Loading...
HomeMy WebLinkAboutWM0100453_Approval_20190611DocuSign Envelope ID: DF89B729-CE33-494C-87BE-A62F09723E45 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director First Citizens Bank Attn: Allyson Sonntag 4300 Six Forks Road Raleigh, NC 27609 NORTH CAROLINA Environmen tat Quality June 11, 2019 Re: Well Construction Permit WM0100453 Long's Chapel United Methodist Church 111 Old Clyde Road and 67 Britt Way Haywood County Dear Ms. Sonntag: In accordance with the application submitted on your behalf by James Bevers on June 10, 2019, we are forwarding well construction permit WM0100453 dated June 11, 2019. The permit is for the construction of three temporary monitoring wells on property owned by Long's Chapel United Methodist Church as described in the application and the attached permit. The permit will be effective from the date of issuance for a period of one year and is subject to the conditions and limitations as specified therein. A Well Construction Record shall be completed and signed by the certified drilling contractor for each well. The forms shall be submitted to the Department upon completion of the wells and shall reference the applicable permit number. Please review the attached permit conditions. If you should have any questions or need additional information, contact Andrew Moore at 828-296- 4500. Sincerely, DocuSigned by: 7E617A38285848C... G. Landon Davidson, P.G. Regional Supervisor Water Quality Regional Operations Section cc: James Bevers— ECS Southeast, LLP (via email) ARO file D Q �� North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 11 NORTH CAROLINA i nen Q,o,enw-g WIKV �� 828.296.4500 DocuSign Envelope ID: DF89B729-CE33-494C-87BE-A62F09723E45 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO First Citizens Bank FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM consisting of three temporary monitoring wells owned by First Citizens Bank, 4300 Six Forks Road, Raleigh, NC 27609. The monitoring wells will be located on property owned by Long's Chapel United Methodist Church in Haywood County (PINs# 8627-20-5772 and 8627-21-3010). This Permit is issued in accordance with the application received June 10, 2019, with additional supporting information received June 10, 2019, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 2. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 3. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(0) where applicable. 4. The monitoring well shall be maintained in accordance with 15A NCAC 02C .0108. 5. A Well Construction Record (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion in accordance with 15A NCAC 02C .0114. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit and the property owner within 30 days of the well abandonment in accordance with 15A NCAC 2C .0114. Permit issued the 11th day of June, 2019 FOR THE NORTH CAROLINA E %KFXTAL MANAGEMENT COMMISSION Landon Daly son',1kegional Supervisor Water Quality Regional Operations Section By Authority of the Environmental Management Commission Permit No. # WM0100453