •\ ,? '--'= _ -' AP I • o RPRAP PERIMETER FENCE (SEE SHEET 12) 11 It - / PIPE INVERT - ' - AT EL. 171.0 -? _ ? - 0.5 CRUSHED AGGREWTE BASE COURSE 4ANTAN 3.0' EL. 174.0 At SECTION I SHOULDER SFE Ersf 2 ,_ • 1 120 ? 2.. 1 PERIMETER iENCC ? _ ? ? (= _?_--?? '(Si"E"SHEEi-a2 v_ \ ? JNT NA M - _ _ " Ow L E ACCESS ROAD ?,o ?r - E.1 S 9 oa H7 5? [ = _ - - ; - _ /N. 5 3` ?ST UCTUi I N 2].2]921 371 C TROI P T I 98071.20 J.9 N. 23,2 J 6 . 1 0 \3~ `' f! fi B 5 Ll E. 958, J I F TE S UCT E BT B SPILL WLE Si TORE o (SEE 1 SH IS 5 ANO 7) \ ' / 1H:1'J? .'/?/ % /? ,? - IH IV 1- E%6TING GROUND] C 1 3' CRUSHED AGGREWI' CTI211.11 SUB-BASE COURSE NOT TO ? EL. 16].0 RIPRAP _ - I a` N. 52 ,213.}4 I E. 1, 8.086 26 EL 1 \ RIPRAP BEDDING TYPICAL RIPRAP SECTION ? 1 t 4 GRAD STN AN EE T 6 NOT TO SCALE °• N. 573.210.69 - - E. 1,998.107.11 % CH L? NOT EL. 1740 (? \ 1. STOCNPILE EXCAVATED MATERIAL FOR USE AS STRUCTURAL F, LL AT A LOCATION DETERMINED BY THE COR. N. 198 '5 E. 1,998;T64. 2. SEE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING 'CUP* PIPE CULVERT INSTALLATION AND ACCESS ROAD CONSTRUCTION. PIPES TO BE PLACED IN EXISTING DRANAGE CHANNELS. 3. COMPI ACCESS ROAD BASE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. W W GRADI?) PLAN IA +N C EE ' 4. BASE IRIGTH OF DOWNSTREAM CHANNEL VARIES FROM 46' AT THE SPILL CATE STRUCTURE TO 26' AT THE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE. E%-ATE S;DE SLOPES AT 2H:IV. 0 20 J ? S. RIPRAP To BE PLACED FOR I8.0' IN THE AREA DOWNSTREAM OF THE NEA' SPILL GATE STRUCTURE. F 6. ExWVAGON OF THE UPSTREAM CHANNEL SHALL NOT BE MORE THAN 21 FEET UPSTREAM OF THE SCALE STRUCTURE. Fit L DESIGN w rEmunwc u.F[ ?TTUro .o.cTS wt r& rtv :ho/os /7N4 ? ?1°O icM. °"? rLS MANCHESTER ROAD (di-8) SPILL GATES REPETMMLL CH N Q a POPE AIR FORCE BASE 's O9'? R °LSCn SV ci; ro FAYETTEVILLE NORTH CAROLINA 9 1 , PLAN PLANNED MODIFICATIONS ?} 1?? "oi °'p K s.aTT 4 a I7 pl7-i1•-479) ' e/7/o• -1Ci- ??j•/ / EXISTING I FkCIR?CA (SEELNOTEL3) c ELECT DUCT SANK 1, ?7 a ° DUCT BANK FOR POWER FEEDER (PC-1) 7 8 d's i S'a ! wuTl 10'. COPPER \ GROUND RODS (3 EA) ) 1 I ??a ! 1 e ° O ANTENNA TOWER 10'. 3' COPPER----_ 1ND RODS (3 EA. SEE DETA:L /JA SEE DETAIL I B POPE AIR FORCE BASE FA)(ETTEVILLE. NORTH CAROLINA 1 DUCT BANK \ LINE FOR CAMERA/FLOOD LIGHT (PC-10) 11 1 1 1 I CAMERA/FLOOD LIGHT LOCATION I SEE DETAIL SHEET 17 9.00 -y 2 BwN.ars -b., TX )!t]] !1]-ll.-.lvl 0 10 20 25 I SCALE IN FEET 10', 3' COPPER GROUND RODS (3 EA.) NOTES: 1) REUSE EXISTING UTILITY POLE WITH 45 INA TRANSFORMER BANK (3-15 kVA, 10), LOCATED NEAR POLE #2A-16-12. 2) PROVIDE NEW CIRCUIT (PC-1) FROM TRANSFORMER SECONDARY TO NEW MAIN SAFETY S'W'ITCH (55-1). SEE EQUIPMENT RISER. CONDUIT, AND CABLE SCHEDULE ON SHEET 15. MINIMUM BURIED DEPTH OF PC-i AND PC-10 SHALL BE 2'-0'. 3 HORIZONTAL DISTANCE FROM EXISTING POLE MOUNTED TRANSFORMERS TO EXISTING ELECTRICAL PULL BOX IS APPROXIMATELY 400 FT. USE EXISTING CONDUIT FOR PC-1 FROM SECONDARY TO EXISTING ELECTRICAL PULL BOX. 4) MOUNT ALL ELECTRICAL EQUIPMENT ABOVE EL. 180 FT. FINAL DESIGN 4°°'° !n REPAR MANCHESTER ROAD (ST-8) SPILL GATES Q of F"ET LLE. RC ELECTRICAL PLAN 14 TMROt N SGILL o.rv .,.. ,,,. !n[R 14 a< I7 Ash / /- FNTRY A, EXIT QIACR.41 QI"ERSION CH<1lNfL SECTION 0' 00' EXISTING GROUND 10o' /- HORIZONTAL CONTROL .. IRON STAKE 174 l7a C C 5]3.{61 573 177 1]2?- R /- E: 1,99B.3p5.169 t7 0 -4 11 / / 16B -. 166 a ti / 1 ti 2 N /- E 63 6 W 1 ur.E11 w?? 1 j./ NC6 SECTION A-A \Ah\ .? o _ I RWRAP / / 5P Il 30 0 110) W ° INV OUT. EL. 164.80,. j' p0''0 P WWC /t SCALE IN FEET FORT 6RAGG MILITARY R RVATION P StE WASTE WATER TREAIUEN PLANT hN WV OUT. EL. 16497 DIVERSION CH AA'N°L WITH LIN'?R SECTION GUARL /-- /,/ \\ CORK 7 AR[ 11' wEDGE X SL PIPE 6' TALL \ \ \ t' THIEK \ \ CONCRETE \ ^ ^ { ?? 7 0' 100' CO. EXI$T9+G LROUNO 172 . _, 1]2- 1]0 -? 170 z 168 -- 168E CONTROL LW -/-/-- \ \\ WALL /t \ 1 GNtt ? ^ \ / \ ? \ u 167 162 PK RE WV EL. 165.15 ?T E S \\\\ \ ? ?' FUEL LINER LOCK TRENCH NC IUA 99 CUT W TOP OF CONCRE INV W 16508 EL , \ ?v L' - SECTION B-B : . CULVERT HEAD" \ {-_ I A !_ TIO Of SOIL BORING GT-01 Lp ELEVATION: 1 N. 523.] 094 57 ONCR" ' C RE OVEO) 0 10 20 30 SCALE IN FEET _ . E. . r?? CONCAEiE WNG WA . CUNTRGL TO BE REPLAC TS B S - GUARDRAIL S L GATE STRUCTURE 63p1 /- 711 GA.Ip1 K / A /-' AFT uaunaN PORTAQAI':STRUCTURE SECTION -P /- PPROXIMATE LOCATI EDGE O OF FIBER OPTIC LINE ASPHALT • ^ APRON TEMP RE ARY DIVERSION CAM SaLL GATE IOCAnCN STEEL SUPPORT FABRIC MEUBRAIVE ISEPEERVX US?FXSNIC FMUE ^ / ^ ? 174 --v_..--.... 114 172 172 C ^? ri? r ^ 170 170 z Tae - Im 130 / 164 h t `) a... of 62 u PpVj -?+ / 6 • / 1 /\ J 161 lOADWG (STONE) ti r / SEE MUTE 5 9 SECTION C-C 0 I ?.- ?POPPROX. AA I? E "A FORCE 11 C 4 SChLE IN FEET BOUNDARY LINE W 18 DIYEXS CHANNEL N CHANNEL NOTES q t FrFrln 1. SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON -RY 20, 2003 BY THE ROSE CROUP, -,y - -? _ a +- W - - LIMITS OF WET 1 04 91 NC. TELEPHONE CJLLESPE NOS 91 -323-3400, S., FAYETTEVILLE. 0 X LLi FENCE Z. BORING "OLE WFORMAIION PROVICED BY GAVID WARREN, URS CORP.. MORRISVILLE, NO. yy A PROXIMATE III 3. AL COORDINATES AND ELEVATIONS ARE W UNITED STATES ES SURVEY EY FEET. . MO HOW ZONTAL COORDINATES ARE BASED ON THE NORTH __ W; : T NY K CREEK T ABOVE MEAN SEA LEVEL (.SL) ELEVATONS ARE IN FEET ABOVE ERIN SEA LEVEL Y DIVE TEMPO SION NATIONAL GEOGETIC VERTICAL DATUM GF 1929 USING DAY (NGVD 29). yf, I g % g 4. UWTS OF WETLAND OEl O+EAT10N .6 /-- LINER MATERIAL USED WITH THE PORTA CAM WILL BE 5 .6 / 0 ZO 40 60 . ANCHORED AT THE END BY WEX;nTEO MATERIAL DR BY A ENTER LOOK TRENCH. u SCALE w FEET FINAL DESIGN 3 GATES '°" lE9 REPAIR MANCHESTER ROAD (BT-8) SPILL ?? W tiu 5ama FAYETTVILLE, NO a 1TI. oa/ 0/9. POPE AIR FORCE BASE QC ¢Y aimio NORTH CAROLINA FAYETTEYILLE V CHANNEL DIVERSION DETAILS l l , J ?c . ?v? u ? n a 7 r IXmU n+ w/II/aI .]I eiSY F 1 1o y F {/b/M s.c ?- -7 S -P? Final EA or Spill Gate Construction NORTH CAROLINA STATE CLEARINGHOUSE* DEPARTMENT OF ADMINISTRATION INTERGOVERNMENTAL REVIEW STATE InJt-MER: 04-E-0000-0030 F03 DATE RECEIVTD:07/29/2003 AGENCY RLSPONSX.' 08/25/2003 REVIEW CLOSED: 08/29/2003 115 RENEE GLEDHILL-EARLEY CLEARINGHOU3E COORD DEP': OF COL RESOURCES OW, ARCHIVES-HISTORY BLDG - HSC 4617 I? RALEIGH NC REVIEW DISTRIBUTION CCGPS - OEM, NFIP DENR LEGISLATIVE AFFAIRS DEPT OF AG7ICULTURE DEPT OF CUL RESOURCES DEPT OF TRANSPORTATION MID CP.ROLINA COG PROJECT INFORMATION APPLICAIIT: Pape AFB TYPE: Natioral Environmental Policy Act co, Environmental Assessment /Finding of No Signiiicant Impact DESC: Proposed action is to demolish and reconstruct three existing spill gates and construct one new spill gate az a fourth location on Pope AFB. The attachod project has boon submitted to the N. C. State Clearinghouse for intergo v-r:uaental review. Please review and sut=it your response by the above indicated date to 1302 Mail Service Center, RaleLgh NC 27699=1302. If additional review time is needed, please contact this office :at (919)807-2425. AS A RESULT OF-THIS REVIEW THE FOLLOWING IS SUBMITTED: NO CotSMENT ??1?Z Z6?71g ,? COMMENTS ATTACHED A(j _ X003 R ?-SIGNED BY: - t'arQry(?la??O A ?t ?zP.I ?('r 0 s 100,1 AUG 0 4 2003 C7 6.0 List of Agencies and Persons Consulted and/or Provided Copies 6-15 E •y -K U p N? s o ? =. -r 7 - I ? a ?J I h`A M .71 OC BT-8 SPILL GATE STRUCTURE AIR FOR BASE POPE AIR FORCE BASE FAXETTEVILLE,-NORTH CAROLINA, USA PREPARED FOR; AM FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE ET-d SPILL CA7 N sTRLmm ?I e ?F??GH?? ? PA4N /,/ 111 RR/P 4RwP ?? 4. l? f ?•? ?y o AIRDT HURST GATE \ DRIVE / I? ?1 K REIU_Y?r CATE WALO'Y LANES ARIASTTA7 1 GOLF COURSE GATE TO FORT POPE AIR FORCE BASE CONTRACT NO. F41624-00.8-8028 TASK ORDER 0193 s .so.. 1 CAROLINA PROJECT r ?i " N SITE L--- N STATE PAIL? NOT TO SCAM c v O 3 d 9 S--ALE N UILES `"""x" m POPE AIR FORCE BASE dart n.N- osa weuTTk Tcy ern/o. ?wok 61RIIIC)IV, G7i a,amu Tm - FAYE=VI LE, NORTH CAROLINA Fgaj r mu- sueunK txs7 7[y De/,d OCDJNIO, v avmi • art 1400 k"(NnNN?n u..-m Wflti Tt77? 5,2-454 -4727 SHEET NUNEER DRAWING INDEX DRAWING TITLE 1 COVER SHEET 2 TLLE?FJ. ANO ADORC 111ONS 3 DZTIW- C069RKHS 4 MHM9 Y30IIY7 GMS S DE XXMN PUN E STRUCTURE MIN AM PRWLE 7 STRUCTURE SECT%WS AND DGA11S E STRUCTURE DETAILS D RUNFOCEMENT DETAILS (SHEET 1 OF 2) 10 RETNFDICEIAMT DETAILS (SHEET 2 OF 2) 11 TRASHRAfJE =Ft(1Y GPATE 12 TYPE FE)tM DETAILS 13 WTE NSlNSATICN DETMS 14 ELECTRRX PLAN 13 CONDUIT AND CAnx EIETAR. 4EC11ECAL Ids R DV--.W 16 MONIACO n;E SYSTEM E7.ECTRCAL LK;RW ONE IAE'/PNF1 Sr!£AJ1E 17 45DELLA# DUS ESLCTFWAL OEU1S ive 1u tA-8 SPN. WE SmLc URE RAW ® °USII HKe 11 TNS W D06 COVER SHEET TWN DRVMNO Is W7 NOT TO s."N.E: 6/=0/01 FINAL DESIGN FAY= U.F- NO 7 a, ;- I r 15ws zH;n 1 a 1) El r- 0 N J .~.l1 A U? i.1 ?.I ° `V E 7 0 F x' ? ig? I? I f 7 d M O "r yI? INTERSTATE TEOHWAY -?? UI:(TED STATES NZT11'AY EXISTING C1VAnD4 CONTOUR WITH ELEVATION IN = AEA MEAN SEA LEVEL ----- NEW ELEVATION CCNTWR WITH - ELEVATION IN FEET ABOVE MEAN SEA LEVEL Lw-1 {+ IXlS11NC SURVEY CONTROL PDKT EXISTING WATER LINE OR CREEK W W W- UMITS OF WETLANDS FLOW INDCATES DIRECTION OF FLOW -o --? -? - FENCE CUARORA& PAVED ROAD ------------ ------------ UNPAVED R^OAZ I NEW CON7!ETE r ,?.? '. ExisnN? cm7?TE EXISRN: CONCRETE TO BE DEMOUSHED sTRUCTuRAL FTLL/9ACKnLL LL11.'1A.L RIPRA° RIPRAD BEGGING TRASHRACK/SECURITY CANE LJ CRATING CRUSHED AGGREGATE OASE COTP.SE CRUSHED ACGZECATE SUO-BASE COURSE NON-SHRINK GROUT TIM DESd DRAT fVWL DC%T . VANOTT1L LOX SLPR ^. ; PR'SYNA41' D6CN SUPWMAL fSR) (®IRA V RY¢? O EXISTING UTILITY POLO -5- EXISTING SANITARY SEWER UN-- -m- EXISTING CAS UNE EXISTIIC BUILDwC/STRUCTUR: -UCE- UNDERCPDUND ELECTRICAL LNE .........'............_ FIRER OPTIC LINE -W BORED WATER UNE -CM--- CUP CULVERT G EC5TING LIGHT PCLE -0 TFST NONE LOCATION EXISTING MOWORINC WELL/ODSERVAMON WELL THE ROSE CROUP SURVEY CONTROL • NEW SURVEY CONTROL POINT 8 ECM. - EXTSTNC CONCRETE MCNUVETIT 0 MH EXISTING MANHOLE LGSM-1 NEW SURVEY MONUMENT ----- CENTERLINE -•fl/w ••- Ri-NT OF WAY ?., ., ..-.?.- PERIMETER OF TR= --??? TPEES TO BE P.EMCN.D r POPE AIR FORCE BASE FAYE7rn LLE. Noma CAROL7RA ABBRW AMONS ® AT I DECREES A DtAJXL= FEET INCHES L PERCENT _ PLUS OR MINUS AFa AIR FORCE BASE ISTM AM17,ICAN 5 SO7;TY FOR TESTING ANO MATMALS BE BURIED ELECTRICAL DCS BELOW GROUND SURFACE fE CENTERLINE CJ CONSTRUCTION JOINT CMP CORRUCATCD METAL PIPE COR CDNTRA„'TINC OFFICER'S REPRES£NTATNE CID CONTROL POINT ou oIAU ER E EAST F/. EACH EL ELEVATION N HORIZONTAL RN. INVERT MAX MAXIMUM MN MAlHO.< MIN INNIJUM Ms, MEAN SEA LEVEL N NORTH WD NORTH AMERICAN DATUM NAVO NORTH AMERICAN VERTICAL DATUM N-= NATIONAL GEODETIC VERTICAL DATUM NO NUMBER NTS NOT TO SCALE CC ON CENTER CO DJTSIOE DIAMETER OE OVERHEAD ELECTRICAL Nn: POLYVINYL CHLORIDE PRO. PRCPOSED •M?N9 1w 6 I 1 Mse oa. 6® W00 Nn. - IaA-M MDT YFASDA•' I' A-0n. TK 7 72 fl[N OPAwC IS 512-5-7197 -F to RCN( S SLOPE SCH SCt11EDULE SM SURVEY MONUUEbT 5TA STATKNi TP TEST PR TYP TYPICAL USA UNITED STATES OF AMERLCA, v vERrICA. A' NEST OR WATER UNE F71AL DESIGN aA- aT-a SPILL CAT6 SB9,TUIC FAYESIENLLE, W;, HKe-l I LEGEND AND ABBREVIATIONS C/]0/DA I?"'t" 711?SNI rc 22 OF 1T 6. HORIZONTAL CONTROL L IRON STAKE M k: 523,561-673 •,gfET /'/ C.' 1,99,°,](15.163 ...E / i P!PRAD FORT BRACG KIILITAPY PZSMVA704 INV OUT: EL 11i WASTE WATER TP,EATLENT PLANT INV WT: EL 161.97 12 cOMETAL PIPE 1 AP, T)I' MfDE r 8.E' TALL r/ CJARGRAIL -I' Titr-K CONCRETE 11 1 W'Ll / .-CONTROL. LJNE / /J T /? ? MARK $OtfRRE INV EL 1Es.15 tE It 1 1 , ' ?? ? , / /CUT IN 700 G cc 1 PIV Kt: E:. 165.D9 t ON CULVERT HEADWki 51 + APFRpA':uA'E LOCATION OFF 501; BORING GT-01 p'ft,/ [1,VAMON: 17A-I-Z .1 ' NE9 ?'/ /.•/ N. 523.3Z25T 'e ) / NCRT.RIB (GRAY: PEMOVcU / C 1y9'?C44.57 / /'• / j '`• ?^ (RATING, wr HORIZONTAL, CONTROL GATE STRUCTURE IRON STAKE /.• .` ?? ) EXISTING BT-B CPILL r.I N: 523.294.630 / /•" •?', ?? _ - '' ' A--• PROXWAL7 LOCATION WOE -T OF PIKER OPTIC ONE CCNCPElE APRON Asaxur j IL UNOERORtXA4G 4 EIECTRI BOK N 1 1 ,-LAMBS OF WETLANDS EX:STNO STRUCTURES IL PERSON)Nr' GATE 1 r £,. J? ???AWROXIMATE LOCATKR 0 20 f0 60 3 / 0' VNDER RaND'ELECTRI: 4r b;' ;' \\ ?` SEAL IN FEET . j POPE A;R FORCE 1111 BOUNDARY LINE R 7 NOTES ........... .. .. .... ... ..... a 3 ......... .... ... ......... ? 1 SITE TCPOGP?PtD' AND FEMURS ARE BASED ON SURVEY CONDUCTED ON JANUAJR 20. ZDC3 BY THE ROSE CROLIP, 104 CIL ESP;E ST., FAYETTMLIL NC. TELEPHONE B10-323-SADO. 2. BDRIND HOLE INFDRIMTION PRC.9000 BY OWI0 WARREN, VRS CORP., UCRRSVrt1-1. NC. _ -? ,.... R? .. _ ?: ?/.• :. HORZONTA_ COORDINATES AND ELEVATIONS ARE IN UNITED STATES SURVEY FEET. HORIZONTAL COORDINATES ARE APPROXIMATE "° W t TANK CREEP BASED ON THE NORTH AMERICAN CATUM (NAO) 1983. I)J/ ELEVATIONS APE IN FEET ABOVE MEAN SEA LEVEL (LIST) [ f A _I VSI!Y' THE NATIONAL GEDD:TIC VERT)G: DATUM OF 1329 F ... 4 (NOYD 29). ?j 3 • :j "•.?• •." r / 4. LIM"S Or WETLAND DEUNEAT)ON PROVIDED BY POPE AFB VA EMAIL ON MARCH 5. 2004. NNc a?-.n ny - ra,. BT-8 SPILL C.UE STRUCTURE FAY'ET1EV1[1F, W' M rr of 179 a ? awY n? ? ammo. mw un/o? POPE AIR FORCE 'SASE ?•"•' r °'°r'`?n •,"`s' Y?xws yj Y NrU-a-TE - SEa1mAl Tr 1a/1n oA U FAYEI fEYS[! E, N0°.TH CARDSINI Tom M a ab 6 s m WES EXISTING CONDITIONS $ PQOy r D--C S~mL (m) Try M/13/w woo NnC n 767" INM....e T-E[N wD-- I C ' AurtIR TO sr'5 uT2 Cy ®?? a c.'x` R mw 512-f5f-7797 T. .OT TO Sb1S r¢ K/30/M SST 3 Or Y7 \J / ENTRY & EXIT DIAGRAM DIVERSION CHANNEL SECTION HORIZONTAL CONTROL 10 EXISTING GROUND /-' wF /' ' IRON STAKE X174 174 r N: 523,461.873 ,w. 172 172 sr / E: 1,998,305.169 70 170 z 16B 168 g / / • 166 166 < Up`A? w 164 164 w G / 35 6 w 162 62 w p 5P? PVC LINER RIPRAP /•; 2 SP t"? SECTION A-A /-' w uNOS DISTURBINCE FORT BRAGG MILITARY RES 1 ERVATION J INV OUT: EL. 164.80 0 10 20 30 +0.0037 TOTAL SCALE IN FEET WASTE WATER TREATMENJ PLANT;` WV OUT: EL. 164.97 DIVERSION CHANNEL WITH LINER SECTION l ? 0 2 CORRU^ D METAL PIPE ' Y GUARDRAIL ARCN , 11 WIDE x 6.6 TALL 2.0' 10.0' , 10.0' X2,0' EXISTING GROUND ,. 174 I_ 174 /,. / /' _1' THICK CONCRETE 1 1 WALL 1-72 172?t 70 70z 1 1 g 68 m 1168 2 CONTROL UNE / / 1 PZE 166 66 / / 4 p w . 1 64 4 w 16 INV EL. 165.15 1 BENLrHMARK EUUARE T 1 ?j w 152 L162 w LOCK TRENCH / 1/ /'• CUT IN TOP OF CONCRE'" ON CULVERT HEAD INV IN: EL. 165.08 _ ?1 /? ?-AP IM LOG TIC 0= SOIL BORING Gi-01 FUEL LINER SECTION B-B p ? T ,/ /•• ELEVATION: 17 N. 523,3 7 - -; CONCR? LA ATE REI OVED) 0 1 D 2??0 ONTROL CONCRETE WING WA TO BE REPLAC 1 094.57 GUARDRAIL XI I LL GATE STRUCTURE SCALE IN FEET / GABION BASKETS 7 630 /- /' AFTE MOLITION % 7.'S7 PORTADAMr STRUCTURE SECTION PPROXIMATE LOCATIO EDGE OF OFIBER OPTIC LINE ASPHALT n/•,? APRON TEMPO NE RARY DIVERSION DAM W SPILL GATE LOCATION TEEL SUPPORT FABRIC MEMBRANE IMPERVIOUS FABRIC s ? SEALING SHEET FRAME 174114 0 a • u L j , NI7 r m 1 1 170 0 ?? 70 0 z ° 168 .168 ` 166 66 a T- p E C POP n' w >1.? f I ?? J 164 w 164 w 162 162 w / ? LOADING (STONE) SEE NOT 5 ' / r / APPROXIMAT OC OF UNDERGR ND'-EL sF I S4 1 \ HC- g E SECTION C-C 0 10 20 30 A POPE AIR FORCE S " 1 \ SCALE IN FEET BOUNDARY LINE N EW 180'x20' 3 DIVERSIO N CHANNEL A NOTES ` -' LEGEND 1. SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, 104 GILLESPIE ST., FAYETTEVILLE, NC. TELEPHONE - - W - W- W- =LIMITS OF WET ANDS 910-323-3400. ? W A SF - SF - = SILT FENCE ROXIMATE 2. BORING HOLE INFORMATION PROVIDED BY DAVID WARREN, URS CORP., MORRISVILLE, NC. 3. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UNITED STATES SURVEY FEET. HORIZONTAL COORDINATES ARE of 81: '7 - 3 TEMPORARY DIVE j DAM T RSION J NK CREEK BASED ON THE NORTH AMERICAN DATUM (NAD) 1983. ELEVATIONS ARE IN FEET ABOVE MEAN SEA LEVEL (MSL) USING THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD 29). 0 0 rn o 0 o , 0 ''? I o e. - / o a ? o o n 4. LIMITS OF WETLAND DELINEATION rn m m 0 20 40 60 5. LINER MATERIAL USED WITH THE PORTA DAM WILL BE _ ANCHORED AT THE END BY WEIGHTED MATERIAL OR BY A - olo w w w w SCALE IN FEET w LINER LOCK TRENCH. FINAL DESIGN /\ WARNING OESiL"EU: TAM REPAIR MANCHESTER ROAD (BT-8) SPILL GATES RENSION I ? 1® I °P'""' RAM FAYETN]LLE, NC Q ° FINAL DAs'°" ITEM Os E ? M POPE AIR FORCE BASE ANC ?? ?' HK9 PROJECT 22235649 m 05/21/04 IGN SUBMITTAL FT F qp ` 7 o? DRA INAL DES el s- FAYETTEVILLE, NORTH CAROLINA i I? I?rr -I .. IF THIS BAR DOES R"`"MrZ INTERMEDIATE 6Ox SUBMITTAL EM lG/1D/D3 NOT MEASURE 1' rro,ECr -E. CHANNEL DIVERSION DETAILS n0 PRELIMINARY OESIGN SUBMITTAL (30%) TEM 06/71/07 THEN DRAWING IS T T . MTZ Wlj - ? REV DESCRIPTION OF REVISION BY DATE NO O SCALE wa. 6/30/04 SHEET OF C7 WIDTH VARIES (SEE NOTE 5) /•/ 1 1 11 1 ?/ /• I .. , 174. T '--- 172 Gam„ 172 EXISTING PIPE 74 ARCH CULVERT 170 N? ?cH 170 z 168 2 N69'06'07"E 166 _ 166 < 1 1 1 SEE DETAIL 2 ?i 164 1 164 >w 468.65'(CONTROL LINE) / 07 w 162 I H.1V 162 w / PIPE IN T '.5 BEDDING 5 RIPRAP 171.0 EGE EXISTI ?c ASPHALT / AT _ SECTION 04 / 0 10 20 30 SCALE IN FEET ,? /•' ? ? EXISTING GROUND /"• ° ' 1ti _____ _ WIDTH VARIES (SEE NOTES 6 AND 7) ? 1 ? 176 -176 .- 174 174 C 70 1172 172 70 170z 5 ' c-3? 4H:1V 2168 168 POPE AFB 166 -- --------- N66?6p5? PROPERTY JE '? 164 - rm•? " r° 166> w / w 162 162 w N PIPE IP ERT TOP OF RIPRAP . 523,287.00 / EXISTING ELECTRICAL I EL. 167.0 ERT SECTION B EL EL. 169.0 8"m GALVANIZED E. 1,998, _.03? / PULL BOX A, EL! 16 . 17 . " _ " CMP CULVERT D4 / GR T^ ( 0 10 20 30 NEW ICLE GATFi'° EL. 174 TO 173 A? ??'• 2 'IV - - __ - SCALE IN FEET m CU T 0 ti - L TO ',OFF RIPRAP °- s PERIMETER FENCE ^EL. io o` Y Q -`(a i (SEE SHEET 12) RIPRAP / u A r 0.5' CRUSHED AGGREGATE PIPE INVERT = \ Qke BASE COURSE AT EL. 171.0 MAINTAIN 3.0' EL. 174.0 AT SECTION SHOULDER SEE D? 2 12.0' v7 >> 4 a o a? .i??- ?? / A \ ?BACKFILL 2H:1V X6,59 Z"E ?---- PERIMETER FENCE o JJ?? _ IH.1V ?NTEENNa 1H:1 L o 11., -L- I 6 EXISTING ACCESS ROAD N. 5 1149, g DA GROUND 11 Q i ? 1.3' CRUSHED AGGREGATE SECTION C 59' -'1,99E7160' 9? SUB-BASE COURSE NOT TO SCALE D< ?l N7 5a3,?37.9 - ST UCTU E rW ti' N 523,239.21 -y E. 1,9.9 113 CO TROL PPI T I l z E. 1,998,077.20 N. 23.2 3.26 EL 167.0 RIPRAP ; i b,EL. 1 3,0 B', 8 S ILL-? E. 1 996, 3 .1 ' TE S UCT - o BT 18 SPILL GATE o ^TURt S T (SEE p o 1 i 7 Ff£" L'£I i £f £i i ££fFfi ££££Ff£i F£PP -? 8 SHE_ S 6 AND 7) q o• i??/??i? I N. 528.213.34 RIPRAP BEDDING s E. 1,998,085.26 0 g EL. 17.0 < s TYPICAL RIPRAP SECTION 1 GRASTREAM NOT TO SCALE o4 t N. 523,210.69 CHAN4E? SEE N VT 6 NOTES - - E. 1,99B,107.11 EL. 174.0 1. STOCKPILE EXCAVATED MATERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DETERMINED BY THE n T CA! BRA/FLOOD COR. GHT LOCATt9 N. ' ,198.05 2. SEE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING "CMP" PIPE CULVERT INSTALLATION AND E. 1.99 ACCESS ROAD CONSTRUCTION, PIPES TO BE PLACED IN EXISTING DRAINAGE CHANNELS. 1y 3. COMPACT ACCESS ROAD BASE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. W GRADI PLAN TANK C EE ) 4. BASE WIDTH OF DOWNSTREAM CHANNEL VARIES FROM 46' AT THE SPILL GATE STRUCTURE TO 26' AT THE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE EXCAVATE SIDE SLOPES AT 2H:IV. 0 20 3Q e C) 5. RIPRAP TO BE PLACED FOR 18.0' IN THE AREA DOWNSTREAM OF THE NEW SPILL GATE STRUCTURE. SCALE 1 _ 6. EXCAVATION OF THE UPSTREAM CHANNEL SHALL NOT BE MORE THAN 24 FEET UPSTREAM OF THE STRUCTURE. I J _ FI L DESIGN FOR PERMTTING CBS 7/20/05 ???" rarsD" REDUCE urTUND IMPACTS TEM a/2/Da WARNING TEM, REPAIR MANCHESTER ROAD (BT-8) SPILL GATES Q TLS FAYc"TTVILLE, NC 4 / FINAL DESIGN TEM, 6/25/04 POPE AIR FORCE BASE ?. _._ cemFm FR6,E°, p - DRAFT FINAL DESIGN SUSMMAL TEM 5/21/04 HKe 22215645 INTERMEDIATE 60w SUBMITTAL TEM 10/70/03 FAYETTEVILLE, NORTH CAROLINA Amber Oaks G THIS BAR DOES emFu?TZ PLANNED MODIFICATIONS n 4 9400 ATX 7Ben Boulevard NOT MEASURE 1' "em¢r uuuc¢rt. w / PRELIMINARY DESIGN SU9MtfTAL (3C.^.) TEM 08/13/03 THEN DRAWING IS MTZ Austin, T% 18729 NOT TO SCALE anr•. ?h eLV DscFIFTIDN OF xcutsioN ? sr i DATE ._ S12-454-4797 8/2/04 SHEET 4 OF 17 • • 0 T STRUCTURE I I ` r? I `mSHEtr PIPE m $ T-EXGM'O PIPE ARCH CULVERT-1 I ARCH -AVERT 1^ I L I/ F f V REMOY GRATING I W76K40 (REMOM Y --------------- -------- ----- ------------- ------- /?O ---------------------------_--_-__-----_.-_Y•...a_v.. u I 25.7'2 .?.?.? ~? RELOCK EXISTING SLIDE GATES ( '`? (SEE NOTE 4) Z RE4CVE CAT HEADWALL CSTRUCTURE ItDTE 4`? L F Q 34.0'1 Q i NOTp? E c TOP Or HEAD WALL rGRATING C.. 174.11 / (REMOVE) 6 I--E STRUCTURE !1 I vARIE,$ II /f 4?1 ! A'?WI6P10 J EXISTING (Z' Ems} -- L f I.0'3 /Xv 1 0? SECTION ?Ik NOT TO SCAL?- os O ?.3 I °r t- Tt:w ""v' To, 3/11/a POPE AIR FORCE BA I «rt>dmun- eoX aaPrML m mVla23 FAYEITEVIL[,E, NOR'fE] CAP.Oi: ONMIIWRY 065K S94iLl Tkrsi Td 06/1?/N m o?.mr n uwo. n a¢ 1.0'_ REMOVE CATE OPERATOR AND ( OPERATOR SUPPORTS (GATE OPERATOR NCT SHOWN) REMOVE GATE HEA;wALL a.0(SEr NOTE 4) CONCREE STRUCTUP-? t I ^! ? NS J1 REUOF_ EY'=NG GP.ATING • ?V" !,fir (EL 173.21) `CULVERT HEADWALL .A TO R.EAUJN rIXSTND CONCRETE / SIDE WAL'S TO PD0161 REMWC TRASHRACK EXtSRJ11t `REMOVE Vf16K40 ECURITY SCREEN (NOTE 2) AND (SEE SNOTE 4) ?/ A?N,7EEL. 166.71 (TYPJ E6.91 SEE of N I A L--- os CUTOFF WALL j - SAWCUT AND REMOVE- g ALL CONCRETE NCT TD .M.ALE cs UPSTREAM OF SAWCUT JO'NI REMOVE TPASHRACK AND SECURITY SCREEN (SEE NOTE 4) 4.0'1 TOD Or 037NO GROUND 4'1 I I I I EXS ING L COMPAzrm PILL! CULVERT HEADWALL TO REMAIN C'- 174.11 13.75 j ? PERSCM14VEL,....-?!! GATE???!! /a N 523,234 .. E 1.998,023 '? i/?' / `N 521.349 ?'? ? ? E 1,999.117 REMOVE APPROXIMATELY 155' 0' EXIS11N--.PERaETER FENCING. .. (Sti,NOTE?S) ~ EXISTING P---RlmETEZ_ FENCE ?t? NOT TO SCALE "vI 0 ENSIGNS OF EX!STWO ETT-B WILL COTE STRUCTURE 4. THE GATES. OPERATORS, AND/OR TRPSWW_K WILL Or ARE APPROXIMATE. CCNTRA;TOR TO FIELD KRI'Y SALVAGED. CARE SHOULD BE TAKEN TO ENSURE 1HE OIYENS!ONS. FEATURES ARE REMOVED N SUCH A WAY TO PRESERVE THE EO'JIPME.NT WITHOUT DAMAGE 2. C'ON'CP-7T WALES SUPPORTING EXISTING EMBANKMENT ARE TO REMAIN UNID!SNRSED. 5. FOR ESTIMATION PURPOSES, ASSWE FLT.-,:E TO DE CHAN UNK FENCE, APPROXIMATELY 7' HIGH. 3. IN ORDER TO MAINTAIN WATER-CONTROL CAPABILITIES, OEUOLIPON Or EXISTING STRUCTURE SHALL BEGIN ONLY ?? AFTER OBTAINING WRITTEN APPROVAL FROM THE COR. FNAL DEMN CDC ST-6 SPTIL LATE SIRIKTURC FAYETTF ur- NC ?' PAY - ?`?1 x? MKP ""K" VSSSH4 "r,.,S fvA DEMOLITION PLAN .? & 9W0 M'oe?irn 4uuM+altl NOT YEwmRE I? - A,.AV., iK 19725 THEN GgAVIC A 9 " 1 YT` e/w/oA SKIT S m 17 ?? . ETT-B SPILL 3 FEE SHEET PILE DE714 ?. GATE STRUCTURE- oe ? ,` pg 00 \VI mo ?o PERR17FR FENCE, SEE FEKING DRWEN SHEET PILE COMO, JCINTS (TYP.) ' (Sfi SHEET 12, TRANSI7IDN. CMOff WALL + DETAIL. SHEET 12-\ A I. I OPERATOR D.cK I I ' ?11 j II I-- 11 (BEYOND) r II _ ANTENNA TOWE.' (5 EENCTE2) _?? IIII •? I?' I•? -.?,c T RAISED CONCRETE LADDER RUHQUS I II I E W CATE i1 HANDRAIL ANTENNA SUPPORT - I„ II II r II / EMBEDDED INTO I Cg WATERWAY (SEE SHEET 12) BLCS7C I V I'1 II II II I III CONCRETE 11 II I I I I I I ? I If1 ?RfPRAP, RIPRAC 'o a I BEDDING AND SAND BASE COURSE. , ?I t I FILL NOT SHOWN FOR n SJ?-t3ASE COUPE, n I I .. 1 , ... CWt01' I II' I , , ...:. .. ..., rTRASHAACK I J AND SAN:) FILL NOT I SECURTF GRATE SHOWN FOR CLARITY L--- _ ...._ 1, .... I i ! '...:.:.. c,,-- SHEET 13) I :I II 'I 1. CATEJ li 9'-7#` 9 -7?` II f -6?1 2G,-3, DRtJE!! SNIE7 PILE) ! SLIDE J CUTOFF WALL STRUCTURE =N'TFML Ra, I HANDRAI_ h N. 522,243.2E (SEE SKEET 12) E. 1,99n,1A.iD BOTTOM OF TRASHRACK/ EL 157.03 STRUCTURE PLAN E SLICE CATES SECURITY CATE D 4 B 12 EL. 227.0 SCALE IN FEET ?I I J/- PERIMETER FENCE NOT SHOWN /rJ-.. {IkIIL ? Bf-8 SPIC 3 SEE CJ1TF DEfaL CAR STRUCTURE u SILIDE CATE ?I Gs1VAN2E0 STEEL OPERATOR DECK SUPPORT WALLS ANTENNA TOWER \ (GEtt1NO)7 "yp') (BEYOND) I -_? •?? I EL 1E2.0 7\j!/// ~ 2 ( 1 I I PERIMETER fL , (SEE SHEET ) U a PU INT 1J EWB INT U1©OED O I >2K CONCRETE j I 1 ?I I I ?L (SEE SHEET 10) I I ( EL 176.0 BACKFlIl TO --L--?------------ ----- - ' -- T -- - - - - uATCH EXISTING 7 D? ACCESS ROAD E` CRUSHED A."lx{EGATE -- --- - ---- - -- J ----- UN -- - t '- TR T: NOT i..l (ACC SHEET 4) ?N4AFOR CLJR pTSTING BASE COURSE OVER 15` n f0 CU1 TTY GROUND GRA NG ` CRUSHED AC---Z--AE R In` RBRAO OVER E6` P "POUND 4 Y -- --- --BASE -COURSE 1 2 • RPRAa EECDINC -- ---IT-- 1 -_-- -- 1 _-?----- --------- ^- - ? I { ? ..Tl?i- - - l J j 7 -D I ` I N //,t • I ,. `\?' I t?{• L51RUCTURAL 1F9.5 r `I I I STRUCTURAL ' 7N BArXF11 ?5AND FILL \\ •y,n F`SNO FlLL Fl / ? •.YAY ??S -- -?---- - ?I l 7,! ?n• a I -?' I z ,r70 .rT le v umas OF EXCAVATION LTYPE `T' THTWDLLS i CJ 1?1__--_-_-_- \ SR DETAIL i GATES NOT SHOWN FOR CWRrtv / e sEE OE7al o \ ,n V / CE J/ I c ? 3 I I DRNEN SHEET PILE CMOF" WALL (BEYOND) CONTROL JOQlTS (717.) IN FLOORS AND EACH WALL $ I EL 157.75 _______ __ 5 25'-C' STRUCTURE PROFI L ? = ^ , ?O eJ ? WA?O° ACROSS FOOTIN, L PLACE: S-INCH Y i r ±I f n . 12 5. `* SJLE IN FEET 2 IN ' P E' el?t1 ?ry `WALL DEMN 5 N # (GLEN MART EERMG OR APPROVED mINL). ENGA 1 oow Ny ST-B SPCA. GATE STRUM FAYEf1ENLLE. NC ?? G e _ a '"'L a CN IDA "KB POPE AIR FORCE BASE '. _ °a° ""° AY xI W T& wil/iF, t FAYE771%TIE NO = CAP ULDU "" u u elm?mstt 9eAn OWnAL V m +Clloru , . . A... ar. r ra t«A 1,06 WT : ,• n ? STRUCTURE PLAN AND PROFILE 6 {sue Uywrv p V tp tC/,o/m +N+Oepxn Boxx,rro b.M, Tc 7dta ut a7o7 s1z tlEl1 TO wm ro s? .m 6A„?? swlr a a 17 _ ,K ? oQanor u,om2 a as - - .'7 r? I.r.l U it -ell :7. .7 I L ^^I I T L 20'-C' TRASH2ICK/ V SECURITY GRATE f (SEE SHEET 11) e 1. k 84'N7V SI.1DE 2_ . GATE (TYP) LL- PERIMETER HWIDRATL (LEFT FENCE SEE DETAIL 1 ABJ1MEN'1 ONLY) FOR FENCE 12 MOUNTBNO -- BACCKFlFI OF lL YARICS PERIMETER FENC! 20'-0' 13'-6' C' ASGREOATE BASE COURSE a'ER 15' CRUSHED AGGREnk-, SUR-11LSE COURSE (LEFT AD111MENT, SHOWN). 18' RPRAP OtiLR 6' R',PRAP CMDWC; (P.ICHT ASUNENTj ---------------- ---???--- ----------------------? L---?- -713 ??Z4 //pp ?' ?'?n N n Jn l1 n -OPERATOR DECK FILL CJ SAND C3 a El. I ?,'. RPRAP AND DEDDINC 'n (SEE SHEET 4) SECTION C --? ~ STRUCTURAL FILL 0 2 4 6 D (SEE NOTE 1) 17r1; S;AL< IN fEET I GPOUN? 5'-0' ¢ STRUCTURAL 1? SLIDE car B2CKFILL? a WATERWAY RLINFDROEMFNT .".. - - NOT SHOWN ly. ? ?.? FJ.. 167.0 UM,TS OF EXCAVATION mpa SEE FLUSH BOTTOM DCTA'L 1 0 4 IS I o G ,•TrtL'CTUR11 i (S+ NOTE 1) I oe 0 2 A 6 0 SALE IN FEET COMPACTED EA;KFlLL ABOVE PIP: CROWN! 2 -0 /N yJ? lip `6' BCDYJ; MATEPLK- -DRIVEN SHEET PILE ? CUTOFF WALL (TYP.) Ll. 102D 1'-3' OPERATOR DECK CONCRETE WALL 2._0. - gl o ? o EXISTING GROUND I o L -----? -?; -- EL 173.0 Z.. "17 NOT SHOWN EL 170.0 n. > AT BOX SECTION;"A HANDRAIL r. N CJ ^-PERIMETER FENCE tP CULVERT (SEE SHEET 12) I? 11 . v 4 tCLR[ FENCE TO EMEEDDED SS EYE BOLTS fr I73.D V-0. (SEE DETAIL Z. SHEET 12) TRASHRA.-Y/SECURITY GRATE (SEE SHE 11 T.Ie F c I ci 3. 2 f"l' I CRWN I I P- 167.0 RENFORCEMEN7 NDT SHOWN \ 1 i^ JtNCTICNS. F D NOTES UP'TRE PIP GRILL 2 06 STRUC? BACI?FILLAOB?PAC NOT 10 SCALE 0 0 2 A 6 6 FOUNDATION TO GRADE PRIOR TO PLACING STRU;TURAL FILLCONCRETE FOR SPILL GATE STRVTURL (SEE NOTE 1) SCALE IN FEET 3/6' ROUND WIELDED AT Al MAX OPENING BACKFILL FOR PIPeS D A B 12 SCALE IN F-M FWAL DEMIGN TER .na.w " M-3 Spu GAT STR Fp4AL °` S`" rtN N'°/°' P,s E UL Nnc FAYETTEMAI.E, HC !? .. fYNNE TN31.'il Su9d11L NWT HEY 2/71/ POPE AIR FORCE BASE C .5 ,, ? HO NTEARQV.TE 8= AL TEN N0/,./w . \ FAYF.E UZ. NOP.TH CARDMNA '.•.;,..: Oou F TNS W 0M STRUCTURE SEC'iIONS y Vi?lvrn iKS41 u (JC z TEN ?gq3?7 ( NN G lrr...G b "'•c?..nk I AND D`TAJ S %2 ? ? T2, 112-IS.-4727 _. TO s-lE i"" 6/30701 ` sKr 7 Q 17 LJ D J ^1 .1. v r 12d ?iy U h? ? Ix c `i ^I F..V 1 { o I M O L? E'_ 178A EL 167.0 SECTION a? ob 0 2 4 6 I!T? SCALE 14 FECT RCNFORCEUENT NOT SHOWN L SmD e. ?•_.• SEE WATFRS70P DETAIL FILL -? ` 1 r t r2,; N 1 0 6' p1t WATEPSTOP CONTROL JOINT 1 DE%L 06 0 7 4 6 SCAL IN FEET DWft n..k FC%0 9B AL Nasclwr[ 4= sJeWTIA, 2mTa2w2r oaol s4vNA. I? 2vona>« v c?aa.T REINFORCEMENT NOT SHOWN 1 { . :: SAND CJ ° L FlLL? .YVI I 0 6 "? ??y c 14 :x: FF?'! 6' PVC WATERS 00 ` L CONTROL JpM 2 2 4 6 SCALE N FEET POPE AIR FORCE BASE ' FAYMMgUZZ, VOPT CAROUNA 1 O i .1?' • I 1 _C. I o REINFORCEMENT 1 NOT SHOWN I,1 COLUMN SUPPORT RAIL s D 2 ce SCALE IN FEET 2'-0' L N'SDE fACE O?- FLOW J SLOTTEC CHAN4EL pVC PIPE (SEE NOT[ 1} 'EINFORCEUENT DRAIN PIPE SECTION NOT SHOWN F m O 2 ! 6 SCALE IN FFET SHcEIPILE QEfAIL 0 4 6 SCALE N FEEL PZ-22 STEEL SHEET PILE SECTIONS TYPICAL ry P E 4 c? 1, SLOTTED PVC PIPE LOCATED AT THE BOTTOM. DOWNSTREAM CORNER OF THE LEFT AND R1C1i1 CONCRETE BOX SECT.ONS. LOCATE THE PIPES ON THE INSIDE (CHANNEL) SIDE OF THE BOX CULVERTS TO OPA'N WATER COLLECTED w Try; BOX SECTION;. ar a sm( u>r sTelclu;c rATCMA W ? 2 ? TL5 , t,E; L II-b- 0.. F TMS W DOM m STRUCTURAL DETAILS olaa a.e.? e.w..d Tar Is .?.w.. 51214. TX 512-454-47S7 7S7 97 s 1 WT TO NCr 10 7xL TZ bn 6/75/OI sw-p a pr 17 r u } ' ' ' ? ' ' " 111 ' ' -71 < ( 1606' N D /601 -D -O 0601 I 5 -: LCCS }601 -C `0806- ^ / I6zJ2'-1.012' h 06z?'-1.012" iv 4' I C i a l2 V' 4• SAL' IN FEE' , ((j '--P222 STEEL SHfE'f PILE (TtP.) NOTES: ? 5ECi1QNe N c m DD 1. SEE SHEET 10 FOR CENERAL STRUMURAL NOTES 0 4 6 12 0 4 L 12 .. AOJUS7 SPACING AS NECESSARY TO ENSURE 5-06 AT THE I UPSTREAU FACE EXTEND VERTICAtlr BETWEEN TH. CATE SCALE N FEET SCALE N FEEL OPENINGS LiANTNh' J" OF CO','ER AT CC>ti'1RJ. JO'ITTS. [? r m o U o CONTROL JOINT i Ia -8 SPILL GATE STR MRE ... r 7 50'_0 CONTROL JOINT CONTROL JOINT / I EL. 182.0 u'-0• I E SURE GATES CONTROL JONT 0800' NEAR FACE ! EL 178.0 1'-J' 1 1 G ? I 1"3? 0-1 ua i'-1" O °p 0601'-0' I I 0501'-0' FAR FACE 060 i'-0' Cl o I 1'--• 601'-OI l EL 177A rt?cc 06Q1'-0. R¢ o6uA 1 1 0601'-U- ? ? }50t'-0' ?` h't ? ? ? 0601'-O' ? }6Q1'-G' /601'-G• EL. 167 0 1Y LEGS 1 U {601'_g ?N 12 lCS 0606' V", NOTE 2 ' ' 0601'-0' Ii LECS I 12, IEUE ^1 I 1 I -7j 9 I --T1N a D? 0 4 8 12 CA-1E N FELT r ?:l iF..dl 1 I 1'-S' I ? EL 18LC ? ^ EL 1820 ' k ? EL. 1710 r.w ,? ( n }601 -C ~ 0806' ? ' ' (601'-C' 0601'-0' U F 0601 -L ?/ 11E 0 LL n 8 EL 1180 . . }601'-C' I?_« ! ? I El. 167.0 l 9 5 CL 115.0 ? 0601'-D' }601•-C' ro OLOCX6'JT OETAIL 12' LEGS 17' LE.-6 I }6zJL? t-1'o1T E01 -0. }E01'-0' 1 n 1• I 0601'-0' 2'-0' LEGS i'-P' 9ENC5 (TYP.) J f }501._0. EL 187.0 r EL 167X: I FRAL DESIGN ? .I h ,Af FI 06SCK M • D KI FEML X-V'. 9JBYRLI N 4AYFDfl E 40L S? 4 PAEL.,,- DCsn. LWIL- IJa1 r y ? q Own' n u?m POPE AIR FORCE BASE r FAYE,7EV=, NORTH CAROLINA 9{00 M O E V e o ° 1X Au.tn. 'I6715 i 51F-IN-1]07 2. SCE SHEET 10 FOR ANTENNA NDUNTINC; DETA'- >" ti Q 1i1biG Bf-8 SPL1 CAPE 4R1CtUiE FATLTIEVILI, NCI J IF r4S W D06 REINFORCEMENT DETAILS WX ?U --1" (SHEET I OF 2) tNTll U-0 5 Y7 MlI TO soca - 6/30/01 Lm 9 v 17 • CAn x7, U bb r n F-4 r r:r? YEN F!? Us YT Y t7 {1 E-o", 1 as Q7 I Q M O FY 178.0 El 167.0 `(. r r ?l:i If I Ic LEM ,• F E D6 0 2 4 6 SCALE IN FLIT ANTENNA TOATR < Cx o' 1'-C OIAv • of ! HOOFS (TYP.) m ANTENNA TOWER MOUNTING O 2 4 6 01111111111 SCALE IN FEET FOUL rlL a r K 2N 51ATr"m WrOtWE NTE M SJSWI"K FR]AYxaT' UC9Yie 9 rt& Om amnoi a nmP? I I 1 ?d01'-C" A N\ A X601'-G"? ? I F BT-11 SPILL GATE STRUCTURE X601'-C i ?6o7'-C' 1 n SEE COLUMN' 1'-C' m r fAe,' n' i? ?°l Jf 1 I / A x I d, ?601'-0" FSTNFORCEUFIIT L DOWEJS I QI I 3/t' nu EN[ RIM-- CONCRETE FACE ??.. nn N ry .r I ? d. ,IsoyF.1111 J1 SECTIO LADDER DETAIL NOT IV SCALE POPE AIR FORCE BASE FAYE7M7[.fE, NORYH CAROLNA COLUMN SUPPORT DETAIL T IS 9 2 3 ??7? SCALE IN FEET NOTES 1. - A CLOSED CI?RGLE AT THE END OF A BAR INDICATES A FEND WTH THE BAR TURNED TOWARDS THE 0°SERVEP.. SPLICES SHOWN THIS INO:CATE A UPPED SPLICE, NOT A BEND IN THE BAR. DIMEIS',ONS EETWEEN BARS ARE TO THE CENTERLINE Or THE BAPS UNLESS ' OTHERWISE SHOWN. CLEAR CCNT.R DIMENSIONS ARE MARKED "CL'. 4. PLACE THE REINFORCEMENT SO THAT THE CLEAR DISTANCE BETWEEN FACE Or CONCRETE AND NEAREST PENFORCCMENT Is 1' FOR 05 BARS AND SMALLER, FOR f6 BARS THROUGH }6 BARS AND 3' FOR 19 BINS THROUGH Oil BARS. PRCVIDE J" CL1R DISTANCE FROM FACE OF CONCRETE FOR ALL DABS WHEN THE CONCRETE IS PLACED AGAINST EARTH OR ROCK CLEAR DISTANCE IS THE DESIGN DIMENSION LWC REINFORCEMENT PARALLELIINO CONSTRUCTION J0YNT5 SHALL HAVE A MINIMUM OF 2' CLEAR COVER. 5. UNLESS OTHER RA:IUS BENDS ARE INO'.CATED ON THE DRAWINGS. ALL REINFORCEMENT RECUIRNG BENDNC SHALL BE BENT AROUND A. PIN HAVING THE FOLLOWNG D'AA,ETER,, PIN f111MrrFR IV IN^MFC EAR NO. J 4 1 5 1 6 7 5 1 9 1 ,0 1 1 11 STANDARD BENDS 12 1/41 3 3 )/414 Ill 5 1/4 6 19 1/2110 3/ 12 STIRRUP AND Ti: BEN a 11 1/21 2 2 1/214 1/2 5 1/41 6 I - I - 6. REINFORCEMENT MAY BE ADJUSTED LATERALLY TO MA1NTbN A CLEAR D.STANCE OF AT LEAST I" BETWEEN THE RE'NFOZOEMENT AND WATEP.STOPS, m=KnR BOLTS. FORM TES. THIMDLE A14D OT}SR EMBEDDED MATERIALS. 7. BAR SUPPORTS, SPACERS. AND OTHER A;CCSSORICS ARE NOT SHOtM ON THE CRAWINCS. TFT P.ECOMMENIATICNS OF THE ACI CETAJLING MANUAL-1988, OR OTHER APPROVE SUPPORTING SYSTEU MAY EE USED. 8. UNLESS OTHERWISE SHOWN FOLLOW THE RECOMMENDATIONS ESTABLISHED B! THE AMERICAN CONCRf < 1-47IM17S 'MANUAL OF STANDARD PRACTICE FOR DETAIL= REINFORCED CONCRETE STR'UCRRt'S. A.'T 315'. 9. SPLRti LENGTHS SHOWN ON THE TABLE ON MR DRAWING ARE FOR CLASS H SPLICES IN ACCCROMCE WITH ACI 3115-02 SPUC'S OR DEVELOPMENT LENGTHS OTHER TNAN IHCS-L SHOWN IN THE TABLES MUST BE DETAILED ON THE REINFORCEMENT 06164 DRAWINGS. SECTION A 9 0 I 2 3 SCA'- IN FL- 10. THE MINIMUM LENGTH OF LAP FOR SPLCNG PARALLEL DUNS SHALL DE GIVEN IN THE APPLICABLE TABLE (REINFORCEMENT TALLL). SPLICES SHALL DE STAZGERED TO ZK 24 INCHES CLEAR BETWEEN ENDS OF ADJACENT SPLICES. BARS SRUCED BT NONCONTACT LAP SPLICES SHALL NOT B: SPACED TPANSVEP.SELY FARTHER APART THAN ONE-FIFTH THE REOUIRED LAP SPLICE LENGTH. NOR 5 IL WHEN REINFORCEN: BARS OF DIFTLRENT SCE ARE TO DE SPLICED, THE LENCTHS OF LAP SKILL. BE CDVLRNZD Sy THE SMALLER DVJ4LTLR BLED. SPLICES ARE TO BE MADE 50 THAT THE REQUIRED CLEAR DISANCES TO FACE- OF CONCRETE WILL EE MANTAINED- fONFORCEM;NT TA13 x.4000 Rz f.-60.000 Psl BAR SIZE MINIMUM E TO r LENGTH OF LAPPED DEVELOPVENT LENGTH SPLICE (INCHES) (Ld) (INCHES) f BAR SPACING (Iw,UfES) TDP BARS' OTHER TOP OTHER awls BARS' BARS 3 I 3 24 19 19 15 4 3 33 25 25 19 5 ) 41 31 11 24 6 4 49 37 37 29 7 5 71 54 54 42 6 5 E1 62 E2 td 9 6 91 % 70 54 10 9 102 78 76 60 U 19 113 87 NT7 ` 67 TOP BARS ARE HDRRONTAL DAPS IN BEAMS AND SLABS SO PLACED TWAT MORE THWN 12' OF CONCRETE IS CAST IN THE MEMBER E2CW THE W. SPLICES MUST DE STACOERED 95% DESIGN Try EIT-E SPILL CATE STRUCil84£ FAYERE>11.LE, me pA(? NKH 9j119619 Amw Der a T6 WA DCCS REINFORCEMENT DETAILS 6An Bw,MMOrY 9AD9 0-14'K ,' WENOfx TA? I E ?.P MTi (SHEET 2 OF 2) 1V Tx 7 7 N°T M 5<"F °`° 797 5l 12i-4s4-4 - s/IS/oF sxEtr 10 ? 17 11, r-PERwETER fEtY'E NOT 4 SLICE GATES 1 SHOWN ? LVOER RUNGS EMBEDDED INTO t SPILL CUE STRUCTURE Cr. CONICRETE ~ < = r.i NANDRAIL an {SHEET 12) l .I V I I J I OR1'EN SHEET PILE CUTOFF WAIL 47'-C• SEE BOLTING L 1820 CETAIL I, THIS SNEEI TO" 0' TRLSHRACK EL 1820 -TOP OF EL 181.16 TRASHRALK/SECURITY GIWTE, EL 181.16 EL 175 J ,. llj l J +?? i EL 173.C f! LSLIDE CATE EL 167.01 EL 167.C 1 L WATERWAY I NOT SHOWN SCE Do,-1114G DETAL 1, TH'S SHEET SECTION A 0 4 8 2 6 SCAN IN FEET ?4'. 1/2' TRASHRACK BAPS TOP OF TRASHRACK/ SECURITY GRATE BA.'%FI;1 BACKFgL NOT SHOWN, NOT SHOWN I I ------ ---'------'--_-__-----'- TRASHRACK ELEVATION 0 4 6 12 16 SCALE IN FEET EL IMC', o ? C 181.16' TRASHRACK/ SG^URITY GRATE 9 F CUT MOUNTING ENOS OF TRASHRACK GRATING TO CE FWSH WTTH HORIZONTAL AND YERTIC4 FACZS f T A WELD AT ALL JOINTS rr s. a .11.5 CF STEEL RC EPOXY ANCHOR 0 BE FLUSH WITH ?;?.,'.•,.? OR FATES •.9 REINFOPCAIENT NOT SHOWN 1• STEEL i O " - D 4 8 12 16 6 tf SCALE IN INCHES M M ., I- 014„ ,IML 93,31 SAKI,. 44'(AUmY.'T !3 4MY71t r9G.MW.CY D!2M SD81lTll I "y„? r awn a uimn o I z ., ?v 1 u •? o 4• CLEAR BOTTOM CF TRASHRMK/ Imo) SECURITY CRAiE TYPI. ! TRASH RACK /SECLIR TTY GRATE PAN=1 (9 REWIRED) 0 2 4 6 SCAN: IN FEET POPE AIR FORCE BASE FAY= .:VALE, hCRTH CAROLINA A D,, 1497 ATOfpn Iwhae A-t? TK 78775 517-454-4797 '7116 STEEL PLATE'--? J I! 4'KI/2' TRASHRL'K B 9'KIf2' 1RASHRACK OAAS \\ TOP CONNECTION DETAIL i L - - - f F 1 I a U"'LL y THRO j STEIL 1$• DM. UGH FOR RD= (T HOLES 1' CIA 'P.) I I /4' I i ?, I 1• CIA, STEEL RODS-/ S'Xt/2? STEEL PLATE J HOLE FOR 'L 4•K1/Z' 7RASHfUCK EPOXY ANCHOR W-5 BOTTOM CONNECTION D"TAII SIDE VIEW 0 6 9 12 SCALE IN INCHES NOTES• t. THE TRASHRADK AND PERIMETER FENCING SHALE COAIFORM TO MIL wjcsBDOK 1017/10,•DESNN OUd1C1NE5 FDR BECUR(iY FENCING, GATES, BARRICRS, AND GUARD FACIUTCS'. 95on' DES13N VAaDC ?. .. TOd UT-8 SPCC GATE StRix1URE FAYETMVUL Nts?m Q TS 2 e A ? wtcn uTL L1 IF T IE SNt WM T, TRASHRACK / SECURFTY GRATE .VT 1KA9:7RE I• T-[M DwfVC IF ui( bT TO Sxx - 5R1/D4 1 ? 17 11, Ell, N 9..I H F z Y.r W U ? r? 1 1 S F I? C I e ^I M O . END POST ALL POST SPACING uHE GoTRr9ER ? to PCSI RAL P0?51 SPLICE BRACE i BAND Ly,. TMSION ASTEN TENSION, BAND k ?" pYP,) ? • 0?1 TENSION BAR o i I • I S. n rte, u TENSION WIR:J ?q "' WtC. ° n o (NOTE 1) r u2t'i 1/B TMC-A FENCING HOT TO SCMI CHAINUNK MESH (NOTE 2) 1 1/2' DA, SON 40 PIPE RATS, HAT DIP GALVANIZED v 6 6'-C' MAY R 1 I S 12 1 ! Z ??- RCINFDRD?JAENT NOT SHOWN HANDRAIL WfTH CFWN LINK MESH DETAIL NOT TD SCALE (SEE NOTE E) CRAW LOCKING SYSTEM MITT TO SCALE Ifs rwLr><sn m Arsroa DR ?T Fl'+'t D9], SbTLI 1[L 5/11/M le?d IfILiiI1AATC acs 1lBNIiN to ,O/1Dfw AN PWUJM 1 DLSI- TJ9 Ri 0M) TEM W/I310) POPE AIP, FORCE BASE FAYMEVIUZ. NORM CAROLINA A ew Dd 9400 A-M I.. Bou-V link, TX 76719 512-I5A-1797 HORIONTAL RAY k 3/E' ROD EN' PERMEILR DECK 3'A WEEP NOTE CATE ODEN!NC CONTROL JOINT FENCE TRANSfTION DETAIL NOT TO SEAL TENSION WIRE SS EYE BOLT WTH DETAIL z 9C BEND (11?) 12 D T' Y 4' r 0 r 116'm DOE3 Tot MfARI4E 1' NOT 10 S%1f SEE DETAt- 1• TH5 SHEET DST BANDS AND rR BAR AT DE S/6' HOLE FOR 1/2' DA. SS THREADED AN„^HOP,S 1' IONC WITH C EMOEpuEAT. LS- HR HY150 ADHESM1: ST•61EM, H01 03 COUAL 1/2 ' DLA. SCL 40 fYP.) HOT DP CALVANSEO /4' STEEL PLATE HOT O.D CALVAN:ZED HANDRAIL SUPPORT BRACKET 1 NOT TO SCALL- [f,C7 NOTES: 1. WHENEVER UNEVEN GROUND (BOTTOM OPENING LARCER THAN 2 INCHES) G ENCOUNTERED, FILL IN BELOW FENCE WITH ADO7ONAL STRANDS OF BARBED MRE AT 4-RY.'H SPK7N;. 2. ATTACH FA--RC TO AL FENCE AND GATE STRU;TLFRE AT 1- INTERVALS VERTICALLY AND A7 20' HORIZONTALLY. 3. OuatSIO,15 or D c"NG CFUtN LINK A=S GATE INCLUDING POST EMBEDMENT DEPTH ARD UNKNOWN. ACTUAL FIELD OMEI,'SCHS RECUIREO TO COMPLETE THE WORK SHALL DE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO DEVELOPMENT or SHOP DRAWINGS. 4. PROVOS, FADR9:ATE, AND INSTAL CHAIN LINK FENCE AND CHAIN LINK FELAE VEHICLE GAT: COMPONENTS IN ACCORDANCE WITH THE REOUIREMENT5 OF THE TECHN'CAL SPECIFIGU:CNS ALL FENCING STEEL MATERIALS TO BE HOT-DIPPED GALVANQCD AFTER FADRKJSAN. 5. CAST SS EYE DCLTS IN CONCRETE TO SECUW- BASE OF FENCE. THIS INGLLIOES VERTICAL CDNDRCTE SURFACE AT TRAJIMON TO OPERITDR DECK. 6. PADLOCK 70 CONFORM WITH Yd-HD9K-1013/10 AND RR-F-191/7 AS AN APPROVED GENERAL FETD SERVICE PADLOCK. AXITIONALLY, PAD.DC:S TC HA'Ur A REIA'NABLE CORE MAL D_SM BT-9 SP%L GATE STR=IJPL FAYIIM%lr. HD Q n NNB'? 1935x49 TYPICAL FENCE DETAILS .? 12 6/75/Da sear 12 DE 17 ?11 !L-tW- %,nwry UNIS htM;c Vr-HIGL. VAlt NOT TO SCAIF r- a., 0 M J r w U c. Ic 0 0 A 0 M O a c? L EXISTING i ELECTRICAL PULL BOX (SEE NOTE 3) C ELECT DUCT BANK 17 DUCT BANK FOR POWER FEEDER (PC-1) 10', 4' COPPER GROUND RODS (3 EA.) ANTENNA TOWER _ }11 i i 1 ??' wNW ? y i r0 ' . f ELECT DUCT BANK / C DUCT BANK \ LINE FOR CAMERA/FLOOD 1y HT (PC-10) I 0 10 20 25 -- - SCALE IN FEET 10', a' COPPER GROUND RODS (3 EA.) NOTES: 1) REUSE EXISTING UTILITY POLE WITH 45 kVA TRANSFORMER BANK (3-15 kVA, 10), LOCATED NEAR POLE #2A-16-12. 2) PROVIDE NEW CIRCUIT (PC-1) FROM TRANSFORMER SECONDARY TO NEW MAIN SAFETY SWITCH (SS-1). SEE EQUIPMENT RISER, CONDUIT, AND CABLE SCHEDULE ON SHEET 15. MINIMUM BURIED DEPTH OF PC-1 AND PC-10 SHALL BE 2'-0". I 10', 4' COPPER 4 3 HORIZONTAL DISTANCE FROM EXISTING POLE ryo O RODS MOUNTED TRANSFORMERS TO EXISTING (3 ?•J ` ELECTRICAL PULL BOX IS APPROXIMATELY 400 FT. USE EXISTING CONDUIT FOR PC-1 FROM SECONDARY TO EXISTING ELECTRICAL PULL BOX. SEE DETAIL A I 4) MOUNT ALL ELECTRICAL EQUIPMENT CAMERA/FLOOD LIGHT ABOVE EL. 180 FT. LOCATION N ' ? QE$(?N 5E DETAIL B SHEET 17 SEE DE 17 $ < rEVCa WARNING ®@ REPAIR MANCHESTER RQA? (6T-8) SPILL GATES Q wwc DT FAYERVILLE, NC . c ? 2215549 POPE AIR FORCE BASE mo 2 e+9 V C90 7/20/05 FAYMEVILLE, NORTH CAROLINA Ambw Oaks F TH5 aAR ? ""vs - ELECTRICAL PLAN !`d mwim FFB 6/25/04 9400 AmbsiWm Bouknard NOT LEASIIIE Y THEN ORANINO 15 T wilt IgOi_ DRAFT FINAL DESIGN S16110TN. Of 5/21/04 Austin, TX 75729 NOT TO MILE CVL 9/25/ SHEET 14 OF 17 y RFY DCSMWWN OF REV501 fff DA= _ 512-454-4797 r F., 0 r 01 M-t ----- --- ---------------------------=====1====--------------------- ------ ------------------------- -I-1 P.w uE,bA i 1 , 1 , I I 1 rte. Antrn I , I i I I ?^ I I S' c??srmn 1NNPt A., 1 An : ? ACT --------------------------- ____________________ - ------- ----- A. z U BT-8 SPILL GATE ?PC•10 Cs,Md 10 69.w/rko9 E,yil Pte{ N ' F u I u M u u a-13-? I 1 ACi I 2 T tir5 ACT -1 PC-7 PC-T ( ?1(-7 -PG-7 T a-t a-f ii am-79 SM BTi-7A FP-1 SS-1 a1 J 1 J ` Il R 10 -6 a-x I`G-2 CC-2 `CC-2 a-2 6 tl { I C-7 `CC-6 `V-!, CC-4 C- PC-9 )-Y,-2 I I Q $ L--------9 ---- , '10 - - - - - - - - - - - - - - -- -- vex s J / a- 'V s'1L rwE/wP'aWr RAU ron PANGS A I Xnart. A X RISER DIAGRAM T (VIEW FACING SOUTH) X POPE AIR FORCE BASE w as rm FAYEl1E9A LC, NCT?CH CAROLINA ft, r O.1A C /J pWT AWL CCSCN 5M9wnAL 0=x) Ir 5/21/W ( 94M A - 8- TX 78729 m o?na d 1Im W Da[ 512-459-4797 DESIDNATK)N I FROM TO COND, SIZE! CONDUCTORS OTY SIZE REMARKS PC-1 POLE MTD XFMR SEC. (DOSTINC) SARR' SWOCH Sc-1 2' 4C)1, iC)I GND 2DS VA:, 3 PH. IN,:OMIN; POWER PC-2 SAFETY SWATCH SS-1, LOAD SID[ POWER PNL, PP-1 2' 4C)1, 1C)I CND 205 VA:. 3 PH. INCOM!NC POAEP. PC-3 POWEP. PNL PF-I PC-4 15[)1. 5Cj10 ONO 2D6 VAC, 3 PH. PWR_ TO A_"TUITDRS P; PC-3 P:-5 I-1/4' 12[)10. 4C)I0 GNO 208 VAC, 3 PH. PICK. TO ACTUATORS P:-5 5 PC-4 PL-6 I' 0C)10, 30/10 GND 206 VA7- 3 PH. P8R TO ACNATORS Y,-6 PC-5 PC-7 2C 10 CND 208 N4;, 3 PH. PWR TO ACTUATORS PC-7 PC-3, PC-A, PC-5, PC-E CATE A"TMATOPS 1-5 3e4' 3CIV1C, IC f0 6ND 205 VA:, 3 PH. PPP, TO ACTUATORS PC-6 P0ATIR PNL PP-I P:-9 1 IC 12 GND 120 VAC PWR. TO MONACO W2-7A $ B P11-9 PC-6 ST2-7A 67-78 3/X' C)12, 2C/12 GND 120 VAC PWR. TO MONACO SR-7A k D PC-10 POWER PNL PF-1 VIDEO J-6OX 3/A' 2C)12, IC 12 CND 120 VAC PWR, TD U,DEO PWR. SUPPLY PC-11 VIDEO J-DOX LYHTS AT CAMERA Z14' 2012, IC?12 GND 120 VAC PWR, TO CAMERA UGHTS CC-1 GATE 1-5 MOV PSM GTE A"TLIATOP.S 1-5 1 20,011 CONTROL WIRE TO GTE ACTUATORS CC-2 C-3..7 GTE 1-5 MOVE PEN 1' 23C# 14 CONTROL WIRES TO GTE ACTUATORS C-s --T,-7A a-2, WE 1 1-1/7' 2 95:)19 CONTROL WIRLS C-/ C-3 CC-2, GTE 2 1-,/. 26C )t9 CONTRO: WIRES CC-5 C-4 a-2, GTE 3 1-1/Y C) IA CONTPO. WRS CC-E C-5 LC-Z, GTE a 1-1/I' 11,)14 CONTROL WIRES CC-7 C--6 CC-2 GTE 5 T-I/Z' 31Cj11 CONTROL MR'S C/-'-8 C-7 Bt7-79 1-1/2' 54Cr14 CONTROL WARES CC-9 VIDEO J-SO% CAMERA 1-1g' PWR- CONTROL, k COW( TO CAMERA CC-f0 NDED J-EAOX VIDEO XMTR PWR- CONTROL, & COAX TO MED XMTR CC-11 V1DE0 XUTR ANTENNA A-2 3/4' COAX TO ANTENNA CC-12 MONACO ST2-74 k B = LIONTIN'O ARR. LA-1 3/4' COAX TO LA-1 (2 PLACES) C-IS W.NG ARR. LA-1 U ANTENNA, A-1 COAX TO ANTENNA (2 PLACES) CONDUIT & CABLE SCHEDULE NOTES: 1) SEE DRAWING 16 FOR ADDMONAL CETRLS ON SSA. 2) WIRING GLITTER IS AN ACCEPTADLE ALTERNANS FOR CONDUITS AT PA-lK EXCEPT FOR CC-9 THROUGH CC-13. 3) ALL CONDUIT S2E5 ARE MINMUM SZES FOR CONJUR. LARGER S2b ART- A =u TAaLE O CALLED OUT ETSEWHERE !, TH5 DRAIYMO PACKAGE. A) SEE SPECIFICATIONS M DMSION 16 FOR ACOTIONAL MFORMATION RE^.ARDINO MATERLALS AND N3UJIATX3N. FVAL DEEM ?wGTE Q WuNWS DT 1IT-a SPIV. COTE STRV Pl FATETIE171.E Pr- DT 9??1 ""`= 222Jxn r Twc AMA "IS ? CONDUIT & CABLE DETAIL ,tOI YJSIAE I' Y - AN ?,.: 5 ELECTRICAL RISER DIAGRAM ... Nm To PxC .a 6/2.5/04 snm 15 of 17 t- I? P.I bA F F? O ??I 1 n V I 1 ? 7 O i M T X L t5Yl O1R ?en?R WL wrF1CN4P6 AIC 101t [aWt9 InEY 01I CCILTC141 l.u 1YVFKIVIe9s W 'OR Cp1l' ccxw -1. R,.+s 5? .p w iceuu?«? I naaw . mn?sn. u sln .n. >- Yf+FItM YAK fW? IYA' [MJ-II-I+x OOM-is-YN c41 m f1A00 Lnw B II Y-r Ix?P I IvE t1 l 06'3EP INL WM WTURLYS NE -UK ETYL-) I?ICEFI VCWRCWN IN1 WWjr+CTLAERS .RE *OR EQUI:^, I IS POPE AIR FORCE BASE CAWERl 1s[E 5 TOP OF C4ADE 0 I R. I IMlf MATION TAPE L..?? PDLVE-WeUkE F" ME WE` 161$1. 1 1 =:' • Z hli vi -19 r a• s• f 0 A- 2: F `RED "W." Tc b B= 2' C -Nm PS ELECT DUCT BANK C =8-UP TYPE A q A NO REINORCE]AENT I+ 16 FWAL DES04 EM 6125/a ,; FAYLT7'E1'[L[.E, h-RTH CABOLAA DM'T NYL D'Sf+11 SJ6WrV.; W 5/2 1/a HlaFlb V RIOIPi K na[ ?e~ oaw YWO Nb. ear.P?d A,Y1n TC teRD 51I-15+-q97 -_-.- a Fn M(Wd WVVQ N?a3 M279 FtGAFx FOAM I lug j' j (JVE11a IY I I l l x I I j I 1 i 1 1 x i 1 f;~E11AL' i r I I I; I N V II I I !?' i a;Etkkrscrc I I I I I xl I 1 I I (T?'E710.llrj8J I r I 1 - i E I Iix- I I I I I I III il 111 (1:E7h3?iD 1: r I I I I I J' CCE?IIUIW,1 I' C I I I 6;'E71H)i1ER1F x l I oc-71(7¢?_p!G I I- I I r I I I l (S"F31 ? I I x I - I I I I I! i l j (x^E11t9C? I '. I? I r l - I I I I ! t I I l i l 07E3 1 xt I 1 1 1 1 Yf7QID I I YI I 1 1 I I C?IV{}FiFA]f ! I I I ! I aoF31n + ? I 1 I ?' I I I I I I x ! V I I I I (? I I I ' I I I I T I I I I I I I I I I I I rllll l dCF5t0.ll Irl I l ? I I '. I z' I I I I YI I I 1 V l x I I CL'231FWVp?g11 1 i I x I CJCE?I F I I =FS m--,aec I FL= I I I I . n l i x n EmFCMWA) I l I FWAL DESKW U-5 SFU GATE STRJCUFE FANUTL UL Ir. Q x TN5 w DOES tAS {MISCELLANEOUS jT '°r =3 is ELECTRICAL DETAILS _ NOT ID SCAU "` eJa/a SKS 17 or 17 ...._..?: t7 Pope Air Force Base 43 Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB, NC 28308-2314 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources April 28, 2005 Subject Property: Manchester Road Repair Approval of 401 Water Quality Certification with Additional Conditions Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 04-1995 Cumberland County You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.096 acres of wetlands and 105 feet of perennial streams for the purpose of repairing Manchester Road at the subject property, as described within your application dated April 18, 2005 and received by the N.C. Division of Water Quality (DWQ) on April 21, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3366 and 3402 (GC3366 and 3402). The Certification(s) allows you to use Nationwide Permit(s) 18 and 33 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state., or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 211.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved ATF? 4G 9a --) '< The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream 105 (feet) Tanks Creek 404/CAMA Wetlands 0.0996 (acres) 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htto•//h2o enr state.nc.us/ncwetlands Nose Carolina Ntura!!y Pope Air Force Base Page 2 of 3 April 28, 2005 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent. practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of Pope Air Force Base Page 3 of 3 April 28, 2005 the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Ken Averitte in the DWQ Fayetteville Regional Office at 910486-1541. AWKlcbk/bs Enclosures: GC 3402 and 3366 Certificate of Completion cc: USACE Wilmington Regulatory Field Office DWQ Fayetteville Regional Office DLR Fayetteville Regional Office File Copy Central Files Filename: f04-1995 Pope Airforce Base Manchester Ext (Cumberland) 401 Sincerely, DEPARTMENT OF THE AIR FORCE HEADQUARTERS 43D AIRLIFT WING (AMC) POPE AIR FORCE BASE NORTH CAROLINA 18 APR tom MEMORANDUM FOR NCDENR, DIVISION OF WATER QUALITY ATTN: 4011WETLANDS UNIT .: FROM: 43 CES/CC 560 Interceptor Road Pope AFB, NC 28308-2314 401 ISSN SUBJECT: Amended Request of 401 Water Quality Certification, Repair Manchester Road (BT-8) Spill Gates Project, Pope AFB, NC; Reference Project No. 04-1995 1. The purpose of this amended application package is to request a 401 Water Quality Certification for the repair by replacement of an existing spill gate structure, which has structural deficiencies. As instructed by Mr. Ken Averitte from your Fayetteville Regional Office on 7 Jan 05, the original application package dated 12 Dec 04 needed to be amended to also apply for a Nationwide Permit No. 33 to be able to use a temporary diversion channel during this project. 2. We are hereby submitting seven sets of the completed US Army Corps of Engineers (USACE) amended Preconstruction Notification (PCN), and application for a Nationwide Permit No. 18 and a Nationwide Permit No. 33 (Attachment 1) for the subject project. Additional documents in support of this amended application package are provided as Attachments 2 through 5. The total wetland impact is 0.096 acres, which is within the threshold for the Nationwide Permit No. 18. The package also explains that, under the Nationwide Permit No. 33 being requested, the diversion channel to be used for this project will temporarily impact 0.0037 acres. 3. We have already submitted the amended PCN and application package for the Nationwide Permit No. 18 and Nationwide Permit No. 33 to the USACE. A check for $200.00 from the project's contractor was already provided to your office with our initial application package submitted on 12 Dec 04. 4. Should you have any questions, please contact. Mr. Alberto R. Marquez, Water Quality Program Manager, at (910) 394-1637. MICHAEL R. HASS, Lt Col, _!I1? Commander APR 2 2b05 Attachments: 1. PCN and Nationwide Permit No. 18 and No. 33 Application DENR - WATER qu iIT?, 2. Project Location Map 11?E1UWQSMDSTORMWkiRBR4WH 3. Proposed Project Design Plan 4. Wetland Impacts from the Proposed Design Plan 5. State Clearinghouse NEPA Final Approval Letter AMC-Global Reach for America J Office Use Only' Form Version May 2402 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "NW%) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 18 and Nationwide 33 Permits 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page ® 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information F&EOwR P 1. Owner/Applicant Information AUG 1. 6 ?005 Name: Pope Air Force Base, Attn: Lt Col Frank Freeman III Mailing Address: 43d Civil Enaineerina Squadron/CC VENR - YVAI LR QUALM tY %=N QS NO STBRW?*ER BRA 4CH 560 Interceptor Road Pope AFB NC 28208 Telephone Number: 910-394-2561 Fax Number: 910-394-1643 E-mail Address: frank freemanOyope.af.mil 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: C.7 Page 5 of 14 Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than l I by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Repair Manchester Road (BT-8) Spill Gates, Pone AFB ® 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cumberland Nearest Town: Spring, Lake Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From the intersection of SR 87 and Manchester Road in Spring Lake, take West Manchester Road to Pope AFB; the site is after the Seaboard Coast Rail Line on the left, traveling, west. _ 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 2,130 acres (includes the entire Pope AFB) 7. Nearest body of water (stream/river/sound/ocean/lake): Tank Creek 8. River Basin: Cape Fear C7 Page 6 of 14 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site already contains a spill gates structure, surrounded by wooded areas on three sides, parallel to Manchester Road, located within a wetland which is hart of a Military Installation. The Fort Bragg- Wastewater Treatment Plant is located diagonally across the road from the existing structure. This site is located at the northern boundary of the Base, where Tank Creek flows under Manchester Road. 10. Describe the overall project in detail, including the type of equipment to be used: Overall project plans include repair by replacement of the existing gates structure by building a larger, independent structure approximately 50-feet upstream of the existing one, outside of the NCDOT's right-of-way, then demolishing the existing structure. The channel portion immediately downstream of the new Gates structure will be re-graded and riprap placed. Correspondingly, the upstream area adjacent to the new structure will also be re-graded to facilitate flow into the structure. Five, six-foot high by seven-foot wide slide gates, with motor operators that will be controlled both locally and remotely, will regulate flow. The base perimeter fence will be extended upstream to the structure and across it. A 12-foot wide gravel service road will be constructed from Manchester Road to the new structure. Equipment used on the project will include, but not limited to: a small backhoe, dump truck, earth compactor, dewatering pumps, air compressors, excavators for sheet piling and cranes. Additionally, the project will include the diversion of Tank Creek during construction. It is anticipated that approximately 0.0037 acres of wetlands will be temporarily impacted by the diversion of approximately 300 linear feet of Tank Creek around the construction site. TolTest will divert Tank Creek by placing Porta-Dams across it (see attached drawing for locations and details) and routing it through a PVC lined channel. The diversion channel will be approximately 180' long, with a trapezoidal cross-section 20' wide on its top dimension. All bank walls will be slopped back at 1 to 1 or 1 '/2 to 1 depending on soil types. This diversion channel will require the temporary excavation of approximately 1,200 cu/yds of soil, which will be stored on-site, out of potential flood areas, and covered at all times. Additionally, the perimeter of the stockpile will be closed-in with silt fencing (see attached drawing for soils stockpiling and silt fence locations). The anticipated timeline or sequence of events associated with the diversion of Tank Creek is as follows (note all days listed are working days): ¦ Excavate diversion channel 10 days ¦ Install PVC liner 4 days ¦ Tank Creek diversion 30 days ¦ Backfill/restore diversion channel 7 days At the conclusion of the diversion. TolTest will restore the areas temporarily affected by the diversion channel back to like conditions. Once the new gates are operating, the old gates will be demolished. The areas of the bank presently protected by the existing wing walls will be stabilized with gabions. The procedure to restore the entry and exit ways of the diversion is channel will be: Porta-Dams will be relocated to seal the entry and exit ways of the diversion Page 7 of 14 channel so that Tank Creek may return to its oriainal course. At that point. TolTest will begin to restore the breakthrough walls at each end of the diversion channel; followed by backfilling and compacting the diversion channel; removinu the relocated Porta Dams; and stabilizing the restored banks with coco matting or root wad, with an underlying wetland seed mix. 11. Explain the purpose of the proposed work: To provide a suitable spill gates structure to pass the normal flow of Tank Creek and be able to contain multiple hazardous material releases within the boundaries of the base. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Pope AFB provided limits of the Wetland Delineation. E V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream 11 Page 8 of 14 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed proiect will impact a total of 0.0920 acres of wetlands adjacent to Tank Creek and 89.6 linear feet of Tank Creek. The diversion channel will temporarily impact approximately 0.0037 acres. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet) Type of Wetland*** Structure/ rip rap 0.0920 No 0 Riparian * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/hvww.icma.aov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0.3719 Total area of wetland impact proposed: 0.0920-acre permanent impact 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Tank Creek Structure/rip rap 39.6 Tank Creek 34' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated riprap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and afler, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uses.aov. Several intcmet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 89.6 ft Page 9 of 14 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma) ,? Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation: N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Between the nreliminarv and final designs, the amount of rinran to be Placed within the stream and the amount of gadina of the upstream and downstream channel were minimized to avoid greater permanent impacts to the stream and adjacent wetlands. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 10 of 14 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htm1. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions 10 and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wM/index.htm. If use of the NC WRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Page 11 of 14 Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) ® It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total ? El Page 12 of 14 Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone I. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A X1. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No net change to the impervious area will occur as a result of this project. Storm water controls will include silt fences, riprap and permanent grassing on all exposed soil. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 13 of 14 9 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A kkzz,,?? /04). .) 0S Applicant's Signature Date FRANK FREEMAN III, Lt Col, USAF Commander, 43d Civil Engineering Squadron (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 14 of 14 ,. _, i .,Y25??y ? ,? , 11? l 7 f \-l ',•?. } is/? N? r ? ` `'f` f ? .v `?^? ? 1 i` 7 -1 \`\\ . r .L 00 ?, s ??? \ 136• I 1 ` `?--?.L._,- -A ?`/-\ - \ l ??i \. LIrL ?? - ?•_ ?w i? 'tiJ III ?~ _??-?i X11 .'L' _ ''','. ' ? • F??hel .'?::. . .SITE LOCATION v,,? T 13 ilu +, r' 1500' Radius ` sal ' + ? ?*? /? ??. ,: ,r: t _ .?? % ?I? f ? r? ??-'t ?"•. 'fir,-' ?l `,.? `J {? r-A S 1 OT"j A II.;,.,VUR C' I+: 13 'C' \-,(IR. F0.RCI, 1 ' arE?z '} 1\ /? .; d L!.. •a.I i,b ail t /J ?•; `rN +.? ?. FIGURE 1. LOCATION MAP • POPE AIR FORCE BASE _ BT -8 SPILL GATE STRUCTURE SCALE IN FEET Qt 'ADRANGI.Gt.OCA710N r` FAYETTEVILLE, NORTH CAROLINA Q 2000 Prepored for: v, SOURCE: USGS 7.5• TOPOGRAPHIC QUADRANGLE l,, OVERHILLS. NC - DATED 1957, REVISED 1971 DRAWN BY: EHJ ant e " C+ - znc• USGS 7.5' TOPOGRAPHIC QUADRANGLE DATE: 06 08 04 Fig. MANCHESTER. NC - DATED 1957. REVISED 1987 PROJECT NO. 1 A)-C N Z YQ f? s t; 7 .?OTN VARIES SEE NOTE . R 1 .%ISTING PIPE "'1 170 'V '70 z ` RCH CULVERT 1 -l . - I 16e Y 66 4 / .690607"E / / SEE EETA!L 2 166 > -'"+nf _-+tc•`;`i+'.`T " y 16fi? 46885'(CONTRUL LINE) 1 ` / 07 y , 162 162 I ., ` 1 /-" PIPE NryEgT u AP u,N? 1. IPR EDGE CF ` AT ?I71.0 ?- SECTION A E%ISTINC ASPHALT `+ a• 0 t0 70 3J / •' S.]7' I EXISTING GROUND SCALE IN FEET / - W:OTH V_.S (SEE NOTES 6 AND 7) .-.r7e ne C "72 112` '? I i 4N. IV 4166 ? ?' ?? ,, 1664 `POPE KB PROPERTY E J N. 521287.00 E 1 990 C3 6 EXISTING ELECTRICAL PIPE I ERT PU L fiU% AT 1 I TOP 1f RFRAP _ ERi L. 165.0 . GAL VPN12ED 162 B u' u 62 SECTION . . ? EL. 17 NEW ICLE wi EL 171 TO 173 L ? CUP CULVERT 10 20 e• 1O _ 2 SCALE IN FEET / 0 CU "RT EL TOP 7 RIPR/P I ° PERIUETER FENCE / . (SEE 5HEET 12) - PIPE INVERT ?? 05' CRUSHED AGGREGATE BASE COURSE AT EL. 1710 MAINTAIN 1.0 I -= ' EL I74.0 AI SECNGeN ? SHOULDER 1 / G I 120 SEE I T* / - ? BA:,MFILL 2HAV ' 2E PERIMEZER FENCE SEE-5HEEH2 - i _ \ Ty T ?J NJ fi'Sg „?- - -?-_-' - - • ~ _ - / IH:1VJ ?i IH.IV 1 / v ,? OW ' ill L '- e ?( J ° Y, V_ _ X t EXISTING GROUND F( ACCESS ROAD ti -- N. 5 31 9 S 1.3' CRUSHED AGGREGATE SECTION C 59 E 1.9 J. 9 / SUB-43ASE BASE COURSE NCT 70 SCALE ", N? - N 23.23921 / ,. _ 98071 20 Vti - N. 5 .37.9 ST UC C E 1. 113. C TAR P T N. 23,2 3. 6 2 EL. I6J.0 RIPflAP . \ . 1 0 F B 8 LL E. 1990, 3 .1 ` BT 8 SPILL wTE ` TE 5 LOT E 1\ /.?? 1 ST NCTURC (SEE 1 SH IS 6 AND 7) \ 1 ° I \ \ \ N. 52 .213.3. 1 H OHfi 26 \ ` flIPRAP BEDDING . o . EL I ?--•-L_ 4 TYPICAL RIPRAP SECTION?1 _ I Nor TO SCALE ?' N. 523,210.69 4 GRAD SIR CMAn L? 'EE N T 6 4 NOTES E. 1.998.107.11 EL. I7w0 1 r /nooD \ I. 5TOCRPILE EXCAVATED MATERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DETERMINED BY THE ' HT LbCAT61? CDR. N. ,19805 2. SEE TECHNICAL SPECIFICATiONS FOR DETAILS RECAROING *CUP* PIPE CULVERT INSTALLATION AND E. 1,09 ACCESS ROAD CONSTRUCTION. PIPES TO BE PLACED IN EXISTING DRAINAGE CHANNELS. 3. COMPACT ACCESS ROAD BASE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. ,,/'' W?_ W TA IN C EE / A. H0.5E WIDTH OF DOWNSTREAM CHANNEL VARIES FROM 46' AT THE SPILL CATE STRUCTURE TO 26' AT GRAD ?FG PLAN THE UPSTREAM ENO OF THE EXISTING CULVERT STRUCTURE. EXCAVATE SIDE SLOPES AT 2.: IV. 0 20 7a 5. RIPRAP TO BE PLACED FOR IB. G' IN THE AREA DOWNSTREAM OF THE NEW SPILL GATE STRUCTURE. SCJIIE I -?? ? i? / - F 6. EXCAVATI ON OF THE UPSTREAM CHANNEL SHALL NOT BE MORE THAN 24 FEET UPSTREAM OF THE STRUCTURE. Fill' L DESIG N .o, . aiJPAR, W ,A, TLU. CSTER ROAD (BT-6) SPILL WTES REPAIR Q AEWCC nTnarlo w•cn rtM /LO• ?+ Ry FA NO °r° IT . POPE AIR FORC E BASE w?rtti V NO C OLIN K m FAYETTE IUE. RTH AR A w+ PLANNED MODIFICATIONS 4 _ _ `•"'X T?ii ?'n0i•w1 A. ? o•A»w a moT R Mr _ :a.-•A1 !I]- , fcxl e.c a/}/o. a ar 17 n \o • s • • s • / FNTRY A, EXIT DIACR41 DI\FR4ON CHPIVIFI SECTION 100' 00' EXISTING GROUND HORIZONTAL CONTROL -i ,-, IRp5 STAKE i,LNE 174 171 2 523..60873 t I12 I)- ,? / ? E. 1.998.305169 zz 17 0 ?S - 1)D 6H ti 1 _- 166 < N - --_ 161 16. " VE u 162 C ur+ER 162u /-/ 66 SECTION A / h o 01 ? er I a RWNAP / ' O w0 _ a m it 1 l=+ 10 7 ol o INV OUT. EL 164. BO,/ A 90 V SCALE IN FEET FORT BRAGG MILITARY R RVATIGN 0 5 / WASTE WATER TREATMEN PLANT .?/ ,, INV OUT: EL. 164.9) r)IVERS104 CHANNEL WITH 11N' R SECTION GUARDRAIL /.• \\ 2 CORR ED METAL PIPE ARC 11' WIDE • 66' TAIL \ \ \ -1' THICK CONCRETE I + { ? 20' 100' 100' E1ISTI1NG GROUND 172 72 t 170 -? 170 z 168 - 168Q 168 i [ONiROI UN / / / ' \ WALL 1 1 \ 1 GNtC 166 _ -- --- T.H 16 `m'- --. 16 / \ //•" \ BENCFunRN RS/WA E WV EL 165.15 ? \\ 1 ^ 0\ \ 1 J" ,A 2 162 2 ?H R 167u FUEL LINER LOCK TRENCH B B / CUT W TOP DF CONCAE INV IN: CL. 165.08 ON CULVERT I.A. H \ I -- IM ,? LOS T Of SOIL BORING GT-01 SECTION - pl C / ELCVA7ILH: 1 / 0 10 20 30 2Sl }? S OIICR fE RE OVED) ? y E q l B,O9 ' SCALE M FEET CONTROL CONCRETE WNG WA /•/ _ / TO GE REPLACEYG S" GUANDRAIL . r'`5 LL GATE STRUC 7URE / GABION BAGKE TS 6307 /' /" ARr Younal PORTADAII STRUCTURE SECTION ,P /- EDGE OF PPRONIMATE LOCATM OF FIBER OPTIC LINE ASPHALT APRON TEMP NE ARY DIVERSION DAM SPILL GATE LOCATION STECI SUPPORT FABRIC MEMBRANE .PERVIOUS FABRIC !BANE SEAL F" SHEET / .? - • 074 C 7 1 + 2 72 1 170 170 168 16H4 L ? ?1 164 62 161 1 ? 1 LOADING (STONE) r / 5CE NOTE S SECTION C-C \ - 30 ((( \ APPROXIMA DL l? 4 / HQ \ D ID 70 S 7 \\` Of UNOERG ERGR 11 POPE AIR FORCE CTRW- 4 \ S: ALC W FEET 1 F BOUNDARY LINE N W 180'.20• DIVERS, ( 4 CHANNEL NOTE A >, ? I LEGEND 1. SRE TOPOGRAPHY AND FEATURES . 23 3R BASED ON SURVEY A ONRY 20 1J, Y THE THE ROSE GROUP, B U CONDUCTED AN E 104 IE fAVETTEVIIIE, C. NC. TELEPHONE 57., IE - ""? l W ? M LIMITS Of WLT - - 910-323]23--3 ]100. NDS ,,, - y - y SILT FENCE NNPROVIDED BY DAVID WARREN. 1. BORING LEINFO SV LE ? I R , ORP AND ELEVATIONS ATE IN UNITED ]. NIA,. COO A T NN PRO-CREEKATE STATES FEET. HORIZONTAL STATES IKE AMERICAN HATES ARE SUAI BASED ON THE NORTH T ABOVE DATUM ATUM tHAD) 1983 . SEA ELEVATIONS ARE N W E i. I E y ? TEMPORARY GIVE 90N DATUU G 1919 I CnI SING THE IL6TIONnL L EOGE CVER U 6 DAY (NGVD 19). 0 O oo / g 4. LIMITS OF WETLAND LELWEATION 0 USED WITH THE PGRTA DAM WILL BE S. LINER - 0 2p 00 60 - ANCHORED AT THE END BY WEIGHTED .ATERAL OR BY A BI r/ u SCALE W FEET LINER LOCK LINER LOCK TRENCH. FINAL DESIGN .3 ' ' W.K m E9 rNC REPAIR MANCHESTER ROAD (BT-8) SPILL GATES Q T??° ] ,NC /L'`/-3, / , ---- u+. Ny ? fAYETMLLE, NC ?•. v HK.L ? l POPE AIR FORCE BASE L l „.. ? ?. A4AFT r J NORTH CAROLINA FAYETTEVILLE CHANNEL DIVERSION DETAILS a.TC n , i 1 V7 wlt°AI E 04/10/0] 171-e71 rAIHIYi vKn a 0 0 0 ,? [%6TIxC PwF ?1 11 111 /" I 7RGN GuLVCRT 1\ 1 , 1 1\ /""/ 2 h{4GF'07"F 1 \ " HAA5'(GOI1TFOL l E) PAr IP[ -I71- a m.a FOOE 1 [r,srxlC Aswuu 1 I ? /' \TO N. 533.187.00 L 1.954071.03 PU15TWO ELECTIQAL LL 6G[ CL 171.0 /•" TO OWIN ,1p ca?qc TJ 1 1 CL L 7. lU I73 lt• hEW \LYCLL 171E a "' cuvF"' -- US OF ?TLAND DELINEATION / / OVIDED Y POPE AFB) . APE -1UT1 171.0 AT CL. i 1 OER FENCE R NVETLAND IDIYACTS K PE (ss srSCT 12) \ \ W AREA = 0.096 AC. LENGTH = 105 FT. F AcGas "rra N. 1.",13.2]0.21 yc-? F.1.a94 ,077a0 - 171.9 M. 633.23303 L 1.9'"P9.{2 u n..a Er-{ SPILL 177E ss+aTS a AM1D 7> I \ I _ _ ,.... LN:M LDCA710NJ . M. 1139W 1,959{.1 ,10 4{31{ r=IN . -O LAN { 9 G 70 ? SGA1[ Ix r .1m' ? -_- . • POPE AIR FORCE DASE , .cncr Nr4+o+o . •. .?„?.. _ rAYLITLV=. NCREH CAROLINA a„ 1, l iiHs mo APEAS WKNCATU APE rlf c wf Uwis a cnA+as TvrAL wVCrz or P-N=T r.. Ar ER. 1 L h01M9 MdU1LJ ANE TM04 KONG rhE CChTERLNE 0 T Nx (J1[[x. N.A,lui w TT>. ST-{ SPLL GATE STRUCTURE FAYETTEALLE. NG • Q 5UMMARY OF 0 n ,, WETLANO IMPACTS V 11,0. 4QI d 1 4- 0 0 0 -P Final EA for Spill Gale Consiniction NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION IITT£RGOVERNMENTAL REVIEW ? STATE 1IJ IIIER: 04-E-0000-0030 F03 •. DATZ RECEIVYD:07/29/2003 ' AGENCr RMSPOViE: 88/25/2003 REVIE'rl CLOSED: 00/29/2003 HS RENEE GLEDHILL-EARLEY ' CLEARINGHOUSE COORD DEPT OF CUL RESOURCES C#01 ARCHIVES-HISTORY BLDG - MSC 4617 I RALEIGH{ NC REVIEW DISTRIBUTION CCGPS - DEM, NFIP S DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE DEPT OF CUL RESOURCES- - - ` ' - DEPT OF TRANSPORTATION MID CP.ROLINA COG PROJECT INFORMATION APPLICANT: Pope AFBI? I co, TYPE: National Environmental Policy Act {] ERD: Environmental Assossment/Finding of No Significant Impact DESC: Proposed action is to demolish and reconstruct three existing spill gates and construct one new spill gate aZ a fourth location on Pope AFB. The attachod project has been submitted to the N. C. State Clearinghous¢ for intergovtr:uaontal review. Please review and submit your response by the above Indicated date to 1302 Mail Service Center, Raleigh 14C 27699=1302. If additional review time is needed, please contact this office :at (919)807-2425 AS A RESULT OF-THIS REVIEW THE FOLLOWING IS SUBMITTED: 80 COMMENT COMMENTS ATTACHED k SIGNED BY: DATES ?' 111! t l 016 al;f• p e 10Da AUG 0 4 2003 11 6.0 List of Agencies and Persons Consulted and/or Provided Copies 6-15 Arne. }{• S U -$ Z w i i.d i.1 o; o? I o? . 1} 1 M ? i Y r0'? r ? BT-8 SPILL GATE STRUCTURE FOR POPE AIR FORCE BASE FA `rEVILLE, NORTH CAROLINA, USA PREPARED FOR: AIR FORCE CENTER FOR EPdVIRORM .TrTAL EYCELLENCE RT-5 SPILL CAS N SIRLICR M I F POPE NIL" PARK ?PIJlP E `^^^+yyy?---? H1145TT GATE ?Id ORM1IL ALLY- ? ? ? GTE WILLOW LAKES IddJ'$1F/9 1 COl COURSE TO FCRT POPE AIR RORCE BASE CONTRACT NO. P41624-00-D-8028 TASK ORDER 0193 / CARU1117A PR0.lECf ?/--z? _ f?eMtk lmetYM4 \ STATE tdAp NOT TO SCALE !;EM MAP D 3 d 9 S--qL N UILES `"` VC%. TIM ofxm POPE AIR FORCE BASE DI RA DC9r SU WIR TLW 5/21/D. t0?IY'J'RF f0i MOMMA, Tm lwlo/at FAYEITLMLE, NORTH CAROLINA FRC- M D(SG. 5~nA, (33) TEN DenS/C rr.?ran o ,<rm r nrz arcs a.- n wu..oro 1.00 &'V^ Tx -,k779 4S4 ;77 5?2-.-Iri7 DRAWING INDEX SHEET NuNEER DRAW= TITLE I COYM SHEET a" LET'EM AND AISRLWTKM } D37TN4 CCI:NIID'G 4 PUAW9 UODYLQIONS S DEMOLMON PUN 6 SN L)'.IURE PLAN AM PROMS 7 MUCIURE SM110M AND DUALS 8 STRUCTURE DETAILS P RE]NrDRCOAEIlT DETNLS (SHEET 1 OF 2) 10 RE1Nf'OIC61P.T DETAILS (SHEET 2 OF 2) 11 TRASHRACV=URTIY GRIT: T2 TYPC&L FENCE DUAiLS 13 CITE NSl'ALUrlDN DETAKS 14 EuXTR AL PUN 15 CONDOR AND CAE DETAIL rLCCTWA- FdSER DUCRAU 16 M04%CO FFZ SYSTEM CLEZTRCAL m=Rm OIE Lw-/PAN61 SaimuLE 17 YSCEI1NSDllS ELL^TMA-1 DETAIrS - TEL OT-8 SPILL CATS STWU=RE HK! F TNS W DOES , uusLx r COVER SHEET T'" Daw is YZ NOT TO Scut E/00/04 FRAL DEESIGN FAYETIEYILLF- NC ??"t" L"7YiM5 sm i o 17 t- N J v? ?.I rr r.r U r L r lr, O R 7. ? l- ?i I^?I 'S I M L. -- LEGEND INTERSTATE NIOHWAY UNITED STATES HrHWAY MSI1NC E2.EVAT4ON CONTOUR WITH ELEVATION IN = ASOV_ MEAN SEA LEVEL NEW ELEVATION 0' IN FEET A BOVEZ. -FAN SEA LEVEL CD-1 IXISIINO SURVEY CONTRO_ POINT -•••-•-- EXISTMO WATER LINE OR CREEK W W W- LIMITS OF WETLANDS FLOW INDICATES DIRECTION OF FLOW -? -? - FENCE GUARDRAIL PAVED ROAD ------------ ------------ UNPAVED ROAD ?• . f. NEW CO!N'J'.ETE r EXISTING CONCRETE EXISRN; CONCRETE TO BE DCMVJSHED 9 STRUCTURAL FT,L/BACIMLL V L: RtPRA° RIPRAP BEDDING TRASHRA7C/SECURITY CA L-? GRATIN . CRUSHED ACCRECATE BASE COURSE CROWED ACGRECATC SUB-BASE CCURSE NON-SHRINK CROUT F.A. OSOI DRM1 IM DESCN SLAMOTVC NIQNmWR !DS St _e MILIMP A41 D'SGM SS,7 AL, C,i 0 EXISTING UTILITY POLE -S.- EX',ST[NG SANITARY EEWM UN£ -n U ErSTMC CAS K- I EXISTING SUILDWG/STRUCTURE -UCE- UNDERCRDUND ELECTRICAL LINE ...... _.:,;.:._..._....._ FIBER OPTIC LINE -W EURIED WATER uNE -CM.- CUP CULVERT EXISTING LIGHT POLE TEST HOLE LOCATION O EXISTING MONOORINC WELL/OCSERVATION WELL TH7_ RYE GROLP SURVEY CDNTRDL • N'EW SURVEY CONTROL POINT Q ECM - EXISTING CONCRETE MONUMENT O MIT DGSUNC MANHOLE E95M-T NEW SURVEY MONUMENT ---'-- CENTERLINE RPCHF O? WAY .?.-, ., ....- PERIMETER OF TRH .--??• TREES TO DE REMOVED POPE AIR FORCE BASE FAYE711Vl=. FORTH CAPOla?,k ABBREMAMON C AT c DECREES ? GWAEifR FEET N'CH_S PERCENT _ PTVS OR MINUS AFE AR FORCE BASE ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BE BURIED ELECTRICAL SCS BELOW CP.OUND SURFACE FL CENTERLINE C! CONSTRUCTION JOINT CMP CORRUGATED METAL PIP; pR CDNTRA_-TINC OFTICER'S REPR°S£NTAINE CP CONTRCL. POINT DA DM.MJER E EAST EA. FACN EL ELEVATION H HORIZONTR_ INV. IIAIERT LLAX MAXIMUM MH WNHO= MIN LANUUM MEL MEAN SEA LEVEL N NORTH NAD NORTH AMERICAN DATUM NAVD NOiTH AMERICAN VERTICAL DATUM N= NATIDNAL CEQOETC VERTICAL DATUM NO NUMBER NTS NOT TO SCALE 0: ON CENTER CD DUTSOE DIAMETER CE DVEP.HEAD ELECTRICAL P11: PO_YVNY. CHLOR'DE PROF, PROPOSED S SLOPE SCH SCHEDULE SM SURVEY MONUUENT STA SIATPON TP TEST PD TYP TYPICAL USA UMTED STATES OF AMERICA V VERTA'A_ W WEST OR WATER LINE FNAL DE-8104 hrM Gob IF TINS M DOTS WW Am 1n WoMw7q JT YFlSUIp I' ' Au W, IX 14729 11[M DFM ?C 6 011-51-1177 N S[liF M-B SPILL GATE STR'J=c_ FAYETTEIDLLE, ic Ian M[B I I LEGEND AND ABBREVIATIONS c/7O/w S-? 2 OF T7 HORIZONTAL CONTROL _-L IRON STAKE t?l N: 523.451.873 .? /•/ E, 1,99,°,305.169 a' / RIPRAS /./"/ esA 4A5/ / 4 INV OUT: EL 154,60,. P µO/ (G,, fORT BRACG UUTARY P.SERVAIIDN ? ????-, I .'// yR"5j 4? WAS WATER TP.EATNENT PLANT INV DU-T: EL 164.97 CORP.tICA, : UETA PIPE 1 AR 5 11' WYOE r 6.8 TALL / .. GUARDRAIL /"/ / 1 15 l // f? LN U WALL INV L ICUT INTOO /CUT IH TOP LINV N. E; tC595 [CON-POL ON CULVERT HEADWA2 ? APROO IUA-E LOCATION OF SCI. BORING GT-01 LLEVAT.OIr: i7Ai-Z wE9 `?./ / N. NCRETE SLAbr(GAAT' Rr'AtOV;?) / / L 1,945.:94.57 ? ..r. R RIIZSAKE CONTROL GUARDRAIL EXSRHG BT-6 SPILL GAT- STRUCTURE L / N: 623,291533 I?-? yI PROXIUA'LLU'.ATIOn ?I EDGE OF OF FBER OPTIC LINE LO'dCPET APRON AS-HALT ,/' AiC DOC n ' . L? /'• ?.' / ELECT Merl r-LIAUTS OF W:1lANCS y? U t CRISTN STRJ- lRE / C Ar6 ` -PERSCNNE' CAT / `APRRO%IUA is t.OCAMR '.:l O 20 AO ED P• UtfJER,.RLUNB"CLCCTfU. SCA IN FILET POPE AIR FORCE BOUNDARY LINE£ NOTES 1. STE TOPOCPAP Afd FEATURES ARC RASED ON SURVEY k l} .? CONDUCTED ON JAMLUR• 2O, 2=3 BY THE ROSE CROUP. F 1 104 GRIfSP,E S., FAYETTCVCIL NC. TELEPHONE y ?t.A 910-323-3403. W 2. BDFINC HOLE NFDRMA71ON PROVIDED BY OAVIO WARREN, URS CORP., NOP.R6N',LE, NC. UNM STATES h ASURVEY MET. L, COORRDTNGR A D E L COORDINATE IN ARC APPROXIMATE E BASED ON THE NORTH AAIEPI AN DATUM (NAD) 1982. Q7 i TANK CREEK ELEVA7QNS ARC IN r= ADDV£ MEAN SEA LEVEL (NSL) USING THE NATIONAL GEDDEIIC VERTrAL DATUu Of 1929 (NGVD 29). S ) E?` . 1 4. UM 7S OF WETLAND DELINEATION PROMMO BY POPE AFE VIA EMAIL ON MARCH 5, 2004. . ] MAL M-SIGN M uml--; ,.. r OT-6 SPILL GTE STRUMIR.E FAYETTCViLLE, H= e r .. mK ma s/30 /w POPE AIR FORCE BASE NKB Zol FAYETTEVII.L,E, NCP.T}I CAR6LINA r ,"•a au ooa Q7 Y .. Nrodm?.rt my S~-AL m "/'0/01 rwy«w o r- swn mn3/c7 A 00 wme.? R 1b? Nom. em Na w sua r EXISTING CONDITIONS 3 AuMm, 779 i.(M pNrrl" IS K tT7 n uP, a ?y or rn?mx F GPR S17d5t-1747 M]i TO S:III rrz y/b/t)? SHIT 3 01 17 / ENTRY & EXIT DIAGRAM DIVERSION CHANNEL SECTION 10.0' 10.0' EXISTING GROUND HORIZONTAL CONTROL ? /-" IRON STAKE 174 174 N: 523,461.873 172 - 172 zr /' E: 1,998.305.169 70 p 70 z ° °_ 168 --}158 / / 16666 < p`FE w 164 I 164 w / /' / 35 , V SP?T? w 162 PVC LINER 62 w 0 / / 45, - j6n2 SECTION A-A. ' RIPRAP __ /; / SR 1 D /- w u cs DIS uRBANGE 0.0037 r°ru 0 0 20 30 .. INV OUT: EL. 164.80,. j' 'OP R FORT BRAGG MILITARY RES WASTE WATER TREATMENJ ERVATION PLANT ,// 55E SCALE IN FEET WV OUT: EL. 164.97 DIVERSION CHANNEL WITH LINER SECTION CDRRU^ ED METAL PIPE ^° '1 ARCH 11 t4CE x 6.6' TALL EXISTING GROUND 2.0' 10.0' 10.0' 2.Q' GUARDRAIL- : 174 /,' 1 11 1 1' THICK P- 174 172 172 - /-/ ?CONCREi / / 1 1 1 WALL / 170 702 2 168 `D 168 CD ONTROL LIN c 166 16164 w 162 62 w 1 NV EL. 165.15 ` OCK RENC MARK RE B_NC CUT IN TOP OF CONCRE FUEL LINER - - INV IN: EL 165.08 ON CULVERT HEAD1 APR, 'IM LOC C OE SOIL BORING CT-01 B-B SECTION 1 ./ / ELEVATION: 17 .I N. 523,32-- 7 / CONCRE ' LA E, 1 ,094.57 ?ATE REI OVED) 0 0 2D 30 CONCRETE WING WA OR / SCALE IN FEET CONTROL O BE REPLAC TO GUARDRAIL EX15TIN ILL GATE STRUCTURE 630 - BION B9SKETS '" AFTE ?MOUTION S / 7.157 / PPROXIMATE LOCATIO EDGE OF OF FIBER OPTIC LINE ASPHALT A ?D? APRON TEMP NE RARY DIVERSION DAM W SPILL GATE LOCATION PORTADAMaSTRUCTURE SECTION o FABRIC MEMBRANE IMPERVIOUS FABRIC STEEL SUPPORT NG SE T ALI SHEE FRAME 174 T- 1 - F6 6 ? 4 s -7 a 5 dNF ?? ?. ? 172 172 - 170 170 ° 168- 168° < 166 66 a 0 O ? n' ti ?1` ?? / 164 164 162 w t Z ? / // x 1 G T Yr / \ w 162 LOADING (STONE) SEE NOTE 5 sl a' 4? \ /i APPROXIMATE OC OF UNDERGR N3-EL ?E rA a V i i /SF ( a ti? y 1 N 5f QC?RC-- : SECTION C-C 0 10 20 30 POPE AIR FORCE SCALE IN FE BOUNDARY LINE N EW 180'x20' x DIVERSIO ? N CHANNEL NOTES 7 % 3 1 \> I LEGEND IMITS 0. N F 'ET - 1. SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, 14 ILLESPIE ST. F AYE7 EVILLE, NC. TELEPHONE C. T_LEPHON_ ND S 910-323-3400. n ((JJJ??? SE - SF - SILT FENCE - 2. BORING HOLE INFORMATION PROVIDED BY DAVID WARREN, URS CORP., MORRISVLLE, NC 3. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UNITED U Sig _ 'III " w TEMPORARY DIVE Ili' DAM A / T RSION PROXIMATE q NK CREEK STATES SURVEY FEET. HORIZONTAL COORDINATES ARE BASED ON THE NORTH AMERICAN DATUM (NAD) 1983. ELEVATIONS ARE IN FEET ABOVE MEAN SEA LEVEL (MSL) USING THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 "g (NGVD 29). m 0 0 y o G:'? - a n 4. LIMITS OF WETLAND DELINEATION „ m m m co c of rn of 0 20 40 60 m 5. LINER MATERIAL USED WITH THE PORTA DAM WILL BE A ANCHORED AT THE END BY WEIGHTED MATERIAL OR BY A 00 w w w w SCALE IN FEET w LINER LOCK TRENCH. FINAL DESIGN l WARNING pESILN[6 TEM REPAIR MANCHESTER ROAD (BT-8) SPILL GATES REVISION I n ????? "" RAM FAYE TVILLE, NO FINAL DESIGN E" G6"°'°° p? POPE AIR FORCE BASE (( JJ LNG ° a ^ ' GfEIXEJ HKB PROTECT 5649 22P DRAB FINAL DESIGN SUBMITTAL I TEM 05/21/04 ?" . NORTH CAROLINA FAYETTEVILLE IF TH AR S R"" EWED T °RA1Yk4 EM 1o/1D/G3 I nI IN MEOUTE bas sueMl a , .? "' 'I_; DOES I B NOT MEASURE 1' M [ CHANNEL DIVERSION DETAILS PRELIMINARY DESIGN SUBMITTAL (3D%) TEM. C6/31/03 ,4i- -- -- THEN DRAWING 15 MT7 wl< REV I DESCRIPTION OF REVISION BY DATE NOT TO SCALE L 7a' 6/30/04 SHEET OF EXISTING PIPE \ ARCH CULVERT N69'D6'D7"E 46B.65'(CONTROL LINE) EDGE 0= EXISTING ASPHALT, \ EL, SEE D 2 T 1 ? r1? ?i 2H:1V? PERIMETER FENCE r __ E - 2i .?Nl a?T \V TM L a ACCESS ROAD GRADII? PLAN 0 /lu 20 _ SCALE IN :Eft \?1 l \ 1 \ 11 1 t ; \ ? 1 1 w ,? l / / SEE DETAIL i TOP OF RIPRAP E_. 167.0 11 o I `11/ TOP *OF RIPRAP 1 EL. ?67.0? S?1 ,r?` NAB 7 1i? .. J N 1 I _rt ? \ /11 N. 523.210.69 E. 1,998,107.11 a EL. 174.0 Z /' -CALERA JLOOD „HT LOCATION N. ^ ,198.05 E. 1 a9.,, W 1 9? N. 5 337.9 ?ST UCTU E. 1,9,98113.98 r,CCIITROL? . 523.2, q 8?-,-8 SPILL- ?? E. 11998, ATEST,RUCTURE 11 ? 10 1 1 1? CHANCE TAN K A?T. 171 a 4H:1 V 169. /ERT . GALVANIZED 169.0 ?8 Q CMP CULVERT ?ro a 9g,91 ?? / 1 B? ?I I ? I ? o RIPRAP -176 174 172 0 170 168 166 164 w 162 WIDTH VARIES (SEE NOTE 5) 1 _ 174 174 172 _ 172 170 .?ti.. - 170 z x C 168 168 w 164 -2H:1V 1656 4 w w 162 ?.5 BEDDING `-1.5 RIPRAP 162 w SECTION A 0 10 20 p4 30 SCALE IN FEET EXISTING GROUND WIDTH VARIES (SEE NOTES 6 AND 7) 176 174 , t 172 ' 170 168 0 --P ;< ----------- n ?„ 4=? 166 Q > 164 162 w SECTION / e 0 10 20 p4 30 SCALE IN FEET PERIMETER FENCE (SEE SHEET 12) 0.5' CRUSHED AGGREGATE BASE COURSE MAINTAIN 3.0 EL. 174.0 AT SECTION SHOULDER 12.0' I ACKFILL w. ?? - - ? tHa\ tHav J EXISTING GROUND 1.3' CRUSHED AGGREGATE SECTION C I SUB-BASE COURSE NOT TO SCALE o< EL, 167.0 RIPRAP - N \ \ o ILI I 1 ? `RIPRAP BEDDING TYPICAL RIPRAP SECTION D j NOT TO SCALE D< NOTES 1. STOCKPILE EXCAVATED MATERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DETERMINED BY THE COR. 2. SEE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING "CMP" PIPE CULVERT INSTALLATION AND ACCESS ROAD CONSTRUCTION. PIPES TO BE PLACED IN EXISTING DRAINAGE CHANNELS. 3. COMPACT ACCESS ROAD BASE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. 4, BASE WIDTH OF DOWNSTREAM CHANNEL VARIES FROM 46' AT THE SPILL GATE STRUCTURE TO 26' AT THE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE. EXCAVATE SIDE SLOPES AT 2H:1V. 5. RIPRAP TO BE PLACED FOR 18.0' IN THE AREA DOWNSTREAM OF THE NEW SPILL GATE STRUCTURE. 6. EXCAVATION OF THE UPSTREAM CHANNEL SHALL NOT BE MORE THAN 24 FEET UPSTREAM OF THE STRUCTURE. J I I FI L DESIGN ?w o? / FOR PERMITTING CEO 7/20/05 WARNING DE9DNED TEM REPAIR MANCHESTER ROAD (BT-8) SPILL GATES RE"voN /a REDUCE WETLAND IMPACTS TEM 5/2/01 TILE FAYETTVILLE, NC 4 o e w / FINAL DESIGN EMI 6/25/04 CHCCxEL. PROJECT POPE AIR FORCE BASE HRB 22235699 /Al DRAFT FINAL DESIGN SueMITTA. TEM 5/21/04 FAYETTEVILLE, NORTH CAROLINA INTERMEDIATE 60". SUBMITTAL TEM 10/10/07 Amber Oaks If THIS BAR DOES P[ie Rrn MT-1 PLANNED MODIFICATIONS ?- 940° Amberalen Bautevard NOT MEASURE 1' PROJECT w.CER PRELIMINARY DESIGN SUBMITTAL (30R) TEM 08/13/03 THEN DRAWING IS MT7 w -, TX 78729 p?r•. REV oescRlar10N or RcvlsoN BY I oar[ 512 -454-a797 797 NOT TO SCALE 8/2/04 SHE -7 4 0' 17 `` ?? PROPERTY I I N. 523.287.00 / EXISTING ELECTRICAL PIPE IpIVERT E. 1 ,998, -03 PULL BOX AT E?Z 16 GRA " T? -8 NE A' ICLE GAT RA'? 0 ?.. " ? EL. 1 74 TO 173 s CU T m/x PIPE INVERT AT EL. 171.0 N 523,239.21 Y 1, 98077.20 ti EL. 1 .0 BT?8 SPILL GATE STRIUCTURE (SEE SHEETS 6 AND 7) N. 528,213.34 E. 1,998,080.26 EL. 1?S.o t- M J ?r t STRUCTURE 1-0'= r (Ty") •-i i RrM L GATE O?ERATOR AND OPERATOR SUPPORTS (GAT- I 1- r `-•IXISTINC PIPE j OPERATOR NOi SHOWN) REMOVE CRTE XEACwALL SEE NOTE 4) CONCRETE STRUCTURE EXISTING PIPE ( ARCH CUEIRTt-? I ARCH CLT.VEM -\ I L ?, I I I -.,`• ..? •:... ... ? _ :. -.. ? '?` />r• ' f ?S /Y REMOF EXGTING OAT,,- (EL. 177.21) CU.V[Ri HEADWALL `RTt41wtN ------}---------------------------? Rol rAr CRATING i ?-W16N40 (REMOVE) J -------------------------- ---`-----------`----------- -------------------------- ----------------r.? .+: ?. J 11 I 25.1'i ??w REIJM''E EXSTING SU9E CAFES (3 I {SEE NOTE 4) r REMOV-L CAT- r l HEADWALL CONCRETE ... .. .... . .... . . .. ty STRUCTURE (SEE -y ... ... « r.l HOTE 4) n U i Q 34.D't '\-CLLV RT HEAOA'ALL TO REMAIN EX:STM CONCRETE SIDE WALLS TO P,- NI R?'E TRASHR4-'K I -RE1104E W1fi.10 (NOTE 2) AND SECURITY SCREEN gjDE LATES i?•) (SEE NOTE 4) : / A71O S-EMS EL. 166.71 a_ 166.91 NOTE 4) 1.0'± (TYP.) ;e x }!. 1.5.1 ,cf f p .. ?? e. 13.74 , A -- -------------------------------------- CUTOFF WALL os j S4WCUT AND RfMOVf-/ SECTION Fl ALL CONCRETE NOT TO .ALE C5 UPSTREAU OF SAW'CUT JUNI i REUO?- TRRSHRACK ANC SECURRY SCREEN (SC: NOTE N) 4,0't P 4 FY g TOP Or HEAD W'LLl r RATING P_ 174.It r (REMOVE) g I-E STRUCTURE NAPoES ` 5 I 4'1 ! -W16.40 -}? / EIOSnNG -- (RFJXJ`E} I ---- (-CCMPA,-TED FTLL /. J t L 7 I 20'3 11.1, (TYP.) ° al • ? [? %? /l,??s?,r ? ??J??f .;,/..: fir/ ??:'?? .??r/? :?...` \ I o I ? ? N A 3 NOT 70 SCALE CS I POPS AIP FORCE BA a , .. r DA.rT rrw ttsoE s?.eLLTIk TCV s/n!w ' , OJ +rt0m¢u2 eoX swrK m +oAIa55 FAYETTE ;; VILLE. NORTH CAROL _ "EL.-N LAu" S9rt1.V_ (3m) TEN 06/11/03 I m aaErr.w o mm. n a¢ TW 0- EXISTINC GROUND 4'1 I I I I Fk5 NG L COUPACTED TILL N N 52`,319 ?t :1.99°•117 ?? I$QI N RENO' APPROXIUAELY 165 OF C(ISTING.PLRNIETER FENCING. ??. (T,'Y,NOT- 5) GATE,i?. ' A? . -.' ?N 523,26A. E 1,996,029 EXISTING PeRIMETER FcNCE ???7?•? NOT TD SCALE "v1 `D E'NS'ONS 0- IX:STMG 07-6 SPLL CATS STRUCTURE A. THE GATES. OPERATORS, A)*/OR TR/SPRACK WILL B- ARE APPROXIMATE. CCNTRACTOR TO FIELD VERIFY SALVAGED. CARE SHOULD RE TAKEN TO ENSURE IHE DINENSiONS. FEATURES ARE REMOULD IN SUCH A WAY TO PRESEFA2 THE MnPM;hT WITHOUT DAUALE . CON'CRE(E WAILS SUPPCRTINC EXISTING EMBANKMENT ARE TO REUMN UND:SNR6E0. 5. FOR ESTIMATION PURPOSES, ASSUME FENCE TO DE CHAN UNK FENCE, APPROMATELY 7' 24CH. IN ORDER TO L"Ig7A1N WATER-CONTROL CAPABIUTIS• DENOLRION OF EXISTING STRUCTURE SHALL BEGIN ONLY AF1ER CNTAJNING WRNTEN APPROVAL FROM IHE COR. FKAL DEMN i ruNN cm ST-6 SPILL CATE SIRUMRE FAYETiE47UL MC rev Q 3 o AA" K. =135"w N 6 THIS IAA " 'm RE I" ? • DEMOLITION PLAN ra 9 W wrodN4? 6ew.aro h91n4 TX 7X725 THEN c 11c n wi' 512-5-297 NW = -E i+R 6130/0, SKTT y OE 17 3 EEE SHEET PILE oEfu; BS-B SPILL CATS STRUCTURE oe ri ?` Uo O6 imo Ua PERIIfTER 12NLE, 50. SIO DRNEN SHEET PIL`. \ CONTROL JCIKi$ (TYP '?'! ($LE SNEET 12, iRANSlTITION, (LfOFF WAIL -•? DETAIL, SHEET r1 - --' -- ;? -- ---' - , ?1 I I l'-E' 1-E' i I 0. ERATOR DECK I ! (BEYOND) ilr ? I: 11 ANTENNA TOWER 1? h- l_ .- ?_ l_ r _ ,_ ,_ I?f (SEE NOTE 2) I I I I ._--._ I•-? f RNSCO CONCRETE I IIII I ,p IIIN // /p ANTENNA SDPPORT t1+DOCR RuNCS ?t + r ! 1 E WADC GTE I -?HNIDPoVL / r r__ •-? 1 Ell?EDCED INTO I 0g WATERWAY n III ($F: SHEET 12) RLOCK v l 'I L// 1 III CONCRETE I 11 i,l LR.PRAP, RIPRA° 'p 'a EEDDING AND SAND COURSE, J Fdl NOT SHO%NX FOR RASE SUP-6ASE COURSE. I I II I I RACK ? -TRASH I I ?IJJtltt ? A WDSAND FILL NOT ? L ) a AND I [....... .?t ... .I . .....:... (? ? a.. Top J 5 S IIII; ?I......... .:..;.... (, ... !I ..._.L.... .. I' 1 .I. I?III I I L J 1I I /__?il 1 I I I I 1, ORIJFN SHEET PILE SLIDE OAE-/ J WTOFF WALL STRUCTURE CONTP,OL PUNT-11 HAIDRAL h N. 521,241.26 (S= SHEET 12) 1,951,117.1D BOTTOM OF TRA,HRACK/ FL 167.09 MUMEE PLAN F. SUDS CATES SfCURnr CATC D 4 B 12 .+ CL 221,0 SCALE IN FEET L JE KPIUETER FENCE NOT SHDKTI I ILL 3 S[T G9F DRNL C E1-B W r 1 G,LtlAKZM GATE STRUCTURE u OPERATOR DECK Iv SHOE FATE SUPPORT WAITS l?.1 SffIL -?__ ANTENNA TOWER \ (a!YDND)(BEYOND) /., ?? I 1 I? I EL 112.0 11J PUtMETER {ENCL r (SCE SHEET 12) U 2 EMBEDDED IN70 I j JJ I I CONCRETE I 0. 171.0 L TO (SEE SHEET 10) __y I I UATCH '?-`---- 4------ I- ----- WT?1 E XICTING -- - - - - -- r T--- -----, _--_--, o I fACCS¢T:`S SHEET ROIL 4; 1' BASE CRUSHED COURSE CRUSHED D Tw^ 15GRCtATE • - - _ - _ _ - - - - - - - - - - - I - - ^ 1 - - - - - - _ - i ( - _ - _ _ _ _ - _ - J 3 r----i 1 ST? m FOR AR,T' ATE NOT IXISIC.>JJt10 .r > I I r I 1' RPRA OVER 6' -ROUND 1 /r J l , ll I 1 r----------- I'. NG 1 sue ?" - GROUND ---`----------------- 7'-0 --- ZSTRUCTURAL /A\' ` k• SP.NDTURAL E' 7195 ' V ° I I - I Flu M1?", ^?G? • •? ^ I • e I I - ' I .; ` SAND FILL "?? IP FLL 'SANJ FILL f UM:TS CF EXUVATIDN I ?+.Yn/a" ??, ?y ? ?'I+" ?.. LTrPE Y THIUS _ .., ? R L . j, ? / I < W ?--__-__--_-- I ? SCE DETAIL T 0° SLOE GAZES NOT SHOIW! FOR CIARITV ? \ / \ Z SFC DPh: 0 cE ? ' I I CRnFN SHEET PILE -CONTROL JDlFrs (TrH.)-, IN FLOORS AND EACH WALL p r ? ^ I curoF• WALL (BEYGNDI ---- ------ ------------- --- -- - EL 157.75 ? I-° ------" ------------- --------------------------- --T - --- - V I f? 1 rX NK! S""` POPE AIR FORCE BASE a tier RrIN o 9w ssx vA rw arzva '? ! FAYEffE1 TILE, NORTH CAROLINA MW MATE IM SUOhNnA, TCY 10/10(00 Sr Al, PRDJ. !'R VESGM iU+Yf1Al (SST ID! 10/10/0 ,? C G?O1 Q rdmR K OLR STRUCTUR= PR F E os 4 e 12 SCALE IN FLU A.Mr mb lW01m0 BouM.a M.da, 1X 75729 su-4x-4te' ITV IL 1. PUCE 6-I4CH RC WATERSTOD ACROSS FOCaNC CONTROL JOINTS. 2 ANTENNA TOWER TO 6E A PRE-FARRICATED UtNT F4?lA! "$}(?4 (CLEN WRRN ENGNEERING OR APPP•ovED MILL). Bf-B SIw.1 Gl1E SIRiLIptC FIYEETEHU,(, Irr e R t ? NKB .}]-Sill 'sue STRUCTURE PLAN AND PROFILE I G KK lrJ.su2i r wy- w.z? TIER' 0YY Is ur2 x TD- UQ7 IS 0i 17 e 0 0 :r L r.r U ? g :r ?C t R 9 p a II I P1 I 8 O a; M ? o G"J 2 I82.D I EL 181.16 r W' TRASh]ULN! / ?? li SECURITY GRATE •? F (SEE SHEET 11) i Lr ? . l PERII-17R FENCE SEE CETAIL 1 FOR FEI4CE NOUNIING 1 C- 178.0 d4'vi' SLICE r--.- G41E (TYP.) EXISTING GRDUNQ 5'-0' STRUCTURAL SLIDE GA?'L- FNCY.FIIL-? WATERWAY RETNFORCEUENT -?--_- _ - - - - - - - -------- h 7 NOT SHOd'N n ' / r I I EL. 167.0 I A / UMlS OF a a LXGVATION r / i 7 (TYP•) 7 S? FLU, RQTTOU OCTAIL 1 ca is ?" °. C STRUCTURAL FLL (SEE NOT 1) I ? s-EcTo OW 0 2 A 6 8 SCALE IN FEET Y CONPAC'EO BACKFILL ABOVE P+oE CRO'AT' v \ y .?y 1 f .2-D / ? ? ? 6' SMOINC WATEP.4l 3/6' ROUND WELDED AT Al uA%. OPENING BACKFILL FOR PIPeS O 4 8 12 SCALE IN FM MAL DESIGN PAJJ1 M1L VMON SMMiIAI NfERYQV.'E ]= SUBWiUc wmrwm ttszat surrfa (nzI 4Wno:l P` RK]P? RIPRAP AND DEDDINO (SEE SHEET A) DRIVEN S6!'-'T PILE CUTOFF WALL (TYP.) POPE AIR FORCE BASE r MYETTEWLLE, NORTH CAROLINA PEMUETER FE HAJiDML (LEFT A3JTUENT ON1 E' AGGREGATE BASE COURSE GVER 15' CRUSHED ACGREG?c SUB-BASE a °z . HCICHT OF PACKFILL VARES- 7 COURSE (LEFT AE,J' IA1- T, SHOWN' , 18' RYRAP OVER 6• P.IPRM EEDU'NG (RA7ii 0.'tJfuCNT) rc o o rMSTIvG GROUND \ - b. II I EL t73 D ' -' L -3' ? • r -t c T)t a - BMKFlLL ? ? Sd}TJ FL.L U v .a: . "- E'. 167.0 /l tip.. ? lo- ANd v w IP CULVERT CL -P.ENFOrY„EN SECTION c NOT SHOWN rM S"U-TURAL f1LL 0 2 A 6 8 (SEE NOTE 1) SCALE IN FEET L'. iC2,0 I I OPERATOR DECK 1'-3' OPERATOR DECK •'''`?' L. 1780 C CONCRETE HALL 3_102• ;A ?.:.? > L AT &7E SECTION --1 PER M TER N HANDRAIL r C.1 I E FE CE (SEE SHEET 4 E.CUP.E FENCE TO EYE'.DOED SS EYE DOJS L 173.0 ? -0• , (SEE Dr,AJL L SHEET, 12) I 1- TRASIIRACK/SECURCY 1 GRAZE (SEE SH= 11 ? e F I 07 I CJ 3' 6 PJ" 1 I ' C.RAftI I E- 161.0 I / ?•'? _ MONFORCE4ENT NOT SHOWN SPICTION p NOBS ?y 1. F NECESSARY, PLACE AND COUPACT J0 2 A 6 8 SIRUCTURA SACKM- TO SRNG STRUCTURAL flLl FOUNDATION TO GRADE PRIOP TO PLACING CONCRETE FOR SPILL GATE STR1Y'TUP.£. (SEE NOTE 1) SCALE IN FELT wmw? ICY TAT-a SPILL GTE STRUCTURE FAYETTEV LF- NC W i rs I s D'As STRUCTURE SEnt ONS ] 00 ?° "°" +L w )Y 7 T29 N oM.wc 6 u• AND DETAILS . n X12-/S?-a7]] um 17 sGF irrt. 6/!0/Ul Sx[I1 7 0, 17 up5m Em PIP- RI s NOT TO SCALE a t- v? i..l L-V I.r 1?1 ^f t? Wd s I T' I M O , nzd PERUAETER FENCE (SEE SHfEi 12) B7-8 SPILL CAT- STPUC7LMV r I _ CONMG? JOINT EL 178.0 :T TpNTPOLi I ?? ! RCINTORCEJACM JO N1 AN / NOT SHOWN ?N SEE COLUMN ?, I E _C k':; SUPPORT CETUL 3 1 EL. 167.0 r t r gMROL JDNTS? SECTION D 2 t s SCALE f4 FEET RE'NCORCEMEM NOT SHOWN 1,-D. r'.4 P9NFORCEMENT .-NOT SHOWN L SAND? FILL CJ / I •?I 7 ri1 L 6' PVC W'ATERSTCP CONTROL JOINT 2 1) 7-TAI L O 2 t 6 SCALC IN FEET 7 L SANG T C MA FLL _ Scr WA ERST , IL 7 n 1 / 6' PVC WATCPSTOP gwROL JCITlM 06 Q 2 4 6 SCALE IN FEU. roEl 06CN ok"FT Flwl Tc9.'EV slxwT.K N:E,91pWTC 9= SJsiETV. IQY4M1' 06101 SMYRK fxW otzalo' u a?aan M ? POPE AIR FORCE BASE PAYi.TfE9I:,L, SORTY CARDIM t-0-D ?CONTRC. JW I I ? 4 ? ,tl I I o, REQIFORCEMEM NCT SHOWN e f,? 1. :.:'.-. COLUMN SUOPORT DETAIL ce D 1 2 SCALE IN FEET 2'-C' (YYP ) t INSIDE FACE-, 0- FLOW 3, SLOTTED CNAN4EL PVC PIPE (SEE NOTE 1) REINMRCEMENT SECTION DR,NN PIPE NOT SHOWN 07 0 2 t 6 SCALE IN FEET SHE 1LE DETAIL C 4 6 SCALE IN FEET PR2 STEE'. SHEE'T P:LE SEOTIDNS I^? TYPICAf PVC W P E AI 4 Ds 1. SLOTTED PVC PIPE LCCATEO AT THE BOTTOM, DOWNSTREAM CORVER OF THC LEF7 AND R'I;Hl CONCP.ETE BOX SECTIONS. LOCATE THE PPS ON THE INSL+E (CFUNNEL) SIDE OF TIE BOX CULVFATS TO DRAIN WATER COLLECTED IN THE BOX SECT1101a FERAL DE-U N DT-5 SML CAT; SJP=TURZ FA4STEMLF- W 7U ?, 9 fi @4C° STRUCTURAL DETAILS M5 l con N7F M U6 1• wr7 z THIN D"-. 6 WT T9 SC-RE . 'E Ent/Oa wn a OF 17 u TQ ,Me. Oeu 94-17 rntw M U..Wl-d w.., TX Tern 512-134-4797 t- 4. Fr 7 L. z FAR U F a f gfiI i r ? t `i ^I I..i M CONTROL JOINT 25'_0• u +601'-0• r4l DEW 1 ?601'_G• F I \1-12, LEGS I ^ 1 I 1 601 1 11 -3 ^ EL.ISZ-0 V 1 +806' Sol' P U CONTROL JOKT Y DT-a SPILL WE STRUCNRE ? ? ? CONfRO' JOINT I EL 162.0 SLICE GATES CONTROL JOpn #POE• NEAR FACE 1 L' 1780 +601'-0' FAR FACE I I X60,'-6' o i.-3. EL 173,0 I ? (601'-0' ?' ? ? ? X601'-0• f601'-0• .??1.-O• EL. 1670 y . J•' - - Y 5 ? V ' ' ` ? I tY tfGS}/ {50 1Y LEGS I ?1 Sr-- NOTE 2 ? I g'-7j' 601 -O 9'-1;' y_?• I:• LEGS ? J Tl N A u 0 < 6 17 SCALE IN FELT EL I8 2.0 l EL 1730 P-0E:. 17x.0 E-Z V,1601,-c, EL 113.0 J SEE BLOCKD'JT OEfAII n ' J6cJc-4'017•? 4• ^ X60 i'-C' L ?? Cal'-0' ' , BE 'S W ) , 1 \ I 350,'-G' 1 T-0 LEGS ^ N Q . I -F J CL 1a7A ? EL 167.0 1 I X601'-0' ` ? 5=2' LOS 1607'-O' ^ f6ot'-0' ?B06' I rEII6' ? I ?fiR?2'-4'0,2• H / fE:JT-4'ot2' rv 4• •I n <' ?PZ22 STEEL SHEET PU Mp.) SECDON L9 SECTION 09 G 4 a 12 "mw 0 4 a 12 mmm? ;AL W FEET SLAE W FEET FWAL QeStaN POPE AIR FORCE BASE ceva WITT- TEU 5/71/w , FAYS;TEVILLE, NORTH CAROEINA N w!TMTE a9[ wa•mK nu 19/29!93 ero.r o2?, R?00 /In ?WCVa.C RRElIY24.R DESC SUBITILL U?1 nv 19/19/93 1u?LN TI 16)75 ?O' O?PI u 7 :17-4N-4727 VO i ?6or-D' fool'-c' LEGS "il N o C9 E 4 B 17 SCALE IN FEES NOTES: 1, SEE SHEET 10 FOR GENVkAL S7RUOLURA_ NOTES. ... ADJUST SPACING !S NECESSARY TO ENSURE S-)a AT THE UPSTREAM FACE EXTEND VERTICALLY BEEN THE GATE OPCNINOS MAINTAIN J' OF COVER AT CONTROL JOTffS. ., SEE SHEET 10 FOR ANTENNA MOUNTING DETAIL •'A'r6 x... TEn IRT-B SPLL GATE STRUC7URE FATETTEIILLE, NC rw,? G S ?KD rz _ a e I 77 m"s IF THm W 90E5 REINFORCEMENT DETAILS (SHEET 11(71 IxTIMyi IS Yi ' OF 2) Nor f9 stxa ..c E/l9PJ4 s1aT 9 tr 17 A^ L4. vAl 1?4 ..vl. 7r rF-,+ V I? I? r.?t Ua 1 ?p 1 f i I as M `i III o, '--E 01-8 SPILL CATE STRUCTURE {6D1'-C' - I ? 179.0 ' 1 r..i 4 :1 Y I H ? L / A 1 =C' SEE CLXJJMN r, SUPPORE CETAIL I A l{ I tp ? i A! I {FDIC-0' ?6Df'-D' I 1 CL 167.01 1 f ./,....?' f M ! 12' LEGS y 12' LE05 SEOON E 0 2 4 6 SCALL IN FEET MJTENNA TOWER I'-C' D'A,-' n HOCPS (rYP.) m MMNNA TOWER MOUNTING 0 2 4 6 SGl'E N FEET Alll CLLCM yOjXIJ.RATE eM SUD9MAL FAm1V.'M tE< MINITIAL (.%S) 0®PIO, a Ap60A 1'-C' 1 I j6Dl'-0' E REINFORCEMENT DOWELS UPSTRFAW FA .CE t? COLUMN SUPPORT DETAIL n Ip 0 1 2 J SCALE N FEET NOTES 1. - A CLOSED CIRCLE AT THE END OF A BAR INDICATES A BEND N7H THE BAR TURNED TOWARDS THE OOSERNE'P 2. SPLICES SIIDWN THUS Z- INDICATE A V.'PED 5PLICE, NOT A BEND IN THE BAP DIME125!ONS BETWEEN BUTS ARE TO THE CENTERLINE 0' THE BAPS UNLESS OTHERWISE SHOWN. CLEAR CON'M DIMENSIONS ARE WARKEO 'CL'. 4. PLACE THE REINFORCEMENT SO THAT THE CLEAR DISTANCE BETWEEN FACE O° CONCRETE ANO NEAREST R:NFORCEWENT IS 1' FOR 05 BARS AND LMALLEF. FOR {6 BARS THROUGH {6 SIRS AND 3' FOR {9 BARS THROUGH {11 BARS PROVIDE 3' CLEAR DISTANCE FROM FACE OF CONCRETE FOR ALL BARS WHEN THE CON--M IS PLACED ACAI.NST EARTH OR ROCK CLEAR DISTANCE IS THE DESIGN DIMENSION LNE. REINFORCEMENT PARAILEUN3 CONSTRUCTION JOINTS SHALL HN'T A M:NINUM D?- Y CLEAR COVER. 5. UNLESS OTHER RADIUS BENDS ARE INOZATED DN THE DRAWINGS, ALL REINFORCEMENT RECUIRIND RENDING SHALL BE BENT AROUND A PIN HAVING THE FOLLOWING OAMET"ER. 3/4, DA. POLYPROPYLENE RUNG CONCRETE FACE , n N? I I p' "E?j .L+t.OMSI I ?aYJ11G11 LADDER D_TAII NC' TD SCALE POPE AIR FORCE BASE FAYE7,rEV=. NORTH CARULUCk EAR NO. 3 14 5 1 6 7 6 I 9 1 10 11 STANDARD BENDS 12 1/41 3 3 3/414 1/2 5 1/41 6 19 1/2110 J/ 12 STNCL'P AND T N , 11 1/11 2 2 1/214 112 5 1/41 6 1 - I - - 6, REINFORCEVENT WAY C ASR'STED LATERALLY TO UANTAIN A CLEAR DISTANCE OF AT LEAST I' BETWEEN THE REINFORCE4ENT AND WATER' STOPS, ANCHOR BOLTS, FORM TIES. THIMBLE AND 011¢R ELBEDDED MATER'A'S. 7. OAR SUPPORTS, SPACERS, AND C7HER ACCCS-SORICS ARE NOT SHOWN 04 THE CRAw[%--. THE RECOuVENDATIONS or THE AC! CETAIUNG MANUA;-19BE, OR OTHER APPROVED SUFPORTINC SYSTETA MAY BE USED. 6. UNLESS OTHErvr= SHOWN F0U_CW THE REZOMMENDATIONS ESTABLISHED 9' THE AMERICAN CONCRETE NSTITL=S 'MAN'UAL OF STANDARD PRACTICE FOR DETAILING RONFORCED CONCRETE STRUCfi1R2 AZ 315'. 9. SPLICE LENGTHS SHCWN ON THE TABLE ON THIS DRAWING AP.E FOR CLASS 9 SPLICES IN ACCORDANCE MTH ACI 318-02 SPUCES OR CEVELOPMENT LENGTHS OTHER THAN PHCSA SHOWN IN THE TAMES MUST BE DETAILED ON THE REIN:'GRCEuENT DESIGN DRAWNCS. l9M' N 1 •-C' SECTION A 10 D t 2 3 SCALE IN FcET 10. THE MNNuu LENGTH OE LAP FOR SvU_'NG PARALLEL BARS SINLL K C11<N 8t THE APRJCABLE2 TABLE (REINFORCEMENT TADLE). SPLICES SHALL BE STk;GE^nCD TO GhE 24 INCHES CLEAR SETWEEN ENDS OF AIUACEN7 SPLICES. BMS SYUCED Bt NONCONTACT LAP SPLICES SHALL NOT BE SPACED TRwL;VFP,SElY FARTHER APART THAN ONCE-FIFTH THE REOU:RED LAD SPUOE LENGTH. NOR 5 tH. WHEN REINFORCING BARS OF DIFFERENT SCE ARE TD BE SPLICED, THE LLNGiHS OF LAP SHALL BE GOVERNED DY THE SMALIER DIAMETER OAR, SPLICES ARE TO BE M4OE SO THAT THE REOUIRED CLEAR D17ANCES TO FKE OF COKRETE WILL BE uANTA'NE7. REINFORCEMENT TABLE r-.4co0 GP 1.-MOOD 0s' REAR SIZE MINILIUM E TO E LENGTH OF LAPPED GIEVELOPWENT LENGTH SPLICE (INCHES) (Ld) (INCI IES) f BAR SPACING (INCFIES) TD° BARS' OTHER TOP I OTHER BARS BARS. EARS 3 I 3 24 19 19 15 4 J 33 25 25 19 5 3 41 31 I 31 I 24 5 4 49 37 37 I 29 7 5 71 54 54 I 42 6 5 I E1 62 I 62 48 9 6 91 7: 70 { 54 10 9 102 76 75 60 11 10 113 67 87 ` E7 I TOP SAPS ARE HORIZONTAL BAPS IN BEAMS AND SLABS So PLACED TINT MoRE YHAN 12- OF CONCRETL G CAST IN THE MEMBER BELOW THE BAR. SPLICES MUST BE STAGGERED 95% DEMN "0e S rW o Ty 6T-8 SPILL GALE STRtX TU rz FAT'EMEVIL F, 1C ° t TS '. ,?3 DRIED. H101 '19 F TAG W CC FS REINFORCEMENT DETAILS t0 9400 AmD<W- lh_k_m nNQfcA I. -7 (SHEET 2 OF 2) A , TS 79:29 519-A -4797 An- TO zxr 6/zs/04 sNTJT 10 fr 17 u 0 O PERIMETER FENCE NOT SHOWN Q SUDS CATA :OFR P.UHM I,N EMBEDDED WTO G..I CONICREf E ;SPILL CATS STRUCTURE ( = .7 HANDRAIL '. v.n (SHER 12) FBI '.I . .. I... .... i .? .I ? , III DRNTIN SHEET PILE i CUTOFF WAIL 47.-C. r U 4 C I Q 5 I i M L L 18ZC SEE BOL7IHs MAIL 1, THIS SHEET y, TO' OF C EL 1E2.0 TRaSHHA^.K CSI -TOP OF EL 181.16 tt?? u 1PASHRALlt/SECt1Rlh Z CRATE, EL 181.16 EL 178.0 EL 173.0 suDE car EL 187.0 ,3'-<-{ EL 167.0 1 I : 1 1 WATERWAY I I f L.A.- FILL I BACKHLL NOT SHOU'T' j H37 SHOWN ------------ !------------------------------------------- TRASHRACK ELEVATION 0 4 8 12 16 SCALE IN FEET WELD AT ALL JOII EL 18ZC' o - -NOS Di STEEL RE EPOXY ANCHOR '0 BC FLUSH WTM EL 1BT.16' ' !AR FK°S . v 19 TTLSHRACK/ SCIIIRRY CHASE N ".EMEN1 NOT OT SHOWN V STEEL CUT MOUNTING ENDS OF TR,"RACK DRATINC TO CC FLUSH WTTH HORIZONTAL AND VERTICAL FACES 1 1:p m m a \ 1 G n - v n D C N ? C I LL o CLFM eonau Cr 1RA,HRA:X/ (?) ` 4 - SCCU"nTY CRATE E301-flNG DERAIL 4 ° 12 16 6?? TYPICAL TRASHRACK/SECURIT Y GRATE PANEL SCALE IN INCHES (9 REQUIRED) C 2 4 6 SCALE IN FELT POPE AIR FORCE BASE 4 17- T. 5/21 ro 1y_ ' ' ' MNpY¢U'[ ecc saaM /F,tl ohpre? (TMLLF, NOR T H CAROLM& FAYE Ambr 0- FvaAII :IE a svmrnR f1.^X7 7p m/II/h. Lmt Bv,4t.dV 7! M vmvvrv a sumo n O+S I 512-454-4797 NOT SHOWN SEE BO!TING DETAL 1. TH'S SHEET SECAON A 11 0 4 B 2 6 SCALE IN FEET 1/2' TRASHRACK BARS TOP Or TRASHRACK/ SECURITY GRATE 4'XI/2- TRASHRACK BARS T' CIA. STEEL RODS S'X1/2- 7,E0. PLATE FOR v ?4'Xl/ " TR HR K EPOxy ANCHOR AS AC 2 BARS BOTTOM CONNECTION D=TAIL SIDE VIEW 0 6 9 12 SCALE 114 INCHES NOTES. 1. THE TRASHRACK AND PERIMETER FENCNO S14M1 CONFORM TO MIL RAHDDOp( 1017/10,'DCSNN GUIDELINIES FOR SECURTrr FENCING, Q1f2?? GATES. BARRIERS. AND CUARD FACILITIES'. 96% DESMN ra ?+^ Q rMrtiec Bi-E SF4t. GAZE SiRLC1URE FAYETIEWJ.E. N," 2 ovicen A MI W D= TRASHRACK / SECURITY GRATE I CT WP JRE I' TEN L----C 6 r?sn YR 'OT 10 Sc E i0E s/tl/O4 sfaT 11 cl 17 4'x1/2' TRASHRALK TOP CONNECTION OXTAIL W-j w v N v?1 .v A FNn P.^.ST TYPICAL EENCM NOT TO SCALE NO k R HDRIZONTAL RAP_ k 3fE• AOC EN PERMETER C. t )ST BANDS AND ER BAR AT 7E OPERATOR DECK z F? `W r I?1 I I? O M O a' ? e CHNNUNK UESSH (NCTE 2) 77 t 1/2' Da. SCH AD °i I Y PIPE RAPS. HOT DIP CALVAN;ZED h xr oa 6'-L' ILLS rr 1 Lz2? I r,R, x. R ? v i 7 I?- RCIKfDZMACNT NOT SHOWN HANDRAIL Wn- CHAIN LINK MESH D,-III NOT TO SCALE MAL Ocsc. BA.NT F-4. Dc V 5dT4 9 tci IX WE 11M stlltwrK WtSll, 9 9FSCJ S,RYRA: tem.rml D (SEE NOTE E) CHAIN LOCKING SfST I NOT TO SCALE POPE AIR, FORCE BASE I ° FAYETEVaIX. FORTH CAROLRIA ''•? tl 5/8' HC_ FOR I/Y D0. SS THREADED AN-HORS 7' ,? R SEE ORAL 1 -1 LONG KITH C EUREDNEN'„ ? , ,.^. USE HO Ftt15o ADHFS"1; " THIS SHEET 1 ?? V SYSTEM, HIITT OR COUAL • I 1f2 D0. SCH lO HUT DIP GALVNJQED TTS;TINC 1/1• STEEL PIATE HOT DIP GALVANZZED cr An 2 12 HANDRAIL SUPPORT BRACKET Ys WEEP NOTE NOT To CATE O°ENINC CONTROL JOINT FENCE TRANSITION DETAIL NOT TO SCALE TENSION WIRE CHOW SS EYE DOLT WITH DETAIL 2 4C SEND QYP) TZ u t' 7' / E' 1. wHENEWR UNEVEN GROUND (BOTTCN OPENING WtCER THAN 2 INCHES) G ENCOUNTERED, FILL IN BELOW FENCE WITH AMMONAL STRANOS OF BARBED WIRE AT /-tmCH SPACING, 2, ATTACH FAOR'C TO AL FENCE AND CATE STRUCTURE AT 12' INTERVALS NSRTtCALLY AND A7 20' HORRONTALLY. 3. OWEF?SIDNS OF EXSTING LHA.TI UNK AC-SS CATS INCLUDING PCST EUo,0' VENT DET'IN ACE UNKNOWN. ACTUAL FIELD DUEN'SIOHS P°_ LARED TO COUPLETS THE WORK SHALL DE FIELD VERIFIED BY THE CDNTRArDR PRIOR TO DEVELOPMENT 0' SHOP DRAWINCS. 1. PROVIDE, FABRCATE, AND INSTALL CHAIN LINK FENCE AND CHAIN UNK FETCE VEHICLE CASE COUPONENTS IN ACCORDANCE WITH THE REOUREMENTS OF THE TEOFIN.CA'- SPE inc=N'S. ALL EEN'CINC STEEL MATERLNS TO BE HOT-DIPPED CALVAN2ED AFTER FAZI ATION. CAST SS EYE BCLTS EV CONCRETE TV SECLIFE BASE OF FENCE. THIS 114CLUDES VERTICAL CONCRETE SURFACE AT TRPNSMON TO OPERATOR DECK 6. PADLOCK TO CpIFORM WITH MIL-HDOK-1013/10 AND RR-F-191/2 AS AN APPROVED GENERAL FIELD SERVICE PADLOCK. ADOMDRAL'Y, PAD.OCKS TO HAY A REMO'VADIE CORE MAL DESIGN Ta BT-8 SPILL GATE SRUMIRE ;7AYETTEVt1G NC Q TYPICAL FENCE DETAILS 12 7ro1 seal 12 17 auww o I 1 9100 ImDryb. B-1V F w,RE I' A,.- T% 18729 T,[N D51n110 6 512-15-4197 NOT TO 9IiL 1L--F-Wl MAIN LNK H'NG? VEHIGL±-. God NOT TO SCALE M ^I V.,? tt z U 4 ?n 0 0 M O a cc L- / EXISTING / ELECTRICAL PULL BOX (SEE NOTE 3) I I I ?1` `1 µ I ? 1,, 1 I I ?1 1 1 III i ` \+ C ELECT DUCT BANK ,, 1 1 I '= I I ` ?OTp0 c" cp DUCT BANK FOR POWER FEEDER (PC-1) /j ? wN 10', 4' COPPER GROUND RODS (3 EA.) o?? - - 1 n r_ N 1 1 I 111 r/ r/ -17 ANTENNA TOWER tai 1 ?c \ t ELECT DUCT BANK ( C DUCT BANK \ LINE FOR CAMERA/FLOOD 1y HT (PC-1 D) 1 10', 4' COPPER ROUND RODS (3 EA.? SEE DETAIL go, A SEE DETAIL B 0 10 20 25 SCALE IN FEET 10', 4 COPPER GROUND RODS (3 EA.) NOTES: 1) REUSE EXISTING UTILITY POLE WITH 45 kVA TRANSFORMER BANK (3-15 kVA, 10), LOCATED NEAR POLE #2A-16-12. 2) PROVIDE NEW CIRCUIT (PC-1) FROM TRANSFORMER SECONDARY TO NEW MAIN SAFETY SWITCH (SS-1). SEE EQUIPMENT RISER, CONDUIT, AND CABLE SCHEDULE ON SHEET 15. MINIMUM BURIED DEPTH OF PC-1 AND PC-10 SHALL BE 2'-0". HORIZONTAL DISTANCE FROM EXISTING POLE MOUNTED TRANSFORMERS TO EXISTING ELECTRICAL PULL BOX IS APPROXIMATELY 400 FT. USE EXISTING CONDUIT FOR PC-1 FROM SECONDARY TO EXISTING ELECTRICAL PULL BOX. CAMERA/FLOOD LIGHT LOCATION ' SEE DETAIL SHEET 17 4) MOUNT ALL ELECTRICAL EQUIPMENT ABOVE EL. 180 FT. FINAL DE8( N wrsm?9 °?"` REPPJR AIANCHMIER R= (BT-B) SPILL GATES o * l ww? pT FAYETMLLF- NC 1 pftol? w ?I , POPE AIR FORCE BASE MR PS?Ma m OB9 7/20/05 c r, ,® ee-c? wrlow FlINL GIIYON EFB 6/25/O4 FAYEITEV=, NORTH CAROLINA IF THS W DOES vs NOT 1ElSORE 1' ELECTRICAL PLAN 'Q4 DRAN3 IS Mnbar Oo1o rx-r rvwsrc u DRAFT' FlNA D31i A19iOfTR 9f 5/21/94 9400 /mbeTlen Boubwrd 29 m ecv o[i'79n]N OF MOM By om 512-154.4797 N? TO ?5?/1E ucE: 8/25/D4 mm 14 aF 17 ---------- - -------------- ------------------ ----------------------------- ----------------------------------------------------------- ------------- I, Pew c id.* K I7 I I I I I 1 1tw6 Ai1t/!I I 1 Yo+R of 6Ae I I iwr Gelbn Ana/LerArN CeYn?b I ba?a Ne\bM I ? 1 I I I 1 I 1 I 2' ?''? SIVdM I \ 1 T\ I 10' HMgPt `ALT 1 r 2 `ACT s ??,Cf ,Ic7 I I i I I I I I -=============3;?=========__=======I====================================t_==_ ==_=============================k===================================== __ c \ r???lr I CPC-ID C.,d 7,. CPAtIIImtl lWn U t A-1 r A-1 M L' M M u CC -13? - ', AC! A T Ap A:,T I U_1 )? I CC-1- U_1 I -7 AS/vC-7 PC-7 VvC-7 l wC-) 8 I L-1 - tt-t P[«-1 P-i { v:?!-i PC-3-1 J a-12 a. -- -- ??-- OT1-r3 PSM PqM -P84 Phu - PCM BT2-7A PP-1 SS-1 CC-12 d §II l R f a_e a-2 Cd 00-2 `OC-2 CC-2 R { 1 C-T «-+3 PL'-9 1-Y.-2 I r $ ^- L ------- T` --------------------? 'J rvAFAlm 1Ma'[C NR+II7G /?, µx kIH GLWJCFD V VEEL FM P PAVCS A = h H1CX fill I wan' A P RISER DIAGRAM (VIEW FACING SOUTH) ?lS 1 a p ,5 POPE AIR FORCE BASE wn FAYSITEL'I=. NCTfH CAROLINA fi, dwT RNt ccr.N str3lmu 11ma1 m 5121/M t: m PE>ne+Rr s ¦m r art .-11 -to 0 BT-8 SPILL GATE DESIGNATION FROM TO CONO, S{ZE CONDUCTORS OTY SIZE REMARKS PC-1 POLES A4.D XFMR SEC. (EXIMINC) SAJTTY SWIT SS-1 2' 4CJ1, ICJ1 GID 2:8 VAC, 3 PH. INCOMi%; POWER PC-2 SAFETY SWITCH SS-I, LOAD SIDE POWER PNI PP-t Y iCJt, ICJ1 CID 205 VAC, 3 PH. INCOMING POWER PC-3 POWER PN-. PF-1 P-_ - 1-t 11' 15[+10, -Ito GNO 205 VAC, 3 PH. PWR. TO R^1UATORS PC-A PC-3 PC-5 I-1/4' 1X)10. 401110 GND 238 VAC, 3 PH. PWR. TO A.-TUATCR' PC-5 PC-4 PC-E I' 9010, 3CJ10 GND 208 VAC, 3 N. PWR. 70 ACTUATORS PC -6 PC-5 P:-7 6CJ10 ICM10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -7 PC-3• PC-4. P:; 5. PC-E GTE ACTUATORS 1-5 3(4' 3C010. iC}10 GND 208 VAC, 1 PH. R+R. TO ACTUATORS PC-E POW" PNL PF-I PC-9 1 3CJ12, iC 12 GND 120 VAC PWR. TO MONACO W2-7A k 8 PC-9 PC-6 ST2-7A M-70 3/4' GCJ12, 2C 12 GNO 120 VAC PWR. TO MONACO BT2-1A A, B P_ 10 POKER PNL PF-I VIDEO J-BOX 3/4' 2CJ12, 7[112 CND 120 VAC PWR. TO NOEC PWR. SUPPUY PC-t7 VIDEO J-GOX LY'HTS AT CAMERA 3/4- 20112, 1072 GND 120 VAC PWR. TO CAMERA LIOHTS CC-1 WT 1-5 ,IOV P911 GATE A^RN10R$ 1-S 1' 20414 CONTRO. WIRE TO GATE A'TUAbRS CC-2 CC-3..7 WTE 1-5 MOVE PEN 1' 20C114 CONTROL W1REs TO GATE ADTUATCRS a-3 M-7A CC-2, WTE 1 1-1/2' 45-1)1+ CONTROL WIRES CC -4 CC-3 CC-2. WTE 2 1-1/1' 28CJ 14 CONTROL WIRE CC-5 CC-4 CC-2, WTE ? 1-1/2' GCJ 14 CONTROL WIRES a-E CC-5 CL-2, WTE A 1-1/2' 14=J14 CONTRO. WAR a-7 CC-6 CC-2. WTi 5 1-112' 34CJ14 CONTROL WIRES «-8 CC-7 RT2-79 1-1/2' 54CJ14 CONTROL WIRES CC-9 VI OED J-BOX CAMERA 1-1/i' PAR. CONTROL, k COAX TO CAMERA CC-10 1ADED )-BOX VIDEO X14TR PWR- CONTROL, k COAX TO NOCO XMHt HOED %MTR ANTENNA A-2 3/4' COAX TO ANENNA CC-12 MONACO ST2-7A k B U3471%0 ARR. U-1 3/<' CC4% TO U-1 (2 PLACES) a-13 UCNIMNC ARR. LA-1 ANTENNA. A-1 3/4' COAX TO ANTENNA (2 PUCE) CONDUIT & CABLE SCHEDULE NOTES: 1) SEE DRAWING 16 FOR ADDIBON4' DETAILS ON S'1• 2) WIRING GUTTER IS AN AC0ffTABLE ALTERNATN: FOR C04DL ATS AT RA'X EXCEPT FOR CC-9 TNROUCH CC-13. 3) ALL CONDU'r 5RE3 ARE MIN'.MJM SZE FOR CONDUIT. LARGER SZE ARE Ar EPTASLE 6 CALLED OUT ELSEWHERE IN THIS DRAWWC; PACKAGE. 4) SEE SPSCITICATIONS 64 DMSION 16 FOR ADI)MONAL INFORMATION RCWRCING MATERAS AND I4STALLA7DN MAL DE$!GN '" ) Pu Mmc DT 6I 8 SP1(! CAT l , . UM s OT - F STRIKTUP FAlL7TE5C1E Q1 FAH ' 12275641 "b9 OIM r THS 51A 00(5 -- CONDUF & CABLE DETAIL 6400 MW- &-6 ,,,,n,\ TX 76729 I Ir.Jd1m 1' tAA1 -.is N O h',AGt ELECTRICAL RISER DIAGRAM 513-45 -4797 ,•- ro N - 6/25/06 sHm 15 01 17 NOTE:: 1) CONTACTS SHOWN: VALVE CLOSED, VOLTACE OFF, S/S HAND. 2) TCROUE SWITCH TCI & TO1 INC CONTACTS OPEN, AND T= & TC2 CONTACTS MAKE ON FRIG ADJUSTABLE MECHANICAL OVERLOAD IN (C) CLOSE, OR BI (0) OPEN DIRECTION. G.r 3) 0 &C (22-21) REVERSING CCNTA=TOR NC INTERLOCK CONTACTS 0 &C (14-13) MOMENTARY PUSHBUTTON NO SEAL-IN CONTACTS. 4) MOTOR THERMAL CONTACTS OPEN WITH EXCESSIVE TEMPERATURE. 5} POSITION INDICATOR PILOT LIGHTS. LED SOLID STATE -OPEN IND'. TES: FULL OPEN (RED) T 0 -CLOSE INDICATES: FULL CLOSED (GFE[N) -MID-PGSYDOIN: BOTH CPEN AND CLOSE ILLUMINATED J G) POWER ON INDICATORS ONLY MS'BLE WTH COVER, OPEN FOR CCNVEWANCE DURING M;NTENACE PROCEDURES. 7) CONTACTOR AUXILIARY CONACTS ARE LOCATED ON EACH END OF •+ CONTACTOR. EACH CONTACTOR COT, HAS A SET OF NO ARO NL, CONTACTS. B) VRIND SCIiF1u,T.C, TERMIMAL NUMBERS, AX=ER NUMREP.S AND DEVICE DSIGNATK RASED UPON Elm COYTROS WIH'NC VLAZRAM M2CP-10 DATED 5.19.95 CONTRACTOR TO PREPARE SUBMITTAL WITH CORRECTED DESGIIr'ATIONS FOR SELECTED EQUIPMENT. 9) SEE CCNTR(Y 1/0 TABLE FOR 1/0 ASSIGNMENTS TO BT2-7 PANELS. ID) VARRND SHOWN IS TYPICAL FOR FIVE GATES 11) GROUND SS-1 AS A SUNCE ENTRANCE DISCONNECT. 12) LOADS CALCULATED EAS'D ON 2HP MOTOR MAXIMUM. PREPARE SUBMTTAL FOR ACTUA, HP AFTER SEL.E= CATE ACTUATOR V[NDOR DATA RECEMED. Ip--4 z M-I haLl R>1 I a PV/? W ^^1 I?1 0 M O G1 x,12 T 7 _ ?? g? WOTOR P LDP o a r r-'---- OFT------- c HAN Y STO° P n P CLO.. ? n L m C I P P a l a ?1 yyF IA f PANEL NO. PP-1 2DB ?s 19O a1. 5[B+CC TS MD. 1 1 aO7M ArL&kTOR I = NCIE 12) 7 MOTOR ACRWTOR S (Sri NCT: 12) 7 ... .. I ^ NAM ?JI a s n c D w nY[ < .,w ...... u, . NIA lr l? ,nP U A,I,I a I o ...>„ Ll WE CO L---__.-.------- PB 6 O I a w??Iig a u nd I TMI Q6'94i6 9?9T9T 7,TTI3 n9??>i Uri ?riiAnF9Z' ti I I I ?' I II I I I I ? II I I i SE: I/D TABLE D ?a OO0 (?(] LTC n0 0® TBM • Trftw A BU= IN MOTOR ACTIrBAR LMT I TMROMo4 ACT 5) P'BM - RCMCI! IIOIDR CONIKL BDY TDBOAM PCX {FDWI TMROtr4 IBM-? B-2-7 - MONACO IPANSUNEx B17-7A OR BT2-70 tfll7 N Y17?AW' 17RP __ A B C y'r S DCI Dot 11 I MOTOR ACTUATOR S (`II NOTE 12) Sol i5 9r 17 is Now1co E-2--p 2-0 2! 1PP_ COLOR CODE: NXISE A ELACK NEURAL_rrE TNMSE D-RED tld10ND-CR=4 NN `E C-BLUE 1SCA S1 (Sa NCTE 11) 45 KVA (! A 15KVA), 31 ll.J. 241/120 V SECONCART - ICXCSnMG) POPE AIR FORCE BASE m v/2s/w c-, FAYE2ZE4II Z. NORTH CAROLINA N SUBIPTIA. D' s/SIro1 IADO M,MP,a B°Mnaro A,,X 7197Z9 727D1 wF?NI a tv?, N p11[ 312-54512-54-4727 RER 291! 270! )2w 20 I-o E]OCI D 0\ 0 nYI 20 1-0 r? 2D J-0 20 I-O 29 -0 2D -0 20 -0 -0 r? r? 20 15 -0 - f -0 I I ^ -0 C? f I r? O ro_ I - D - I^ CID BUS LOCATED POPF AFR NEMA OR ! TRIP low M VOLT-MIP n r*L rw + e T ? SERVICE TO "? 0- 20 001 MOTOR AMMTOR 2 (SEE WT[ 12) 2 ? O- IO 907 ? C O- 20 I DDI I fi 0- 2O 901 I WCTDR ACTJATOR 1 (SG NUE 12) B 0 D D- 20 901 :C D0 0- 20 I I 1 0Ot N2 r? D C- 1! 740 MONACO M-7A c c D o- it ? I cMF.'RA/xM1R a,A*R - / 7 O- 1' 1 SOO CAMERA F1DOD LIGHTS (>- 15 E75 I CP11 DUPLEX PCCE'. CL ? o- , ? o- I I o- - C P- 0 C_ O' 0 C_ I NEUTRAL ?: WAD PER TOOL P.Ukl 2117 1!52 V02 APSE IN L017 N MA 22 52 MID - - - ?1.1REP PANT ?a-1 - - - - MlJito{Y, w. PUS YYA S??)Y 1??b1 7 ?79 ,°??I>a O 1% W lIA IP ?tItM c e P d d a% 0 o n 0 0 u U u V U ? I a ?? 0 o e o o Ta "" w7.Tx Aw+E o d o d ENCLOSED ^^II rAtKADE i- B- (T'R-) 1 ? ? 1 swm SWTCH 'X-CAT[ ACTUATOR LP' 511RL GR I 51.0! WE 2 SLUcE V? O YL= WC 1 SLUCT CA' 5 I.'RATDA Acl`w R A RmmY __TI TDR ICTWTOR FWAL DESIGN w A [MO BT-8 SPILL Cd7C STRUCTURE FAYETTEVIL(E, NC m "H u =MB MONACO FIRE SYSTEM ?z7ss.P P THIS BM Eli ?JRE 11 00, ::A ELECTRICAL DIAGRAM 1a "+. IPP:N DAAnK 6 K.it. TO Sci z >z 6/25/04 ONE LINE/PAN L SCHEDULE 5- TT 16 IY 17 t- 0% 0-0 [ w 1 Ir?I?1I? ? L ? D1 .7 I 1 A 'S O M 'L11T 1 IL9R- tk: M+r5lCll1496 ME 'dt [RW? IR[Y PYy oa?sYal Uu YwxrcrROS M. b+ mwl cwr va Yn+. s?Y w ?<?r.rs ? Y I nom nrt namo ? mr • Y-r? ssn ue ron Mw Irr [Ri??«a Y OCK YF9r! CAUEMA RDOD L1 {f B Ix I'-Y rRn l d\ IPE1tIO Du'SpRIYNI (Y( YW,frClllgEpS NS bR E.",- IflFlll Oxxl DOCRVIgN (ILL WMxICNRib -[ 'OR EDU&I, I 1 2 IfTJI',JwC. Of.S, $2E RS R;OG 1 1 1(P?OIYNP RrcuM_. Snt I$ IFDT M FTQ D, LYI2Rl (ME s TOP or ?cuo! Vft 5- IDENTIrr-OCN TAPE PDEK'91YL(NE r" Imo-'--?I (S,R SPL 16,It, 7 4 ? -3-- V 1 0 0 A= Z• C `RCJ CONCRUE O B= 2" C wro a91 ELECT DUCT BANK I C STUB-UP TYPE A q A NO RONORCEMENT u ,• POPE AIR FORCE BASE rw oSa vs 5295 a FAYCTT =, FORTH CAR011NR DM'x (M4 O[5 SLOW M, m 5/91/a 94M m'e.ml? ea,4.wd A ' Tx 75729 rmnlor Pr aYao? ey Pm _ 51Z-RSa-4797 CTS mroAd I RAW Ra5z M779 Ram WAW I ILtL? (F1E11P x I V I ,ylnrn I x l I I I V I I I ! f ? I l i _I I SI I I I'-l -I I I I ? I I I 43^.E1 RL119CGICI I xl 1 I { N I I ?1 C'O(:IG I I I I EI I I I I (iC-7Ikuy w I I! xI I I I l l (=E711'9C_ I I I, 1 I I ) I i a"E7 I I? x I I I I I I i l l I I I om"It1UIY(I cm) I 1 " x I I I ' (77_?7NiArmr I V I I x 1 1 1 1 1 I I I I [4z7k"flnx; l x l I I t 'Y6$l I x I 1 1 1 1! 1 1 1 ' 1 ??S 59C.."PD I I xl I I I I ! I I I I I I . CT.'E7t71CEFn I I I I Ixl I I I f l l 1 I I 1 , I I yp•? I l xl I I mLJNOi1tR1E i! I I I I I ' x 0=73If t'?S39fi I I . I rl CZZFaIP , I 1 1 1 I I x ! I I 1 (7961 11 1 x l V x 1 1 1 1 I (T761IRUtt1.7m1 I 1x1 I I (7CFA 4YTUrLE I I V x' =S41 I x I x' jr?c' = Iyl I I I I I ! I I ! 1 1 1 1x 1 1 (f.231Rllt?m£Y 1 I ! - x I I I I V I I I- 'x R?31R?+,C1+G I I I I I? I rl I MY FL= I ? I i I I Y I I I ' 1 k V 77 x I l III i11f 1 I I I Y V I I I I I z l I I I II I ? I x i I! I I I GZE31=11MA ( ! I I 1 1 FNAL QESKRN •M„" om? m £i-5 SPU GATE STPIJ=P-- FAYLULMiLE• NC Q ]iMn ? nun 2RFN9 IF Try w Dols vs MISCELLANEOUS WT YE.IDWE,• - ELCTRICAL DETAILS Pw. 47 Ira ON z s a MCI To SGIE - 1/751oa SMfl 17 Of 17 W AT -9pG E LUG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources April 28, 2005 Pope Air Force Base 43 Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB, NC 28308-2314 Subject Property: Manchester Road Repair Approval of 401 Water Quality Certification with Additional Conditions Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 04-1995 Cumberland County You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.096 acres of wetlands and 105 feet of perennial streams for the purpose of repairing Manchester Road at the subject property, as described within your application dated April 18, 2005 and received by the N.C. Division of Water Quality (DWQ) on April 21, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3366 and 3402 (GC3366 and 3402). The Certification(s) allows you to use Nationwide Permit(s) 18 and 33 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream 105 (feet) Tanks Creek 404/LAMA Wetlands 0.0996 (acres) 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: htto://h2o.enr.state. nc.us/nmetlands No°C Carolina Naturally Pope Air Force Base Page 2 of 3 April 28, 2005 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of Pope Air Force Base Page 3 of 3 April 28, 2005 the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Sincerely, This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Ken Averitte in the DWQ Fayetteville Regional Office at 910-486-1541. AWKIcbk/bs Enclosures: GC 3402 and 3366 Certificate of Completion limek, cc: USACE Wilmington Regulatory Field Office DWQ Fayetteville Regional Office DLR Fayetteville Regional Office File Copy Central Files Filename: f04-1995 Pope Airforce Base Manchcstcr Ext (Cumberland) 401 o? - iCvq5 DEPARTMENT OF THE AIR FORCE HEADQUARTERS 43D AIRLIFT WING (AMC) POPE AIR FORCE BASE NORTH CAROLINA • 1 B APR n05 E C MEMORANDUM FOR NCDENR, DIVISION OF WATER QUALITY ATTN: 401/WETLANDS UNIT FROM: 43 CES/CC 560 Interceptor Road Pope AFB, NC 28308-2314 SUBJECT: Amended Request of 401 Water Quality Certification, Repair Manchester Road (BT-8) Spill Gates Project, Pope AFB, NC; Reference Project No. 04-1995 1. The purpose of this amended application package is to request a 401 Water Quality Certification for the repair by replacement of an existing spill gate structure, which has structural deficiencies. As instructed by Mr. Ken Averitte from your Fayetteville Regional Office on 7 Jan 05, the original application package dated 12 Dec 04 needed to be amended to also apply for a Nationwide Permit No. 33 to be able to use a temporary diversion channel during this project. 2. We are hereby submitting seven sets of the completed US Army Corps of Engineers (USACE) amended Preconstruction Notification (PCN), and application for a Nationwide Permit No. 18 and a Nationwide Permit No. 33 (Attachment 1) for the subject project. Additional documents in support of this amended application package are provided as Attachments 2 through 5. The total wetland impact is 0.096 acres, which is within the threshold for the Nationwide Permit No. 18. The package also explains that, under the Nationwide Permit No. 33 being requested, the diversion channel to be used for this project will temporarily impact 0.0037 acres. 3. We have already submitted the amended PCN and application package for the Nationwide Permit No. 18 and Nationwide Permit No. 33 to the USACE. A check for $200.00 from the project's contractor was already provided to your office with our initial application package submitted on 12 Dec 04. 4. Should you have any questions, please contact Mr. Alberto R. Marquez, Water Quality Program Manager, at (910) 394-1637. MICHAEL R. HA S, Lt Col, k-Q? LI ?l r Commander ?(J f ?? Attachments: APR 2 Y 2005 1. PCN and Nationwide Permit No. 18 and No. 33 Application IyETL DENR WATER 2. Project Location Map ATER BRANCH 3. Proposed Project Design Plan 4. Wetland Impacts from the Proposed Design Plan 5. State Clearinghouse NEPA Final Approval Letter AA1C-Global Reach for America RPM 01 o W - 00 APR i ]I- Office Use Only: " Form Version May 2002 10S - WATER cwaun? ? q S F??tN?DSAt;0 STor USACE Action ID No. ll (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Proccssinb 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 18 and Nationwide 33 Permits 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? ® 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Pope Air Force Base, Attn: Lt Col Michael R. Hass Mailing Address: 43d Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB, NC 28208 Telephone Number: 910-394-2561 Fax Number: 910-394-1643 E-mail Address: michael.hass-020a pope.a£mil 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: E Page 5 of 14 Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Repair Manchester Road (BT-8) Spill Gates, Pope AFB 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cumberland Nearest Town: Spring Lake Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From the intersection of SR 87 and Manchester Road in Spring Lake take West Manchester Road to Pope AFB; the site is after the Seaboard Coast Rail Line on the left traveling west. 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 2,130 acres (includes the entire Pope AFB) 7. Nearest body of water (stream/river/sound/ocean/lake): Tank Creek 8. River Basin: Cape Fear n Page 6 of 14 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site already contains a spill gates structure, surrounded by wooded areas on three sides parallel to Manchester Road located within a wetland which is part of a Military Installation The Fort Braga Wastewater Treatment Plant is located diagonally across the road from the existing structure This site is located at the northern boundary of the Base where Tank Creek flows under Manchester Road. 10. Describe the overall project in detail, including the type of equipment to be used: Overall project plans include repair by replacement of the existing gates structure by building a larger, independent structure approximately 50-feet upstream of the existing one, outside of the NCDOT's right-of-way, then demolishing the existing structure. The channel portion immediately downstream of the new gates structure will be re-graded and riprap placed. Correspondingly, the upstream area adjacent to the new structure will also be re-graded to facilitate flow into the structure. Five six-foot high by seven-foot wide slide gates, with motor operators that will be controlled both locally and remotely, will regulate flow. The base perimeter fence will be extended upstream to the structure and across it. A 12-foot wide gravel service road will be constructed from Manchester Road to the new structure. Equipment used on the project will include but not limited to: a small backhoe, dump truck, earth compactor, dewatering pumps air compressors, excavators for sheet piling and cranes. Additionally, the Droiect will include the diversion of Tank Creek during construction. It is anticipated that approximately 0.0037 acres of wetlands will be temporarily impacted by the diversion of approximately 1,050 linear feet of Tank Creek around the construction site. TolTest will divert Tank Creek by placing Porta-Dams across it see attached drawing for locations and details) and routing it through a PVC lined channel. The diversion channel will be approximately 180' long with a trapezoidal cross-section 20' wide on its top dimension. All bank walls will be slopped back at 1 to for 1 t/2 to 1 depending on soil- types. This diversion channel will require the temporary excavation of approximately 1,200 cu/yds of soil which will be stored on-site out of potential flood areas, and covered at all times. Additionally, the perimeter of the stockpile will be closed-in with silt fencing (see attached drawing for soils stockpiling and silt fence locations). The anticipated timeline or sequence of events associated with the diversion of Tank Creek is as follows (note all days listed are working; days): Excavate diversion channel 10 days Install PVC liner 4 days ¦ Tank Creek diversion 30 days ¦ BackfilUrestore diversion channel 7 days At the conclusion of the diversion. TolTest will restore the areas temporarily affected by the diversion channel back to like conditions. Once the new gates are operating, the old gates will be demolished. The areas of the bank presently protected by the existing wing, walls will be stabilized with gabions. The procedure to restore the entry and exit ways of the diversion channel will be: Porta-Dams will be relocated to seal the entry and exit ways of the diversion Page 7 of 14 channel so that Tank Creek may return to its original course. At that point, TolTest will begin to restore the breakthrough walls at each end of the diversion channel to be followed by backfilling_and compacting; the diversion channel; removing the relocated Porta Dams, and stabilizing the restored banks with Coco matting or root wad with an underlying wetland seed mix. 11. Explain the purpose of the proposed work: To provide a suitable spill gates structure to pass the normal flow of Tank Creek and be able to contain multiple hazardous material releases within the boundaries of the base. r: IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Pope AFB provided limits of the Wetland Delineation. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be ® included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 8 of 14 ® mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed project will impact a total of 0.096 acres of wetlands adjacent to Tank Creek and 105 linear feet of Tank Creek. The diversion channel will temporarily impact approximately 0.0037 acres. 2. Individually list wetland impacts below: Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland*** (indicate on ma) (acres) (es/no) (linear feet) <0.3 acres in the immediate vicinity Structure/ rip rap 0.096 No 0 Riparian of the project * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized cleanng, grading, 1111, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at htip:Hwww.fcma.c ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A ® Total area of wetland impact proposed: 0.096-acre permanent impact 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Tank Creek Structure/rip rap 105 Tank Creek 10' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated riprap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us's.eov. Several interact sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 105 ft C7 Page 9 of 14 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: ' List each impact separately and identify temporary impacts. Impacts include, but are not limited to. t , excava ton, g g, flooding, drainage, bulkheads, etc. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact (acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. ) N/A • f II t' dred in 5. Pond Creation: N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): E Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Between the preliminary and final designs the amount of riprap to be placed within the stream and the amount of grading of the upstream and downstream channel were minimized to avoid greater permanent impacts to the stream and adjacent wetlands. VIII. Mitigation is DWQ - In accordance with 15A NCAC 2H .05 00, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to Page 10 of 14 freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial ® streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Pennits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp:/ih2o.enr.state.nc.us/ncwetlands/strmgide.litml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions ® and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation casement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:Hh2o.enr.state.nc.us/wM/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Page 11 of 14 Amount of Non-riparian wetland mitigation requested (acres): is Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? ® X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. • Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total Page 12 of 14 x Zone 1 extends out 30 feet perpendicular from near bank of channel; 'Lone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No net change to the impervious area will occur as a result of this proiect. Storm water controls will include silt fences riprap and permanent grassing on all exposed soil. ® XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No C] Page 13 of 14 i XIV. Other Circumstances (Optional): s It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A Applicant's Signature MICHAEL R. HASS, Lt Col, USAF Commander, 43d Civil Engineering Squadron (Agent's signature is valid only if an authorization letter from the applicant is provided.) r? is Page 14 of 14 Cl l? u ET-8 SPILL GATE STRUC'T'URE FOR POPE AIR FORCE EASE FAYETTEVILLE, NORTH CAROLINA, USA PREPARED FOR: AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLEN E BT-8 SPILL GATE N STRUCTURE ??? a0p0 SSfR POPE ???,?ON y PARK J o 0 1 ,S P?? 0 u • e Q- p ?Y a RAMP -\? RAMP \ «e.D J tiµy4Y?? °? J,? ?? o"va"/? . Rr. 'tiv'N""0 I1 1. $oo i AI G GENE % )RRNE •-,. J y?`? .? c`Yty i REILLY/- GATE ,.. -? - WILLOW LAKES ARMISTEAD GOLF COURSE GATE TO FORT BRAGG POPE AIR FORCE BASE C CONTRACT NO. F41624-00-D-8028 TASK ORDER 0193 STATE MAP NOT TO SCALE SHEET DRAWING INDEX NUMBER DRAWING TITLE 1 COVER SHEET 2 LEGEND AND ABBREVIATIONS 3 EXISTING CONDITIONS 4 PLANNED MODIFICATIONS 5 DEMOLITION PLAN 6 STRUCTURE PLAN AND PROFILE 7 STRUCTURE SECTIONS AND DETAILS 8 STRUCTURE DETAILS 9 REINFORCEMENT DETAILS (SHEET 1 OF 2) 10 REINFORCEMENT DETAILS (SHEET 2 OF 2) 11 TRASHRACK/SECURTIY ORATE 12 TYPICAL FENCE DETAILS 13 GATE INSTALLATION DETAILS 14 ELECTRICAL PLAN 15 CONDUIT AND CABLE DETAIL ELECTRICAL. RISER DIAGRAM 16 MONACO FIRE SYSTEM ELECTRICAL DIAGRAM ONE IJNE/PANEL SCHEDULE 17 MISCELLANEOUS ELECTRICAL DETAILS SITE MAP 0 3 6 SCALE IN MILES 9 FINAL DESIGN OE-0): l1w REVISION _ WARNING °P""" BT-8 SPILL GATE STRUCTURE FAYETTEVLLE NC 3 - W /* NAL DESIGN F EA /30/04 M 0 1 wuI DRAFT FINAL DESIGN SUBMITTAL EM 5/21/04 POPE AIR FORCE BASE ® ?: WLC HKB PROJECT 22235649 L INTERMEDIATE 607 SUBMITTAL TEY 10/10/03 FAYETTEVILLE, NORTH CAROLINA Amber Oaks IF THIS BAR DOES MiZ t PRELIMINARY DESIGN SUBMITTAL (3C%) TEM 08/13/03 9400 Amberglen Boulevard A TX 78729 ti NOT MEASURE I* THEN DRAWING IS m aEDT UTZ COVER SHEET 1 w REV DESCRIPTION OF REVISION BY DUE us n. 512-454-4797 NOT To SCALE n.TC 6/30/04 SHEEP 1 OF 1 T LEGEND ABBREVIATIONS INTERSTATE HIGHWAY O EXISTING UTILITY POLE ® AT S SLOPE P 9 V UNITED STATES HIGHWAY SA EXISTING SANITARY SEWER LINE 0 DEGREES SCH SCHEDULE 4 DIAMETER ---6220--? EXISTING ELEVATION CONTOUR WITH CL - EXISTING GAS UNE SM SURVEY MONUMENT ELEVATION IN FEET ABOVE MEAN SEA LEVEL FEET STA STATION _-6220f NEW ELEVATION CONTOUR WITH EXISTING BUILDING/STRUCTURE INCHES TP TEST PIT ELEVATION IN FEET ABOVE MEAN SEA LEVEL PERCENT ?P-1 EXISTING SURVEY CONTROL POINT UNDERGROUND ELECTRICA t PLUS OR MINUS TYP TYPICAL -UGE- L LINE USA UNITED STATES OF AMERICA -•• -•• -•••- EXISTING WATER LINE OR CREEK AFB AIR FORCE BASE V VERTICAL FD FIBER OPTIC LINE ASTM AMERICAN SOCIETY FOR TESTING W WEST OR WATER LINE W W-W- LIMITS OF WETLANDS AND MATERIALS W BURIED WATER LINE BE BURIED ELECTRICAL FLOW INDICATES DIRECTION OF FLOW -CI/,P CMP CULVERT BGS BELOW GROUND SURFACE -R -r -x - FENCE rn EXISTING LIGHT POLE CENTERLINE GUARDRAIL CJ CONSTRUCTION JOINT TEST HOLE LOCATION CMP CORRUGATED METAL PIPE PAVED ROAD 0 EXISTING MONITORING WELL/OBSERVATION WELL COR CONTRACTING OFFICER'S REPRESENTATIVE ------------ UNPAVED ROAD CP CONTROL POINT ------------ THE ROSE GROUP SURVEY CONTROL DIA DIAMETER NEW CONCRETE E EAST NEW SURVEY CONTROL POINT EA EACH 0 ECM - EXISTING CONCRETE MONUMENT EXISTING CONCRETE EL ELEVATION O MH EXISTING MANHOLE H HORIZONTAL EXISTING CONCRETE TO BE DEMOLISHED INV. INVERT ®SM-1 NEW SURVEY MONUMENT STRUCTURAL FILL/BACKFILL - --- CENTERLINE MAX MH MAXIMUM MANHOLE --f?/W--- RIGHT OF WAY MIN MINIMUM g I RIPRAP MSL MEAN SEA LEVEL JU PERIMETER OF TREES N NORTH J 6 RIPRAP BEDDING V v TREES TO BE REMOVED NAD NORTH AMERICAN DATUM <I NAVD NORTH AMERICAN VERTICAL DATUM NGVD NATIONAL GEODETIC VERTICAL DATUM TRASHRACK/SECURITY GATE NO NUMBER NTS NOT TO SCALE OC ON CENTER GRATING 2 / OD OUTSIDE DIAMETER CRUSHED AGGREGATE BASE COURSE OE PVC OVERHEAD ELECTRICAL POLYVINYL CHLORIDE PROP PROPOSED P„ ?D CRUSHED AGGREGATE SUB-BASE COURSE NON-SHRINK GROUT FINAL DESIGN WARNING CBG BT-8 SPILL GAT T RLHSIDN W FINAL DESIGN TENT 6/30/04 POPE AIR FORCE uAm ° Mwm: RAM E S RUCTURE FAYETIEVILLE, INC DRAFT FINAL DESIGN SUBNOTA BASE m ® <~? F„aLC, S - - L TENT 5/21/04 ?t4 HKB 22236649 Q INTERMEDIATE 60% SUBMITTAL TEM 10/10/03 4:. " FAYETTEVILLE, NORTH CAROLINA Amber Oaks F THIS BAR DOES MT7 LEGEND AND ABBREVIATIONS """ PRELIMINARY DESIGN SUBMITTAL (30%) TEM 08/13/0} 9400 Amberglm Boulevard NOT MEASURE iS THEN DRAWIN I RRa[cr wwc01: 2 N REV DESCRIPTION OF REVISIDN 13Y DATE Austin, TX 78729 512-454-4797 G S NOT To SCALE MR DA- 6/30/04 SHEET 2 OF 17 FORT BRAGG MILITARY RESERVATION WASTE WATER TREATMENT PLANT INV OUT: EL. 164.97 PRAP / INV OUT: EL. 164.80,. j'-/ l /. / ? / - N65 Z1 } f, 5 SR / 2 CORRU ED METAL PIPE ARC 11' WIDE x 6.6' TALL )l GUARDRAIL / % 1 1111 1 1' THICK CONCRETE CONTROL LINE / WALL /. /" OPS6 NV EL. 165.15 BENCHMARK RE 11 1 ;?ti i/CUT IN TOP OF CONCRE l? / ON CULVERT HEAD INV IN: EL. 165.08 / ?g0/ --APPROXIMATE'LOCATION N. 523,3 . /6 ELEVATION: 1 ONCRETETLAB?{GRATE REMOVI E. 1 ,094.57 CONCRETE WING WAJk " - > GRATING, CONTROL TO BE REPLACF[3 ?Y Y GUARDRAIL 1TB 'EXISTING BT-8 SPILL GATE ST 630 GABION B TS 1.157 AF MOL17ION ' _! /=- - - /,=yam -- -- PPROXIMATE LOCATION EDGE OF OF FIBER OPTIC LINE CO CRETE APRON / ASPHALT TEMPORARY DIVERSION DAM a . L / 1 3 NEW SPILL GAT UNDERGR0 ?ELEOTRI a 1, 5/ STh TURc? ! ?/ i 0 9I ?,' S - fRSONNELGATE 0 - /? ? do-- I T! i ?!? PROP o?, > ?/ // 1z SAOP? / / '/? /ys 41 /%4 ?? P111E R 6 5c y? APPRDXIMAT!LOC 54 ? e ??I 3 OF UNDERGR UN ELEC 5 POPE AIR FORCE BOUNDARY LINE NEW 180'x20' ? a DIVERSION CHANNEL A P _ LEGEND V I e a w- w- w- =LIMITS OF SF - SF - = SILT FENCE 3: T ?TT? W µ, o.. W i T 3 TEMPORARY DIVERSION DAM 111h 1 I r rY i -APPROXIMATE q TANK CREEK 0 20 40 60 SCALE IN FEET HORIZONTAL CONTROL IRON STAKE N: 523,461.873 E: 1,998,305.169 PW?' SP? 50 WARNING FINAL DESIGN ENT 6/3°/°' POPE AIR FORCE BASE ° DRAFT FINAL DESIGN SUBMITTAL TEM 5/21/04 INTERMEDJTE 60% SUBMITTAL TEM 10/10/03 FAYETTEVILLE, NORTH CAROLINA ?A Amber Oaks IF THIS BAR DOES PRELIMINARY DESIGN SUBMITTAL (307,) lEM 08/13/03 9400 Amberglen Baulev°rd A ti TX 7 NOT MEASURE 1' THEN DRAWING IS DESCRIPTION OF REVISION BY DATE u s r. 8729 512-454-4797 NOT TO SCALE ENTRY & EXIT DIAGRAM DIVERSION CHANNEL SECTION iD _ rEXISTINC GROUND 174 72 174 z 170 172 ?- 170 z ? 168 co 168 2 a 166 166 a 164 164 w w 162 162 w PVC LINER SECTION A-A wETUUOS DISTURBANCE 0 10 20 30 .o.aan roTu SCALE IN FEET DIVERSION CHANNEL WITH LINER SECTION 2.0 10.0' 10.0' rEXISTING GROUND 174 174 172.,172 z 170 170 z 0 168 co 168 4 a 166 166 a w 164 t<4Tv'v.G<iJ > > 164 W 0 162 162 w FUEL LINER LOCK TRENCH SECTION B-B 0 10 20 30 SCALE IN FEET PORTADAMo STRUCTURE SECTION STEEL SUPPORT FRAME 174 172 z 170 0 168 a 165 w 164 w 16z IMPERVIOUS FABRIC SEALING SHEET 174 172 170 z 168 166 a 164 Ej 162 w SEE NOTE 5 0 10 20 30 SCALE IN FEET NOTES 1. SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, 104 GILLESPIE ST., FAYETTEVILLE. NO. TELEPHONE 910-323-3400. 2. BORING HOLE INFORMATION PROVIDED BY DAVID WARREN, URS CORP., MORRISVILLE, NC. 3. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UNITED STATES SURVEY FEET. HORIZONTAL COORDINATES ARE BASED ON THE NORTH AMERICAN DATUM (NAD) 1983. ELEVATIONS ARE IN FEET ABOVE MEAN SEA LEVEL (MSL) USING THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD 29). 4. LIMITS OF WETLAND DELINEATION 5. LINER MATERIAL USED WITH THE PORTA DAM WILL BE ANCHORED AT THE END BY WEIGHTED MATERIAL OR BY A LINER LOCK TRENCH. FINAL DESIGN TEM REPAIR MANCHESTER ROAD (BT-8) SPILL GATES NrnsoN Q RAM FAYETTVILLE, NC HKB PROJECT 22235649 MTZ oRrrrAw oLER. CHANNEL DIVERSION DETAILS I-L 6/30/04 1 1 SHEET OF SECTION C-C FORT BRAGG MILITARY RESERVATION WASTE WATER TREATMENT PLANT INV OUT: EL 164.97 GUARDRAIL HORIZONTAL CONTROL /-' IRON STAKE N: 523,461.873 Act /' E: 1,998,305.169 /'/ / / a66•ZN 35 ? SO ?? RIPRAP / ; j-/ a N45A / INV OUT: EL. 164.80,. j'/ RpPO +/ d 2 CORRUGATED METAL PIPE 1 ARC E5'11' WIDE x 6.6' TALL ; 1/ 1 m / 1111 1' THICK ?? p) 1 CONCRETE 11 11 WALL i 1 1 /?? GP i, r 1o f CONTROL LINE INV : EL. 165.15 1 / BENCHMARK RE ? T / /CUT IN TOP OF CONCRETE l / /' ON CULVERT HEADWAt? INV IN: EL. 165.08 ELEVATION: 17A-1?' 1 4. 523,3Z2.-5-7 l E. 1 96,094.57 IRON STAKE CONTROL GUARDRAIL N: 523,294.630 E: 1,997,86/./ PPROXIMATE N LOCATION ASPHALT OF F FIBER OPTIC LINE EDGE OF / `UNDERGROUN ELEC IC BO! ?-+ o, CL EXISTNG STRUCTURE- OpE PF0 4?a PERSONNEL-GATE- APPROXIMATE LOCATION OF UNDERGROUND'ELECTRIC POPE AIR FORCE BOUNDARY LINE l 1 \ f 1f r 1Y? - 0 ----------------- APPROXIMAIE? ?., TANK CREEK 0 20 40 6D SCALE IN FEET NOTES 1. SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, 104 GILLESPIE ST., FAYETTEVILLE, NC. TELEPHONE 910-323-3400. 2. BORING HOLE INFORMATION PROVIDED BY DAVID WARREN, URS CORP., MORRISVILLE, NC 3. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UNITED STATES SURVEY FEET. HORIZONTAL COORDINATES ARE BASED ON THE NORTH AMERICAN DATUM (NAO) 1983. ELEVATIONS ARE IN FEET ABOVE MEAN SEA LEVEL (MSL) USING THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD 29). 4. LIMITS OF WETLAND DELINEATION PROVIDED BY POPE AFB VIA EMAIL ON MARCH 5, 2004. V FINAL DESIGN TOM a isax ILD WARNING BT-8 SPILL GATE STRUCTURE FAYETTEVILLE, NC Q ° FINAL DESIGN TEM 6/30/04 U 0 e t RAM DRAFT FINAL DESIGN SUBMITTAL TEM 5/21/04 , POPE AIR FORCE BASE ARam- ® HKEI PxaLa 22235649 Al INTERMEDIATE 607 SUBMITTAL TEM 10/10/03 FAYETTEVILLE, NORTH CAROLINA Amber Oaks IF THIS BAR DOES Mrz y ' PRELIMINARY DESIGN SUBMITTAL (107) TEM 08/13/03 9400 Amberglen Boulevard A ti TX 78729 EASU SURE E 1' 1. NOT M THEN DRAWING IS qa y w t q MTZ EXISTING CONDITIONS 3 S = REV DESCRIPTION OF REVlsrox BY 617E us n, 512-454-4797 _ NOT TO SCALE: w,E 6/30/04 SHEET 3 OF 17 1 N -APPROXIMATE LOCATION OF SOIL BORING GT-01 CONCRETE SLAB (GRATE REMOVED) GRATIS EXISTING 9T-8 SPILL GATE STRUCTURE CONCRETE APRON LIMITS OF WETLANDS L ?r EXISTING PIPE / 1 x R ) 1 1 - WIDTH VARIES (SEE NOTE 5) 174. 72 - -- -- 174 1 EXISTING -GROUND -? 172 / - A CH CULVERT 1 1 11 1 - I ;' N69'06'07"E SEE DETAIL 2 170 168- 170 z CD 166 68 66 468.85'(CONTROL LINE) 67 EL / 2Hav , 64 164w w 162 - w INVERT , 162 5` BEDDMG 5 RIPRAP EDGE OF , 171.0 ATP 1 " EXISTING ASPHALT 1 - _ -- SECTION A R. 0 10 2D 30 ' E L T y ,1 i P?j ? a S 3 ? EXISTING GROUND SCALE IN FEET 1?. 1 WIDTH VARIES (SEE NOTES 6 AND 7 < /P-CUNCRE WALL -?i @?-REPLACLACEED BY \ N T0 , CABION BASKETS / AFTER DEMOLITION 00 ' i I 4H:,V 9 `? `A 4 - - ) '• 176 17E.. 174 174 172 172 0 4-?-170 2y?L °- 168 ° , ? -POPE AFB ?621 g - - _-_ -_ ---- 168 166 - Z P PROPERTY LINE t'. 66p5 `. - ., x ?- _ - . -- a 66 164 W / ,? TOP OF RIPRAP - 164 162 Pi INVERT N. 523,287.00 EXISTING ELECTRICAL PIPE INVERT E. 1,9980}2.0} PULL BOX AT EL 169.0 EL. 167.0 -EL 169.0 8"O GALVANIZED - 162 - SECTION B EL 1749 " /-' - ?' - CMP CULVERT Da GRADE-TO-DRAM NEW VEHICLE GAT- _ 0 10 20 30 L. 174 TO 173 2 V /? ?a1 u1 \P T 1 l SCALE IN FEET ? ?,'v b4 . o 8"o CULVERT ? /' w > ?T lTw 1 IPRAP P PERIMETER FENCE (SEE SHEET 12) N PIPE INVER 0 L 0.5' CRUSHED AGGREGATE T -j R AT EL 171.0 ^? - \ \ J ` ``t \ \ Q h 1' + ? ! i /'\ \ 1,/? ? ! i• / v vL ? ? _?T -v??? -,I 1 h ? ? BASE COURSE PIAINTAIN 3.0' EL. 174.0 AT SEGIION SHOULDER T + a F v ?y t v 'T AIL SEE D 659 ' BACKFILL \ ?? i t N 1 i il PERIMETER FENCE- ------- -- (SEE-SHEET. 12)-- ANTENNA -, -1 TOWER rT` j ----- - iH, IHlV _ Ot ACCESS ROAD GA 5 J EXISTING GROUND ' E.1 °960 9 ' S9'2E a 6 \ - 1.3 CRUSHED AGGREGATE SECTION C SUB-BASE COURSE NOT TO Da NO STRUCTURE NT N. 523,239.21 LA E 1 9811398 1 CONTROL P I I SCALE E' ,, 98,077.20 N 523243 6 J7 7 0 L BT-8 SPILL- E 11,99813 in : a EL. 167.D RIPRAP r ^ ATE STRUCTURE 0 N. 523.2 2.02 E. 1,998,0 9.62 p \ EL 174.0 ?? 1'ov6 oa-ovo -? I \ o& 1 - RIPRAP BT-8 SPh L GATE ` p f STRUCTURE (SEE BEDDINC t..3. 1 3.D' ......... SHEETS 6 'I'D 7) 1 '..' '• ••. \ 4 TYPICAL RIPRAP SECTION D GRAD ?PSTREAM 1 . \ CHANNE?(SEE NOTE 6 4 NOT TO SCALE 1\0 ; \ GRADING PLAN NOTES D 10 20 30 1` ' 1 STOCKPILE EXCAVATE .•,•? -CAI;F.?A/FLOOD IJGHT LOCATte . D MATERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DETERMINED BY THE COR. o v • SCALE IN FEET N. 523,198.05 r . 1 998;14.86 ---w? ! II ' 2. SEE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING "CMP" PIPE CULVERT INSTALLATICN AND ACCESS ROAD E. W ., CONSTRUC"ION. PIPES TO BE PLACED IN EXISTING DRAINAGE CHANNELS. s I „N 3. COMPACT ACCESS ROAD BASE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. / TANK CREEK 4. BASE WIDTH OF DOWNSTREAM CHANNEL VARIES FROM 46' AT THE SPILL GAZE STRUCTURE TO 26' AT T W HE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE. EXCAVATE SIDE SLOPES AT 2H:ly. W / DO 5. RIPRAP TO BE PLACED FOR 25' IN THE AREA DOWNSTREAM OF THE NEW SPILL GATE STRUCTURE. 33 / _ r 6. EXCAVATION OF THE UPSTREAM CHANN'E'L SHALL NOT BE MORE THAN 24 FEET UPSTREAM OF THE I 1 STRUCTURE 7. SLAB BETWEEN THE SIDEW4LLS ADJACENT TO THE CULVERTS HEADWALL WILL NOT BE DEMOLISHED. a ? •' __ ? \ f w w - w - = LIMITS Or WETLANDS F11111 L DESIGN -- ,... ------ ------ ------- oES C 4 REDUCE wETUN6 IMPACTS TEM a/z/Ga WARNING I "m EM REPAIR MANCHESTER ROAD (BT-8) SPILL GATES mvaN FINAL DESIGN EM e/25ro4 POPEAIR FORCE BASE 7 n o1 S FAYETrnLLE Nc DRAFT FINAL DESIGN SUBMITTAL TEAT 5/21/04 FAYETTEVI u , c m- Hxe FaaE[T 222356/9 INTERMEDIATE 60% SuBMnTAL EM 10/10/03 LLE, NORTH CAROLINA Amber oaks THIS BAR DOES PExErEa MTZ PRELIMINARY DESIGN SOBMnTAL (30%) TLM 08/13/07 v u 9400 Ambergle Boulevard A ti TX 7 7 NOT MEASURE 1' THEN DRAWING IS Pearce u.wrrlr PLANNED MODIFICATIONS 4 ? RN DESCRIPTION OF REVS10N 8? DATE us n, 8 29 512-454 47 7 NOT TO SCALE MT7 6 E , - 9 . 8/2/64 SHEET 4 OF 17 STRUCTURE I T?" I I r ? T- I r I I r I I 1 EXISTING PIPE m $ EXISTING PIPE ARCH CULVERT I ARCH CULVERT B.0'± I __\I, I , I ? I 27.9'± REMOVE GATE HEADWALL CONCRETE STRUCTURE (SEE NOTE 4) ?y ------------------ --------------------------- , REMOVE GRATING W16x40 (REMOVE) -------------------------- ----- --------------------- ---------------------------I 25.7'± REMOVE EXISTING SLIDE GATES (3? (SEE NOTE 4) TOP OF HEAD WALL EL 174.1± 4'± I EXISTING COMPACTED FILL L 1.0'± 34.0''± LA± ? PLAN NOT TO SCALE I--EL STRUCTURE VARIES Z-?W16x4O (REMOVE) 11.1' (TYP.) b SECTION A NOT TO SCALE llliS FINAL DESIGN DRAFT FINAL D_-SIGN SUBMITTAL Q7 INTERMEDIATE 607 SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (30X) 5 REV DEffRIPTtlN OR REVISION 6/30/04 641E GRATING (REMOVE) 1.0'± REMOVE GATE OPERATOR AND (TYP•) OPERATOR SUPPORTS (GATE OPERATOR NOT SHOWN) REMOVE GATE HEADWALL (SEE NOTE 4) CONCRETE STRUCTURE REMOVE EXISTING GRATING (EL 173.2±) `-CULVERT HEADWALL TO REMAIN EXISTING CONCRETE SIDE WALLS TO REMAIN REMOVE TRASHRACK_ (NOTE 2) AND SECURITY SCREEN (SEE NOTE 4) 1.0EL 166.9± (TYP.) OS REMOVE TRASHRACK AND SECURITY SCREEN (SEE NOTE 4) 4.0'± TOP OF EXISTING GROUND EXISTING REMOVE W16x40 SUOE GATES (NP.) AND STEMS EL. 166.7± (SEE NOTE 4) CULVERT HEADWALL TO REMAIN EL. 174.1± L. 165.7± cv - I O N ---- ------------- CUTOFF WALL I SAWCUT AND REMOVED/ SECTION B ALL CONCRETE UPSTREAM OF SAWCUT NOT TO SCALE 65 JOINT PERSONNEL CATE i N 523,284 E 1,998,028 + N 523,349 E 1,998,177 REMOVE APPROXIMATELY 165' OF EXISTING PERIMETER FENCING. (SEE NOTE 5) i ?I . ?, 4'± I EXISTING )- COMPACTED FILL 7 POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA EXISTING PERIMETER FENCE NOT TO SCALE NOTES 1. DIMENSIONS OF EXISTING BT-8 SPILL GATE STRUCTURE 4. THE GATES, OPERATORS, AND/OR TRASHRACK WILL BE ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY SALVAGED. CARE SHOULD BE TAKEN TO ENSURE THE DIMENSIONS. FEATURES ARE REMOVED IN SUCH A WAY TO PRESERVE THE EQUIPMENT WITHOUT DAMAGE. 2. CONCRETE WALLS SUPPORTING EXISTING EMBANKMENT ARE TO REMAIN UNDISTURBED. 5. FOR ESTIMATION PURPOSES, ASSUME FENCE TO BE CHAIN LINK FENCE, APPROXIMATELY 7' HIGH. 3. IN ORDER TO MAINTAIN WATER-CONTROL CAPABILITIES, DEMOLITION OF EXISTING STRUCTURE SHALL BEGIN ONLY AFTER OBTAINING WRITTEN APPROVAL FROM THE COR. 03 WARNING oc--: CBG onxn: BT-8 SPILL GATE STRUCTURE RAM CHECK HKB Amber Doks 9400 Amberglen Boulevord IF THIS BAR DOES NOT MEASURE I' Miz f QJSCT x ER DEMOLITION PLAN Austin, TX 78729 THEN DRAWING IS MT7 512-454-4797 NOT TO SCALE w_ 6/30/04 FINAL DESIGN FAYEfTEVILLE, NC isn. AS PROJECT 22235649 5 SHEET 5 OF 17 k Ft BT-8 SPILL 3 SEE SHEET PILE DETAIL / GATE STRUCTURES U o p^ \ I n OB PERIMETER FENCE, SEE FENCING DRIVEN SHEET PILE CONTROL JOINTS (TYP.) m o V a / (SEE SHEET 12TRANSITION, CUTOFF WALL DETAIL, SHEET 12 --- /--? _ I-X X-X-X-X-T-X-.I-C \ 1 4'-6" OPERATOR DECK I ?I I j (BEYOND) I r x- [_ X_ x? x L ANTENNA TOWER I I (SEE NOTE 2) ` RAISED CONCRETE ANTENNA SUPPORT FI-- -- BLOCK _? I II LADDER RUNGS LI l II EMBEDDED INTO CONCRETE II x?- I ? I II i l I l I I II I I l x x- x- x- x x.?,1 II I l I E SLIDE GATE II I oa WATERWAY I I x t HANDRAIL (SEE SHEET 12) / m I RIPRAP R1PRAP o BASE COURSE, I I I , BEDDING AND SAND SLID-BASE COURSE, I I FILL NOT SHOWN FOR o AND SAND FILL NOT SHOWN F R R I I I I 1 TRASHRACK/ CLARITY ITY L_____ O CLA 1'-0" I I- i I t , I I I SECURITY Y GRATE SECURITY (SEE SHEET 11) ? 5-9 l I I N \ I I I i I I I I I I I I / i GALVANIZED STEEL ANTENNA TOWER LADDER RUNGS EMBEDDED INTO CONCRETE (SEE SHEET 10) ACCESS ROAD r 6" CRUSHED AGGREGATE (SEE SHEET 4) EXISTING 845E COURSE OVER 15' GROUND CRUSHED AGGREGATE SUB BASE COURSE - - - --- ^ ?? ?-STRUCTURAL EL. 169.5 BACKFILL _SAND FILL A, LIMITS TI EXCAVATION CJ I SEE DETAII I I I I i ------------------------ 25'-0" 08 OPERATOR DECK (BEYON D) SLIDE GATE-/ STRUCTURE CONTROL POINT N. 523,243.26 E. 1,998,137.10 EL 167.00 STRUCTURE PLAN 0 4 B 12 SCALE IN FEET PERIMETER FENCE NOT SHOWN PL BT-8 SPILL FL SLIDE CATS I GATE STRUCTUR (TYP) SUPPORT WALLS (BEYOND) ------ I -- -- ------------ ------ 1 1 J EE SLIDE CATES 3 SEE GATE DETAIL E t3 I I ? I I I I ' I ?- i F- I II i I I 1 I II I I I o I I ? ?? t0 I EL 182.0 EL 178.0 TRASHRACK/ SHOWN FOR 26-3-3" J ECURITY GRATE NOT CLARITY 18" RIPRAP OVER 6" RIPRAP BEDDING A O6 PERIMETER FENCE (SEE SHEET 12) BACKFILL TO MATCH EXISTING GROUND EXISTING 1 --- GROUND 1 E-L --17-3--------- --- --- - ?_0 ?t ZSTRUCTURAL /7 -SAND FILL FILL 1 n?EL 167.0 TYPE "F" THIMBLES SLIDE GATES NOT SHOWN FOR CLARITY v DRIVEN SHEEP PILE CONTROL JOINTS (TYP.)-/ / CUTOFF WALL (BEYOND) N FLOORS AND EACH WALL ------- ---------------- -- -------------t---------------------- 50'-0" STRUCTURE PROFILE A Ofi 0 4 8 12 SCALE IN FEET FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL INTERMEDIATE 60% SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (30x) DESCRIPTION OF REVISION HKB 5/21/04. POPE AIR FORCE BASE gm, 1' `4 10/10/03 FAYETTEVILLE, NORTH CAROLINA Ayer oaks 10/10/03 9400 Amberglen Boulevard Austin, TX 78729 DATE 512-454-4797 i 2 SEE DETAIL o oe ------- ----------------------------- 25'-0" NOTE 1. PLACE 6-INCH PVC WATERSTOP ACROSS FOOTING CONTROL JOINTS. 2. ANTENNA TOWER TO BE A PRE-FABRICATED UNIT (GLEN MARTIN ENGINEERING OR APPROVED EQUAL). ocscNm: AT WARNING TE BT-B SPILL GATE STRUCTURE TI-S o e I ® cnECxm HKB I -CJ I I I I I I EL. 157.75 I FINAL DESIGN FAYE TEVILLE. INC IF THIS BAR DOES Paa xvcrMTZ NOT MEASURE I' PROJET -ER, STRUCTURE PLAN AND PROFILE THEN DRAWING IS MR NOT TO SOAlE mrz: 6/25/04 Ad PROJECT 22235649 wxm.a 6 SHEET 6 OF 17 DRIVEN SHEET PILE- I N J CUTOFF WALL J HANDRAIL n (SEE SHEET 12) BOTTOM OF TRASHRACK/ SECURITY GATE 9'-74" 1 4,_64• 20'-0" 9'-6" FENCE EL. 182.0 EL. 181.16 p, ae CJ III TRASHRACK/ SECURITY GRATE A (SEE SHEET 11)? o EL. 178.0 84"x72" SLIDE e GATE (TYP.)- EXISTING GROUND 5'-0" d STRUCTURAL Z _ -SLIDE GATE BACKFILL _ ° I WATERWAY REINFORCEMENT ----- a h NOT SHOWN i EL. 167.0 1 °? e ° b -::p 51' ° o.? ° ve LIMITS OF o e EXCAVATION 0 </VA/lVx \VA//,?/ A/ v', T'x TYP.) ( SEE FLUSH . ^ BOTTOM DETAIL 1 cD 3 oCL I STRUCTURAL FILL (SEE NOTE 1) SECTION e O6 0 2 4 6 8 SCALE IN FEET 2' COMPACTED BACKFILL ABOVE PIPE CROWN /..//:/ 6" BEDDING MATERIAL 3/8" ROUND BARS WELDED AT ALL JU MAX. OPENING OF BACKFILL FOR PIPES 0 4 8 12 SCALE IN FEET FINAL DESIGN PERIMETER FENCE 20'-0" 2'-0" 2'-0" HANDRAIL LEFT 6" AGGREGATE BASE COURSE OVER SEE DETAIL i ABUTMENT ONLY) 15" CRUSHED AGGREGATE SUB-BASE a z FOR FENCE T2 COURSE (LEFT ABUTMENT, SHOWN), 18" w EXISTNG GROUND MOUNTING HEIGHT OF 721• RIPRAP OVER 6" RIPRAP BEDDING BACKFILL VARIES (RIGHT ABUTMENT) m -? 17 ----- --- - ------- - EL. 173.0 -OPERATOR DECK 1'-3" BACKFlLL ? SAND FILL t < CJ ZeACKFILL \ \ \ / EL 167.0 v v° a v v " a ov- v° e -.v v a', vc` v ? ?\??\\?? 2'-0" n RIPRAP AND BEDDING iv (SEE SHEET 4) Dj REINFORCEMENT -- iv SECTION C NOT SHOWN -, STRUCTURAL FlLL 0 2 4 6 8 (SEE NOTE 1) SCALE IN FEET DRIVEN SHEET PILE I -3" CUTOFF WALL (TYP.) EL. 182.0 d V-3" OPERATOR DECK 1" 11 EL. 178.0 CONCRETE WALL 3-101 ° d AT BOX SECTION O HANDRAIL PERIMETER FENCE 1P CULVERT (SEE SHEET 12) D CJ a SECURE FENCE TO EMBEDDED SS EYE BOLTS EL. 173.0 5'-0" (SEE DETAIL 2, SHEET 12) I D 1'-3" UPSTREAM PIPE GRILL NOT TO SCALE 04 TRASH RAC K/SECU R ITY I GRATE (SEE SHEET 11 g E I I I , Da I CJ 3" 0 PVC I' r DRAIN EL. 167.0 a 2 -3" REINFORCEMENT e v e NOT SHOWN D.. p , p r •D D v v d P ? v?-G ? Q V xy °? ' SECTION o NOTES 06 1. IF NECESSARY, PLACE AND COMPACT 0 2 4 6 8 STRUCTURAL BACKFILL TO BRING STRUCTURAL FILL FOUNDATION TO GRADE PRIOR TO PLACING (SEE NOTE 1) SCALE IN FEET CONCRETE FOR SPILL GATE STRUCTURE. /\ ? - WARNING TEM ST-8 SPILL GATE STRUCTURE FAYEfTEVILLE NC R qN w FINAL DESIGN ?" 6/3°/6` POPE AIR FORCE BASE ° e 7LS ° 0 3 S DRAFT FINAL DESIGN SUBMITTAL TEM 5/21/04 , ; HKB rnaEn 22235649 Al INTERMEDIATE 60% SUBMITTAL TEM 10/10/03 , r. FAYETTEVILLE, NORTH CAROIINA 1 Amber Ocks IF THIS BAR DOES 'R STRUCTURE SECTIONS y PRELIMINARY DESIGN SUBMITTAL (30X) TM F C8/13J0} 13 4 94010 Amberglen Boulevard NOT MEASURE 1" THE PROI¢T wv° AND DET 7 c N ROI °t3RIFION OF PEYISpN ° Austin. TX 70729 512-454-4797 N DRAWING IS NOT TO SCALE MTZ are 6/30/04 AILS SHEET 7 OF 17 PERIMETER FENCE (SEE SHEET 12) L. 178.0 ? 4'-6" Ot BT-8 SPILL GATE STRUCTURE CONTROL JOINT M ?? . CONTROL 1 ° I JOINT I 1 / REINFORCEMENT ` NOT SHOWN SEE COLUMN SUPPORT DETAIL 3 I• 5'-0" 06 „ i i` vi ° 1,-0" CJ CJ e EL. 167.0 I l I' CONTROL JDINTS SECTION E O6 0 2 4 6 SCALE IN FEET REINFORCEMENT NOT SHOWN v< SAND o FILL o V_3• SEE WATERSTOP DETAIL I CJ " e r d 6" PVC WA FOP L CONTROL JOINT DETAIL Ofi 0 2 4 6 SCALE IN FEET REINFORCEMENT NOT SHOWN ? ;.1 .rtv CJ I v .o. `-SAND FILL ? 0 o D n-N t > o v 6" PVC WATERSTOP CONTROL JOINT DETAIL z 06 O 2 4 6 SCALE IN FEET LIT-4 ,-CONTROL JOINT i c I CJ o? REINFORCEMENT O NOT SHOWN d n?0 e V-0" COLUMN SUPPORT DETAIL a 08 0 1 2 3 "ME - SCALE IN FEET 2'-0" p INSIDE FACE ° - OF FLOW 3" SLOTTED CHANNEL o _ e PVC PIPE (SEE NOTE 1) • !n QVM1 r 4 e V ° d p e ? REINFORCEMENT DRAIN PIPE SECTION F NOT SHOWN 07 0 2 4 6 SCALE IN FEET PZ22 STEEL SHEET PILE SECTIONS TYPICAL PV WA R P DETAIL 4 CSI NOTES: 1. SLOTTED PVC PIPE LOCATED AT THE BOTTOM, DOWNSTREAM CORNER OF THE LEFT AND RIGHT CONCRETE BOX SECTIONS. LOCATE THE PIPES ON THE INSIDE (CHANNEL) SIDE OF THE BOX CULVERTS TO DRAIN WATER COLLECTED IN THE BOX SECTIONS. FINAL DESIGN FINAL DESIGN W - DRAFT FINAL DESIGN sUBMTTTAL I INTERMEDIATE 60% SU2lJnTAL PRELIMINARY DESIGN SU9MITTAL (30Z) REV DESCRIPTION OF REVISION WARNING DE-O), _ _ 13T-8 SPILL GATE STRUCTURE REYLSiON 25/04 M ° TLS FAYETTENLLE, NC Q 3 5/21/D4 5 POPE AIR FORCE BASE `S ® ? HKB PRNLCT 22235649 10/10/03 FAYETTEVILLE, NORTH CAROLINA ' Amber Oaks IF THIS BAR DOES RFER REYEWDI: MTZ STRUCTURAL DETAILS aueiw 05/13/03 9400 Amberalen Boulevard A ti TX 78729 NOT MEASURE 1' THEN DRAWING IS RRcu¢ Nm - MTZ 8 DATE us n. 512-454-4797 - NOT TO SCALE a>E 6/25/04 SHEET 8 OF 17 SHEETPILE DETAIL 0 2 4 6 SCALE IN FEET CONTROL JOINT 25'-0" V-3" V 3" 0 0 X601'-0' #601'-D =G 12" LEGS x'601'-0" 12' LEGS SEE NOTE 2 I x'601'-0' 9'-7y" 9'-7' 4'_64.. SECTION A O6 0 4 8 12 SCALE IN FEET #806" NEAR FACE CONTROL JOINT Ii BT-8 SPILL GATE STRUCTURE C501-O" CONTROL JOINT SLIDE GATES #601'-0" FAR FACE EL. 182.0 CONTROL JOINT 25'-0" - #601'-0" V-3" EL 178.0 o 0 ANTENNA TOWOR (SEE DETAIL Z 1 SHEET 10) IlI x'601'-0" r I , , X601'-0' X601'-0" L- h 1, 3" EL. 182.0 i X866" '- EL 178.0 X661'-D' EL. 173.0 601'-D' #6x-/2'-4'012 4" 2'-O" LEGS 1'-9" BENDS (TYP.) EL. 167.° 6©1'-0" I 5'-2" LEGS x6D1'-D' . In x'806" #6x-/2 -4"012" N 4" 'I-PZ22 STEEL SHEET PILE (TYP.) SECTION a 09 0 4 8 12 SCALE IN FEET FINAL DESIGN FINAL DESIGN W DRAFT FINAL DESIGN SUBMITTAL Q INTERMEDIATE 60% SUBMITTAL ?= g REV PRELIMINARY DESIGN SUBMITTAL (307.) oELPIPT10N OF AM;ION 1'-3" EL. 182.0 I 1. r #601'-0" x'806" SEE BLOCKOUT DETAL x601'-0' I EL 167.0 x601'-0" y X806" / YN #6x- 2'-4"012" 4" ` POPE AIR FORCE BASE 4 25/2 3 FAYETTEVILLE, NORTH CAROLINA 3 ATE SECTION c 09 0 4 8 12 SCALE IN FEET -Iw NA Amber oaks 9400 Amberglen Boulevard ALStin, TX 78729 512-454-4797 EL. 173.0 #601'-0" EL. 167.0 12" LEGS 12" LEGS X601'-0' EL. 173.0 J601'-0"i X661'-D" EL 178.0 EL. 167.0 / 1 4 A i x`601'-0" #6®1'-0" f 12" LEGS 12" LEGS T; N SECTION o 09 0 4 8 12 N SCALE IN FEET NOTES: 1. SEE SHEET 10 FOR GENERAL STRUCTURAL NOTES. 2. ADJUST SPACING AS NECESSARY TO ENSURE 5-J8 AT THE UPSTREAM FACE EXTEND VERTICALLY BETWEEN THE GATE OPENINGS. MAINTAIN 3" OF COVER AT CONTROL JOINTS. 3. SEE SHEET 10 FOR ANTENNA MOUNTING DETAIL. OC9aNm: TEAT RcmioN WARNING TLS 3 BT-13 SPILL GATE STRUCTURE FAYETTEVILLE, NC 3 °?'""a® cNecrru HNB PN m 22235649 IF THIS BAR DOES MTZ REINFORCEMENT DETAILS NOT MEASURE I' NIaECT IN EA: 9 THEN DRAWING IS MTZ (SHEET 1 OF 2) NOT TO SCALE - 6/30/04 SHEET 9 OF 17 #6m1'-0 EL. 178.0 #601'-0"- A Al"l #601'-0' EL. 167.0 a ? t 12" LEGS BT-8 SPILL GATE STRUCTURE #601' 0" ? L I ,I I :a I ? i I I SEE COLUMN 1 -0" SUPPORT DETAIL I r i r 10 #601'-0" I 12" LEGS SECTION E O6 0 2 4 6 SCALE IN FEET ANTENNA TOWER ,a .a a.a a. a ' a a a c o a a • o a a a , 1'-6" DIA.y HOOPS (1YP.) ANTENNA TOWER MOUNTING 0 2 4 6 SCALE IN FEET 3/4- CIA #601'-0" M I #6®1'-0" o I I a I e u' ?o I I > I - I #6D1'-0' I I t #6 REINFORCEMENT DOWELS 1'-0" POLYPROPYLENE RUNG CONCRETE FACE N NI I 7" SECTION LADDER DETAIL NOT TO SCALE UPSTREAM -? FACE COLUMN SUPPORT DETAIL I tD 0 1 2 3 SCALE IN FEET NOTES: I. ' A CLOSED CIRCLE AT THE END OF A BAR INDICATES A BEND WITH THE BAR TURNED TOWARDS THE OBSERVER. 2. SPLICES SHOWN THUS --- INDICATE A LAPPED SPLICE, NOT A BEND IN THE BAR. 3. DIMENSIONS BETWEEN BARS ARE TO THE CENTERLINE OF THE BARS UNLESS OTHERWISE SHOWN. CLEAR COVER DIMENSIONS ARE MARKED "CL". 4. PLACE THE REINFORCEMENT SO THAT THE CLEAR DISTANCE BETWEEN FACE OF CONCRETE AND NEAREST REINFORCEMENT IS 1" FOR #5 BARS AND SMALLER, 2" FOR #6 BARS THROUGH #8 BARS AND 3" FOR #9 BARS THROUGH #11 BARS. PROVIDE 3" CLEAR DISTANCE FROM FACE OF CONCRETE FOR ALL BARS WHEN THE CONCRETE IS PLACED AGAINST EARTH OR ROCK. CLEAR DISTANCE IS THE DESIGN DIMENSION LINE REINFORCEMENT PARALLELING CONSTRUCTION JOINTS SHALL HAVE A MINIMUM OF 2" CLEAR COVER. 5. UNLESS OTHER RADIUS BENDS ARE INDICATED ON THE DRAWINGS, ALL REINFORCEMENT REQUIRING BENDING SHALL BE BENT AROUND A PIN HAVING THE FOLLOWING DIAMETER: DInI nlnucrro In i"I BAR NO. 3 4 5 6 7 8 9 10 11 STANDARD BENDS 2 1/4 3 3 3/4 4 1/2 5 1/4 6 9 1/2 10 3/4 12 STIRRUP AND TIE BENDS 1 1/2 2 2 1/21 4 1/21 5 1/4 6 - - - 5. REINFORCEMENT MAY BE ADJUSTED LATERALLY TO MAINTAIN A CLEAR DISTANCE OF AT LEAST 1" BETWEEN THE REINFORCEMENT AND WATERSTOPS, ANCHOR BOLTS, FORM TIES, THIMBLE AND OTHER EMBEDDED MATERIALS. 7. BAR SUPPORTS, SPACERS, AND OTHER ACCESSORIES ARE NOT SHOWN ON THE DRAWINGS. THE RECOMMENDATIONS OF THE ACI DETAILING MANUAL-1988, OR OTHER APPROVED SUPPORTING SYSTEM MAY BE USED. 8. UNLESS OTHERWISE SHOWN FOLLOW THE RECOMMENDATIONS ESTABLISHED BY THE AMERICAN CONCRETE INSTITUTE'S 'MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES, ACI 315". 9. SPLICE LENGTHS SHOWN ON THE TABLE ON THIS DRAWING ARE FOR CLASS B SPLICES IN ACCORDANCE WITH ACI 318-02. SPLICES OR DEVELOPMENT LENGTHS OTHER THAN THOSE SHOWN IN THE TABLES MUST BE DETAILED ON THE REINFORCEMENT DESIGN DRAWINGS. WARNING FINAL DESIGN TEM 6/25/04 POPE AIR FORCE BASE ° DRAFT FINAL DESIGN SU9MITTAL TEM 5/21/04 ® Q INTERMEDIATE 607, SUBMITTAL TEM 10/10/03 FAYETTEVILLE, NORTH CAROLINA Amber Oaks IF THIS BAR DOES u y PRELIMINARY DESIGN SU9M TALE (30X) TENT 08/13/03 9400 Amberglen Boulevard A i TX NO MEASURE 1" THEN DRAWING IS G ? REV DESCRIPTION OF REVISION BY LATE ust n. 78729 512-454-4797 NOT TO $ONE TEM TLS HKB 6/25/04 AFni'-n" SECTION A 10 0 2 3 SCALE IN FEET 10. THE MINIMUM LENGTH OF LAP FOR SPLICING PARALLEL BARS SHALL BE DEGNEN INSTAGGEREDTHE APPLICABLE24 Of SHALL TO TABLEINCHES(REINCLEARFORCEMENTBETWEENTABLE)ENDS. SPLICESADJACENT GIVE SPLICES. BARS SPLICED BY NONCONTACT LAP SPLICES SHALL NOT BE SPACED TRANSVERSELY FARTHER APART THAN ONE-FIFTH THE REQUIRED LAP SPLICE LENGTH, NOR 6 IN. WHEN REINFORCING BARS OF DIFFERENT SIZE ARE TO BE SPLICED, THE LENGTHS OF LAP SHALL BE GOVERNED BY THE SMALLER DIAMETER BAR. SPLICES ARE TO BE MADE SO THAT THE REQUIRED CLEAR DISTANCES TO FACE OF CONCRETE WILL BE MAINTAINED. REINFORCEMENT TABLE fC=4000 psi f„=monn nsi BAR SIZE MINIMUM TO LENGTH OF LAPPED SPLICE (INCHES) DEVELOPMENT LENGTH (Ld) (INCHES) # BAR SPACING (INCHES) TOP BARS' OTHER BARS TOP BARS' OTHER BARS 3 3 24 19 19 15 4 3 33 25 25 19 5 3 41 31 31 24 6 4 49 37 37 29 7 5 71 54 54 42 8 5 B1 62 62 48 9 8 91 70 70 54 10 9 102 78 78 60 11 10 113 87 87 67 "TOP BARS ARE HORIZONTAL BARS IN BEAMS AND SLABS SO PLACED THAT MORE THAN 12" OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR. SPLICES MUST BE STAGGERED 95% DESIGN BT-8 SPILL GATE STRUCTURE FAYETTEVILLE, NC RLms" AS PRWLCT 22235649 REINFORCEMENT DETAILS ?? (SHEET 2 OF 2) SHEET 10 OF 17 I M RI SLIDE GATES LADDER RUNGS EMBEDDED INTO CONCRETE HANDRAIL (SHEET 12) I PER' METER FENCE NOT SHOWN SPILL GATE STRUCTURE _I I I DRIVEN SHEET PILE CUTOFF WALL 47'-6' 1 i 1 SEE BOLTING EL. 182.0 DETAIL 1, THIS SHEET TOP OF TRASHRACK -TOP OF EL 181.16 TRASHRACK/SECURITY GRATE, EL 181.16 EL. 173.0 EL 167.0 EL. 167.0 4ACKFII I I NOT SHOWN BACKFlLL -------------------------------------NOT SHOWN---- TRASHRACK ELEVATION 0 4 8 12 16 SCALE IN FEET WELD AT ALL , EL. 182.0' o c O epra) :NDS OF STEEL EPOXY ANCHOR "0 BE FLUSH WF EL. 181.16' 3AR FACES C PI 4 TRASHRACK/ SECURITY GRATE D..: REINFORCEMENT NOT SHOWN P > 1" STEEI CUT MOUNTING ENDS OF TRASHRACK GRATING TO BE FLUSH WITH HORIZONTAL AND VERTICAL FACES , v r o a ` a a co ? a .I ? e7 N 0 0 o: 0 A ? a 4' CLEAR BOTTOM OF TRASHRACK/ SECURITY GRATE a ? BOLTING DETAIL 0 4 8 12 16 TYPICAL TRASH RACK /SECURIT Y GRATE PANEL SCALE IN INCHES _ (9 REQUIRED) 0 2 4 5 SCALE IN FEET WN A w - POPE AIR FORCE BASE 8 - DRAFT FINAL DESIGN suBMR Al TE7 5/21/04 ; 4 r; tr Y Al INTERMEDIATE 60% SUDMITTAL TEAT 10/10/03 ' FAYETfEVILI E, NORTH CAROLINA Amber Oaks PRELIMINARY DESIGN SUBMITTAL (307.) TEM 08/13/03 4 9400 Amberglem Boulevard W N REV DESCRIPTION OF REVISION B/ aTE AsGm. TX 78729 512-454-4797 SLIDE GATE WATERWAY \_REINFORCEMENT NOT SHOWN SEE BOLTING DETAIL 1, THIS SHEET SECTION A tt 0 4 8 12 16 SCALE W FEET ° 1/2' TRASHRACK BARS TOP OF TRASHRACK/ SECURITY GRATE EL 182.0 v EL. 178.0 4"X1/2" TRASHRACK BARS 1' DIA. STEEL RODS 5"X1/2' STEEL PLATE SIDE VIEW EPOXY ANCHOR -4"X1/2" TRASHRACK BARS BOTTOM CONNECTION DETAIL SIDE VIEW 0 3 6 9 12 SCALE IN INCHES NOTES: 1. THE TRASHRACK AND PERIMETER FENCING SHALL CCN70RM TO MIL HANDBOOK 1013/10,-DESIGN GUIDELINES FOR SECURITY FENCING, GATES, BARRIERS, AND GUARD FACILITIES". 95% DESIGN TEM REVISION wARNwc BT-8 SPILL GATE STRUCTURE FAYETTEWILLE, NG Q ns 2 accxm MTZ PROJECT 22235619 IF THIS BAR DOES `MTz TRASHRACK / SECURITY GRATE NOT MEASURE 1' PRwECT w k 11 THEN DRAWING IS MTZ NOT TO SCALE a'E 5/21/04 SHEET 11 OF 17 12'X1/2' STEEL PLATE 4"X1/2" TRASHRACK B, TOP CONNECTION DETAIL G :7 NOTES: 1) CONTACTS SHOWN: VALVE CLOSED, VOLTAGE OFF, S/S HAND. 2) TORQUE SWITCH TC1 & T01 NC CONTACTS OPEN, AND TC2 & T02 CONTACTS MAKE ON FIELD ADJUSTABLE MECHANICAL OVERLOAD IN (C) CLOSE. OR IN (0) OPEN DIRECTION. 3) 0 &C (22-21) REVERSING CONTACTOR NC INTERLOCK CONTACTS 0 &C (14-13) MOMENTARY PUSHBUTTON NO SEAL-IN CONTACTS. 4 MOTOR THERMAL CONTACTS OPEN WITH EXCESSIVE TEMPERATURE. 5 POSITION INDICATOR PILOT LIGHTS, LED SCUD STATE -OPEN INDICATES: FULL OPEN (RED) -CLOSE INDICATES: FULL CLOSED (GREEN) -MID-POSITION: BOTH OPEN AND CLOSE ILLUMINATED 6) POWER ON INDICATORS ONLY VISIBLE WITH COVER OPEN FOR CONVENIANCE DURING MAINTENACE PROCEDURES. 7) CONTACTOR AUXILIARY CONTACTS ARE LOCATED ON EACH END OF CONTACTOR. EACH CONTACTOR COIL HAS A SET OF NO AND NC CONTACTS. 8) WIRING SCHEMATIC, TERMINAL NUMBERS, JUMPER NUMBERS AND DEVICE DESIGNATIONS BASED UPON EIM CONTROLS WIRING DIAGRAM M2CP-10 DATED 6.19.98. CONTRACTOR TO PREPARE SUBMITTAL WITH CORRECTED DESIGNATIONS FOR SELECTED EQUIPMENT. 9) SEE CONTROL I/O TABLE FOR I/O ASSIGNMENTS TO BT2-7 PANELS. 10) WIRING SHOWIN IS TYPICAL FOR FIVE GATES 11) GROUND SS-1 AS A SERVICE ENTRANCE DISCONNECT. 12) LOADS CALCULATED BASED ON 2HP MOTOR MAXIMUM. PREPARE SUBMITTAL FOR ACTUAL HP AFTER SELECTED GATE ACTUATOR VENDOR DATA RECEIVED. tC2m x3(?"?"?r6 xl q 11 IS V x 1I5V T1 IS n 4 102 it II f Fps u u s T s S Z as I MOTOR 4 iHERWL 5 PPOIECTOP 03 CJ 1 x %D V Y II cl s HAND?izREMOTE c x oI STOP o 51 s 1 yC CLOSE I ...? ?? c' s A c s2_ 15 `5 ---I Lt3 xl 7 LI S3 12 1 I o '3 Re a C2 LA= 11 14 11 0-41 R5 c 3 Q Ss TABLE LL77--??----YYJJ OPEN ° o1 m1 10 II II 0 03 b4 R s O R 2 1 4 51 M P O ,qTC t 2 0 0 % S3 o s x 4 II 4 a B xc Q z xc 0 s. xso d w? 9 xo? PJM PRt WP ------------- PBM NTlYWOMTE CO-ACTS ---- c a acs cos AI u el e2 III rBw 4?4AA4R?944444944??.. 4lA???? ?? lI I I l 1 I l I l) I I I I SEE 1/0 TABLE p M-x oro+? L717 ?170? ?? (717 ,7 S W cLosm TOM - TERMINAL BLOCK IN MOTOR ACTUATOR (ACT 1 THROUGH ACT 5) PBM - REMOTE MOTOR CONTROL BOX TERMINAL BOX (PBM1 THROUGH PBM-5) BT2-7 - MONACO TRANSCEIVER BT2-7A OR BT2-78 FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL DESCRIPOON OF RLV610N POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA PANEL NO. PP-1 208 VOLTS 1Do AMPS, 4 WIRES CKT LOAD IN VOLT-AMP TRIP NO. SERVICE TO BKR. A B C SIZE oao 0 0 0 L?OL TRIP LOAD IN VOLT-AMP 1 MOTOR ACTUATOR 1 (SEE NOTE 12) 901 20 -0 0- 3 901 20 1-1 --0 0- 5 901 20 -0 o- 7 MOTOR ACTUATOR 3 (SEE NOTE 12) 901 20 -0 0- 9 901 20 -0 C- 11 411, sal zp -0 o- 13 MOTOR ACTUATOR 5 (SEE NOTE 12) 901 20 --O 0, 15 901 20 -0 O- T7 901 20 -0 0- 19 MONACO BT2-78 240 15 -0 0- 21 -0 o- 23 -0 0- 25 .-0 0- 27 -0 0- 29 -0 0- 3 1 -0 0- 33 -0 35 n 37 -0 c- 39 -0 41 -0 WIRE COLOR CODE: PHASE A-BUCK NEUTRAL-WHRE PHASE B-RED GROUND-GREEN PHASE C-BLUE SUB-TOTAL LOAD PER VAHASE IN 2943 2703 2703 CND BUS - a ? U n N 150A SS1 (SEE NOTE 11) 45 KVA (3 x 15KVA), 30 E a 240/120 V SECONDARY a rY (EXISTING) - BKR. SIZE A B C 0- 20 901 __C- 20 901 r? 0- 20 901 0- 20 901 ? 20 901 i1 0- 20 901 0- 15 240 0- 15 50 0- 15 500 0- 15 625 i1 0.- 0_ 0_ C- 0- C- o- o- 0- 0- NEUTRAL BUS LOCATED POPE AFB NEMA 3R SERVICE TO CKL NO. MOTOR ACTUATOR 2 (SEE NOTE 12) 2 4 6 MOTOR ACTUATOR 4 (SEE NOTE 12) B 0 MONACO BT2-7A CAMERA/XMTR POWER CAMERA FLOOD LIGHTS GFCI DUPLEX RECEP. I LUAU PLH TOTAL PANEL 2667 1852 2302 PH S IN LOAD IN VA 20 40 14510 POWER PL 208/120V. 30. 4W, BUS 3P I20A 3P ?20A 31 J204 3P ?20A 3P J20A 1P 151 IP I15A 1P /15A IP ?15A 0 0 z v 0 o z v 0 0 z v 0 0 z v 0 0 z v o Y FOR 12 SYSTEMS SEE PP-I POWER •- - PANEL SCHEDULE, ABOVE 0 0 ? o x a a ENCLOSED PACKAGE n n n n n (TYPICAL) _10A ?01 ,G1 JDA SAFETY SWITCH _ _ o I u a I I _J I N I I _J I L m a I I _J i I 4 I _J I M 0. I GATE ACTUATOR I _ SLUCE GATE I ACTUATOR SLUCE GATE 2 ACTUATOR SLUCE GATE 3 ACTUATOR SLUCE GATE 4 ACTUATOR SLUCE GATE 5 ACTUATOR 0 d FINAL DESIGN WARNING EHB BT-8 SPILL GAT REVSIDx RS B p°x'-' DT E STRUCTURE FAYETTEVILLE, NC Q 1 ® ?E? EHB MONACO FIR RRGEG 22235649 Amber Oaks IF THIS BAR DOES " s E SYSTEM E M 9400 Ambergl- B-1-rd 2 NOT MEASURE i rHE" DRAWING is W7Ojmt NwAmt A LECTRICAL DIAGRA 16 512-454-4797 NOT TO SCALE twc 6/25/04 ONE LINE/PANEL SCHEDULE SHEET 16 OF 17 BT me xnw sx.ws Q xu «tw»a larws ?cam.x.w rwm +ca- 4mui xra AWN e ITEM OTY DESCRIPTION (ALL NANUFACURERS ARE "OR EOWL') ITEM OTY OESCRIPnON (ALL MANUFACTURERS ARE 'OR EOLML-) 1 2 CDNOULET, EXM u_, -PROOF, 4-3 4 HU95 6 A R 2' SGH, t0 PIP GALV GROUSE-HINDS GUAX26 CABLE CONNECTOR 12' MALE C-H TYPE 'C9 7 1 ROCOUGHT, HRS. ENCLOSED h GASIFIED. wTN 2' 5UPFITTER MOUNT, HOW. 120V, CROUSE-HINDS 3 4 1 REDUCWG BUSHING J t'N 1 2' C-M TYPE RE' CONDOR CLAMP 3/4% W SPRING NUT A I FIAVSY100 MT-)6-SFA6 UNNQ2SL HREATHER DRaN, 3/4-X 1/2- R CHANNEL STRUT P-1000 CALV. CAMERA FLOOD LIGHT g 14 V-3' Ifl REM Ott DESCRIPTION (ALL MANUFACTURERS ARE: -OR EOUAL-) ITEM OTY DESCRIPTION (ALL MANUFACTURERS ARE -OR EQUAL-) 1 2 COUPUNG, FIGS, SIZE AS REO'0, t 1 REDUCING BUSHING SIZE AS PEO'D. 2 I CONDUIT RENO 90'LONG RADIUS RCS SIZE AS REO'D. 3 I PVC TO RCS ADAPTER SIZE AS REO'D. 3' All AROUND CONNECTION FINAL DESIGN DRAFT FlNAL DESICN SUBMITTAL DESCWF [ON OF RLNSION CAMERA (SEE SI CAM FOOD LIGHT MOUNT NOT TO SCALE TOP OF GRADE 1 rJ?zr^r.??:. CONNECTION 6• IDENTIFICATION TAPE POLYETHYLENE FILM (SEE SPEC 16111, 2 oZ 1'-2• I s N ee b ? 2 TOP OF GRADE ?t•< ea•< r 3• S. 3• 2 n z L 3 1 .. r•, n eaa O ,I A B , 3 ALL AROUND 3000 PSI CONCRETE PVC RCS ENVELOPE A= 2• C RED CONCRETE B= 2° C 3000 PSI 1 ELECT DUCT BANK C STUB-UP TYPE A A A NO REINORCEMENT + 4 5 POPE AIR FORCE BASE EFS 6/25/04 FA=EVILLE, NORTH CAROLINA Amber Oaks 5/21/04 CATE 9400 Amb-c;Ien Boulevard Austin. TX 78729 512-454-4797 WAQ RPA 3 99M RIM Rf4M R,4m hN R= ME GAEL R-LYCFEN x X 1 I II xl I I I I I I I I I GUE1 RllY? X I I I I GqE1 HOT= 1 X I , (?E2 R LYCR N I l x l 1 Gn1E2 Z= x GM ma= x GUB2 R11YaCTTd) I I x I GUE2 H13frCRaE x I I , GZE2 137B)CAG I x GAE3 RllYCPEN X1 I GSE3 vac= I I I I I I x I I 1 GVE3 33C11ffi] 1 1 1 1 1 1 Ix 1 1 GUE3 RuYa x GUE3 F aMME X- ,11 GUE3 G B,NhG I I I I x GUE4 ( I X I G?JE4 I x GUE4 x GQE4 R11Ya= I x l l 1 1 GUE4 434 Gil - I 1 X I I I I G ' J E 4 I I X I 1 1 XI I I Ix I I GOES 33(ILf? Ix I GMES RllYQCFM I %I GUE5 f -1ITME ( X GME5 C;MCAn I X1 I FINAL DESIGN wuNlNC DEW.e : OT 8 SPI BT F10N R+NN. D - LL GATE STRUCTURE FAYETTEVILLE. NC 1 0 0 I DT ® "'C- EF13 PROJECT 22235649 IF THIS BAR DOES PAR R ? MISCELLANEOUS DR NX? NOT MEASURE IS THEN DRAWING IS PR 6 YN11 U ELECTRICAL DETAILS 17 NOT 10 SGALE a"rC. 6/25/04 SHEET 17 OF 17 L="J A A \ F%6P NO PIPE /I 1 \ `1 MGH CUMRT! 1 / I^ry 1 _ N[9'08'07'E 1 \ 1 IeE e5'(COMP0L LIME) /" rr R 2 . Pmt s O AT EL 171 " E15 !ASPialT 11 '_ ?'. . I /' 11p / N. 6iS.77700 _/" E%ISTMO EIECTPIC/1 E. 1,999,0]2-0] ULL I, EL 171.0 -711 CRAOE 70 DfWN ,o MEN bTJNC1E CATE iiN is ,T2 2 A I 1 ` eY CULVERT /"•%' _-, 1 I 11TS OF ETLAND DELINEATION OVIDED Y POPE AFB) nT" T AT Fl. 171.0 ?\ f 1) -=1 a\ \\ = ?' •?•T"': :; :''' 1 -- ' N' ND INIPACTS «ETL EIER FENCE . _- -/' r PERI - - A kr AC. 4 ct5s Rpo / ° `' r 1dNC'1'LI - 105 Fl'. N. 621.770.71 E. 1,998,077.70 C'=?'- '• ti: .f :'.'. \ ajL. 171,0 - 1 ?... ..>..xx; ,. N. 527.77202) S E. 1,908,079.02 - c vco T SFU f M a+tE25 a 90 7) Bu s 1. t P l - HS MID R EAS FOCATED A0E TIICEE WMM1 LIUIt9 N.tR.VaOS. TOTAL W-S OI PROIFLt wLL eE CER. _ CAME /n?o \ i l 0 -7115 KMCATED APE TWIN MONO WE CURER YIE 1rvAC cn2rx l?- - ' LN.HT tOG'lUN 1RNp5 H i . , e75. ?- 1.99e,Tp4.ee ` GRADING PLAN - EEK .10 70 0 - scat IN -- I T/ M CR ' ?. o / ?.. ?. a'^"? ' 11Y IT NC -8 SPILL 09,1E STRUCLIN'E PR,FTTE`ALLE eae Qj . POPE AIR FORCE DAaE PL7 TE1' i ORTH CATIOU A , SUMMARY OF ?w NMI!r Rc.AOM MN /.?/aa _ FAYE1 I 1.E, N N Ampar OMa \yE CiS -- ?< a/?a/w \. ?M rrw?allwa.v? 1 .n°?R ?? a i ? ? s¢T 1 R 1 a[v O[Yarivla RN!W art 517-15 -NIT/ 11 FORT BRAGG MILITARY RESERVATION WASTE WATER TREATMENT PLANT i.. HORIZONTAL CONTROL /•' IRON STAKE N: 523.461.873 P{M /'/ E: 1,998.}05.169 /'- /' SE Spp1/ /' j./ N66.11? '.TO RIPRAP / /• 1.51 - .INV OUT. EL 164.80,_ R ENTRY & E XIT DIAGRAM D NERSION CHANNEL SECTION 100' ~--- 0o' EXISTING GROUND C 174 ..• 172 " ? 171 C 172 t- 2 170 170 z 0 166 '- 166 m ? 16B ? 166 Ti 164 tti'; y 164 Zi u 16I ,62w pyO LINER SECTION A-A 0 10 TT ZO 30 SCALE IN FLEI INV OUT: EL 164.97 DIVERSION CHANNEL WITH LINER SECTION 2 CORP 0 METAL PPE "r 1 ARC 11' WDE K 6.6 TALL ?t?" - ---_- -EXISTING GROUND _ 2.0' 100' 100' GUARDRAIL t, 1 j C 174 174 /'. / \ \ \ 1' THICK f 12 172-• /./ 11 \ \ A o Ic70 a iea s /_/• \ CONCRETE CONTROL LING / /'" 1 \ 1 11 WALL 166 166 164 ;64 Zi 162 62 d , 11 1 1 / dJ / / LOCK(iRENCH / BENCHMARK RE INV EL. 1651 NEL LINER / /GuT IN TOP OF Co" RE INV IN: CL 165.08 1 SECTION B-B EL HEAD 1 +?-APPROXIMATE' MATE . LOCATION OF SOIL BORING CT-01 p'1 ON CULVERT 1 0 10 20 10 H6;j / /.• N. 523.3 77 ri CONCRETE YA9 (CRATE REMOVED) E. 1 .094.57 CONCRETE WING WALE SCALE IN FEET /?.,a?,`?Ct fRATM1A CONTROL TO BE REPI-Acr GABION BABKE -BY GUARDRAIL /y F }? EXISTING BT 8 SPILL GATE STRUCTURE 630 / AF MOUTON ^ . 7,111 / ,/'' --+ PORTAI)AM?STRUCTURE SECTION PPROXWATE LOCATION P'PW EDGE OF OF FIBER OPTIC LINE \ /CO^`CRCTCAPRON TEMPORARY DIVERSION DAM STEEL SUPPORT FABRIC MEMBRANE IMPERVIOUS FABRIC / ASPHALT I\ - / t NEW SPILL GATE LOCATION FRAME SEALING SHEET / - ' UNDCRGRO ELECTA t 170 1720 t / STNr TllaE I. W' 170 170 z 68 3 9.?/ f' RSONNCL GATE' ??!?? / 0166 16 60 64 4 2 ` 1624 10P .+• ?,/ f'/ `?Q __?- _/?/f j/// /1 16 ?: '+" FR?PpCK -?___. T ?'J,%/?`//?/i'L L J LOAD HG (STONE) SEE NOTE 5 i?•e'` ---?" ?? EA B V/?/ Jl?i: SECTION C-C ?.•" / ?APPRDXIMA ioc / `. B0 10 20 30 OF UNDERCR [R NLECmI?? ,'?1\\t SGLLE POPE AIR FORCE IN fCll BOUNDARY LINE NEW 160'•20' \.. \\\\\ j DIVERSION CHANNEL _ _ _ \\\\ b R NOTE s ( • \ \\ - \ i -- - --_- 1. SOE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY E \ \ 1 LEGEND CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, F _ - ? - • r \ \ 104 GILLESPIE ST., FAYETTEVILLL, NC. TELEPHONE LIMITS OF WETLANDS 910-323-3400. z p 71 rr _ sF - Y SILT FENCE 2, PORING HOLE INFORMATION PROVIDED BY DAVID WARREN, ? ?'? / UPS CORP., MORRISVILLE. HC. ?\ ... - ej ' J. HORIZONTAL COOROfNAT[S AND ELEVATIONS ARE IN UNITED STATES S ::6 FPROXI4ArE C STATES SURVEY FEET. HORIZONTAL COORDINATES ARE ? W 98}, USING BASED ON THE NORTH AMERICAN DATUMSFA (MAO) 1 LEVEL (45l) / ! W TEMPORARY DIVER90N^?? \ s 't TANK CREEK / T TOME IN FEET ABOVE 4EAH E / ,+ j DAM _ NATIONAL GEODETIC VERTICAL DATUM OF 1929 /,'' I A _ ?` •? 4. LIMITS OF WETLAND DELINEATION '. ?? 0 ZO 40 60 5. LINER MATERIAL USED WITH THE PORTA DAM WILL BE ? ANCHORED AT THE END BY WEIGHTED MATERIAL OR BY A ya - SCKE IN FEET LINER LOCK TRENCH. FINAL DESIGN W4I,.K 11M RE PAR MANCHESTER ROAD (BT-8) SPIEL GATES Q ITNA vcK [• 4/b/a a,A FAYETTNLLE, NC `r ,J„jadN POPE AIR FORCE BASE ® N W6 1?2?• o-.rz m IT. ?oj?o/os FAYEf7EVILLE, NORTH CAROLINA ATw ?• e.A oas "uT2 '?` nr (vrKl oens/os ?' '? •.oo •..... H. e«+..e.a ...ei CHANNEL DIVERSION DETAILS ,T, 1X TO I-E5 zHm or 7T M .N. a . e. _•6.-.- 7.7 ?T , 4/bjo Final EA for Spill Gate Construction 0 NORTE CAROLINA STATE CLEARINGHOUSE. DEPARTMENT OF ADMINISTRATION INT'-"RGOVERN2'r--'NTAL R.7VIM7 STATE 2`'LJ"SiER: 04-E-0000-0030 I WITS n==1V-0: 07/29/2003 ' Amnay aZTSPOVSE: 08/25/2003 SL'VIE'W CLOSED: 08/29/2003 HS RENEE CLEDHILL-EARLEY " CLET,RINGHOUSE COORO DEPT OF CUL RESOURCES ? ? V ARCHIVES-HISTORY BLDG - l:SC 4617 I RALEIGH NC •?-?" ' - ? REVIEV DISTRIBUTION S CC4rS - DEPT, NF IP DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE ' DEPT OF -'U L RESOURCES - - - - - -- DEPT OF TRANSPORTATION MID CAROLINA COG PROJECT INFORMATION APPLICANT: Pope AFB TYPE: National Environmental Policy Act ERD: Environmental Assessment /Finding of No Significant Impact D--SC- Proposed action is to demolish and reconstruct three existing spill gates and construct one new spill gate at a fourth location on Pope AFa. F03 The attached project has been submitted to the N. C. State Clearinghouse for intercovern.•aental review. Please review and satmit your response by the above indicated date to 1302 Mail Service Center, Raleigh NC 27699-1302. If additional review tine is needed, please contact this office :at (919)807-2425. :.S A RESULT Or THIS REVIEW THE FOLLO ING IS SUS`!177ED: NO COVNT-NT COM.tiWNTS ATTACHED SIGNED BY: DATE•r ? 11 ? ?? I U a1,'08zap; A(jG2 003 ?e0 ry i 0? •.? CLA AUO 0 4 2003 6.0 List of Agencies and Persons Consulted and/or Provided Copies 6-15 Afr-r^ t 1 1-i AM I IJ1 ? ?? NC®ENR North Carolina Department of Environment and Natural Resources r A? Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan Klimek, P.E., Director Division of Water Quality February 4, 2005 Lt. Colonel William B. Harris, III, P.E., Commander 43d Civil Engineering Squadron/CC au' Q ?J D 560 Interceptor Road Pope AFB, North Carolina 28208 FEB g 7005 Subject: Additional Information Request p>=t;rt , ?? r Repair of Manchester Road (BT-8) Spill Gates °,?tlJIDS DWQ 401 Certification, project No. 04-1995 Pope AFB, Cumberland County r = c f T- Dear Colonel Harris: On December 15, 2004, the Division of Water Quality received your request for a 401 Water Quality Certification for the subject spill gate repair/replacement project on Pope AFB. On January 5, 2005, Ken Averitte of this office visited the project site with members of your staff as well as representatives of the contractor. During this visit, alternatives were discussed for dewatering the stream channel during the construction phase. Diversion of the stream was apparently the preferred alternative for isolating the work area and allowing the construction to take place in a "dry" environment. Since the stream diversion proposal was not part of the original 401 application, an amended application was requested. As of this date, this application has not been received. Therefore, statutory limitations require that this office place this project on "Hold" until the amended application is received. It is important to note that the revision should be sent to the Central Office address used for the original application. In order to expedite the review, you may also send a copy directly to this office. Upon receipt of the amended application, review of the project will proceed in a timely manner. If you have questions concerning this matter, or if we can be of assistance, please contact Mr. Ken Averitte or me at 910-486-1541. Sincerely,, Belinda S. Henson Acting Water Quality Regional Supervisor BSH/KA/ka cc: Cyndi Karoly Lillette Granade, USACE Fayetteville Regional Office 225 Green Street - Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910486-15411FAX: 910486-0707\ Internet: www.enr.state.nc.us/ENR An Enual Onnortunity 1 Affirmative Artinn Emnlover -50% Recvcler1110% Post Consumer Paner NC®ENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan Klimek, P.E., Director Division of Water Quality February 4, 2005 Lt. Colonel William B. Harris, 111, P.E., Commander 43d Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB, North Carolina 28208 Subject: Additional Information Request Repair of Manchester Road (BT-8) Spill Gates DWQ 401 Certification, project No. 04-1995 Pope AFB, Cumberland County Dear Colonel Harris: On December 15, 2004, the Division of Water Quality received your request for a 401 Water Quality Certification for the subject spill gate repair/replacement project on Pope AFB. On January 5, 2005, Ken Averitte of this office visited the project site with members of your staff as well as representatives of the contractor. During this visit, alternatives were discussed for dewatering the stream channel during the construction phase. Diversion of the stream was apparently the preferred alternative for isolating the work area and allowing the construction to take place in a "dry" environment. Since the stream diversion proposal was not part of the original 401 application, an amended application was requested. As of this date, this application has not been received. Therefore, statutory limitations require that this office place this project on "Hold" until the amended application is received. It is important to note that the revision should be sent to the Central Office address used for the original application. In order to expedite the review, you may also send a copy directly to this office. Upon receipt of the amended application, review of the project will proceed in a timely manner. If you have questions concerning this matter, or if we can be of assistance, please contact Mr. Ken Averitte or me at 910-486-1541. Sincerely, Belinda S. Henson Acting Water Quality Regional Supervisor BSH/KA/ka cc: Cyndi Karoly Lillette Granade, USACE Fayetteville Regional Office 225 Green Street - Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-1541/FAX: 910-486-0707 \ Internet: www.cnr.state.nc.tus%I;NIt An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper Triage Check List Date: i2 1 ?'(c:1 Project Name: D Q#: County: r14n??erlan? To: 9ZAO Kevin Barnett ? WaRO Tom Steffens and Kyle Barnes FRO Ken Averitte ? WiRO Noelle Lutheran ? MRO Alan Johnson ? WSRO Daryl Lamb ? RRO Mike Horan From: Telephone : (919) S' _ 34 s The file attached is being forwarded to\our for your evaluation. Please call if you need asst}stance. E2/stream length impacted "` ` ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues ? Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching Are the stream and or wetland mitigation sites available and viable? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: e,%. No 'p l-d s ; (z QnSS,`?(z (? Gk Sh--? uU-, 1-e U, to (11VUC ( IOC ctC6dr,?SSeJ 4e) Sp:tl 1412 ??Sfurj? It??-c I 0770 1 DEPARTMENT OF THE AIR FORCE E -- _ 1 HEADQUARTERS 43D AIRLIFT WING (AMC) < < POPE AIR FORCE BASE NORTH CAROLINA 1 w DEC 2004 MEMORANDUM FOR NCDENR, DIVISION OF WATER QUALITY ATTN: 401/WETLANDS UNIT FROM: 43 CES/CC 0A 199 ' 560 Interceptor Road Pope AFB, NC 28308 • SUBJECT: Request of 401 Water Quality Certification, Repair Manchester Road (BT-8) Spill Gates Project, Pope AFB, NC 1. The purpose of this package is to request a 401 Water Quality Certification for the repair by replacement of an existing spill gate structure, which has structural deficiencies. We are hereby submitting seven sets of the completed US Army Corps of Engineers (USACE) Preconstruction Notification (PCN) and application for a Nationwide Permit No. 18 (Attachment 1) for the "Repair Manchester Road (BT-8) Spill Gates" project, Pope Air Force Base, North Carolina. Additional documents in support of this PCN and permit application are provided as Attachments 2 through 5. The total wetland impact is 0.096 acres, which is within the threshold for the Nationwide Permit No. 18. 2. We have already submitted the original PCN and Nationwide Permit No. 18 application to the USACE. A check for $200.00 (Attachment 6) from the project's contractor is included to cover the application fee. 3. Should you have any questions, please contact Mr. Alberto R. Marquez, Water Quality Program Manager, at (910) 394-1637. IV, 94U4 r\. WILLIAM B. HARRIS, III, P.E., Lt Col, USAF Commander *0 Attachments: 1. PCN and Nationwide No. 18 Permit Application 2. Project Location Map 3. Proposed Project Design Plan 4. Wetland Impacts from the Proposed Design Plan 5. State Clearinghouse NEPA Final Approval Letter 6. Contractor's check for $200.00 (Application Fee) /? 1I ftlftwfl !&§ DEC 5 2004 l c? sTO,-RQ?ALJT}. 7ZR$ 'W 4 AVC-Global Reach for Attlerica [1] Office Use Only: 0 19 9 5. Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 18 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Pope Air Force Base, Attn: Lt Col William B. Hams, III, P.E. Mailing Address: 43d Civil Engineering Squadron/CC 560 Interceptor Road Pope AFB, NC 28208 Telephone Number: 910-394-2561 Fax Number: 910-394-1643 E-mail Address: william.harris(a,pope.af.mil 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: 7 Page 5 of 13 Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Repair Manchester Road (BT-8) Spill Gates, Pope AFB 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Cumberland Nearest Town: Spring Lake Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From the intersection of SR 87 and Manchester Road in Spring Lake, take West Manchester Road to Pope AFB; the site is after the Seaboard Coast Rail Line on the left, traveling west. 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres):___ 2,130 acres (includes the entire Pope AFB) 7. Nearest body of water (stream/river/sound/ocean/lake): Tank Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://112o.enr.state.nc.us/adniin/maps/.) 11 Pa-e6of13 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site already contains a spill aates structure, surrounded by wooded areas on three sides, parallel to Manchester Road, located within a wetland which is part of a Military Installation. The Fort Bragg Wastewater Treatment Plant is located diagonally across the road from the existing structure. This site is located at the northern boundarv of the Base, where Tank Creek flows under Manchester Road. 10. Describe the overall project in detail, including the type of equipment to be used: Overall project moans include repair by replacement of the existing gates structure by building a larger, independent structure approximately 50-feet upstream of the existing one, outside of the NCDOT's riaht-of-way, then demolishing the existing structure. The channel portion immediatelv downstream of the new gates structure will be re-graded and riprap placed. Correspondingly, the upstream area adjacent to the new structure will also be re-graded to facilitate flow into the structure. Five, six-foot high by seven-foot wide slide gates, with motor operators that will be controlled both locally and remotely, will regulate flow. The base perimeter fence will be extended upstream to the structure and across it. A 12-foot wide gravel service road will be constructed from Manchester Road to the new structure. Equipment used on the project will include, but not limited to: a small backhoe, dump truck, earth compactor, dewateringpumps, air compressors, excavators for sheet piling and cranes. 11. Explain the purpose of the proposed work: To provide a suitable spill gates structure to pass the normal flow of Tank Creek and be able to contain multiple hazardous material releases within the boundaries of the base. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Pope AFB provided limits of the Wetland Delineation. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. 0 N/A Pa(e 7 of 13 0 VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed project will impact a total of 0.096 acre of wetlands adiacent to Tank Creek and 105 linear feet of Tank Creek. 2. Individually list wetland impacts below: E Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A Structure/ rip rap 0.096 No 0 Riparian * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/iwww.fema.f*ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A Total area of wetland impact proposed: 0.096-acre permanent impact 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Tank Creek Structure/rip rap 105 Tank Creek 10' Perennial Pace 8 of 13 +:. * List each impact separatcly and identifv temporarv impacts. Impacts include. but are not limited to: culverts and associated rinran. dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usl?Seov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tot)ozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 105 ft 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation: N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and ® financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts Page 9 of 13 were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Between the preliminary and final designs, the amount of riprap to be placed within the stream and the amount of grading of the upstream and downstream channel were minimized to avoid greater permanent impacts to the stream and adjacent wetlands. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne.us/ncwetlands/stnnE!ide.litm1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. E, Paee 10 of 13 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://li2o.enr.state.ne.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ® No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ® No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 11 of 13 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square Multiplier Required Mri ion 1 3 2 1.5 Total Gone 1 extends out A feet perpendicular from near bank of-channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No net change to the impervious area will occur as a result of this project. Storm water controls will include silt fences, riprap, and permanent urassing on all exposed soil. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 12 of 13 ® XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Z. 0-u, Date Applicant's Signature WILLIAM B. HARRIS, III, P.E., Lt Col, USAF Commander, 43d Civil Engineering Squadron (Agent's signature is valid only if an authorization letter from the applicant is provided.) C7 1?1 Pate 13 of 13 :J 0 ?11 3p0.:))?-?!? /?j??-•/i---// 1 _736 1 \``???•r ???j.? - ?.J `???'UOf ?`-,,:i??r--. 170 ^(1-?,? 1 •.1,,_,1/*'?.'\l?.?U wil- ?- SITE LOCATION - v. J T."RR /74 1 ?'! ,?T?'??1 ? ??jy? -???-, '?'?_ 1, j •- ( ' -c? •?, 1 - 2. lip ?6? sao' Radius,,- //? t{ ??r~?T_? /? -% ?.?!• r'r , (Igo ro 1 •+??? / 7199 ?' ?•---?? ? `?I ll? `?` • ?l ... ? r ? ?q. '? ?.l 269' - 1 "??^ <//i'+ ??' 1?' s ? 1 ? ??J-1 / .li j ? ice.' ???? • `' a LR' 1? ?l? 4J ,r•"'` - ?,r"_V,?f - '?a Jlt ?`.. -J ii??" ?~- _.??/: •'? { ,.-.?,••?/?+,.i =? ? r.=E?L,? ?` FIGURE 1. LOCATION MAP • I POPE AIR FORCE BASE BT-8 SPILL GATE STRUCTURE SCALE IN FAT QUADRANGLE LOCATION FAYETTEVILLE, NORTH CAROLINA 0 2000 Prepared for- SOURCE: USGS 7.5' TOPOGRAPHIC QUADRANGLE uj.. O VERHILLS, NC - DATED 1957, REVISED 1971 DRAWN BY: EFIJ USGS 7.5' TOPOGRAPHIC QUADRANGLE DATE: 06/08/04 Fig. MANCHESTER, NC - DATED 1957, REVISED 1987 PROJECT NO. 1 z A BT-8 SPILL GATE S'T'RUCTURE C7 11 FOR POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA, USA PREPARED FOR: AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLEVICE BT-8 SPILL GATE N STRUCTURE H p,D POPE PARK o, ay Vim} ?• P t 0 ' 0 e0 d.;f?d 7, 4 t RAMP P RAMP A a e Ij "r? o D ,, a?eo AIRBORNE GATE DRIVE REILLY?? GATE ?- ? - WILLOW LAKES ARMISTEAD GOLF COURSE GATE TO FORT BRAGG POPE AIR FORCE BASE SITE MAP 0 3 6 9 SCALE IN MILES FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL INTERMEDIATE 60% SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (30X) DESCRIFTION OF REVISION 6/30/04 5/21/04 10/10/03 08/13/03 DATE CONTRACT NO. F41624.00-D-8028 TASK ORDER 0193 STATE MAP NOT TO SCALE SHEEP NUMBER DRAWING INDEX DRAWING TITLE 1 COVER SHEET 2 LEGEND AND ABBREVIATIONS 3 EXISTING CONDITIONS 4 PLANNED L10DIFlCATIONS 5 DEMOLITION PLAN 6 STRUCTURE PLAN AND PROFILE 7 STRUCTURE SECTIONS AND DETAILS 8 STRUCTURE OEFAILS 9 REINFORCEMENT DETAILS (SHEET 1 OF 2) 10 REINFORCEMENT DETAILS (SHEET 2 OF 2) 11 TRASHRACK/SECURITY GRATE 12 TYPICAL FENCE DETAILS 13 GATE INSTALLATION DETAILS 14 ELECTRICAL PLAN 15 CONDUfT AND CABLE DETAIL ELECTRICAL RISER DIAGRAM 16 MONACO FIRE SYSTEM ELECTRICAL DIAGRAM ONE LINE/PANEL SCHEDULE 17 MISCELLANEOUS ELECTRICAL DETAILS FINAL DESIGN WARNING uscHU TEN SPILL GATE STRUCTURE Rrn6aN D D i au.N. RAM FAYETTEVILLE. NC Q 3 POPE AIR FORCE BASE ? ? HKB PNaLCT 22235649 FAYETTEVILLE, NORTH CAROLINA Amber Oaks F THIS DnR DOES - p""MTZ C a 9400 Amberglen Boulevard Austin, TX 78729 NOT MEASURE 1' THEN DRAWING IS OIEcT uN? RR MTZ OVER SHEET 1 512-454-4797 NOT TO SCALE wre 6/30/04 SHEET 1 OF 17 LEGEND -- INTERSTATE HIGHWAY 0 EXISTING UTILITY POLE - UNITED STATES HIGHWAY SA EXISTING SANITARY SEWER LINE ---6220? EXISTING ELEVATION CONTOUR WITH 0. EXISTING GAS LINE ELEVATION IN FEET ABOVE MEAN SEA LEVEL --6220-? NEW ELEVATION CONTOUR WITH EXISTING BUILDING/STRUCTURE ELEVATION IN FEET ABOVE MEAN SEA LEVEL CP-1 EXISTING SURVEY CONTROL POINT -UGE UNDERGROUND ELECTRICAL LINE - •- - ••- EXISTING WATER LINE OR CREEK FO FIBER OPTIC LINE W _W-W_ LIMITS OF WETLANDS 1Y BURIED WATER LINE FLOW INDICATES DIRECTION OF FLOW -Clap CMP CULVERT -M -I -e - FENCE Q--- >__<1 EXISTING LIGHT POLE -- GUARDRAIL TEST HOLE LOCATION PAVED ROAD 0 EXISTING MONITORING WELL/OBSERVATION WELL ------------ UNPAVED ROAD - _______ D THE ROSE GROUP SURVEY CONTROL NEW CONCRETE 0 NEW SURVEY CONTROL POINT ° ® ECM -EXISTING CONCRETE MONUMENT EXISTING CONCRETE 0 MH EXISTING MANHOLE HH EXISTING CONCRETE TO BE DEMOUSHED ®SM-1 NEW SURVEY MONUMENT STRUCTURAL FILL/BACKRLL - - - CENTERLINE `0 --H2fN`--- RIGHT OF WAY i RIPRAP PERIMETER OF TREES 0 _ RIPRAP BEDDING v TREES TO BE REMOVED TRASHRACK/SECURITY GATE GRATING CRUSHED AGGREGATE BASE COURSE l1 MD CRUSHED AGGREGATE SUB-BASE COURSE NON-SHRINK GROUT ABBREVIATIONS 0 AT a DEGREES 0 DIAMETER FEET INCHES % PERCENT t PLUS OR MINUS AFB AIR FORCE BASE ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BE BURIED ELECTRICAL BGS BELOW GROUND SURFACE, rti CENTERLINE CJ CONSTRUCTION JOINT CMP CORRUGATED METAL PIPE CDR CONTRACTING OFFICER'S REPRESENTATIVE CP CONTROL POINT DIA DIAMETER E EAST EA. EACH EL ELEVATION H HORIZONTAL INV. INVERT MAX MAXIMUM MH MANHOLE MIN MINIMUM MSL MEAN SEA LEVEL N NORTH NAD NORTH AMERICAN DATUM NAVD NORTH AMERICAN VERTICAL DATUM NGVD NATIONAL GEODETIC VERTICAL DATUM NO NUMBER NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER BE OVERHEAD ELECTRICAL PVC POLYVINYL CHLORIDE PROP PROPOSED S SLOPE SCH SCHEDULE SM SURVEY MONUMENT STA STATION TP TEST PIT TYP TYPICAL USA UNITED STATES OF AMERICA V VERTICAL W WEST OR WATER LINE FINAL DESIGN WARNING X4c : CBG BT-8 SPILL GALE STRUCTUR T REVISION W FINAL DESIGN TEM 6/30/04 m a 8 t RAM °P wn E FAYETTcI ILLE, NC 3 `2 E DRAFT FlN>L DSIGN SUBMITTAL TEM 5/21/04 .;4 POPE AIR FORCE BASE ® CNECID: HKB PROJFU 22235649 INTERMEDIATE box SUBMITTAL TEM 10/10/03 :FAYETTEVILLE, NORTH CAROLIN A Amber Oaks IF HIS? DOES MT LEGEND AND ABBREVIATIONS awwwa ? PRELIMINARY DESIGN SUBMITTAL (307,) TEM 08/13/03 9400 Amberglen Boulevard ti A T% 7 7 R NOT THEN DRAWING IS Z Ma at MTZ Z = N REV DESCRIPTION of REVISION BY wrE us n. 8 29 - 454 -4797 512 NOT TO SCALE 6/30/04 SHEET OF 2 17 0 FORT BRAGG MILITARY RESERVATION WASTE WATER TREATMENT PLANT INV OUT. EL. 164.97 HORIZONTAL CONTROL /-' IRON STAKE N: 523,461.873 E: 1,998,305.169 GVPK6 / ?? / / 66•x` ?5 ? s?? tJ RIPRAP INV OUT: EL 164.80 j'/ ?pPD 2 CORRU D METAL PIPE / 1 ARCHES- 11' VODE x 6,6' TALL pT 1 1 1111 1 1' THICK 1 CONCRETE 1 1 l WALL 1 1 11 ? ? pPSE l VI l 1 /?? Si APPROXIMATE LOCATION OF SOIL BORING GT-01 ONCRETE SLAB-(GRATE REMOVED) ?o f CONTROL LINE INV EL. 165.15 1 IN RE /1 T / /CUT CUT IN TOP TOP OF CON RE 1 ON CULVERT HEAD WA INV IN: EL. 165.06 "3/ 0 N. 523,32251 E. 1 98094.57 ? HORIZONTAL CONTROL GRATING IRON STAKE /-/ / /? EXISTNG BT-8 SPILL GATE STRUCTURE N: 523,294.630 GUARDRAIL E: 1,997.867.157 ?1" PPROXIMATE LOCATION -„? •? ?' /1;1,4EDGE OF CONCRETE / ASPHALT OF FIBER OPTIC LINE / x APRON LUNDERGROUN ELECTRIC' BOX-_ - /PE Pf9 r?°/ Sp Pp rn" w' / APPROXIMATE LOCATION 0- OF UNDERGROUND?-ELECTRIC / POPE AIR FORCE BOUNDARY LINE 0 r-LIMITS OF WETLANDS NOTES SITE TOPOGRAPHY AND FEATURES ARE BASED ON SURVEY CONDUCTED ON JANUARY 20, 2003 BY THE ROSE GROUP, 1] 0 20 40 60 SCALE IN FEET 104 GILLESPIE ST., FAYETTEVILLE. NC. TELEPHONE 910-323-3400. 2. BORING HOLE INFORMATION PROVIDED BY DAVID WARREN, URS CORP., MORRISVILLE, NC. 3. HORIZONTAL COORDINATES AND ELEVATIONS ARE IN UNITED APPROXIMATE STATES SURVEY FEET. HORIZONTAL COORDINATES ARE TANK CREEK BASED ON THE NORTH AMERICAN DATUM (NAD) 1983. ELEVATIONS ARE IN FEET ABOVE MEAN SEA LEVEL (MSL) USING THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD 29). 4. LIMITS OF WETLAND DELINEATION PROVIDED BY POPE AFB VIA EMAIL ON MARCH 5, 2004. FINAL DESIGN wa wNC TEM BT-8 SPILL GAT TR B ° INAL DESIGN FY /J0/04 M ¢ t rri RAM E S UCTURE FAYE TEVILLE, NC Q DRAFT FlNAL DESIGN SUBIATTA ?? ,,2,,D4 POPE AIR FORCE BASE PROJECT 22275649 " INTERMEDIATE 60z SUBMITTAL hu 10/10/03 FAYETTEVILLE, NORTH CAROLINA o `°e BAR ` 'u °0 5 PEER w m: oa. PR0.1A1MARY DESIGN Sl18MITA (7D7.) TEAT DB/13/OJ o a,e 94.00 A7X 79Ie729 eaule ? o EnS uRE THEN DRAWING IS yE«? NTZ EXISTING CONDITIONS 3 r REV OESCRIPMN OF REVISION 6r DATE 512-454-4797 NOT TO SCALE an: 6/30/04 SHEET 3 OF 17 W1UIH VNiItS (Stt NUIt 5) '/ /' 11 11' I l _ 1 1E / ? E ?I1 I 74 1 11 11 /°% " ., 11 72 ?.; [STING GROUND yam'` ? 174 EXISTING PIPE 1 172- ARCH CULVERT 1 A o 170 170 a ( I ? l 1 / -_ ------ - W--- •' • --- 169 F < 165 68.95'OYE 11 11 F 1 /- SEE DETAJL 2 166 07 ?, 184 - --- « 48.85' (CONTROL LINE) 1 1 /' -- EDGE OF , _ "' 2H,1Y 184 1 I I w 162 -- ---- - - - - - ?- PIPE INVERT .5 BEDDING 1.5 RIPRAP 162 11 EXISTING ASPHALT AL EL 171,0 A SECTIO ? a4 0 10 20 30 .4 ( 1, EXISTING GROUND SCALE IN FEET WIDTH VARIES (SEE NOTES 8 AND 7) a 176: _ 174 ?- 174 1.70/?? "'72 •? _ `???'. 172 y z 21 -POPEPfB I I' i???/ Sa3 4H:1V 168 ---- H'v_ ry_w??arx""'_._-_ -- --168 n ? 6bp58 PROPERTY LINE ' i x 164 - - --~ - -- 60 .164 --- _- -_ __._. --- ._. - _ .------- _ ---- --- 182 W N. 523,207-00 EXISTING ELECTRICAL PIPE INVERT TOP OF RIPRAP P ELINVER .D B 18Z SECTION 'm GALVANIZED B 1- 1,998,032. 03 PULL BOX AT EL 169.0' ' EL. 187 . 0 M 174,4 " /•' GRADE-TO- DRAIN CMP CULVERT 0 10 20 01 30 , NEW VEHICLE CAT - - EL 174 ID 173 ?4 /n \ 7 r 2: t11 P x SCALE IN FEET _ D6 i i 6'o CULVERT D -' \, r PERMETER FENCE e/ ?* \ g IPRAP (SEE SHEET 12 PIPE INVERT N `RIPR 0,5' CRUSHED AGGREGATE AT EL. 171.0 TOP OF RIP 1 r? BASE COURSE - - ?- 1 ?'•? ^ i MAINTAIN 3.0' J r !y - 11 ?EL 167.0 ^?/ `_r j / EL. 174.0 AT SEEiION I SHOULDER SE DETAIL Z } 12.0' ?' 7r D7 y\ EWCKFILL 4. 1 PERIMETER FENCE - -- (SEE-SHEET- 12) -- ANTENNA .1 1H1W / 1k1V - 1-? \ TOAER _? [f '=ESS ROM N. 524411-59 04 EXISTING GROUND E,1,99 80.19' 1.3' CRUSHED AGGREGATE SECTION c a N1g5y 27- SUBBASE COURSE NOT TO SCALE w J. N.5 ,237.91 STRUCTUR i q N,; 523,239,21 CONTROL INf E 1, 8,113-98 EL 167.0 RIPRAP E. ,998,077,20 N. 523,243.p6', ? *EL. 17 0 L ;_13 SPILL- E. 1,998,1310 ^ STRUCTURE ' r o ° N, 523 2,02 1', a 1L ° E, 1,998, ,82 1 t °• ?i t 1 ]]] EL 174.0 ETT-8 SPILL GATE RIPRAP BEDDING \ 1 4\•, 3.0' 1 STRUCTURE (SEE V sHE> rs e AND 7) ?. TYPICAL RIPRAP SEC-nONn - ? GRADE'' PSTREAM NOT TO SCALE ? _ _ - - ! CHANNE(SEE NOTE 6 \ N ?-CAILERA??110000?? 1 1, STOCKPILE EXCAVATED W ERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DETERMINED ELY THE - LIGHT LbCA1141? CDR' N. 523,198.05 i 2. SEE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING 'CMP' PIPE CULVERT INSTALLATION AND E. 1,998,104,88--- I ACCESS ROAD CONSTRUCTION. PIPES TO BE PLACED IN EXISTING DRALNAGE CHANNELS, 3- COMPACT ACCESS ROAD 81SE COURSES IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS. I 4. FUSE WIDTH OF OOWNSTFENA CHANNEL VARIES FROM 46' AT THE SPILL GATE STRUCTURE TO 26' AT TANK CREEK THE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE. EXCAVATE SIDE SLOPES AT 2H:1V, 0 !T<f ZO SD V doe o 5. RIPRAP TO BE PLACED FOR 25' IN THE AREA DOWNSTREAM OF THE NEW SPILL LATE STRUCTURE. SCALE IN FEET 171 = 6. EXCAVATION OF THE UPSTREAM CHANNEL SHALL NOT BE MORE THAN 24 FEET UPSTREAM OF THE STRUCTURE 1 FINAL DESIGN ®?m TnAD? REDUCE VEXAAD WACrS TEN 8/2/04 vNPNIlG TE BT-8 SPILL GATE STRUCTURE FAYETTEVILLE, NC Q FINAL DESI TIN 8/29/04 d v 1 DRWT FINAL DESCH SUEIATTAL T01 5/21/04 POPE AIR FORCE BASE uAtb ® "°K?' MKS nose 2Z23W4.9 INTERMEDIATE IM 9U91ARA1 Tw 10/10/a3 FAYETTEVILLE. NORTH CAROLINA Amber Duke F *mrz 0-1-M rro RE' wMT .v.?, PLANNED MODIFICATIONS 4 PiZE11NN44( DE9CN 91B41ip1 (IDS TEN Da/13/O3 9400 /V1'D 7r8q BaJwQO NCTr THEN DRAWING R MR Av ?? OF NDr m o-" r am ?' ?? ?• WE "1-454-4797 72 t/2/04 SLEET 4 OF 17 ?- CE STRUCTURE I I I r I r?EXISTING PIPE m o I EXISTING PIPE ARCH CULVERT I ARCH CULVERT 8.0.± 27.9'± -----I ---?-- W16x40 (REMOVE) ----------R-E-MO-V-E -GRATING ---------------------- 06 $9- i -------------------------- ---------------- 25.7'± REMOVE EXISTING SLIDE CATES (3 (SEE NOTE 4) HEADWALL CONCRETE REMOVE GATE ____ STRUCTURE (SEE NOTE 4) -H REMOVE TRASHRACK AND SECURITY SCREEN (SEE NOTE 4) 34.0'± t PLAN NOT TO SCALE TOP OF HEAD WALL EL 174.1± I--PL STRUCTURE VARIES ? I II / 4"± 1-?W16x40 -}? EXISTING (REMOVE) I COMPACTED FILL L 1.0'± 11.1' (TYP.) 0 GRATING (REMOVE) 1.0'± REMOVE GATE OPERATOR AND (;) OPERATOR SUPPORTS (GATE tl -{I- OPERATOR NOT SHOWN) (SEE NOTE 4) `-CULVERT HEADWALL TO REMAIN EXISTING CONCRETE /EXISTING_,?? SIDE WALLS TO REMAIN REMOVE TRASHRACK (NOTE 2) AND SECURITY SCREEN ATES (SEE NOTE 4) EMS EL 166.9± OTE 4) (TYP.) 1.5': REMOVE GATE HEADWALL CONCRETE STRUCTURE REMOVE EXISTING GRATING (EL 173.2±) REMOVE W16x40 (TYP.) EL. 166.7± CULVERT HEADWALL TO REMAIN EL 174.1± v 7 d EL. 165.7± o / a N - -------------------------------------- N 7L 05 CUTOFF WALL SAWCUT AND REMOVE SECTION B ALL CONCRETE UPSTREAM OF SAWCUT NOT TO SCALE o5 JOINT 4.0'± TOP OF EXISTING GROUND PERSONNEL GiN 523,284 E 1,998,028 ?. 4 GA N 523,349 E 1,998,177 REMOVE APPROXIMATELY 165' OF EXISTING PERIMETER FENCING. (SEE NOTE 5) I 4 4'± I I - / ? EXISTING 1. COMPACTED FILL 7 N SECTION A NOT TO SCALE o5 FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL INTERMEDIATE 60% SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (307.) DESCRIPTION OF REVISION n0/04 POPE AIR FORCE BASE 0/10/03 GC,,S t' FAYETTEVILLE, NORTH CAROLINA 617E NOTES 1. DIMENSIONS OF EXISTING BT-8 SPILL GATE STRUCTURE ARE APPROXIMATE. CONTRACTOR TO FIELD VERIFY DIMENSIONS. 2. CONCRETE WALLS SUPPORTING EXISTING EMBANKMENT ARE TO REMAIN UNDISTURBED. 3. IN ORDER TO MAINTAIN WATER-CONTROL CAPABILITIES, DEMOLITION OF EXISTING STRUCTURE SHALL BEGIN ONLY AFTER OBTAINING WRITTEN APPROVAL FROM THE COR. nil Amber Oaks 9400 Amberglen Boulevard Austin. TX 78729 512-454-4797 EXISTING PERIMETER FENCE NOT TO SCALE 4. THE GATES, OPERATORS, AND/OR TRASHRACK WILL BE SALVAGED. CARE SHOULD BE TAKEN TO ENSURE THE FEATURES ARE REMOVED IN SUCH A WAY TO PRESERVE THE EQUIPMENT WITHOUT DAMAGE. 5. FOR ESTIMATION PURPOSES, ASSUME FENCE TO BE CHAIN LINK FENCE, APPROXIMATELY 7' HIGH. ow Nm: WARNING CBG BT-8 SPILL GATE STRUCTURE oPwm: RAM a® aecan: HKB IF THIS BAR DOES P¢R UTZ NOT MEASURE I• PROJECT x ER, DEMOLITION PLAN THEN DRAWING IS MTZ NOT TO SCALE ws 6/30/04 FINAL DESIGN N SqN FAYETTEVILLE, NC Q 3 PROJECT 22235649 ptaNixG 5 SHEET 5 OF 17 1 k Pt ST-8 SPILL p 3 SEE SHEET PILE DETAIL GATE STRUCTURE 08 I o ? o a + PERIMETER FENCE, SEE FENCING D DRIVEN SHEET PILE CONTROL JOINTS (TYP I m .) I (SEE SHEET 121 TRANSITION, , CUTOFF WALL } DETAIL, SHEET 12 I-X X-X X-I-X-Y-/-' I ` OPERATOR DECK r[-X-Y-I-1 I Y ? ( I (BEYOND) l - - -M-M 1 I I 1 I II ANTENNA TOWER (SEE NOTE 2) ? RASED CONCRETE _? I II I I I I LADDER RUNGS 1 X II ?- I) I I I I I X- X- X- I I I I i o E -? I I I I ANTENNA SUPPORT r--- -- BLOCK / I II I EMBEDDED INTO I II II II II II SLIDE GAPE 1 II I II I Og WATERWAY In I ?I HANDRAIL (SEE SHEET 12) I I CONCRETE II II II II I I m I I RIPRAP RIPRAP o I BASE COURSE, I I , BEDDING AND SAND 1 SUB-BASE COURSE, I FILL NOT SHOWN FOR o AND SAND FILL NOT I SHOWN FOR C ARITY I 11 I - 1 JI I TRASHRACK/ CLARITY SECURITY GRATE w L _ 1'-0" ` I I I I I II I I, . ? I I I I (SEE SHEET 11) . . o E, Z 5'-9" I. I I ! I 1 1 "I I N I _ I I. i I t I - I I I I I I I ? I I ' ---, ,--? ,^--. ,---, ,-1 '-- ,---, ,--II I ^- . -- ,--• ^-- k / Ct SLIDE GATE) i 9'-7" 4'-63" DRIVEN SHEET PILE I I N 1 4 CUTOFF WALL J STRUCTURE CONTROL POINT HANDRAIL n N. 523,243.26 (SEE SHEET 12)J/ E. 1,998,137.10 J BOTTOM OF TRASHRACK/I EL 167.00 SECURITY GATE STRUCTURE PLAN SLIDE GATES 0 4 B 12 EL. 227.0 SCALE IN FEET PERIMETER FENCE NOT SHOWN ? BT-8 SPILL 3 SEE GATE DETAIL I GATE STRUCTURE 13 GALVANIZED STEEL OPERATOR DECK SLIDE GATE SUPPORT WALLS ANTENNA TOWER (BEYOND) (TYP.) (BEYOND) I 1 I LADDER RUNGS I EMBEDDED INTO CONCRETE I i II j (SEE SHEET 10)-------------------- -- I F----------- - --- - ACCESS ROAD 6" CRUSHED AGGREGATE r _ (SEE SHEET 4) ----- -----------Y---?-- r---- ----r 1 -r---r ----------- ---- - EXISTING BASE COURSE OVER 15" l ) l I J I I GROUND CRUSHED AGGREGATE 1 I I I r -- SUB-BASE COURSE I r H7 STRUCTURAL FILL BACK -SAND FILL LIMITS OF-/' ?? EXCAVATION EL. 169.5 r'n•n rr ? Ir J. 1 08 / ------------------------------- 25'-0" 7-0 j j I I `?_ -? -?--- I ---I I _ 26'-3" EL 182.0 EL 178.0 -TRASHRACK/SECURITY GRATE NOT SHOWN FOR CLARITY F18" RIPRAP OVER 6" RIPRAP OEODING A O6 PERIMETER FENCE (SEE SHEET 12) BACKFILL TO MATCH EXISTING GROUND --- EXISTING GROUND ------------- -gL- 173...00- STRUCTURAL NJ < -SAND FILL FILL N/ ?'? `N 4 ???> lll??? ? JEE 167.0 LTYPE "F" THIMBLES I L =="? %\%i -/ > : z `SLIDE GATES NOT SHOWN FOR CLARITY I 2 SEE DETAIL CONTROL JOINTS (TYP.) 05 DRIVEN -/ CUTOF 50'-0" IN FLOORS AND EACH WALL rCUTOFF SHE WALL ET PILE (BEYOND) I ---------------------------------------------------- ----------t 25'-0" STRUCTURE PROFILE A Ds 0 4 8 12 SCALE IN FEET FINAL DESIGN TEM HKB POPE AIR FORCE BASE DRAFT FwA DESIGN SU9MfTTAL TEU 5/21/04 FAYETTEVILLE, NORTH CAROLINA INTERMEDIATE 60% 0x SUBMITTAL MITTAL TEM 10/10/03 PRELIMINARY DESIGN SUBMITTAL (30x) TEM 10/10/03 DESORIPTION OF REVISION MY DATE IFKJM U?V===r Amber Oaks 9400 Amberglen Boulevard Aastin, TX 78729 512-454-4797 0 I co 1. PLACE 6-INCH PVC WATERSTOP ACROSS FOOTING CONTROL JOINTS. 2. ANTENNA TOWER TO BE A PRE-FABRICATED UNIT (GLEN MARTIN ENGINEERING OR APPROVED EQUAL). ocvcxm: TEM WARNING 8T-8 SPILL GATE STRUCTURE a ,L6 e 1 ® aeci¢a HK8 I -CJ I I I I I I EL 157.75 I FINAL DESIGN FAYETTEVILLE, NC IF THIS gaR DOES - gym: STRUCTURE PLAN AND PROFILE NOT MEtSURE 1' Z-WECT uuuc THEN DRAWING IS MTZ NOT TO SCPLE d• 6/25/04 ...- A RC11ECr 22275649 IG 6 SHEET 6 OF 17 20'-0" 1'-3" 9'-3" 1 1 9'-6" FENCE SEE DETAIL 1 EL. 182.0 FOR FENCE 12 EL. 181.16 p: MOUNTING D'-6" CJ If— TRASHRACK/ SECURITY GRATE A ! (SEE SHEET 11) EL 178.0 \ v e 1V° e" ° / -OPERATOR DECK a 84"x72" SLIDE GATE (TYP.) EXISTING GROUND 5'-0" a STRUCTURAL 2 SLIDE GATE BACKFlLL WATERWAY REINFORCEMENT rn --- o n NOT SHOWN I RIPRAP AND BEDDING ------__ v (SEE SHEET 4) EL. 167.0 ' 1 - --- -- -- 1 LIMITS OF EXCAVATION 3 vv'i'?-:/ 'x j x /N 1'-0" P. I SEE FLUSH BOTTOM DETAIL 1 '0 u EL ° STRUCTURAL F (SEE NOTE 1) SECTION e O6 0 2 4 6 8 SCALE IN FEET 2' COMPACTED BACKFlLL ABOVE PIPE CROWN -, 6" BEDDING MATERIAL BACKFlLL FOR PIPES D 4 8 12 SCALE IN FEET FINAL DESIGN PERIMETER FENCE 20'-0" 13'-6" 2'-0" 2'-0" a 6" AGGREGATE BASE COURSE OVER a HANDRAIL (LEFT 12? U ABUTMENT ONLY) 15" CRUSHED AGGREGATE SUB-BASE z COURSE (LEFT ABUTMENT, SHOWN), 18" a HEIGHT OF 71" RIPRAP OVER 6" RIPRAP BEDDING i0 w I BACKFlLL VARIES (RIGHT ABUTMENT) m • ----- --- ------ -? J?IIL A7' V ZBACKFILL ve, Z CU SAND FILL CJ t LBACKFILL h 7l' •C o 7 EL 167.0 '\iAAj/AAj?\j.- ^:N n REINFORCEMENT SECTION e NOT SHOWN O6 STRUCTURAL FILL 0 2 4 6 8 (SEE NOTE 1) SCALE IN FEET DRIVEN SHEET PILE o a CUTOFF WALL (TYP.) `0 EL. 182.0 d. 1'-3" OPERATOR DECK eg EL. 178.0 CONCRETE WALL AT BOX SECTION PERIMETER FENCE HANDRAIL `o CJ 8*0 P CULVERT (SEE SHEET 12) e a SECURE FENCE TO V-3" EMBEDDED SS EYE BOLTS EL. 173.0 a; 5'-0" (SEE DETAIL 2, SHEET 12) V-3" TRASHRACK/SECURITY GRATE (SEE SHEET 11 a 3/8" ROUND WELDED AT AL MAX. OPFNING UPSTREAM PIPE GRILL 2 NOT TO SCALE 04 L EXISTING GROUND EL 173.0 1 I CJ 3° 0 PVC viiii DRAINS 1 I EL. 167.0 if a 2 -3. REINFORSHWN NOT OCEM ENT Lq a ? p..= p..a ,R ?. ......E a T SECTION /D NOTES O6 1. IF NECESSARY, PLACE AND COMPACT 0 2 4 6 8 STRUCTURAL BACKFlLL TO BRING STRUCTURAL FILL FOUNDATION TO GRADE PRIOR TO PLACING (SEE NOTE 1) SCALE IN FEE CONCRETE FOR SPILL CATS STRUCTURE. _ FINAL DESIGN TEM 6/30/04 Y1i DRAFT Emu DESIGN SUBEIITTAL TEU 5/21/04 INTERMEDIATE 6Dx SUBMITTAL TEU 10/10/03 RELIMINARY DESIGN SUBMITTAL (307.) EM 8/13/03 WARNING awn: TEAL ?TLS BT-8 SPILL GATE STRUCTURE FAYErTEVILLE, NC REVISION Q U #ff .4k i a 0 1 -6 POPE AIR FORCE BASE ® M`Ea'? RKB -PROJECT .a 22235649 FAYETTEVILLE, NORTH CAROLINA Amber Oaks IF THIS BAR DOES rz STRUCTURE SECTIONS """'"` 7 9400 Amber glen Boulevard NOT MEASURE 1' PRQIELT ywicER: lwstin, TX 78729 THEN DRAWING IS MTZ AND DETAILS DESCRIPTION OF REVISION 9r DATE 512-454-4797 NOT TO SCALE DAs 6/30/04 SHEET 7 OF 17 PERIMETER FENCE (SEE SHEET 12) V-0" ^ 7 CONTROL JOINT ?Ct BT-8 SPILL GATE STRUCTURE 4'-6" I 4'-6" ,-CONTROL JOINT EL. 178.0 JOINT 11\ REINFORCEMENT NOT SHOWN SEE COLUMN Tp SUPPORT DETAIL 3 5'-0" Da 'Io I, CJ CJ Iq EL. 167.0 e ? `1 0 ° o I: ?-CONTROL JOINTS-' SECTION E 06 0 2 4 6 SCALE IN FEET REINFORCEMENT NOT SHOWN ea ZSAND v° SEE WATERSTOP DETAIL FILL V-3" 6" PVC WATERSTOP CONTROL JOINT DETAIL O6 0 2 4 6 SCALE IN FEET FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL INTERMEDIATE 607. SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (3OS) DESCRIPTION OF REVISION DATE REINFORCEMENT NOT SHOWN V?, CJ I ? '. , /AND FILL f I ° p e ° b 6" PVC WATERSTOP CONTROL JOINT DETAIL 2 O6 0 2 4 6 SCALE IN FEET POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA umll Amber Oaks 9400 Amberglen Boulevard Austin. TX 78729 512-454-4797 I -0" o I REINFORCEMENT NOT SHOWN 1'-0" COLUMN SUPPORT DETAIL r3 oe 0 1 2 3 SCALE IN FEET 2'-O" p INSIDE FACE OF FLOW 3' SLOTTED CHANNEL PVC PIPE (SEE NOTE 1) V a rp Q n a v e ° e `- REINFORCEMENT DRAIN PIPE SECTION F NOT SHOWN 07 0 2 4 6 SCALE IN FEET PZ22 STEEL SHEET PILE SECTIONS TYPICAL PVC WATERSTOP DETAIL 11, oe NOTES: 1. SLOTTED PVC PIPE LOCATED AT THE BOTTOM, DOWNSTREAM CORNER OF THE LEFT AND RIGHT CONCRETE BOX SECTIONS. LOCATE THE PIPES ON THE INSIDE (CHANNEL) SIDE OF THE BOX CULVERTS TO DRAIN WATER COLLECTED IN THE BOX SECTIONS. FINAL DESIGN WARNING DE- TE, ST-8 SPILL GATE STR R RenvoN e R olu+m: TLS UCN E FAYETTEVILLE NC Q J CHEC?:. HKB RRWECT 22235649 IF THIS BAR DOES ' PIDR R STRUCTURAL DETAILS NOT MEASURE 1 FR.- -Ea THEN DRAWING IS MTZ NOT TO SCALE _ 6/25/04 SHEET 8 OF 17 SHEETPILE DETAIL 0 2 4 6 SCALE IN FEET #601'-0' EL. 173.0 #6x -/2'-4-012 4" EL. 167.0 #6®1'-OJ u ? FINAL DESIGN W FINAL DESIGN S - f DRAFT FINAL DESIGN SUBMITTAL AT INTERMEDIATE 607 SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (30X) w 5 RLY CfSCRIRIpN O< RElASION EL 182.0 h #8Q6" A 1 EL. 178.0 1'-9" BENDS (TYP.) PZ22 STEEL SHEET PILE (TYP.) SECTION O6 0 4 8 12 SCALE IN FEET V-3" EL. 182.0 '. M I I #8®6" SEE BLOCKOUT OETAIL n #6m 1'-0" I EL. 167.0 #806- t #6x-/2'-4"©12 4" SECTION e I SECTION c 09 09 0 4 8 12 0 4 8 12 SCALE IN FEET SCALE IN FEET 6/30/04 - POPE AIR FORCE BASE TV" 5/21/04 i. T[''V 14 10/10/03 <<'' FAYETTEVILLE, NORTH CAROLINA Amber oaks 10/10/03 9400 A'berglen Boulevard Austin, TX 78729 DATE 512-454-4797 173.0 >1'-O" EL. 167.0 EL. 173.0 601'-0" #601'-0" #601'-0" EL. 178.0 I /-#601'-0" #6®1'-Dy V-#6®1'-O" M V12" LEGS 12" LEGS N SECTION D 09 n 0 4 8 12 N SCALE IN FEET NOTES; 1. SEE SHEET 10 FOR GENERAL STRUCTURAL NOTES. 2. ADJUST SPACING AS NECESSARY TO ENSURE 5-#8 AT THE UPSTREAM FACE EXTEND VERTICALLY BETWEEN THE GATE OPENINGS. MAINTAIN 3" OF COVER AT CONTROL JOINTS. 3. SEE SHEET 10 FOR ANTENNA MOUNTING DETAIL. tt9a"m: Q WARNING ET-8 SPILL GATE STRUCTURE FAYETTEVILLE" NC REV15*N 3 rn.N: TLS a 0 1 CHECKED. HKB PROVECT 22235649 IF THIS BAR DOES MTZ REINFORCEMENT DETAILS NOT MEASURE I" PRa1FCT-,,Ek 9 THEN DRAWING IS MTZ (SHEET 1 OF 2) NOT TO SCALL wre 6/30/04 SHEET 9 OF 17 .7 BT-8 SPILL GATE STRUCTURE 6®1'-0 i #601'-0" n I EL. 178.0 I I ? :a 1 i 1 I SEE COLUMN -0" SUPPORT DETAIL 1 A 1o I ? ' i #'691'-0" #601'-0" i I EL. 167.0 a' 1 r a o 12" LEGS SECTION E \z6,/ 0 2 4 6 SCALE IN FEET ANTENNA TOWER e c Q aao -a, c•:o • • _ _ _ / • _ a_ QN.. _ 1'-6" DA" In HOOPS (T)P.) ANTENNA TOWER MOUNTING 0 2 4 6 SCALE IN FEET LADDER DETAIL NOT TO SCALE FINAL DESIGN DRAFT FINAL DESIGN SUBMITTAL INTERMEDIATE 60% SUBMITTAL PRELIMINARY DESIGN SUBMITTAL (30S) OESCPoGIgN OF REVISION SECTION V-0" 0 r#6 ' REINFORCEMENT al,, DOWELS -0" UPSTREAM FACE COLUMN SUPPORT DETAIL 10 0 1 2 J SCALE IN FEET NOTES: 1. ' A CLOSED CIRCLE AT THE END OF A BAR INDICATES A BEND WITH THE BAR TURNED TOWARDS THE OBSERVER. 2. SPLICES SHOWN THUS z INDICATE A LAPPED SPLICE, NOT A BEND IN THE BAR. 3. DIMENSIONS BETWEEN BARS ARE TO THE CENTERLINE OF THE BARS UNLESS OTHERWISE SHOWN. CLEAR COVER DIMENSIONS ARE MARKED "CL". 4. PLACE THE REINFORCEMENT SO THAT THE CLEAR DISTANCE BETWEEN FACE OF CONCRETE AND NEAREST REINFORCEMENT IS 1" FOR #5 BARS AND SMALLER, 2" FOR #6 BARS THROUGH #8 BARS AND 3" FOR #9 BARS THROUGH #11 BARS. PROVIDE 3" CLEAR DISTANCE FROM FACE OF CONCRETE FOR ALL BARS WHEN THE CONCRETE IS PLACED AGAINST EARTH OR ROCK. CLEAR DISTANCE IS THE DESIGN DIMENSION LINE. REINFORCEMENT PARALLELING CONSTRUCTION JOINTS SHALL HAVE A MINIMUM OF 2" CLEAR COVER. 5. UNLESS OTHER RADIUS BENDS ARE INDICATED ON THE DRAWINGS, ALL REINFORCEMENT REQUIRING BENDING SHALL BE BENT AROUND A PIN HAVING THE FOLLOWING DIAMETER: DIN n1A1/CTCG IM IAIrurc BAR NO. 3 4 5 6 7 8 9 10 STANDARD BENDS 2 1/4 3 3 3/41 4 1/21 15 1/4 6 9 1/2 10 3/4 q STIRRUP AND TIE BENDS 1 1/2 2 2 1/2 4 1/2 5 1/4 6 - - 6. REINFORCEMENT MAY BE ADJUSTED LATERALLY TO MAINTAIN A CLEAR DISTANCE OF AT LEAST 1" BETWEEN THE REINFORCEMENT AND WATERSTOPS, ANCHOR BOLTS, FORM TIES, THIMBLE AND OTHER EMBEDDED MATERIALS. 7. BAR SUPPORTS, SPACERS, AND OTHER ACCESSORIES ARE NOT SHOWN ON THE DRAWINGS. THE RECOMMENDATIONS OF THE ACI DETAILING MANUAL-1988, OR OTHER APPROVED SUPPORTING SYSTEM MAY BE USED. 8. UNLESS OTHERWISE SHOWN FOLLOW THE RECOMMENDATIONS ESTABLISHED BY THE AMERICAN CONCRETE INSTITUTE'S 'MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES, ACI 315". 9. SPLICE LENGTHS SHOWN ON THE TABLE ON THIS DRAWING ARE FOR CLASS B SPLICES IN ACCORDANCE WITH ACI 318-02. SPLICES OR DEVELOPMENT LENGTHS OTHER THAN THOSE SHOWN IN THE TABLES MUST BE DETAILED ON THE REINFORCEMENT DESIGN DRAWINGS. WARNING aEV Nm T,, 25/04 ° uwN: TLS 21/04 ? i POPE AIR FORCE BASE .. ® aacan HN8 FAYETTEVILLE NORTH CAROLINA ?R m 10/03 , Amber Oaks IF THIS BAR DOES MR /13/03 9400 Amberglen Boulevord A ti TX 78729 NOT MEASURE I' THEN DRAWING IS MWECT -Ek MTZ DATE us n, 512-454-4797 NOT TO SCALE w_ 6/25/04 AFn1'_n• SECTION A 0 0 1 z 3 SCALE IN FEET 10. THE MINIMUM LENGTH OF LAP FOR SPLICING PARALLEL BARS SHALL BE GIVEN IN THE APPLICABLE TABLE (REINFORCEMENT TABLE). SPLICES SHALL BE STAGGERED TO GIVE 24 INCHES CLEAR BETWEEN ENDS OF ADJACENT SPLICES. BARS SPLICED BY NONCONTACT LAP SPLICES SHALL NOT BE SPACED TRANSVERSELY FARTHER APART THAN ONE-PFTH THE REQUIRED LAP SPLICE LENGTH, NOR 6 IN. WHEN REINFORCING BARS OF DIFFERENT SIZE ARE TO BE SPLICED, THE LENGTHS OF LAP SHALL BE GOVERNED BY THE SMALLER DIAMETER BAR. SPLICES ARE TO BE MADE SO THAT THE REQUIRED CLEAR DISTANCES TO FACE OF CONCRETE WILL BE MAINTAINED. REINFORCEMENT TABLE f?=4000 psi f„=60.000 osi BAR SIZE MINIMUM TO LENGTH OF LAPPED SPLICE (INCHES) DEVELOPMENT LENGTH (Ld) (INCHES) BAR SPACING (INCHES) TOP BARS' OTHER BARS TOP BARS' OTHER BARS 3 3 24 19 19 15 4 3 33 25 25 19 5 3 41 31 31 24 6 4 49 37 37 29 7 5 71 54 54 42 8 5 81 62 62 48 9 8 91 70 70 54 10 9 102 78 78 60 11 10 113 87 87 67 'TOP BARS ARE HORIZONTAL BARS IN BEAMS AND SLABS SO PLACED THAT MORE THAN 12' OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR. " SPLICES MUST BE STAGGERED 05% DESIGN 87-8 SPILL GATE STRUCTURE FAYET1EVIllE, NC REVISION 3 PNOJECT 22235649 REINFORCEMENT DETAILS -I: 10 (SHEET 2 OF 2) SHEET 10 OF 17 12" LEGS 3/A• DIA POLYPROPYLENE RUNG CONCRETE FACE N NI " L 7" 6" ISOMETRIC PERIMETER FENCE NOT Ck SLIDE GATES SHOWN LADDER RUNGS EMBEDDED INTO CONCRETE FL SPILL GATE STRUCTURE Q HANDRAIL (SHEEP 12) DRIVEN SHEET PILE CUTOFF WALL 47'-6" SEE BOLTING EL. 182.0 DETAIL 1, THIS SHEET TOP OF TRASHRACK EL. 182.0 -TOP OF EL. 181.16 TRASHRACK/SECURITY > GRATE, EL 181.16 EL 178.0 EL. 173.0 2 SLIDE GATE EL 167.0 3'-2 WATERWAY EL. 167.0 A 1 REINFORCEMENT NOT SHOWN SEE BOLTING DETAIL 1, THIS SHEET SECTION a 11 0 4 8 12 16 SCALE IN FEET 2" TRASHRACK BARS TOP OF TRASHRACK/ SECURITY GRATE LBACKFILL NOT SHOWN NOT SHOWN SHOWN .............. -------------------------------------------- TRASHRACK ELEVATION 0 4 8 12 16 SCALE IN FEET EL 182.0 ? v 4 O EL. 161.16' EPOXY ANCHOR P' v g TRASHRACK/ SECURITY GRATE D REINFORCEMENT NOT SHOWN r v CUT MOUNTING ENDS OF TRASHRACK GRATING TO BE FLUSH WITH HORIZONTAL AND VERTICAL FACES -\ >o D' a c ^A a BOLTING DETAIL 0 4 8 12 16 1 SCALE IN INCHES WELD AT ALL JOINT'. :NDS OF STEEL RODS 0 BE FLUSH WITH 3AR FACES 1" STEEL ROI in •I ? n 0 0 I ? 0 4' CLEAR BOTTOM OF TRASHRACK/ 4" C SECURITY GRATE 4'-D" TYPICAL TRASH RACK /SECURITY GRATE PANEL (9 REQUIRED) 0 2 4 5 SCALE IN FEET 5'X1/2" STEEL PLATE 4"X1/2" TRASHRACK TOP CONNECTION DETAIL 4"X1/2" TRASHRACK BARS BOTTOM CONNECTION DETAIL SIDE VIEW 0 3 6 9 12 SCALE IN INCHES NOTES: 1. THE TRASHRACK AND PERIMETER FENCING SHALL CONFORM TO MIL HANDBOOK 1013/10,-DESIGN GUIDELINES FOR SECURITY FENCING, GATES, BARRIERS, AND GUARD FACILITIES". 95% DESIGN Z?s W? ° "fDi T Nensax micm WARNING S ST-8 SPILL GATE STRUCURE FAYETTEVILLE, NC Q 2 U L BRAT FlNAL DESIGN SUBMITTAL TEM TEM k 5/21/04 OPE AIR FORCE BASE 1 1 11 R lc? TZ ROJECT 22275649 Al INTERMEDIATE soz suBMmu 10/10/03 I- FAYETPEVILLE, NORTH CAROLINA ,' a <r Oar E Hls BAR Boa MTZ TRASHRACK SECURITY GRATE PRELIMINARY DESIGN SUBMITTAL (303) 08/13/03 9400 Amberglen Boulevard NOT MEASURE S 1' THEN DRAWING IS ma¢r uwMT7 ER, MT7 REV DESCRIPTION BR REanOx .Y DATE Dustin. TX 78729 512-454-4797 NOT TO SCALE °"'A 5/21/04 SHEEP 11 OF 17 4"X1/2" TRASHRACK BARS 1" DIA. STEEL RODS SIDE VIEW DST TYPICAL FENCING NOT TO SCALE I?- kND & R HORIZONTAL BRAC RAIL & 3/8"0 TRI ROD END PC c 'v F' PERIMETER R DECK FOOTING S All 2 12 3"0 WEEP HOLE GATE OPENING CONTROL JOINT FENCE TRANSITION DETAIL NOT TO SCALE BANDS AND IER BAR AT DE 5/8" HOLE FOR 1/2' DIA. SS SEE DETAIL 1, THIS SHEET TYP.r CKAINLINK MESH (NOTE 2) I 1 1/2" DIA. SCH 40 PIPE RAILS, HOT DIP GALVANIZED m 6'-0" MAX. SEE DETAIL 2 IL ? - D ?Q d? ,-.p D o a A' .9 a` P c 0 D n 6 REINFORCEMENT NOT SHOWN HANDRAIL WITH CHAIN LINK MESH DETAIL NOT TO SCALE (SEE NOTE 6) CHAIN LOCKING SYSTEM NOT TO SCALE TYP THREADED ANCHORS 7" LONG WITH 6" EMBEDMENT, USE HIT HY150 ADHESIVE SYSTEM, HILTI OR EQUAL 1/2 " DIA. SCH 40 fYP.) HOT DIP GALVANIZED 1/4" STEEL PLATE HOT DIP GALVANIZED HANDRAIL SUPPORT BRACKET NOT TO SCALE D6,m NOTES: 1. WHENEVER UNEVEN GROUND (BOTTOM OPENING LARGER THAN 2 INCHES) IS ((( TENSION WIRE ENCOUNTERED, FILL IN BELOW FENCE WITH ADDITIONAL STRANDS OF 3'-0" / BARBED WIRE AT 4-INCH SPACING. II 2. ATTACH FABRIC TO ALL FENCE AND GATE STRUCTURE AT 12" INTERVALS VERTICALLY AND AT 20' HORIZONTALLY. CHAIN 3. DIMENSIONS OF EXISTING CHAIN LINK ACCESS GATE INCLUDING POST EMBEDMENT DEPTH ARE UNKNOWN. ACTUAL FIELD DIMENSIONS REQUIRED TO COMPLETE THE WORK SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO DEVELOPMENT OF SHOP DRAWINGS. 4. PROVIDE, FABRICATE, AND INSTALL CHAIN LINK FENCE AND CHAIN LINK FENCE SS EYE BOLT WITH VEHICLE GATE COMPONENTS IN ACCORDANCE WITH THE REQUIREMENTS OF THE DETAIL 2 90' BEND (TYP) TECHNICAL SPECIFICATIONS. ALL FENCING STEEL MATERIALS TO BE HOT-DIPPED GALVANIZED AFTER FABRICATION. 12 0 t' 2 4' 6' 5. CAST SS EYE BOLTS IN CONCRETE TO SECURE BASE OF FENCE. THIS INCLUDES VERTICAL CONCRETE SURFACE AT TRANSITION TO OPERATOR DECK. 6. PADLOCK TO CONFORM WITH MIL-HDBK-1013/10 AND RR-F-191/2 AS AN APPROVED GENERAL FIELD SERVICE PADLOCK. ADDITIONALLY, PADLOCKS TO HAVE A REMOVABLE CORE. FINAL DESIGN o<sR?m; TEN REVISION WARNING uuwx: BT-8 SPILL GATE STRUCRIRE FAYETTEVILLE, NC Q 3 FINAL RESIGN TE4 6/25/04 um o e i TLS E DRAFT FINAL DESIGN SUBMITTAL TEM 5/21/04 POPE AIR FORCE BASE g ;r4 ® ?E HKB RRWECr 22235649 ' Al INTERMEDIATE 607. SUSMOTAL TEY 10/10/O} ? FAYETTEVILLE, NORTH CAROLINA lvnber Oaks IF THIS DOES R TYPICAL FENCE D T uunxc w ? PRELIMINARY DESIGN SUBMITTAL (}p/,) TENT OB/I}/O} 9400 Amber len Bwlward 94.00 TX 78729 NOT MEASURE 1' MEASURE THEN DRAWING IS WELT._ maEtr EA; TAR AILS E 12 5 = REV DESCRIPTION OF aMSwN By atE 512-454-4797 NOT TO SCALE a'G 6/25/04 SHEET T 2 OF 17 1L-FUUI CHAIN UNK FENCE VEHICLE GATE NOT TO SCALE END POST 84" WIDE x 72" TALL SLIDE GATE SLIDE GATE DETAIL3 SEE NOTE 1 06 NOT TO SCALE R[iM FLUSH BOTTOM DETAIL 0 4 8 12 07 SCALE IN INCHES NOTES: 1. MOUNT FRAME OF SLIDE GATE TO TYPE "F" THIMBLE CAST INTO CONCRETE WALL. 2. DIMENSIONS OF BLOCKOUT MAY VARY IN ACCORDANCE WITH THE GATE MANUFACTURER'S RECOMMENDATIONS. 3. SEE THE TECHNICAL SPECIFICATIONS FOR DETAILS REGARDING THE ELECTRIC MOTOR—OPERATOR. FINAL DESIGN i POPE AIR FORCE BASE +.. ' FAYETTEVILLE, NORTH CAROLINA mar _ Amb- oaks 9400 Amber len Boulevard Austin. m 76729 512-454-4797 WARNING D 0 t ® IF THIS BAR DOES NOT MEASURE 1' THEN DRAWING 15 NOT TO SCALE o scNm: TEM BT -8 SPILL GATE STRUCTURE FAYETTWLLE, NC REVISION Q 3 FINAL DESIGN TEM 6/30/04 owwN: ns DRAFT FINAL DESIGN SUBMITTAL TEM 5/2vD4 ChECKC: HKB GATE INSTALLATION DETAILS PROJECT 22235649 Q INTERMEDIATE 607. SUBMITTAL TEM 10/10/03 m MTz 13 SHEET 13 OF 17 PRELIMINARY DESIGN SUBMITTAL (3C%) TEM 08/13/03 MOJECT y ER: MTZ DESCRIPTION OF REVISION er DATE 6/30/04 s i a 3 Y 'e 9 PC -1 --------------------------------------- ------------------------------------ % % T_ %-4- X %_ % % % I X— X_ X— %— X. X— T_ X— X— % Power Conduit 1 X- %- X- X- X X- X- X- %- X --f- X- %- X- %- X- X- X- %- X- } i I 1 1 Monaco Antenna I Mount at Mid I 1 Tower Elevation Power/Control Cabinets I Monaco Antenna 2" Conduit Standoff 10' Height ACT 1 ACT 2 ACT 3 ACT 4 ACT 1 SFF 1 � 1 I+ i c m rTAII A I SPC -10 Conduit to Camera/Flood Light I M M M M M CC -13 —-----AST ACT ACT ACT A'T I SS PC -7 SS PC -7 S PC -7 SS PC -7 S PC -7 I FINAL DESIGN DRAFT FlNAL DESIGN SUBMITTAL (1002) DESCWPLION OF REVI510N RISER DIAGRAM (VIEW FACING SOUTH) DATE POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA BT -8 SPILL GATE DESIGNATION C_1 L cc PC -6 CC -1--1 PC– CC -1 PC -4 CC -1 PC -3 CC -12 POLE MTD XFMR SEC. (EXISTING) SAFETY SWITCH SS -1 I 4C#1, 1C#1 CND -1 — —— PC -2 SAFETY SWITCH SS -1, LOAD SIDE POWER PNL. PP -1 — — J 4C#1, 1C#1 GND 208 VAC, 3 PH. INCOMING POWER PC -3 POWER PNL. PP -1 BT2-7B 1-1/4' PSM 208 VAC, 3 PH. PWR. TO ACTUATORS PBM PC -3 PBM 1-1/4" 12C#10, 4C#10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -5 BT2-7A PC -6 1" PP -1 208 VAC, 3 PH. PWR. TO ACTUATORS SS -1 PC -5 PC -7 3/4" 6C#10, 2C 10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -7 PC -3, PC -4, PC -5, PC -6 GATE ACTUATORS 1-5 3/4" 3C#10, 1C 10 GND Q PC -8 POWER PNL. PP -1 PC -9 1" 3C#12, IC#12 GND 120 VAC PWR. TO MONACO BT2-7A & B PC -9 PC -8 I CC -12 6C#12, 2C}12 GND 120 VAC PWR. TO MONACO BT2-7A & B PC -10 POWER PNL. PP -1 VIDEO J -BOX 3/4" 2C 12, 1C 12 GND 120 VAC PWR. TO VIDEO PWR. SUPPLY PC -11 VIDEO J -BOX LIGHTS AT CAMERA 3/4" 2C#12, 1C#12 GND 120 VAC PWR. TO CAMERA LIGHTS CC -1 GATE 1-5 MOV PBM GATE ACTUATORS 1-5 1" 20014 CONTROL WIRES TO GATE ACTUATORS R CC -3..7 GATE 1-5 MOVE PBM 1" 20C 14 CONTROL WIRES TO CATE ACTUATORS CC -3 -2 CC CC -2 CC -2 CC -4 CC -3 CC -2, GATE 2 1-1/2' 26C#14 CONTROL WIRES CC -5 CC -4 CC -2, GATE 3 1-1/2" 6C#14 CONTROL WIRES CC -6 CC -5 CC -2, GATE 4 1-1/2" PC_, CONTROL WIRES CC -7 CC -6 CC -2, GATE 5 CC -7 cc- IS CC -5 -9 - III 1-1/2" 54C#14 CONTROL WIRES CC -9 CC -3 CAMERA 1-1/2- Pc -9 PWR., CONTROL, & COAX TO CAMERA CC -10 VIDEO J -BOX 4 — — — — — — — — — — — — — — — — — — VIDEO XMTR POWER/CONTROL 3/4" COAX TO ANTENNA CC -12 CABINETS–� LIGHTING ARR. LA -1 3/4" PC– COAX TO LA -1 (2 PLACES) / LIGHTNING ARR. LA -1 ANTENNA, A-1 3/4" PROVIDE MOUNTING RACK WITH GALVANIZED STEEL FRAME/SUPPORT —� RACK FOR PANELS & CONDUIT. FINAL DESIGN DRAFT FlNAL DESIGN SUBMITTAL (1002) DESCWPLION OF REVI510N RISER DIAGRAM (VIEW FACING SOUTH) DATE POPE AIR FORCE BASE FAYETTEVILLE, NORTH CAROLINA BT -8 SPILL GATE DESIGNATION FROM TO COND. SIZE CONDUCTORS QTY SIZE REMARKS PC -1 POLE MTD XFMR SEC. (EXISTING) SAFETY SWITCH SS -1 2" 4C#1, 1C#1 CND 208 VAC, 3 PH. INCOMING POWER PC -2 SAFETY SWITCH SS -1, LOAD SIDE POWER PNL. PP -1 2" 4C#1, 1C#1 GND 208 VAC, 3 PH. INCOMING POWER PC -3 POWER PNL. PP -1 PC -4 1-1/4' 15C#10, 5C#10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -4 PC -3 PC -5 1-1/4" 12C#10, 4C#10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -5 PC -4 PC -6 1" 9C#10, 3C 10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -6 PC -5 PC -7 3/4" 6C#10, 2C 10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -7 PC -3, PC -4, PC -5, PC -6 GATE ACTUATORS 1-5 3/4" 3C#10, 1C 10 GND 208 VAC, 3 PH. PWR. TO ACTUATORS PC -8 POWER PNL. PP -1 PC -9 1" 3C#12, IC#12 GND 120 VAC PWR. TO MONACO BT2-7A & B PC -9 PC -8 BT2-7A, BT2-713 3/4' 6C#12, 2C}12 GND 120 VAC PWR. TO MONACO BT2-7A & B PC -10 POWER PNL. PP -1 VIDEO J -BOX 3/4" 2C 12, 1C 12 GND 120 VAC PWR. TO VIDEO PWR. SUPPLY PC -11 VIDEO J -BOX LIGHTS AT CAMERA 3/4" 2C#12, 1C#12 GND 120 VAC PWR. TO CAMERA LIGHTS CC -1 GATE 1-5 MOV PBM GATE ACTUATORS 1-5 1" 20014 CONTROL WIRES TO GATE ACTUATORS CC -2 CC -3..7 GATE 1-5 MOVE PBM 1" 20C 14 CONTROL WIRES TO CATE ACTUATORS CC -3 BT2-7A CC -2, GATE 1 1-1/2" 46C#14 CONTROL WIRES CC -4 CC -3 CC -2, GATE 2 1-1/2' 26C#14 CONTROL WIRES CC -5 CC -4 CC -2, GATE 3 1-1/2" 6C#14 CONTROL WIRES CC -6 CC -5 CC -2, GATE 4 1-1/2" 14C#14 CONTROL WIRES CC -7 CC -6 CC -2, GATE 5 1-1/2" 34C#14 CONTROL WIRES CC -8 CC -7 BT2-7B 1-1/2" 54C#14 CONTROL WIRES CC -9 VIDEO J -BOX CAMERA 1-1/2- PWR., CONTROL, & COAX TO CAMERA CC -10 VIDEO J -BOX VIDEO XMTR PWR., CONTROL, & COAX TO VIDEO XMTR CC -11 VIDEO XMTR ANTENNA A-2 3/4" COAX TO ANTENNA CC -12 MONACO BT2-7A & B LIGHTING ARR. LA -1 3/4" COAX TO LA -1 (2 PLACES) CC -13 LIGHTNING ARR. LA -1 ANTENNA, A-1 3/4" COAX TO ANTENNA (2 PLACES) CONDUIT & CABLE SCHEDULE NOTES: 1) SEE DRAWING 16 FOR ADDITIONAL DETAILS ON SSI. 2) WIRING GUTTER IS AN ACCEPTABLE ALTERNATIVE FOR CONDUITS AT RACK EXCEPT FOR CC -9 THROUGH CC -13. 3) ALL CONDUIT SIZES ARE MINIMUM SIZES FOR CONDUIT. LARGER SIZES ARE ACCEPTABLE IF CALLED OUT ELSEWHERE IN THIS DRAWING PACKAGE. 4) SEE SPECIFICATIONS IN DIVISION 16 FOR ADDITIONAL INFORMATION REGARDING MATERIALS AND INSTALLATION. FINAL DESIGN WARNING oEsicnen:DT Drown: BT -8 SPILL GATE STRUCTURE FAYETTEVILLE. NC REhvon T Q UM oT DT �i a.cc�: EFB HNaECT 22275649 Amber oaks IF THIS BAR DOES `l� 1 CONDUIT & CABLE DETAIL an�w�a 9400 ABoulevard Austin. TX 78729 TX 7872 THEN DRAWINGIS Pea""""""� ELECTRICAL RISER DIAGRAM 15 512-454-4797 NOT TO SCALE o.Tc 6/25/04 SHEET 15 OF 17 NOTES: 1) CONTACTS SHOWN: VALVE CLOSED, VOLTAGE OFF, S/S HAND. 2) TORQUE SWITCH TC1 & T01 NC CONTACTS OPEN, AND TC2 & T02 CONTACTS MAKE ON FIELD ADJUSTABLE MECHANICAL OVERLOAD IN (C) CLOSE, OR IN (0) OPEN DIRECTION. 3) 0 &C (22-21) REVERSING CONTACTOR NC INTERLOCK CONTACTS 0 &C (14-13) MOMENTARY PUSHBUTTON NO SEAL-IN CONTACTS. 4 MOTOR THERMAL CONTACTS OPEN WITH EXCESSIVE TEMPERATURE. 5 POSITION INDICATOR PILOT LIGHTS, LED SOLID STATE -OPEN INDICATES: FULL OPEN (RED) -CLOSE INDICATES: FULL CLOSED (GREEN) -MID-POSITION: BOTH OPEN AND CLOSE ILLUMINATED 6) POWER ON INDICATORS ONLY VISIBLE WITH COVER OPEN FOR CONVENIANCE DURING MAINTENACE PROCEDURES. 7) CONTACTOR AUXILIARY CONTACTS ARE LOCATED ON EACH END OF CONTACTOR. EACH CONTACTOR COIL HAS A SET OF NO AND NC CONTACTS. 8) WIRING SCHEMATIC, TERMINAL NUMBERS, JUMPER NUMBERS AND DEVICE DESIGNATIONS BASED UPON EIM CONTROLS WIRING DIAGRAM M2CP-10 DATED 6.19.98. CONTRACTOR TO PREPARE SUBMITTAL WITH CORRECTED DESIGNATIONS FOR SELECTED EQUIPMENT. 9) SEE CONTROL 1/0 TABLE FOR 1/0 ASSIGNMENTS TO BT2-7 PANELS. 10) WIRING SHOWIN IS TYPICAL FOR FIVE GATES 11) GROUND SS-1 AS A SERVICE ENTRANCE DISCONNECT. 12) LOADS CALCULATED BASED ON 2HP MOTOR MAXIMUM. PREPARE SUBMITTAL FOR ACTUAL HP AFTER SELECTED GATE ACTUATOR VENDOR DATA RECEIVED. TC2 5 4 x2 2A E V X II5V x l TS a OS iCSf T02 P 1 TI 4 LT 17. 3 4 2 T3 y 'Ts T STOP HANOOREMOTE o T1 5 - --- -? c x 12 CLOSE L 7 I 9 S2 _ _ T I 3 I 7 5. 11 SJ 12 RJ 1 0 IJ R2 0 C2 IJ =S414 {{++JJ o SS TABLE OPEN ° 01 ro, 10 8 4 o Io ?J x4 2 MOTOR TNE-L PROTECTOR m CI 2 21 21 R2 a C R5 C x l z sl x o a 1 ? 1 q22: 52 O o x C2 t sJ 0 0 X I Pe $4 x o o II II Y xc ?.? xc Q xo? ° L_ cRN Pm Alr PBJ Y NIERNEDAIE WN'TACTS I - - - - M LS Os fi TBM TTT?_ Awgw?l P? SEEI/0TABLE D oro+ I I I I IIIIII 17 ? L7 E] ?E]E7I7 TJ(] Ell] STOP CLOSED PANEL NO. PP-1 206 1 l TC 100 euoc 4 unacc CKT SERVI E T LOAD IN VOLT-AMP TRIP NO C O A B C BKR. SIZE 1 MOTOR ACTUATOR 1 (SEE NOTE 12) 901 20 3 901 20 s 901 20 7 MOTOR ACTUATOR 3 (SEE NOTE 12) 901 20 9 901 20 11 901 20 13 MOTOR ACTUATOR 5 (SEE NOTE 12) 901 20 1s 901 20 7 -KIL 901 20 19 MONACO BT2-713 240 15 21 23 25 27 29 31 33 35 37 39 41 LOCATED POPE AFB 000 NEMA 3R 0 ? 0\ 0 JI ? T TIP LOAD IN VOL T-AMP Cam' SIZE A 8 C SER?ICE TO NO. -0 0- 20 901 MOTOR ACTUATOR 2 (SEE NOTE 12) 2 -0 0- 20 901 4 -0 0- 20 901 6 -0 0- 20 901 MOTOR ACTUATOR 4 (SEE NOTE 12) 6 --0 0- 20 901 10 -0 - 0- 20 901 4 1Y 12 1 1 -0 0- -0 0- 15 240 MONACO BT2-7A 14 -0 0- 15 50 CAMERA/XMTR POWER 16 -0 0- 15 500 CAMERA FLOOD LIGHTS 16 -0 0- 15 625 GFCI DUPLEX RECEP. 20 0- -0 -0 0- 22 -0 0- 24 -0 0- 26 -0 0- -0 0- 30 -0 32 --0 0- -0 0- 34 -0 C_ 36 -0 0-- 38 -0 0- -0 0- 40 -0 0- -0 0-- 42 WIRE COLOR CODE: SUB-TOTAL PHASE A-BLACK NEUTRAL-WHITE LOAD PER CND BUS PHASE B-RED GROUND PHASE IN -GREEN VA 2943 2703 2707 PHASE C-BLUE - 3P -) 20A 150A SSI (SEE NOTE 11) a yt U n iv 45 KVA (3 x 15KVA), 30 lJ., 240/120 V SECONDARY (Y (EXISTING) _ 0 n N_-] 4 J SLUCE GATE 1 ACTUATOR NEUTRAL BUS SUB-TOTAL LOAD PER TDTAL PANEL 2667 1652 2302 PHASE IN LOAD IN VA 14510 POWER PANEL PP-1 2081120V, 30, 4W, BUS 3P ) 20A 3P ) 20A 3P 1201 3P 1204 1P 1151 iP ) 15A IP ) 154 IP l15A Z C2 0 Z U 0 Z U o Z C3 a FOR 120J SYSTEMS SEE PP-1 POWER PANEL SCHEDUIF, ABOVE 0 0 o a ENCLOSED n - n n PACKAGE (TYPICAL) F J0.1A r JJA? r ?TI 7BA I? 7BA SAFETY SWITCH i M I GATE ACTUATOR - J - L I u-J L L u _ SLUCE GATE 2 ACTUATOR SLUCE GATE 3 ACTUATOR SLUCE GATE 4 ACTUATOR SLUGS GATE 5 ACTUATOR 7 0 - TOM - TERMINAL BLOCK IN MOTOR ACTUATOR (ACT 1 THROUGH ACT 5) PBM = REMOTE MOTOR CONTROL BOX TERMINAL BOX (PBM1 THROUGH PBM-5) BT2-7 = MONACO TRANSCEIVER BT2-7A OR BT2-78 INAL. DESIGN WARNING ttv xm: EHB BT-S SPILL GAT T xrnsaN E S RUCTURE FAYETTEVILL E, NC Q 1 ° POPE AIR FORCE BASE ® CKE `?' EHB MONACO FIR PROJECT 22235649 E Q FINAL DESIGN ff6 6/25/04 FAYETTEVILLE, NORTH CAROLINA Amber Oaks IF THIS BAR DOES EAS E SYSTEM ELE w ? DRAFT FINAL DESIGN SUBMITTAL DT 5/21/04 9400 Amberglen Boulevard T% 78729 lwstin NOT MEASURE IS THEN DRAWING Is PRa¢t u-cm JI CTRICAL DIAGRAM 16 '- m REV OESCRIPIION OF RENSION BY DATE _ . 512-454-4797 NOT TO SCALE o+TC 6/25/04 ONE LINE/PANEL SCHEDULE SHEET 16 OF 17 Q ACP crap ¢nn,NT o ? R,a°A ,ate xaaw,.Exr n°?P PaxaT ITEM Ott DESCRIPTION (ALL MANUFACTURERS ARE -OR COWLS ITEM OlY DESCRIPTION (ALL MANUFACTURERS ARE -OR EQUAL-) 1 2 CONDULEr. EXPLOSION-PROOF, -3/4- HUBS 6 I A /R SCH. 40 PIP GALV CAOUSE-HINDS 'G 26 7 I fLDODUGMT, HP6. ENCLOSED k GASKEfED. WITH 2' GABLE CONVECTOR I 2' MALE 6-:H TYPE 'CGS' EUPFiiTER MOUNT IOOW, 120V, GROUSE-HINDS 3 REDUCING BUSHING J 4'% 1 2' C-H TYPE 'RE' FlMY100 TAT-76-9FA6 4 1 CONDOR CLAMP 3 4' W SPRING NUT 8 1 UNNERSL BREATHER DRAIN, 3 4'% 1/2* R CHANNEL SHAR P-1000 GALV. CAMERA FLOOD UGHT 6 u V-3" WED ITEM OTY DESCRIPTION (ALL MANUFACTURERS ARE 'OR EQUAL-) REM OTY DESCRIPTION (ALL MANUFACTURERS ARE 'OR EOUAL-) 1 2 COUPLING RGS SIZE AS REO'D. 4 I REDUCING BUSHING SIZE AS REO'D. 2 I CONCUR BEND 97LONG RADIUS RCS SIZE AS RE 'D. 3 1 PVC TO RGS ADAPTER SIZE AS REO'D. 3' ALL AROUND CONNECTION I 1 4 ? CONNECTION 1'-2' IP OF GRADE 'I •.<°•.< °..< rv I 3' 9' 3' 2 J 0 I iv I ? I Rd>C?1 ? rerL?a arras ?A? T?IVfH t 0E G7E1 RMYCMA X x I x l =Fj R11Y= X I X 1 GUE1 GZPCAG x GZE2 FLMYCM4 x C!TE2 t3= x GME2 2M= x GME2 RllYC3= x C!TE2 FA311?i2E x CWE2 G?BA?rtG x G'ZE3 RllYC18J x G!E3 V3= I I x GME3 M= X1 I I G!=3 FU1Ya= x GMQ1 H3PUUE I xi G!UE3 G!M0J ; I x GnUE4 FLLLycg3q x I GUE4 X1 I I amA x I =E4 RllYa= x G V E 4 WffUQ_E I x I I al E4 07170)N-, I I x I x GVE5 v3=1 x I I GME5 23a» x I I I I CCTE5 RllYa?D t i ff l xl - I I f?1E5 Ii3il0aE I -- l x f =ES C1e [U ; . X I oA 8 3' A ° AROUND 3000 PSI CONCRETE PVC RCS ENVELOPE A= 2" RED CONCRETE 1 B= 2° C 3000 PSI ELECT DUCT BANK C STUB-UP TYPE A A A NO REINORCEMENT 4 14 5 WARNING POPE AIR FORCE BASE °® c FAYETTEVILLE, NORTH CAROLINA FINAL DESIGN ffR 6/25/06 Amber Oaks IF THIS BAR DOES DRAFT FlNAL DESIGN SUBMITTAL DT 5/21/04 9400 Amberglen Boulevard NOT MEASURE I' Austin, TX 76129 THEN DRAWING IS DESCRWNON OF 13NSION er DATE 512-454-4797 NOT TO SCALE FINAL DESIGN DT R6vaI°N Q ST-8 SPILL GATE STRUCTURE FAYETTEVIl1 E NC DT ?. EFB PROJECT 22235649 S MISCELLANEOUS 17 ""A° ELECTRICAL DETAILS 6/25/04 SHEET 17 OF 17 CAMERA (SEE SI CAMERA/FLOOD IJGHT FOUNT NOT TO SCALE TOP OF GRADE DENTIFICAT"ION C. I TAPE II _ " _ 11 PTHYLENE FILM POLYETHYLENE (SEE SPEC 16111, 2 0 0 C /. 1 1\\,\ 1 1 ` 1 ? -- WJIN VMlkl IyEt N ?, 1N 1? 1174 tTl ISTINO CR17UND ?? 1)7 170 >< ?+' 70 ' ? \ ExISTNC PIPE / MGM CULVERT \ 1 / I % y --- '" - /w 1 __ ___ _ __ l5Xa `?______ le! ___ / 1 1 1 \ 1 \ • 2 v 100 2H:IY 261 161 N69'06 'WE 166.65'(COMRol. UNE) \ \ \ 1\ I \ • / riM /•• 01 I NPC PNCNT R FL 1)1.0 GGG111 162 162 .? BEp01 M0 1.7' R"., q ` FF5nmc ASRYLT 1\ a• l0 37 JO 7 SCALE N FEET .. _ • •/ . _?A A + S ..•?? ??' ?D(ISTRIC CROWD Mpill YARFS (Si.L NOTE 0 WO )) 176 __. /•. .. /•• ? - \10 "5.'S?''', 1HIIV 170 11 [111 __ -__ _____- 172 170 ??711JY "'"-?? 166 106 100 ?. -6.L?i • ?••?POVE N6 / ` I6{ 161 '° - vi PROPERTY LINE w 162 162 N. 31/.151.00 - ELECTRICAL PIPE NIERT • % EK ISTN: 160 0 AT EL "• I OC W 167A -IL' FRM P INVERT tt. 151.0 5'P GALVANIm VERT B V E 1,9917,0]1.0] Fl. 171.0 / _ . . PIAL 801 / GRACE TO DRYN `,(] CNP CUL D 10 20 b SCALE IN FEET NEW VEHICLE CAIE EL 1 71 TO 173 2 "-_ r rt o e _ - - a 6' PERMETER FENCE /• `\ 6Y CULVERT "?-""" '? _ \• ` RffR? IPRAP ? _ I "" (SEE SHEET 12) 6J' C7615HCD ACDPEGTE 6A5L CWnSC RPE IN VERT E AT EL. 171 0 -- ` - = , ,• __ r ? - - ? \ ? EL 117.0 ' i "NTAN 3.o' SHOULDER EL. 171.0 AT SECTION ? \ A 1 -i -? - 7 12.0' , PERIMETER FE NCE , ?` lN:ly-? `1n1v 1 99 (SCC SKR 1 17 _ \ \ mtEN11, TOYER ® ` -\I )--? i 15 l J rs- GROUND C IX _.. f ,rzess W[PD ??_ N. Sio`IO 1R E.1,996T 60.19 SUB (RUSIBD ACCT'EGtE N C SUB-BTSE COURSE NOT TD SCALE W C N. 12].279.21 E. 1,9AeA77.20 ` 1 171.0 _ - --- S ' N STRJCTUAEI 3.7537.91 1 CONTROL ppM E 1,Di9,IIJ.06 ` N. 52121126 E NSTRL T`-`-li E. 1,93&17;.10 TE 1 157RLICU REo ( 1 51 EL 167.0 ICPP/F Si Z W N. 5212!2.02 E. 1.995,079.D BT-N S'. LATE \ Ri'RAP BEDONNC \` STXUCTUPC (SEE TYMAl ftIPRPP SECTIONn SiMTS 6 AA 7) \\\ cRJa^E:' EMA E(SEE NOIE 6). CHANN TO tz NOT or To SCALE 0` i GN[MFLDOO N .I 1. STOCKPILE EXCAVATED MATERIAL FOR USE AS STRUCTURAL FILL AT A LOCATION DEI YMNED BA THE fXX. -- LIGHT LOCATIO T 2. SEE TECHNICAL SPECIFICATIONS FCR OETA9.5 PECARDNC I- PPE CULVERT INS7AlA71CN AND 521.1. e.05 t 1 ACCESS ROM CON57TN,C110N. PIES TO BE PIKED N EXISTINO VRAtWE CHANNELS 1.996.101.66 COMPACT ACCE" ROM ME COUR'5E3 N ACCORDANCE WITH TEL7P SF7=GIF1GA710Xi -- ( T.K CREEK ' I 1. 615C vAc TN OF OOWNSTXEIA OIAFNCL VAAIM 1107] 16' AT TINE SRU- CARE STWU.- t TO 26' AT THE UPSTREAM END OF THE EXISTING CULVERT STRUCTURE IXCA,PJE SIDE SLOPES AT 2HOV. A b I 1 5. THF-P TO BE PVCEO FOR 15 N THE APIA DOMNOIPEAM OF TK NEAP SILL fNE STRUCTURE, 0 TO 7D JO _ EXCAVATION OF THE UPSTREAM CINNTEL SFMIL NOT BE MORE 711AN 21 FEET UPSTREAM OF 7K .1' lGML Ie ILEA _ 1117. _ . I ! ST TICNRG .. FINAL DESIGN A wrNlnc 711 B1-6 SPILL GATE STRUCTURE FAYET1ENfIF, NC E , Q lol- TOM. ? PDTIQ YENND SP/Cle cream TFN a/2/W X POPE AIR FORC E RASE ® " P m nN9 DCA7 THAL 1ESCN a91RAL "N NOMH Eazrr uz CAROLINA r 1 s RAR OUTS PLAMNED MODIFICATIMIS 4 R2 aArz 1vR ~ re. a/aM7 . :"'.m i.?e L ,.s1 PaM m ?^ 17 o1D:i ___._ „ w.• .?,r wa r l?^O .., a/Aa,w Av n u< VL01 } PLY 0f9TPiR1 O R11O1 R PrE 317-434-II17 ^Y t 4 ' a a 1 ARCH IC PIPE 11 1,' \ NiCN CULVERT-1 1 NAYOAOTE Ia3.b3'(CONTROL WE) \ \ \ \ , 1 \ / 01 I PIPC MVCnf AT EL 111.0 1 E1XI T C ASPINLT . 1 Y , ? I rim.. N. 427.291.00 - E7lI a EIECTWCX E 1,R94O72G3 / lAl 80A EL 174.0 NEW VEINCLE CAIE GRACE TO OFWn 10 [l T. to 17l 2 _ AL CULVERT ITS OF GL AND DELINEATION FB OVIDED Y POPE A ) Ai ft. . 171 .0 • \ E I 2 ? - PEwNE7ER FENCE FLAND INIPACI S %VE SMCT 12) \ \ AREA = 0.096 AC. - ,v LENGTH = 105 FT. .. rt AGT E45 WO/U - Y. . W. 423.1!0.27 - •TL. 171,0 ? A ' F. 427.17202 \7 ' E. 1194a,G79.a2 0 9 aSP L m STIIUCiURE (SfE 511EET5 a NO 7) \ \ ROD 1, l ? 5 NCiH9 ANO MFPS MIU7ED APE T1[6E WIRAN 11NI19 MEnM•OS. TOTAL MPACii OF PnO,ECT W 1 !E CER. - - , t CAM [TU/fLIDO - LICRT LOCATION, \ 1 L O NCINS MCATM ARE TWEN ALONG ME CENTERLME TMK CNCO(. N. e1l,lna-a ??? Ls9e,la.e4 4 1 GRAnINC PLAN o id To _ sove III r ? 1 1a ' i - ?+winC ?.a io. AT-a SP0.1 GATE STRUCTURE FAYFTTE'ALLE. NC PO, Q 1 a, POPE AIR FORCE BASE - FAYETTEVnLF NORTH CAROMNA • Rm eA Ouo SUMMAR( 7 ?. - ?+ A^M ?• '°' I A WEILAND lANO 12.1 PACTS a,+c { 7 W11/D1 Otx+rm, a iwvl R rn -1711 31 -13 KI iJ v Final EA for Spill Gate Construction NORTH CAROLINA STATE CLEARINGHOUSE DEPARTMENT OF ADMINISTRATION INTERCOVE1ZN1,=TA.L PLEV W STATE D'LJ MER: 04-E-0000-0030 F03 DATE RECEIVED: 07/29/2003 A=--r ILrSPONSE: 08/25/2003 Rr-VIEW CLOSED: 08/29/2003 MS RENEE CLEDHILL-EARLEY CLEARINGHOU3E COORD DEPT OF CUL RESOURCES ARCHIVES-HISTORY BLDG - MSC 4617 RALEIGH NC ?i REVIEW DISTRIBUTION C CC4PS - DEM, NFIP S DENR LEGISLATIVE AFFAIRS DEPT OF AGRICULTURE DEPT OF CUL RESOURCES - - - DEPT OF TRANSPORTATION MID CAROLINA COG . n PROJECT INFORMATION APPLICANT: Pope AFB Ct" TYPE: National Environmental Policy Act f ERD: tnvironmental Assessment /Finding of No Signiiicant Impact DESC. Proposed action is to desaolish and reconstruct three existing spill gates and construct one new spill gate at a fourth location on Pope AFB. The attached project has been submitted to the N. C. State Clearinghouse for intergovtrnmental review. Please review and submit your response by the above indicated date to 1302 Mail Service Center, Raleigh NC 27699-1302. If additional review time is needed, please contact this office :at (919)807-2425. AS A RESULT OF' THIS REVIEW THE FOLLOWING IS SUBMITTED: No cor ENT 1oZ11g ?i CoM WNTS ATTACHED RAVG Q 03 SIGNED BY: S'at0 i0O DATE?M,r ? ?IIf•' p 3 ZQOa AUG 0 4 2003 U 6.0 List of Agencies and Persons Consulted and/or Provided Copies G-1 S